Sei sulla pagina 1di 10

Cuttack Hospitals Private Limited

Aditya Ashwini Hospital, (Unit of Cuttack Hospital Pvt. Ltd)


0 First issue drawing Bhubaneswar, Orissa-753016, India
REV DATE MODIFICATIONS
01 - Cover Sheet 10 - Delivery - Site Readiness Sayon Ghosh
02 - Equipment Layout
03 - Structural - Electrical Layout GE Healthcare +91 9830682917
04 - Floor Structural Details Sayon.ghosh@ge.com
05 - Radiation Protection Layout
06 - Power Requirements - Distribution
07 - Environment - Interconnections
08 - Equipment Dimensions
REVOLUTION EVO
09 - HVAC- Delivery FINAL STUDY
Drawn by Verified by Concession S.O. (GON) PIM Manual Rev
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in
incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning Veneet Uday - ---- 5866663-1EN 11
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete Format Scale File Name Date Sheet
set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All
dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work
due to scaling from these drawings. A3 1:50 CT-I156187-FIN-00.DWG 04/OCT/2019 01/10
DIMENSIONS LxWxH WEIGHT
EQUIPMENT LAYOUT ITEM DESCRIPTION (mm) (kg)

1 GANTRY 2050x1039x1938 1810


2 GT 1700V TABLE 650x2370x1046 445
3 POWER DISTRIBUTION UNIT (PDU) 700x550x1062 370
4 POWER DISTRIBUTION BOX (PDB) 600x300x800 42

250 75 270 5 STORAGE CABINET 610x915x1070 41

[0'-10"]
[0'-10"] 2960 [0'-3"] 1943 [0'-11"] 6 AURORA SWS TABLE 1300x850x850 40

[0'-10"]

250
[9'-9"] [6'-5"] 7 OPERATOR CONSOLE 736x470x656 80

250 UPS EXAM ROOM HEIGHT

ROUTER
PANEL

BB
FINISHED FLOOR TO SLAB HEIGHT m

[4'-7"]
FALSE CEILING HEIGHT min. 2.29 m

1396
UPS

[2'-6"]
CONSOLE

[0'-6"]

762
ROOM

150

[0'-3"]
ROOM BRICK WALL

75
[8'-10"]
2691

7 6 FIRE RATED PARTITION

[2'-4"]
BATTERY

700
115 LEGEND

[4'-0"]
ROOM

1220
[0'-5"]
LD 1372 (W)X 2100 (H) FLUSH DOOR WITH 2 MM THICK LEAD LINING

[0'-10"]
1
[0'-10"]

250
915 1930 X 1015 MM WINDOW OPENING FOR 1830 X 915 MM LEAD GLASS (2 MM THICK
250

LW LW
[3'-0"] LEAD EQUIVALENT) @ 900 MM FROM FFL

X-RAY 'ON' WARNING LIGHT ABOVE THE DOOR LINTEL


1930
[6'-4"]
IMPORTANT AIR QUALITY NOTE :-
[4'-6"]
1372

SOME OF THE EQUIPMENT COMPONENTS MAY BE ESPECIALLY SENSITIVE TO THE PRESENCE OF


SULFIDES, CHLORIDES AND NITRATE CONTAMINATES IN THE AIR. IF HIGH LEVEL OF CONTAMINATES
LD EXIST, SITE MAY WANT TO CONSIDER APPROPRIATE " AIR FILTRATION SYSTEM".
1
[0'-10"]
250

CT SCAN
2
ROOM
5

[17'-5"]
5309
GANTRY ISO
CENTRE 1800
[5'-11"]
[10'-5"]
3179

4
3
[6'-1"]
1862

1
[0'-10"]
250

[0'-11"]
270
[1'-9"]
528

3203
250 [10'-6"]
[0'-10"] 4978
[16'-4"]

250 270
[0'-10"] [0'-11"]

NOTE:-
THIS LAYOUT IS FEASIBLE FOR 1700 TABLE.

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG 1:50 Rev 0 Date 04/OCT/2019 Equipment Layout 02/10
STRUCTURAL-ELECTRICAL LAYOUT
ITEM QTY DESCRIPTION

1 Gantry anchoring (see Structural Details)


2 Table anchoring (see Structural Details)
3 200x70 duct on floor
4 200x100 cable inlet and vertical duct from floor to PDB (h=1.1m)
5 200x200 cable inlet (see Structural Details)

UPS Electrical outlets: 10/16A 230V + G on raw power

ROUTER
PANEL

BB
Electrical outlets: 10/16A 230V + G on UPS power
RJ45 Network socket for main system console
UPS
CONSOLE XR ON lamp (L1) - 24V, located near access doors
ROOM
ROOM Flush floor duct

BATTERY
ROOM
3230
[10'-7"]
LW
[2'-2"]
650

100 MM THICK PCC BASE


FOR CT MOUNTING M-20
(1 CEMENT : 1.5 SAND :
3 STONE AGGREGATE).
LD 660 2400
1 [2'-2"] [7'-10"]

CT SCAN
ROOM
2970
[9'-9"]

[17'-5"]
5310
[10'-0"]
GANTRY ISO
CENTRE 3050

1
[9'-0"]
2745

2300
[7'-7"]
4 3
5
[4'-6"]
1365

[3'-3"]
1000

[1'-8"]
510

850
[2'-9"]
3030
[9'-11"]
4730
[15'-6"]

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG 1:50 Rev 0 Date 04/OCT/2019 Structural - Electrical Layout 03/10
ANCHORING/LOADING DISTRIBUTION TO THE FLOOR FLOOR REQUIREMENTS
1756 GE SUPPLIED ANCHORS (2106573) GE SUPPLIED ANCHORS (5487992-2)
[69 in]
878 878
[35 in] [35 in] Anchor bolt Anchor bolt
678 678 Anchor washer Anchor washer
[27 in] [27 in] Leveling screw Leveling screw
24 mm [0.95 in] min - 13 mm [0.5 in] min -
Adjuster lock ring 33 mm [1.3 in] max Adjuster lock ring 25 mm [1 in] max
3B Gantry/Table after proper torque Gantry/Table after proper torque
stationary base stationary base
Leveling pad 25 mm [1 in] for Table Leveling pad 25 mm [1 in] for Table
13 mm [0.5 in] for Gantry 13 mm [0.5 in] for Gantry
889

Min 76 mm

Min 63 mm
thick concrete

thick concrete
Min 102 mm

Min 102 mm
[3.08 in]
Gantry [35 in]

[2.5 in]
91 mm

85 mm
[3.6 in]

[3.3 in]
[20 in]

[4 in]

[4 in]
1820 kg

498

[25 in]
[4012 lbs]

630
[16 in]
406
10 3

[12 in]
297.2
[0.4 in] NOTES: NOTES:
1 · Anchors must be embedded at least 125 mm [4.9 in] from · Anchors must be embedded at least 160 mm [6.3 in] from
concrete floor edge or expansion joint concrete floor edge or expansion joint
· Torque anchor to 75 Nm · Torque anchor to 54 Nm

[5 in]
132
GT1700V Table · Required for VT200X Table
445 kg

[35 in]
4 FINISHED FLOOR REQUIREMENTS

885
[981 lbs]
· Installation requires a finish floor in the scan and control rooms
· The floor surface in the scan room directly under the gantry and table must be level.

[15 in]
· The floor levelness tolerance of the floor surface that the gantry and table will rest on is 6 mm [0.24 in] over a 3000 mm [118.1 in]

378
distance.
· Shims should not be used to compensate for a floor that does not meet this requirement.
· Eight or more floor covering openings that are 102 mm [4 in] in diameter are made to ensure the table and gantry rest on a solid surface.
These floor penetrations can be sealed if required.
5 · These requirements apply to all installation types.
420
[4 in] NOT TO SCALE
90
[17 in]
[30 in]
774

CABLE MANAGEMENT
232
[9 in]
FLUSH FLOOR DUCT
[3 in]
80

waterproof joint removable cover

(1) Tilting axis 2


(2) Longitudinal axis
(3) Cable inlet area (889x406 mm) [35x16 in]
(3B) Alternative cable inlets area
(with rear cable cover in option)
(4) 8 Gantry anchoring points
(5) 8 Table anchoring points
Center of gravity
Main anchoring points
Backup anchoring points
SCALE 1:20 NOT TO SCALE

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG Rev 0 Date 04/OCT/2019 Floor Structural Details 04/10
RADIATION PROTECTION LAYOUT

SHIELDING REQUIREMENTS SCALING


CHANGED PARAMETER (mAs) MULTIPLICATION FACTOR (new mAs/100)
80 kV 0.24
100 kV 0.45
120 kV 0.71

UPS
140 kV 1.00

ROUTER
PANEL 1 mm aperture 0.20

BB
3 mm aperture 0.22
UPS 5 mm aperture 0.27
CONSOLE
ROOM 10 mm aperture 0.38
ROOM
15 mm aperture 0.48
20 mm aperture 0.59
BATTERY 30 mm aperture 0.79
ROOM 40 mm aperture 1.00

LW 0.7 SHIELDING REQUIREMENTS:


Engage a qualified radiological health physicist to review your scan room shielding
requirements, taking into consideration:
1.3 · Scatter radiation levels within the scanning room
· Equipment placement.
· Weekly projected work-loads (number of patients/day technique (kvp*ma))
· Materials used for construction of walls, floors, ceiling, doors, and windows.
LD
1 · Activities in surrounding scan room areas.
2.6 · Equipment in surrounding scan room areas (e.g., film developer, film storage)
· Room size and equipment placement within the room relative to room size.

The Illustrations on this page depict measured radiation levels within the scanning room,
CT SCAN 5.2 while scanning a 32 cm or 16 cm CTDI phantom with the technique shown. Use the mAs, kV
ROOM and aperture scaling factors in the table shown here to adjust exposure levels to the scan
technique used at the site.
10.4
GANTRY ISO
CENTRE NOTE: Actual measurements can vary. Expected deviations equals ±15%, expect for the 5 mA
and 1mm techniques, where variations may be greater (up to a factor of 2), due to the
inherent deviation in small values. The maximum deviation anticipated for tube output
equals ±40%.

10.4

5.2

2.6

1.3

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG 1:50 Rev 0 Date 04/OCT/2019 Radiation Protection Layout 05/10
POWER REQUIREMENTS SLD
customer scope
3 PHASES+N+G
POWER SUPPLY
FREQUENCIES
MAXIMUM POWER DEMAND 100 kVA
AVERAGE (CONTINUOUS) POWER DEMAND 20 kVA
POWER FACTOR 0.85
MFM
· Power supply should come into a main disconnect panel (MDP) containing the protective units and controls. EARTH BAR
· The section of the supply cable should be calculated in accordance with its length and the maximum
permissible voltage drops.
GROUND WIRE
· There must be discrimination between supply cable protective device at the beginning of the installation RUNNING FROM THE
(main low-voltage transformer side) and the protective devices in the MDP. EARTH PIT TO HOSPITAL
MDP, THEN IT IS
RUNNING ALONG WITH
SUPPLY CHARACTERISTICS THE 3-PHASE CABLE
· Power input must be separate from any others which may generate transients (elevators, air conditioning, FROM MDP TO PDB IN
radiology rooms equipped with high speed film changers...). THE GANTRY ROOM
· All equipment (lighting, power outlets, etc...) installed with GE system components must be powered
separately.
· Phase imbalance 2% maximum.
· Transients must be less than 1500V peak. (on a 400V line)
PANEL
GROUND SYSTEM
· System of equipotential grounding.
· Equipotential: The equipotential link will be by means of an equipotential bar. This equipotential bar should
be connected to the protective earth conductors in the ducts of the non GE cableways and to additional
equipotential connections linking up all the conducting units in the rooms where GE system units are located.

CABLES
· Power and cable installation must comply with the distribution diagram.
· All cables must be isolated and flexible, cable color codes must comply with standards for electrical
installation.
· The cables from signaling and remote control (Y, SEO, L...) will go to MDP with a pigtail length of 1.5m, and will
be connected during installation. Each conductor will be identified and isolated (screw connector).

CABLEWAYS
The general rules for laying cableways should meet the conditions laid down in current standards and regulations, LOCK OUT TAG OUT ARRANGEMENT
with regard to: DEDICATED EARTHING FOR CT SCANNER WITH
· Protecting cables against water (cableways should be waterproof). LESS THAN 2 OHMS RESISTANCE.
· Protecting cables against abnormal temperatures (proximity to heating pipes or ducts). COPPER CONDUCTOR SIZE :
FOR GEDE UPS : 95 SQ MM
· Protecting cables against temperature shocks. FOR EATON UPS : 120 SQ MM
· Replacing cables (cableways should be large enough for cables to be replaced).
· Metal cableways should be grounded.

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG Rev 0 Date 04/OCT/2019 Power Requirements - Distribution 06/10
ENVIRONMENT INTERCONNECTIONS
EXAM ROOM CONTROL ROOM
MAGNETIC FIELD SPECIFICATIONS
Can be ordered from GE
· Limit the magnetic interference to guarantee specified imaging performance.
MDP
GANTRY: 18.00 m or 23.00 m Operator
· Ambient static magnetic fields less than 1 Gauss. [60' or 76'] Console
· Ambient AC magnetic fields less than 0.01 Gauss peak. Customer supply
17.00 m or 22.00 m
[56' or 72'] 1.50 m or 3.00 m
OPERATOR CONSOLE: [4.9' or 9.8']
· Ambient static magnetic fields less than 10 Gauss.
· Use static dissipative vinyl. 13.60 m PDU 6.00 m or 16.00 m
[40'] [20' or 56']
Gantry
MAXIMUM AUDIBLE NOISE LEVEL OF THE SYSTEM
· The maximum ambient noise level is produced by the gantry during a CT scan acquisition. 4.60 m
[15']
· It is less than 70 dBA when measured at a distance of one meter from the nearest gantry surface, in any
direction. Table
· Noise level produced by UPS system: 69 dBA.
Partial UPS
(OPTION)

CONNECTIVITY REQUIREMENTS

Broadband Connections are necessary during the installation process and going forward to ensure full support
from the Engineering Teams for the customers system. Maximum performance and availability for the customers
system is maintained and closely monitored during the lifetime of the system.

Proactive and reactive maintenance is available utilizing the wide range of digital tools using the connectivity
solutions listed below:

· Site-to-Site VPN/GE Solution


· Site-to-Site VPN/Customer Solution
· Connection through Dedicated Service Network
· Internet Access - connectivity for InSite 2.0

The requirements for these connectivity solutions are explained in the broadband solutions catalogue (separate
document).

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG Rev 0 Date 04/OCT/2019 Environment - Interconnections 07/10
GANTRY WITH GT1700V TABLE POWER DISTRIBUTION UNIT (PDU)
FRONT VIEW SIDE VIEW
1035
2050 TOP VIEW FRONT VIEW SIDE VIEW

[5.9 in]
[3'-5"]
[6'-9"]

150
373 165
[1'-3"] [0'-6"]

[9.3 in]
Scan centerline

235
350
[6'-4"]
1938

[13.8 in]

[21.7 in]
550
[3'-4"]

[3'-0"]
1028

235

912
[9.3 in]

[41.8 in]
1062
10
[0'-0"] 297

[4.9 in]
[19.5 in]
[1'-0"] 350

125
888 868

495
[2'-11"] [2'-10"] 630 [13.8 in]
[2'-1"] 700

[35.4 in]
[27.6 in]

900
Service Area
2746
[9'-0"]
[6'-4"]

Minimum 900 360 150


1938

[35.4 in] [14.2 in] [5.9 in]


air flow
Seismic mounting brackets

[3'-5"]
[3'-4"]

clearance

1046
1028

[1'-7"]
488
Center of Gravity
SCALE 1:50 SCALE 1:20 Indicates air flow (Convection)
627 3117
[2'-1"] [10'-3"]

AURORA SWS TABLE OPEN CONSOLE WITH Z8G4 HOST PC

FRONT VIEW TOP VIEW


SIDE VIEW FRONT VIEW TOP VIEW

650
[26 in] 56 616 400
[2 in] [24 in] [16 in]

172
[7 in]

[23 in]
[33 in]

[23 in]
[30 in]
850

576

576
750
[29 in]

[33 in]
740

850

[13 in]

[12 in]
292.5
327
[20 in]
507.5
[11 in]
277.5

400
[16 in]
600
[24 in]
1300
[51 in]

(Table weight: 40 kg)


Weight: 64.2 kg [141.5 lbs]

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG Rev 0 Date 04/OCT/2019 Equipment Dimensions 08/10
TEMPERATURE AND HUMIDITY SPECIFICATIONS DELIVERY
IN-USE CONDITIONS
EXAM ROOM CONTROL ROOM THE CUSTOMER/CONTRACTOR SHOULD:
Min Recommended Max Min Recommended Max
Temperature 18°C 22°C 26°C 18°C 22°C 26°C · Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.
64°F 72°F 79°F 64°F 72°F 79°F · Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the
movement of GE equipment from the delivery area into the definitive installation room.
Temperature gradient · Ensure that access routes for equipment will accommodate the weights of the equipment and any
F/h F/h
transportation, lifting and rigging equipment.
Relative humidity (1) 30% to 60% 30% to 60%
· Ensure that all necessary arrangements for stopping and unloading on public or private property not
Humidity gradient 5%/h 5%/h belonging to the customer have been made.

STORAGE CONDITIONS
DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT
0°C to +30°C
Temperature
32°F to +86°F EQUIPMENT DIMENSIONS WEIGHT

LENGTH 2810 mm [111 in]


Temperature gradient
F/h GANTRY WIDTH 1290 mm [51 in] 2050 kg 4520 lbs
Relative humidity (1) up to 70% HEIGHT 2000 mm [79 in]
Humidity gradient 5%/h LENGHT 2489 mm [98 in]
VT1700 TABLE WIDTH 762 mm [30 in] 576 kg 1270 lbs
Storage longer than 6 months is not recommended. HEIGHT 1143 mm [45 in]
(1) Non-condensing

AIR RENEWAL
According to local standards.
NOTE
In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to
take measures to protect the equipment from dropping water.

HEAT DISSIPATION DETAILS GANTRY DELIVERY


L= 2810
[111 in]
Max Max
ROOM DESCRIPTION (kW) (BTU)
Gantry 5.48 18700
Exam Room Patient table GT1700V / VT2000 (Without patient) 0.3 1030
TOTAL 5.78 19730

W= 1290
Exam Room or Power distribution unit 1.0 3400 [51 in]
Technical Room* TOTAL 1.00 3400 1039
2050
[81 in] [41 in]
Operator console 0.84 2860
Advantage windows 1.0 3412
Control Room LCD monitor (Total amount of 2 monitors) 0.1 340
AW server 8k (L) 0.9 3070

[79 in]
TOTAL 2.84 9682

H= 2000

[49 in]
1251
AW server 16k (XL) 2.1 7170
Hospital Data Center or AW server stand alone 30k (XXL) 2.1 7170
Technical Room
TOTAL 4.20 14340
*Technical Room is not mandatory, the placements of these elements are recommended in the Exam Room.

· The gantry is shipped on a dolly equipped with elevating casters (normal shipping configuration).
NOT TO SCALE

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG Rev 0 Date 04/OCT/2019 HVAC- Delivery 09/10
DISCLAIMER GLOBAL SITE READINESS CHECKLIST (DI)
DOC1809666 Rev. 6
GENERAL SPECIFICATIONS Customer Name: PMI Name:
GON/SO Number: Field Service Name:
· GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and Equipment: Country/City or City/State:
protective screens or derivatives not mentioned in the order.
Site Visit Date for SRC: SRC Status:
· The final study contains recommendations for the location of GE equipment and associated devices, electrical
wiring and room arrangements. When preparing the study, every effort has been made to consider every
aspect of the actual equipment expected to be installed. Site Ready Checks at Installation
· The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for General Site Planning
the pre-installation work and electrical power supply are given according to the information noted during Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.
on-site study and the wishes expressed by the customer. Ceiling support structure, if on the GE drawing, is at correct location and height according to the drawing specifications. Levelness and spacing
· The room dimensions used to create the equipment layout may originate from a previous layout and may not has been measured. Overhead support Structure has been confirmed with contractor to meet GE criteria.
be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to
lack of information. Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent
debris from entering rooms containing equipment.
· Dimensions apply to finished surfaces of the room.
· Actual configuration may differ from options presented in some typical views or tables. Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.
· If this set of final drawings has been approved by the customer, any subsequent modification of the site must Delivery route from truck to installation space has been reviewed, all communications have occurred, arrangements made for special handling
be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations (if needed). Floors along delivery route will support weight of the equipment, reinforcements arranged if needed.
must be noted.
System power & grounding (PDB/MDP) is available as per GE specifications, installed at point of final connection and ready to use. Lock Out
· The equipment layout indicates the placement and interconnection of the indicated equipment components. Tag Out is available.
There may be local requirements that could impact the placement of these components. It remains the
customer's responsibility to ensure that the site and final equipment placement complies with all applicable System power and grounded audit has been scheduled to be completed during installation of equipment. (If Required) GEHC PM to confirmed
if needed.
local requirements.
· All work required to install GE equipment must be carried out in compliance with the building regulations and Adequate room illumination installed and working.
the safety standards of legal force in the country concerned. Cableways (floor, wall, ceiling, etc.) ready for GE cables and are of correct length and diameter. Cableways routed per GE Final drawings and
· These drawings are not to be used for actual construction purposes. The company cannot take responsibility access openings installed as determined by GEHC PM. Surface floor duct installed at time of system installation.
for any damage resulting therefrom. HVAC systems Installed, and the site meets minimum environmental operational system requirements.
Network outlets installed and computer network available and working.
CUSTOMER RESPONSIBILITIES
Hospital IT/connectivity contacts have been engaged and information has been added to Project management tool. (If Required)
· It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications. Floor Strength and
final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to thickness have been discussed with customer/contractor and they have confirmed GE requirements are met.
ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and Customer supplied countertops where GE equipment will be installed are in place.
final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow Specific for CT & X-ray
up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the
Doors and windows complete or scheduled to be installed. If applicable, radiation protection (shielding) finished & radioprotection regulatory
delivery and installation date. approval for installation obtained.
· Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a
PMI Signature:
way that the loads of the installed system can be securely borne and transferred. The layout of additional
structural elements, dimensioning and the selection of appropriate installation methods are the sole Customer Signature:
responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the FS Signatature: optional
ceiling, floor or walls are the customer's responsibility.

RADIO-PROTECTION
· Suitable radiological protection must be determined by a qualified radiological physicist in conformation with
local regulations. GE does not take responsibility for the specification or provision of radio-protection.

THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.

DATE NAME SIGNATURE

Cuttack Hospitals Private Limited REVOLUTION EVO CT-I156187-FIN-00.DWG Rev 0 Date 04/OCT/2019 Delivery - Site Readiness 10/10