Inspection Points
Frequency of Test or Acceptance Criteria / Tolerance Specification
Item No. Activity Description Inspection & Test Activity Inspection Parameters Reference Verifying Document / Report
SUB-CON CONTRACTOR ITL ENGINEER
1 Method Statement
1.1 Approval of Method Statement Submit to the Enigeer Before Work Approval from Engineer Representative Specification Section A A Approved Submittals
2 Prior Activities
2.1 Approved Shop Drawing Verify the approval Approval from Engineer Representative Specification Section A S Approved Submittals
2.3 Survey + Execution Set out of the excavation area According to the Drawings A A Survey Report
3 Main Activities
FINAL INSPECTION FOR ALL WORK APPROVAL FOR ALL LEVEL AFTER FINSH AND AFTER COMPLEET project specification
3.4 FINAL APPROVAL BEFOR INSTALING SEELING WORK TO THE SHOP DRAWING section A W A/W FINAL SITE INSPECTION
Inspection Points
Verifying Document / Report
ENGINEE
SUB-CON CONTRACTOR ITL
R
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
SIGNED: SINGED:
NAME: NAME:
DATE: DATE:
Inspection and Test Plan for- water supply WORKS
According to the
Drawings
SPECIFICATION &CODES
MIR(material
inspection
VISUAL request check
INSPECTION delivery) and safe
&adequate
protection
MIR(material
inspection
VISUAL request check
INSPECTION delivery) and safe
&adequate
AS SPECIFIED protection
project
DURING WORK Approval specifications specification
section
AFTER project
COMPLEET TO THE SHOP DRAWING specification
WORK section
SIGNED:
NAME:
DATE:
Inspection a
. Co. Ltd.
Agreement No:
1.Open an approved drawing detail for sanitary fixtures . This drawing should be accompanied with
the approved location of mechanical pipe sleeves sanitary fixtures ventilation.
2.Installation of pipes should be done after the block work inside the toilet.
3.Locate the pipe locations in the wall and mark with the line corresponds to the total area to bury
the pipe in the wall.
4.Use block cutter or simply portable grinder to cut a side of block continuously along the line that
had been marked. Absolute care should be done not to cut or damaged the pre-installed pipe
sleeves of fixture pipes.
5.By using sharp- pointed steel rod and other proper chipping tools, chip the block side to the
thickness required to fix the water pipes.
6.Use approved pipes, pipe fittings, and joining compound.
pipes or fittings. Do not over tight the joints.
8.For pipes passing through the wall, install sleeves of size larger than the pipes serving it. Seal
annular space between sleeve and pipe using silicon sealant.
9. Install the pipes at designated height and location on the wall and on the floor.
10.Align the pipes horizontally and vertically without strain. Avoid pipe bending or sagging.
11- Pipes shall be installed by one of the following installation methods
A - For pipes that prove glue, the welding locations are cleaned well, then the welding is made and
the welding process is well
B - For pipes that prove that heat is achieved, the welding locations are thoroughly cleaned and the
welding machine is tested. The welding process is started.
13 - The valves are installed
14.Check the pipes securely and firmly fix on its location before leak testing.
15.Leak test the pipes and proved tight under a water pressure not less than 1½ its working
pressure under which it is to be used. Leak test the pipes for four (4) hours. Do not test the pipes
without the presence of inspection Engineer.
16.After the approval of inspection Engineer, cover
17- The network should be tested partly as well as after the completion of the total extensions of
the building being tested for the entire network
18 - Installation of all accessories as well as sanitary appliances and taps after the completion of the
finishing work for the area where there are sanitary devices
19. The feeding station shall be installed from tarmac, taps, pressure gauges as well as desalination
plant, and the necessary tests shall be carried out to ensure the operation efficiency of the plant
and to provide the required amount for operation of the project with appropriate pressure.
20 - The entire network is washed thoroughly to start operation
FINAL INSPECTION FOR ALL WORK APPROVAL FOR ALL LEVEL AFTER FINSH AND BEFOR
INSTALING SEELING
SUB-CONTRACTOR-if available
SIGNED:
NAME:
DATE:
Date of Issue: 7-5-2017
Contractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General
Hospital ( 200 Bed )
1 Method Statement
2 Prior Activities
3 Main Activities
3.1
3.2
REV. COMMENTS
0
R PipesWORKS
Inspection Points
Verifying Document / Report
CONTRACTOR ITL ENGINEER
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
W W
SINGED:
NAME:
DATE:
Inspection and Test Plan for- HOOT WATER PipesWORKS
Insp
Frequency of Test Acceptance Criteria / Tolerance Specification
or Inspection Parameters Reference
SUB-CON
project specification
DURING WORK section
SIGNED: SIGNED:
NAME: NAME:
DATE: DATE:
ITP Reference Number / Serial No.: 009
Agreement No:
6- Installation of sprinklers
7-Connecting to the fire pumps room
ITP SIGN O
SUB-CONTRACTOR-if available
SIGNED:
NAME:
DATE:
Date of Issue: 25-4-2017
Contractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General
Hospital ( 200 Bed )
1 Method Statement
2 Prior Activities
2.2
Identification, location and
protection
3 Main Activities
Pipe welding and pressure
3.1 testing of pipes After welding
and pressure testing, the
welding locations are painted
and delivered to the
3.2 consultant to start processing
the installation of accessories
WORKS
3.3
REV. COMMENTS
0
WORKS
Inspection Points
Verifying Document / Report
CONTRACTOR ITL ENGINEER
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
W W
SINGED:
NAME:
DATE:
Inspection and Test Plan for- duct WORKS
Insp
Frequency of Test Acceptance Criteria / Tolerance Specification
or Inspection Parameters Reference
SUB-CON
project specification
DURING WORK section
SIGNED: SIGNED:
NAME: NAME:
DATE: DATE:
ITP Reference Number / Serial No.: 005
Agreement No:
ITP SIGN O
SUB-CONTRACTOR-if available
SIGNED:
NAME:
DATE:
Date of Issue: 25-4-2017
Contractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General
Hospital ( 200 Bed )
1 Method Statement
2.2
Identification, location and
protection
3 Main Activities
3.1
duct WORKS
3.2
REV. COMMENTS
0
es WORKS
Inspection Points
Verifying Document / Report
CONTRACTOR ITL ENGINEER
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
W W
SINGED:
NAME:
DATE:
Inspection and Test Plan for- Fire pipes WORKS
Insp
Frequency of Test Acceptance Criteria / Tolerance Specification
or Inspection Parameters Reference
SUB-CON
project specification
DURING WORK section
SIGNED: SIGNED:
NAME: NAME:
DATE: DATE:
ITP Reference Number / Serial No.: 007
Agreement No:
6- Installation of sprinklers
7-Connecting to the fire pumps room
ITP SIGN O
SUB-CONTRACTOR-if available
SIGNED:
NAME:
DATE:
Date of Issue: 25-4-2017
Contractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General
Hospital ( 200 Bed )
1 Method Statement
2 Prior Activities
2.2
Identification, location and
protection
3 Main Activities
Pipe welding and pressure
3.1 testing of pipes After welding
and pressure testing, the
welding locations are painted
and delivered to the
3.2 consultant to start processing
the installation of accessories
WORKS
REV. COMMENTS
0
pipes WORKS
Inspection Points
Verifying Document / Report
CONTRACTOR ITL ENGINEER
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
W W
NAME:
DATE:
Inspection and Test Plan for- Chilled water pipes WORKS
Insp
Frequency of Test Acceptance Criteria / Tolerance Specification
or Inspection Parameters Reference
SUB-CON
project specification
DURING WORK section
Delivery of all work steps
to the consultant according
to specifications and
approved drawings
project
AFTER COMPLEET
WORK specification
section
NAME: NAME:
DATE: DATE:
ITP Reference Number / Serial No.: 006
Agreement No:
ITP SIGN O
SUB-CONTRACTOR-if available
SIGNED:
NAME:
DATE:
Date of Issue: 25-4-2017
Contractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General
Hospital ( 200 Bed )
1 Method Statement
2 Prior Activities
2.2
Identification, location and
protection
3 Main Activities
Pipe welding and pressure
3.1 testing of pipes After welding
and pressure testing, the
welding locations are painted
and delivered to the
3.2 consultant to start processing
the installation of accessories
WORKS
REV. COMMENTS
0
pesWORKS
Inspection Points
Verifying Document / Report
CONTRACTOR ITL ENGINEER
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
W W
SINGED:
NAME:
DATE:
Inspection and Test Plan for- Steam PipesWORKS
Insp
Frequency of Test Acceptance Criteria / Tolerance Specification
or Inspection Parameters Reference
SUB-CON
project specification
DURING WORK section
SIGNED: SIGNED:
NAME: NAME:
DATE: DATE:
ITP Reference Number / Serial No.: 008
Agreement No:
6- Installation of sprinklers
7-Connecting to the fire pumps room
ITP SIGN O
SUB-CONTRACTOR-if available
SIGNED:
NAME:
DATE:
Date of Issue: 25-4-2017
Contractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General
Hospital ( 200 Bed )
1 Method Statement
2 Prior Activities
2.2
Identification, location and
protection
3 Main Activities
Pipe welding and pressure
3.1 testing of pipes After welding
and pressure testing, the
welding locations are painted
and delivered to the
3.2 consultant to start processing
the installation of accessories
WORKS
3.3
Steam Pipes
3.4 FINAL APPROVAL
REV. COMMENTS
0
- MIDECAL GAS WORKS
Inspection Points
Verifying Document / Report
CONTRACTOR ITL ENGINEER
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
Inspection Reports and each
delivery
W W
SINGED:
NAME:
DATE:
Inspection and Test Plan for- MIDECAL GAS WOR
Serial No.: 006
dent Testing Laboratory, SUB-CON=Sub-Contractor, ITP= Inspection and Test Plan, CI=Commen
project specification
DURING WORK Approval specifications section
project specification
DURING WORK Approval specifications section
SIGNED: SIGNED:
NAME: NAME:
DATE: DATE:
ate of Issue: 11-12-2014 ITP Reference Number / Serial No.: 006
ntractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General Agreement No:
Hospital ( 200 Bed )
Project No.: C0517 Legends: ITL=Independent Testing Lab
Project Loc. : ALDARB
Activity Description Inspection & Test Activity
Method Statement
Prior Activities
SIGNED:
NAME:
DATE:
Date of Issue: 11-12-2014
Contractor: A.S. Al-Sayed & Pa
Item No.
1.1
2.1
2.2
2.3
3
3.1
3.2
3.3
3.3
3.4
REV.
0
quid petroleum gas WORKS
Inspection Points
Verifying Document / Report
CONTRACTOR ITL ENGINEER
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
Inspection Reports and each
delivery
W W
SINGED:
NAME:
DATE:
Inspection and Test Plan for- Liquid petroleum gas W
Serial No.: 006
dent Testing Laboratory, SUB-CON=Sub-Contractor, ITP= Inspection and Test Plan, CI=Commen
project specification
DURING WORK Approval specifications section
project specification
DURING WORK Approval specifications section
SIGNED: SIGNED:
NAME: NAME:
DATE: DATE:
ate of Issue: 11-12-2014 ITP Reference Number / Serial No.: 006
ntractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General Agreement No:
Hospital ( 200 Bed )
Project No.: C0517 Legends: ITL=Independent Testing Lab
Project Loc. : ALDARB
Activity Description Inspection & Test Activity
Method Statement
Prior Activities
SIGNED:
NAME:
DATE:
Date of Issue: 11-12-2014
Contractor: A.S. Al-Sayed & Pa
Item No.
1.1
2.1
2.2
2.3
3
3.1
3.2
3.3
3.3
3.4
REV.
0
an for fuel WORKS
Inspection Points
Verifying Document / Report
CONTRACTOR ITL ENGINEER
A A Approved Submittals
A S Approved Submittals
A A Survey Report
A/W A/W
Inspection Reports and each
delivery
W W
SINGED:
NAME:
DATE:
Inspection and Test Plan for fuel WORKS
Serial No.: 006
dent Testing Laboratory, SUB-CON=Sub-Contractor, ITP= Inspection and Test Plan, CI=Commen
project specification
DURING WORK Approval specifications section
project specification
DURING WORK Approval specifications section
SIGNED: SIGNED:
NAME: NAME:
DATE: DATE:
ate of Issue: 11-12-2014 ITP Reference Number / Serial No.: 006
ntractor: A.S. Al-Sayed & Partners Contg. Co. Ltd.
Project Name: ALDARB General Agreement No:
Hospital ( 200 Bed )
Project No.: C0517 Legends: ITL=Independent Testing Lab
Project Loc. : ALDARB
Activity Description Inspection & Test Activity
Method Statement
Prior Activities
fuel INSTALLATION
2-after approved the request
received a business extensions and
fuel INSTALLATION
dimensions are to start work for
testing lines by WATER 24 hour
to make sure no leaks and the
success of the test(TEST PRESSURE
=1.5 OF NET WORK PESSURE )
SIGNED:
NAME:
DATE:
Date of Issue: 11-12-2014
Contractor: A.S. Al-Sayed & Pa
Item No.
1.1
2.1
2.2
2.3
3
3.1
3.2
3.3
3.3
3.4
REV.
0