Sei sulla pagina 1di 3

PROFORMA FOR SUBMITTING SIX-MONTHLY FINANCIAL

& TECHNICA PROGRESS REPORT

A. General

A.1 Name of the Project : Development of Excitation Source


Features Based Spoof Resistant
and Robust Audio-Visual Person
Identification System.

A.1.1 Our Reference Letter No. : 12(5)/ 2015-ESD

A.2 Executing Agency : NIT NAGALAND

A.3 Chief Investigator with Designation : Dr. Debadatta Pati


Assistant Professor

A4. Total Cost of the Project as approved by : Rs. …….……., F.E …….…….
DIT Total …………………………..
i) Original : Rs 41, 40,000/-
ii) Revised, if any :

A.5 Date of starting (Indicate date of first : 18/8/2015


sanction

A.6 Date of Completion 17/8/2018


i) Original :
ii) Revised, if any :
Date on which last progress report was
A.7 : ---------
Submitted

B. Financial :

B.1 a) Funds released by DIT : Rs 20, 06, 000/-


upto 31-Oct-2015
b) Funds released during : -------------
……………….… to ………………..……
c) Total funds released upto … : Rs 20, 06, 000/-
31-Oct-2015 by DIT
d) Total funds released upto ………….……
by other agencies : --------------
B.2 Amount spent Rs. 1,74,258/-
a) Upto 31-Oct-2015 :
b) From ………….…… to : ------------------
………………
c) Total amount spent upto : Rs. 1,74,258/-
31-Oct-2015 from DIT funds
d) Amount spent upto :
………………… from funds from other ---------------------
agencies
B.3 Balance available as on 31-Oct-2015 : Rs. 18,31,752/-
B.4 Funds likely to be spent during the period : Rs. 18,31,752/-
01-Nov-2015 to 17-Aug-2015
B.5 Funds actually required during the period : NIL
________________ to _______________
(col. B.4 – B.3)
B.6 Funds required from DIT : --------------
(________________TO_____________)
B.7 Budgetary Estimate for _________________ : --------------
B.8 Item-wise break up of expenditure as given in : Details Attached in Table-1
Table-1
B.9 Total list of the capital equipment purchased : Details Attached in Table 2.1 &
out of the funds as given in Table 2.1 & 2.2 2.2
B.10 Utilization certificate as per enclosed Form : --------------
GFR 10 and GFR 19A

C. Technical

C.1 Details of the manpower associated with the : Details given in Table-3.
project as per Table-3. Specify Technical Separate sheet is attached for
assignments of each project personnel technical assignment for the next 6
months.

C.2 Suggestions of Steering Committee and : ------------------


follow-up action taken thereafter

C.3 Works completed w.r.t. the proposed works : Two Assistant Project Engineer are
as per Annual Plan (_________________) recruited through proper procedure
and specific intermediate milestones, reasons (Also they joined).
for any shortcomings, in achieving the goals Two Laptops are procured.
(give details on a separate sheet)
Required one more project person
like Assistant Project Engineer.
C.4 Proposed plan-of-work in the next six months : 1. Procurement of lab equipments:
highlighting the proposed action to be taken Voice and Tower servers, Desktops
to achieve the originally proposed targets and Laptops.
2. Procurement of instruments for
data recordings and development of
audio-visual database.
3. Lab setup for data acquisition
and research and experimental
activities.
4. Collection of 50 speakers audio-
visual data.
5. Development of HMM based
speaker recognition system from
vocal-tract information perspective.
6. Development of algorithms for
representation of speakr-specific lip
movements features.
7. Development of audio-visual
features from vocal-tract
information perspective.
8. Performance evaluation of the
audio-visual baseline system with
50 speakers dataset.

C.5 Any additional comments : How do we spend the Overhead


money?
Can we provide renumeration to
supporting Staff?

(Comprehensive details to be provided : use extra sheets wherever required)

Name and Signature


of Chief Investigator
Date:

Signature of Head of Institution/Organization


Date:

(Two times in a financial year – i) April-September & ii) October – March)

Potrebbero piacerti anche