A. General
A4. Total Cost of the Project as approved by : Rs. …….……., F.E …….…….
DIT Total …………………………..
i) Original : Rs 41, 40,000/-
ii) Revised, if any :
B. Financial :
C. Technical
C.1 Details of the manpower associated with the : Details given in Table-3.
project as per Table-3. Specify Technical Separate sheet is attached for
assignments of each project personnel technical assignment for the next 6
months.
C.3 Works completed w.r.t. the proposed works : Two Assistant Project Engineer are
as per Annual Plan (_________________) recruited through proper procedure
and specific intermediate milestones, reasons (Also they joined).
for any shortcomings, in achieving the goals Two Laptops are procured.
(give details on a separate sheet)
Required one more project person
like Assistant Project Engineer.
C.4 Proposed plan-of-work in the next six months : 1. Procurement of lab equipments:
highlighting the proposed action to be taken Voice and Tower servers, Desktops
to achieve the originally proposed targets and Laptops.
2. Procurement of instruments for
data recordings and development of
audio-visual database.
3. Lab setup for data acquisition
and research and experimental
activities.
4. Collection of 50 speakers audio-
visual data.
5. Development of HMM based
speaker recognition system from
vocal-tract information perspective.
6. Development of algorithms for
representation of speakr-specific lip
movements features.
7. Development of audio-visual
features from vocal-tract
information perspective.
8. Performance evaluation of the
audio-visual baseline system with
50 speakers dataset.