5691-CPP-ME-DS-0001
TABLE OF CONTENTS
Page
14 PRODUCT / CASE
15 FEED COMPOSITION
16 FLASH CURVES
FEED
CS
28
29 INLET 7.0 7.0 7.0 7.0
30 OUTLET (NOTE 5 Page 4) (NOTE 5 Page 4) (NOTE 5 Page 4) (NOTE 5 Page 4)
31 DESIGN 15.0 15.0 15.0 15.0
32 WEIGHT VAPOR %
33 INLET 0 0 0 0
34 OUTLET 0 0 0 0
35 LIQUID DENSITY AT T kg/m3
36 INLET
37 OUTLET
38 LIQUID SPECIFIC HEAT kJ/kg.K
39 INLET
40 OUTLET
41 LIQUID THERMAL CONDUCTIVITY W/m.K
42 INLET
43 OUTLET
44 HEAT ABSORBED kW 2500 (NOTE 3 Page 4) 2350 (NOTE 3 Page 4) 1800 (NOTE 3 Page 4) 1450 (NOTE 3 Page 4)
45
46 PRESSURE DROP THROUGH CO bar (NOTE 5 Page 4) (NOTE 5 Page 4) (NOTE 5 Page 4 ) (NOTE 5 Page 4)
47
48 FOULING FACTOR m²-K / W 0.0002 (Note 6 Page 4) 0.0002 (Note 6 Page 4) 0.0002 (Note 6 Page 4) 0.0002 (Note 6 Page 4)
49
50
51 EXHAUST GAS CONDITIONS : TAURUS 70
52
53
54 GAS TURBINE LOAD % 50 - 100 (NOTE 9 Page 4)
55
56 TOTAL AVAILABLE EXHAUST GAS kg/h (NOTE 10 Page 4)
57
58 MAXIMUM ALLOWABLE PRESSURE DROP THROUGH WHRU HEATING COIL BUNDLE bar 0.025 (NOTE 11 Page 4)
59
60 EXHAUST GAS TEMPERATURE TO WHRU ºC (NOTE 10 Page 4)
61
62 EXHAUST GAS TEMPERATURE AT WHRU OUTLET ºC (NOTE 6 Page 4)
63
64 EXHAUST GAS TEMPERATURE TO STACK (TEMPERATURE OF MIXED GAS AT ºC (NOTE 6 Page 4)
65 WHRU OUTLET & BUNDLE BYPASS
66
67 FUEL GAS COMPOSITION TO GTG : (NOTE 12 Page 4)
68
69 EXHAUST GAS COMPOSITION : (NOTE 10 Page 4)
70
WASTE HEAT RECOVERY UNIT DATASHEET NO. 5691-CPP-ME-DS-0001
PROCESS PARAMETERS Rev. 0 Page 4 of 17
1
2 NOTES:
3 1. THIS DATASHEET IS FOR THE 2 WASTE HEAT RECOVERY UNITS 56A105A AND 56A105B ATTACHED TO GAS TURBINE GENERATORS
4 75GQ105A AND 75GQ105B THAT ARE TO BE INSTALLED FOR DAY 1 OPERATION. THE OPERATING MODE WILL BE 2X100%.
5 A THIRD UNIT OF WHRU, 56A105C WILL BE INSTALLED IN FUTURE WHEN TRAIN 2 PRODUCTION FACILITIES INSTALLED.
6 PROVISION OF 56A105C IS OUT OF THE SCOPE OF THIS PROJECT.
7 2. A) CASE 1 IS THE DESIGN CASE. EACH WHRU SHALL BE DESIGNED FOR 2.5 MW.
8 B) CASE 2 TAKES PLACE WHEN 2 WHRUs ARE RUNNING AND PROVIDING NORMAL HOT OIL SUPPLY TO TEG REBOILER TRAIN 1 AND
9 TEG REBOILER TRAIN 2. TOTAL NORMAL HEAT TO BE RECOVERED IS 4.7 MW FROM 2 UNITS OF WHRUs.
10 C) CASE 3 TAKES PLACE AT INITIAL YEARS WHEN HOT OIL IS ONLY SUPPLIED TO TEG REBOILER OF TRAIN 1. TOTAL HEAT
11 RECOVERED NEEDED IS 1.8 MW. ONLY ONE WHRU IN OPERATION.
12 D) CASE 4 TAKES PLACE WHEN HOT OIL IS ONLY SUPPLIED TO TEG REBOILER OF TRAIN 2. TOTAL HEAT RECOVERED NEEDED
13 IS 2.9 MW. TWO WHRUs ARE IN SERVICE SHARING THE LOADS.
14 3. FLOW RATE OR DUTY INDICATED IS FOR ONE UNIT OF WHRU.
15 4. DUTIES AND FLOWRATE ARE BASED ON INITIAL ESTIMATES. TO BE CONFIRMED BASED ON TEG REGENERATION PACKAGE VENDOR
16 INFORMATION ON TEG REBOILERS DUTY.
17 5. MAX PRESSURE DROP IS 1 BAR BASED ON CASE 1. THE OUTLET PRESSURE FOR OTHER CASES TO BE PROVIDED BY VENDOR BASED
18 ON THE PRESSURE DROP AT RESPECTIVE CASES.
19 6. TO BE CONFIRMED BY VENDOR. TEMPERATURE SHOULD NOT BE LOWER THAN 250ºC TO AVOID CONDENSATION OF CORROSIVE
20 COMPOUND.
21 7. VENDOR TO ADVISE THE MINIMUM FLOW REQUIRED TO CIRCULATE THROUGH EACH WHRU TO KEEP THE WHRU IN WARM UP
22 CONDITION WHEN HEAT RECOVERY IS NOT REQUIRED.
23 8. TO BE ADVISED BY VENDOR.
24 9. VENDOR TO ENSURE ALL WHRU DUTIES CAN BE SUPPLIED AT MINIMUM GTG ELECTRICAL LOAD OF 50% FOR A TAURUS 70 UNIT FOR
25 EITHER FUEL GAS OR DIESEL FIRING.
26 10. TO BE PROVIDED BY GTG VENDOR. FOR TENTATIVE DATA, REFER TO PAGE 7.
27 11. MAXIMUM ALLOWABLE PRESSURE DROP INDICATED INCLUDES ALL DRAUGHT LOSSES THROUGH WHRU BUNDLE, ALL DUCT WORKS
28 FROM GAS TURBINE EXHAUST DUCT FLANGE, EXHAUST SILENCER AND STACK LOSSES.
29 12. COMPOSITION OF FUEL GAS SUPPLIED TO GTG : REFER TO PAGE 6
30 13. VENDOR TO ADVISE THE MAXIMUM ANTICIPATED HEAT LEAKAGE TO THE WHRU BUNDLE WHEN DAMPER IS AT ITS FULL BYPASS
31 CONDITION.
32 14. VENDOR TO ADVISE WHETHER THERE WILL BE ANY CONSEQUENCE IF BOTH GTG AND HOT OIL PUMPS TRIP DUE TO ESD. VENDOR TO
33 ADVISE WHETHER HOT OIL PUMP NEED TO BE IN OPERATION EVEN DURING ESD AND IF SO INFORM PERIOD REQUIRED. VENDOR TO
34 INFORM WHETHER ADEQUATE SAFEGUARD IN CASE IF HOT OIL PUMPS FAILURE.
35
36
37 Physical Properties Of Therminol 66
42
43 Liquid Density Thermal Conductivity
Temperature (ºC) 3 Heat Capacity (kJ/kg.K) Viscosity (cP)
44 (kg/m ) (W/m.K)
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
42
43
44
45
46
47
48
49
50
51
52
53
54
55
4 Case 1A 3B (Remark 1)
5 Design Pressure, barg 45 45
6 Design Temperature, °C -20 (Min.) / 90 (Max.) -20 (Min.) / 90 (Max.)
7 Op. Pressure, barg 27.6 27.6
8 Op. Temperature, °C 59.31 42.49
9 Components Composition (Mole Fraction)
10 CO2 0.098980 0.099501
11 Nitrogen 0.004122 0.004179
12 Methane 0.746528 0.756222
13 Ethane 0.078825 0.078351
14 Propane 0.041880 0.039313
15 i-Butane 0.009141 0.007861
16 n-Butane 0.010150 0.008344
17 i-Pentane 0.003335 0.002364
18 n-Pentane 0.002127 0.001425
19 H2O 0.000042 0.000074
20 H2S 0.000021 0.000021
21 C6+_1* 0.002736 0.001478
22 C7+_1* 0.001529 0.000669
23 C8+* 0.000486 0.000175
24 C9+* 0.000077 0.000021
25 C10+* 0.000018 0.000004
26 C11+* 0.000003 0.000000
27 C12+* 0.000000 0.000000
28 C13+* 0.000000 0.000000
29 C14+* 0.000000 0.000000
30 C15+* 0.000000 0.000000
31 C16+* 0.000000 0.000000
32 C17+* 0.000000 0.000000
33 C18+* 0.000000 0.000000
34 C19+* 0.000000 0.000000
35 C20+* 0.000000 0.000000
36 Total 1.000000 1.000000
37
38 MW 22.62 22.15
39 Mass Density, kg/m³ 25.16 26.22
40 LHV, MJ/kg 39.20 39.03
41 LHV, MJ/Std m³ 37.64 36.68
42 Wobbe Index, MJ/Std m³ 46.91 46.25 (Remark 2)
43
44 Remark:
45 1. Case description:
46 - Case 1A is based on Thien Ung production only (3.42MMscmd) without compressor, Low departure pressure.
47 - Case 3B is based on Train 1 (Thien Ung + Satellite, 8MMscmd) with Compressor, Thien Ung Cooler bypassed,
48 Satellite Fluid Arrive at 18°C + Train 2 (Satellite, 13MMscmd) with Compressor, Satellite Fluid arrive at 18°C
49 2. Wobbe index calculations is according to ISO 6976.
50
53
Acentric Normal
54 Liq. Density Critical T Critical P factor Boiling Point
55 Component Mol. Weight (kg/cm³) (°C) (bar abs.) (°C)
56 C6+_1* 84 685 234.63 29.47 0.278 66.93
57 C7+_1* 96 722.2 270.74 28.24 0.304 94.83
58 C8+* 107 745 298.23 27 0.337 118
59 C9+* 121 764 327.92 24.78 0.375 144.93
60 C10+* 134 778 352.83 22.91 0.41 168.32
61 C11+* 147 789 375.15 21.21 0.446 190.27
62 C12+* 161 800 397.29 19.62 0.486 212.76
63 C13+* 175 811 417.96 18.23 0.527 234.31
64 C14+* 190 822 437.62 16.92 0.58 256.26
65 C15+* 206 832 460.85 16.67 0.629 278.18
66 C16+* 222 839 479.11 15.34 0.663 298.25
67 C17+* 237 847 495.88 14.31 0.692 316.42
68 C18+* 251 852 509.49 13.41 0.72 331.89
69 C20+* 335.1 872.6 572.73 9.87 0.94 406.69
70 C19+* 263 857 520.89 12.76 0.742 344.69
71
WASTE HEAT RECOVERY UNIT DATASHEET NO. 5691-CPP-ME-DS-0001
PROCESS PARAMETERS Rev. 0 Page 7 of 17
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
D.S. NO.: 5691-CPP-ME-DS-0001 PAGE : 8 OF 17
SPEC. NO.: 5691-CPP-ME-SP-0013 BY : Jean Kuan
DATE : _ 06 SEPTEMBER 2011___
WASTE HEAT RECOVERY UNIT DATA SHEET REVISION: 0
1 TUBES
2 Vertical or horizontal *
3 Tube corrosion allowance mm *
4 Outside diameter mm *
5 Wall thickness (min/average) mm *
6 Hot side Cold side
7 Max. tube wall temperature (calculated) °C * *
8 Max. tube wall temperature (design) °C * *
9 Inside film coefficient W/m² °C * *
10 Overall film coefficient W/m² °C * *
11 Fouling factor m²C/W * *
12 Inlet velocity m/s *
13 Design basis for tube wall thickness API RP 530 / ASME VIII DIV. 1
14
15 DESCRIPTION OF EXTENDED SURFACE
16 Type mm *
17 Fin dimension mm *
18 Fin spacing mm *
19 Extension ratio *
20 Max. fin temperature °C *
21 EXHAUST DUCT
22 Expansion joints no. off *
23 Expansion joints location *
24 Expansion joints manufacturer *
25 Expansion joints type *
26 Support type *
27 Support location *
28 Access/inspection no. off *
29 Access/inspection location *
30 Access/inspection size *
31
32 STACK
33 Stack height above grade See layout drawing. Approximate (VTA) m above deck
34 Stack weather protection hood type *
35 Stack diameter *
36 Stack material thickness *
37 Stack insulation thickness *
38 Stack liner thickness *
39 DIVERTER DAMPER (Note 4) *
40 Type *
41 Manufacturer *
42 Time to close s *
43 Time to open s *
44 MISCELLANEOUS CONNECTIONS
45 Flue Gas pressure *
46 Flue Gas Temperature *
47 Gas sample and flow measurements *
48 Drain. bottom of WHRU *
49 Drain. ducting *
50 Drain. header boxes *
51 Others *
52 Explosion doors *
53 Painting and galvanizing requirements *
54 Notes *
HEADER BOXES
55 Location *
56 Insulation thickness *
57 Header doors bolted or hinged *
D.S. NO.: 5691-CPP-ME-DS-0001 PAGE : 10 OF 17
SPEC. NO.: 5691-CPP-ME-SP-0013 BY : Jean Kuan
DATE : _ 06 SEPTEMBER 2011___
WASTE HEAT RECOVERY UNIT DATA SHEET REVISION: 0
24
(RPM)
Operating
25 Tip impeller (norm/max. allowable) m/s Nozzle diameter (suction / discharge) mm
26 Moment of inertia kg.m2 Flanges acc.to rating
27 Shaft power req. curve (norm./max.) kw Inlet guide vane yes no make
28 Max.total diff.pressure (bar) surge point (m3/h) Adjustment Req. pressure (bar)
45 NOZZLE SCHEDULE
46 MAIN NOZZLES SIZE RATING(lb) FACING ORIENTATION PIPING SPEC
47 SUCTION
48 DISCHARGE
49 MOTOR AND ELECTRICAL DATA CONTROL
50 Make Frequency Controller yes no
1 AUXILIARY EQUIPMENT
2 ⌧ Suction filter ⌧ Vendor Other
3 ⌧ Suction silencer (Note 2,Page 13) ⌧ Vendor Other
4 ⌧ Suction elbow ⌧ Vendor Other
5 Discharge filter Vendor Other
6 Discharge silencer Vendor Other
7 Safety valve (if required) Vendor Other
8 Non return valve (if required) Vendor Other
9 ⌧ Acoustic hood Vendor Other
10 Anti vibration pads ⌧ Vendor Other
11 Anchor bolts Vendor ⌧ Other
12 ⌧ Flexible connection ⌧ Vendor Other
13 ⌧ Grease system ⌧ Vendor Other
14 Buffer gas supply regulation and piping with FI and RO Vendor Other
15 Pressure control station, with presure control valve and make up valve. Vendor Other
16 ⌧ Dampeners ⌧ Vendor Other
17 INSPECTION - TEST Witnessed by Technip ⌧ Client
18 ⌧ Inspection
19 Hydrostatic test at shop Test pressure (kg/cm³)
20 ⌧ Mechanical running test at shop Duration (hours) ⌧ 4 hours
21 ⌧ Performance measurement
22 ⌧ Vibration measurement
23 ⌧ Static / Dynamic balance test
24 Special test :
25 INLET FILTERS
26 Cartridge type * Material *
27 Pressure drop kg/cm³ (clean) * Corrosion Allowance mm
28 kg/cm³dirty) *
29 Filtration requirement *
30
31 WEIGHT AND SIZES
32 Weight without motor kg * Length mm *
33 Weight of motor kg * Width mm *
34 Total weight kg * Height mm *
35
36 Notes
37 1. VENDOR TO COMPLETELY FILL THE DATASHEET.
38 2. * DENOTED THAT VENDOR TO ADVISE.
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
DATA SHEET FOR
LV MOTORS
1 ITEM: MOTOR FOR SEALING AIR FAN QUANTITY NOTE 4 Page 15 MR: 5691-CPP-ME-RQ-0005
2 LV Motors specification: 5691-GEN-EL-SP-0008 Standards, codes: IEC / NEMA
3 Supplier: WHRU VENDOR Manufacturer: HOLD
4
5 ENVIRONMENTAL CONDITIONS
6 Installation (indoor/outdoor) / Ambient Type Outdoor Offshore, salt laden & tropical
7 Ambient Design Temperature Max: 40 °C Min: °C
8 Altitude (if > 1000m)/Relative Humidity a.s.l.: <100 m 98 %
9 Area Classification ZONE 2, GAS GROUP IIB, T3
10
11 DRIVEN MACHINE DATA (NOTE 5 PAGE 15) b
12 Manufacturer/Machine Type (fan, pump, compressor,...) FAN
13 Maxi shaft power / Shaft power at operating point kW kW
14 Coupling type / To be designed for restarting Yes No
15 Thrust (vertical) Up/Down Up kg Down kg
16 Driven Machine Inertia (WR2) kg.m2
17 Brake torque curve / Required starting brake torque N.m
18
EN MACHINE SUPPLIER
NOTES
1. VENDOR shall supply as a minimum the following data for the purpose of evaluation, approval and record.
a) All physical drawings showing all dimensions, location of terminal boxes and size, connection diagrams, methods of
terminations, couplings, keyways, etc.
b) A complete set of installation, operating and maintenance data.
c) Surface preparation and painting.
d) A list of recommended spares (seperately priced).
2. Cable entry size for terminal boxes shall be suitable for CONTRACTOR's cable termination. VENDOR shall recheck/confirm
with CONTRACTOR the cable entry size requirement during BID.
3. When motors are furnished with the driven equipment as a package, the torque characteristics and speed shall be the
responsibility of the driven equipment VENDOR.
5. To be completed by VENDOR.
DOCUMENT No 5691-CPP-ME-DS-0001
Revision: 0 Page 16 of 17
WEIGHT/ C.G. CONTROL
DATA SHEET
UNITS
APPLICABLE TO: PROPOSAL PURCHASE AS BUILT
FOR FEED FOR THIED UNG FIXED PLATFORM
SITE OFFSHORE VIETNAM
SERVICE WASTE HEAT RECOVERY UNIT
TAG NO. 56A105A/B/C
TYPE ESTIMATED % CONTINGENCY WEIGHT STATUS
WEIGHT WEIGHT ALLOWANCE
DATA DRY INQUIRY INFORMATION
(Tonnes) LIFT VENDOR INFORMATION
OPERATING WEIGHED INFORMATION
TEST
"A" = Note 4
N "A" "B" =
"X" "C" =
C OF G
"Y" =
"B"
"Z" =
"Y"
PLAN
C OF G
"C"
"Z"
SUPPORT STEEL
ELEVATION
NOTE:
6 THE OVERALL MAXIMUM PERMISSIBLE SOUND LEVEL FOR THE EQUIPMENT IS SPECIFIED IN THE TABLE BELOW.
7 VENDOR SHALL COMPLETE THE TABLE BELOW.
8 ALL SOUND DATA FOR THIS TABLE IS:
9 SOUND PRESSURE LEVELS IN dB dBA (RE 0.0002 MICROBAR)
10 AT 1 METERS FROM MAJOR EQUIPMENT BOUNDING SURFACES.
11 SOUND POWER LEVELS IN dB dBA (RE 10^-12 WATT)