5691-CPP-ME-DS-0001

FRONT-END ENGINEERING DESIGN (FEED)


SERVICES FOR THIEN UNG FIXED PLATFORM REV. NO. 0

DATASHEET FOR WHRU Page 2 of 17

TABLE OF CONTENTS

Page

1.0 Process parameters 3


2.0 Waste Heat Recovery Units Data Sheet 8
3.0 Fan Datasheet 12
4.0 LV Motor Datasheet 14
5.0 Weight/ C.O.G Data Sheet 16
6.0 Noise Data Sheet 17
WASTE HEAT RECOVERY UNIT DATASHEET NO. 5691-CPP-ME-DS-0001
PROCESS PARAMETERS Rev. 0 Page 3 of 17
1
2 ITEM 56A105A/B/ C (NOTE 1, 13 Page 4)
3
4 NUMBER 2 + 1 Future (NOTE 1 Page 4)
5
6 SERVICE WASTE HEAT RECOVERY UNIT (WHRU) PACKAGE
7
8 APPLICATION WHRU FOR SOLAR TAURUS 70 GAS TURBINE GENERATOR EXHAUST
9 GTG FUEL TYPE DIESEL (START UP AND FUEL GAS TRIP)
10 FUEL GAS (NORMAL OPERATION)
11
12 PROCESS COIL SERVICE HOT OIL
13
CHARACTERISTI

14 PRODUCT / CASE
15 FEED COMPOSITION
16 FLASH CURVES
FEED

CS

17 (Vol. % Wt. %) CURVE OF VAPOR PHASE


18
19 LIQUID/VAPOR CHARACTERISTIC CURVES
20
21 CASE CASE 1 (Note2 Page 4)CASE 2 (Note 2 Page 4) CASE 3 (Note 2 Page 4) CASE 4 (Note 2 Page 4)
22
23 FLOW kg/h 195652 (NOTE 3, 4, 7) 184891 (NOTE 3, 4, 7) 140870 (NOTE 3, 4, 7) 114457 (NOTE 3, 4, 7)
24 TEMPERATURE °C
25 INLET 220.0 220.0 220.0 220.0
26 OUTLET 240.0 240.0 240.0 240.0
27 DESIGN 300 / 0 300 / 0 300 / 0 300 / 0
PRESSURE bar g.
OPERATING CONDITIONS PER UNIT

28
29 INLET 7.0 7.0 7.0 7.0
30 OUTLET (NOTE 5 Page 4) (NOTE 5 Page 4) (NOTE 5 Page 4) (NOTE 5 Page 4)
31 DESIGN 15.0 15.0 15.0 15.0
32 WEIGHT VAPOR %
33 INLET 0 0 0 0
34 OUTLET 0 0 0 0
35 LIQUID DENSITY AT T kg/m3
36 INLET
37 OUTLET
38 LIQUID SPECIFIC HEAT kJ/kg.K
39 INLET
40 OUTLET
41 LIQUID THERMAL CONDUCTIVITY W/m.K
42 INLET
43 OUTLET
44 HEAT ABSORBED kW 2500 (NOTE 3 Page 4) 2350 (NOTE 3 Page 4) 1800 (NOTE 3 Page 4) 1450 (NOTE 3 Page 4)
45
46 PRESSURE DROP THROUGH CO bar (NOTE 5 Page 4) (NOTE 5 Page 4) (NOTE 5 Page 4 ) (NOTE 5 Page 4)
47
48 FOULING FACTOR m²-K / W 0.0002 (Note 6 Page 4) 0.0002 (Note 6 Page 4) 0.0002 (Note 6 Page 4) 0.0002 (Note 6 Page 4)
49
50
51 EXHAUST GAS CONDITIONS : TAURUS 70
52
53
54 GAS TURBINE LOAD % 50 - 100 (NOTE 9 Page 4)
55
56 TOTAL AVAILABLE EXHAUST GAS kg/h (NOTE 10 Page 4)
57
58 MAXIMUM ALLOWABLE PRESSURE DROP THROUGH WHRU HEATING COIL BUNDLE bar 0.025 (NOTE 11 Page 4)
59
60 EXHAUST GAS TEMPERATURE TO WHRU ºC (NOTE 10 Page 4)
61
62 EXHAUST GAS TEMPERATURE AT WHRU OUTLET ºC (NOTE 6 Page 4)
63
64 EXHAUST GAS TEMPERATURE TO STACK (TEMPERATURE OF MIXED GAS AT ºC (NOTE 6 Page 4)
65 WHRU OUTLET & BUNDLE BYPASS
66
67 FUEL GAS COMPOSITION TO GTG : (NOTE 12 Page 4)
68
69 EXHAUST GAS COMPOSITION : (NOTE 10 Page 4)
70
WASTE HEAT RECOVERY UNIT DATASHEET NO. 5691-CPP-ME-DS-0001
PROCESS PARAMETERS Rev. 0 Page 4 of 17
1
2 NOTES:
3 1. THIS DATASHEET IS FOR THE 2 WASTE HEAT RECOVERY UNITS 56A105A AND 56A105B ATTACHED TO GAS TURBINE GENERATORS
4 75GQ105A AND 75GQ105B THAT ARE TO BE INSTALLED FOR DAY 1 OPERATION. THE OPERATING MODE WILL BE 2X100%.
5 A THIRD UNIT OF WHRU, 56A105C WILL BE INSTALLED IN FUTURE WHEN TRAIN 2 PRODUCTION FACILITIES INSTALLED.
6 PROVISION OF 56A105C IS OUT OF THE SCOPE OF THIS PROJECT.
7 2. A) CASE 1 IS THE DESIGN CASE. EACH WHRU SHALL BE DESIGNED FOR 2.5 MW.
8 B) CASE 2 TAKES PLACE WHEN 2 WHRUs ARE RUNNING AND PROVIDING NORMAL HOT OIL SUPPLY TO TEG REBOILER TRAIN 1 AND
9 TEG REBOILER TRAIN 2. TOTAL NORMAL HEAT TO BE RECOVERED IS 4.7 MW FROM 2 UNITS OF WHRUs.
10 C) CASE 3 TAKES PLACE AT INITIAL YEARS WHEN HOT OIL IS ONLY SUPPLIED TO TEG REBOILER OF TRAIN 1. TOTAL HEAT
11 RECOVERED NEEDED IS 1.8 MW. ONLY ONE WHRU IN OPERATION.
12 D) CASE 4 TAKES PLACE WHEN HOT OIL IS ONLY SUPPLIED TO TEG REBOILER OF TRAIN 2. TOTAL HEAT RECOVERED NEEDED
13 IS 2.9 MW. TWO WHRUs ARE IN SERVICE SHARING THE LOADS.
14 3. FLOW RATE OR DUTY INDICATED IS FOR ONE UNIT OF WHRU.
15 4. DUTIES AND FLOWRATE ARE BASED ON INITIAL ESTIMATES. TO BE CONFIRMED BASED ON TEG REGENERATION PACKAGE VENDOR
16 INFORMATION ON TEG REBOILERS DUTY.
17 5. MAX PRESSURE DROP IS 1 BAR BASED ON CASE 1. THE OUTLET PRESSURE FOR OTHER CASES TO BE PROVIDED BY VENDOR BASED
18 ON THE PRESSURE DROP AT RESPECTIVE CASES.
19 6. TO BE CONFIRMED BY VENDOR. TEMPERATURE SHOULD NOT BE LOWER THAN 250ºC TO AVOID CONDENSATION OF CORROSIVE
20 COMPOUND.
21 7. VENDOR TO ADVISE THE MINIMUM FLOW REQUIRED TO CIRCULATE THROUGH EACH WHRU TO KEEP THE WHRU IN WARM UP
22 CONDITION WHEN HEAT RECOVERY IS NOT REQUIRED.
23 8. TO BE ADVISED BY VENDOR.
24 9. VENDOR TO ENSURE ALL WHRU DUTIES CAN BE SUPPLIED AT MINIMUM GTG ELECTRICAL LOAD OF 50% FOR A TAURUS 70 UNIT FOR
25 EITHER FUEL GAS OR DIESEL FIRING.
26 10. TO BE PROVIDED BY GTG VENDOR. FOR TENTATIVE DATA, REFER TO PAGE 7.
27 11. MAXIMUM ALLOWABLE PRESSURE DROP INDICATED INCLUDES ALL DRAUGHT LOSSES THROUGH WHRU BUNDLE, ALL DUCT WORKS
28 FROM GAS TURBINE EXHAUST DUCT FLANGE, EXHAUST SILENCER AND STACK LOSSES.
29 12. COMPOSITION OF FUEL GAS SUPPLIED TO GTG : REFER TO PAGE 6
30 13. VENDOR TO ADVISE THE MAXIMUM ANTICIPATED HEAT LEAKAGE TO THE WHRU BUNDLE WHEN DAMPER IS AT ITS FULL BYPASS
31 CONDITION.
32 14. VENDOR TO ADVISE WHETHER THERE WILL BE ANY CONSEQUENCE IF BOTH GTG AND HOT OIL PUMPS TRIP DUE TO ESD. VENDOR TO
33 ADVISE WHETHER HOT OIL PUMP NEED TO BE IN OPERATION EVEN DURING ESD AND IF SO INFORM PERIOD REQUIRED. VENDOR TO
34 INFORM WHETHER ADEQUATE SAFEGUARD IN CASE IF HOT OIL PUMPS FAILURE.
35
36
37 Physical Properties Of Therminol 66
42
43 Liquid Density Thermal Conductivity
Temperature (ºC) 3 Heat Capacity (kJ/kg.K) Viscosity (cP)
44 (kg/m ) (W/m.K)

45 220 870 2.27 0.718 0.1036


46 225 867 2.29 0.688 0.1031
47 230 863 2.30 0.661 0.1026
48 235 859 2.32 0.635 0.1021
49 240 856 2.34 0.611 0.1015
50
51
52
53
54
55
56
WASTE HEAT RECOVERY UNIT DATASHEET NO. 5691-CPP-ME-DS-0001
PROCESS PARAMETERS Rev. 0 Page 5 of 17
1

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56 Schematic of Waste Heat Recovery for Hot Oil System


WASTE HEAT RECOVERY UNIT DATASHEET NO. 5691-CPP-ME-DS-0001
PROCESS PARAMETERS Rev. 0 Page 6 of 17
1

2 Normal Fuel Gas Supply to Gas Turbine Generator (GTG)


3

4 Case 1A 3B (Remark 1)
5 Design Pressure, barg 45 45
6 Design Temperature, °C -20 (Min.) / 90 (Max.) -20 (Min.) / 90 (Max.)
7 Op. Pressure, barg 27.6 27.6
8 Op. Temperature, °C 59.31 42.49
9 Components Composition (Mole Fraction)
10 CO2 0.098980 0.099501
11 Nitrogen 0.004122 0.004179
12 Methane 0.746528 0.756222
13 Ethane 0.078825 0.078351
14 Propane 0.041880 0.039313
15 i-Butane 0.009141 0.007861
16 n-Butane 0.010150 0.008344
17 i-Pentane 0.003335 0.002364
18 n-Pentane 0.002127 0.001425
19 H2O 0.000042 0.000074
20 H2S 0.000021 0.000021
21 C6+_1* 0.002736 0.001478
22 C7+_1* 0.001529 0.000669
23 C8+* 0.000486 0.000175
24 C9+* 0.000077 0.000021
25 C10+* 0.000018 0.000004
26 C11+* 0.000003 0.000000
27 C12+* 0.000000 0.000000
28 C13+* 0.000000 0.000000
29 C14+* 0.000000 0.000000
30 C15+* 0.000000 0.000000
31 C16+* 0.000000 0.000000
32 C17+* 0.000000 0.000000
33 C18+* 0.000000 0.000000
34 C19+* 0.000000 0.000000
35 C20+* 0.000000 0.000000
36 Total 1.000000 1.000000
37

38 MW 22.62 22.15
39 Mass Density, kg/m³ 25.16 26.22
40 LHV, MJ/kg 39.20 39.03
41 LHV, MJ/Std m³ 37.64 36.68
42 Wobbe Index, MJ/Std m³ 46.91 46.25 (Remark 2)
43

44 Remark:
45 1. Case description:
46 - Case 1A is based on Thien Ung production only (3.42MMscmd) without compressor, Low departure pressure.
47 - Case 3B is based on Train 1 (Thien Ung + Satellite, 8MMscmd) with Compressor, Thien Ung Cooler bypassed,
48 Satellite Fluid Arrive at 18°C + Train 2 (Satellite, 13MMscmd) with Compressor, Satellite Fluid arrive at 18°C
49 2. Wobbe index calculations is according to ISO 6976.
50

51 Pseudo components properties:-


52

53
Acentric Normal
54 Liq. Density Critical T Critical P factor Boiling Point
55 Component Mol. Weight (kg/cm³) (°C) (bar abs.) (°C)
56 C6+_1* 84 685 234.63 29.47 0.278 66.93
57 C7+_1* 96 722.2 270.74 28.24 0.304 94.83
58 C8+* 107 745 298.23 27 0.337 118
59 C9+* 121 764 327.92 24.78 0.375 144.93
60 C10+* 134 778 352.83 22.91 0.41 168.32
61 C11+* 147 789 375.15 21.21 0.446 190.27
62 C12+* 161 800 397.29 19.62 0.486 212.76
63 C13+* 175 811 417.96 18.23 0.527 234.31
64 C14+* 190 822 437.62 16.92 0.58 256.26
65 C15+* 206 832 460.85 16.67 0.629 278.18
66 C16+* 222 839 479.11 15.34 0.663 298.25
67 C17+* 237 847 495.88 14.31 0.692 316.42
68 C18+* 251 852 509.49 13.41 0.72 331.89
69 C20+* 335.1 872.6 572.73 9.87 0.94 406.69
70 C19+* 263 857 520.89 12.76 0.742 344.69
71
WASTE HEAT RECOVERY UNIT DATASHEET NO. 5691-CPP-ME-DS-0001
PROCESS PARAMETERS Rev. 0 Page 7 of 17
1

2 TYPICAL T 70 PERFORMANCE DATA


3

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71
D.S. NO.: 5691-CPP-ME-DS-0001 PAGE : 8 OF 17
SPEC. NO.: 5691-CPP-ME-SP-0013 BY : Jean Kuan
DATE : _ 06 SEPTEMBER 2011___
WASTE HEAT RECOVERY UNIT DATA SHEET REVISION: 0

Tag no. 56A105A/B/C Location/Module


Unit WHRU No. req’d 2 +1 (Future) Nos. (NOTE 1 Page 4)
Service Manufacturer
Size & type Model
Supplier Job no.
Serial no.

1 UNIT LOAD DATA Min Norm Design L Max


2 load load WHRU load
3 Gas turbine shaft load MW 5.4 MW Power Generation
4 WHRU heat recovery (NOTE 6 Page 11 ) MW 2.5 MW
5
6 EXHAUST GAS DATA
7 Exhaust gas flow t/h (NOTE 3 Page 7 & 11 )
8 EXHAUST GAS
TEMPERATURE
9 Inlet base continuous °C (NOTE 3 Page 7 & 11 )
10 EXHAUST GAS PRESSURE
11 Leaving turbine nominal bar * * * *
12 Allowable total press. drop (GT exhaust flange to exhaust bar 100 mm WC
stack exit) 0.01
13 Calculated total press drop bar * * * *
ducting
14 Calculated total press drop bar * * * *
WHRU
15 Calculated stack loss bar * * * *
16 Calculated by-pass system loss (when WHRU not bar * * * *
operating)
17
18 EXHAUST GAS VELOCITY
19 Main duct upstream WHRU m/s * * * *
20 Main duct downstream WHRU m/s * * * *
21 By-pass duct (when WHRU not operating) m/s * * * *
22 Stack m/s * * * *
23
24 HOT OIL SIDE DATA
25 Flow t/hr
o
26 Temperature C
27 Inlet
28 Outlet
Refer to Page 3
29 Design
30 Pressure barg
31 Outlet
32 Design
33 Max. pressure drop Bar
34
35 MECHANICAL DESIGN CONDITION/DATA
36 TUBE BANK DESIGN
37 Hydrostatic test pressure barg *
38 Number of passes *
39 Number of tubes per row *
40 Number of rows *
41 Straight tube length m *
42 Effective straight tube length m *
43 Bare tube number *
44 Bare tube total exposed surface m² *
45 Extended surface tubes number *
46 Extended surface tubes total exp surface m² *
47 Pitch parallel to flow mm *
48 Pitch across flow mm *
49 In line or staggered *
50 Tube centre to duct wall mm *
51 Weld inspection requirement (X-ray or other) All butt joints – 100% radiography
52 Stress relieve * - As per code
D.S. NO.: 5691-CPP-ME-DS-0001 PAGE : 9 OF 17
SPEC. NO.: 5691-CPP-ME-SP-0013 BY : Jean Kuan
DATE : _ 06 SEPTEMBER 2011___
WASTE HEAT RECOVERY UNIT DATA SHEET REVISION: 0

1 TUBES
2 Vertical or horizontal *
3 Tube corrosion allowance mm *
4 Outside diameter mm *
5 Wall thickness (min/average) mm *
6 Hot side Cold side
7 Max. tube wall temperature (calculated) °C * *
8 Max. tube wall temperature (design) °C * *
9 Inside film coefficient W/m² °C * *
10 Overall film coefficient W/m² °C * *
11 Fouling factor m²C/W * *
12 Inlet velocity m/s *
13 Design basis for tube wall thickness API RP 530 / ASME VIII DIV. 1
14
15 DESCRIPTION OF EXTENDED SURFACE
16 Type mm *
17 Fin dimension mm *
18 Fin spacing mm *
19 Extension ratio *
20 Max. fin temperature °C *
21 EXHAUST DUCT
22 Expansion joints no. off *
23 Expansion joints location *
24 Expansion joints manufacturer *
25 Expansion joints type *
26 Support type *
27 Support location *
28 Access/inspection no. off *
29 Access/inspection location *
30 Access/inspection size *
31
32 STACK
33 Stack height above grade See layout drawing. Approximate (VTA) m above deck
34 Stack weather protection hood type *
35 Stack diameter *
36 Stack material thickness *
37 Stack insulation thickness *
38 Stack liner thickness *
39 DIVERTER DAMPER (Note 4) *
40 Type *
41 Manufacturer *
42 Time to close s *
43 Time to open s *
44 MISCELLANEOUS CONNECTIONS
45 Flue Gas pressure *
46 Flue Gas Temperature *
47 Gas sample and flow measurements *
48 Drain. bottom of WHRU *
49 Drain. ducting *
50 Drain. header boxes *
51 Others *
52 Explosion doors *
53 Painting and galvanizing requirements *
54 Notes *
HEADER BOXES
55 Location *
56 Insulation thickness *
57 Header doors bolted or hinged *
D.S. NO.: 5691-CPP-ME-DS-0001 PAGE : 10 OF 17
SPEC. NO.: 5691-CPP-ME-SP-0013 BY : Jean Kuan
DATE : _ 06 SEPTEMBER 2011___
WASTE HEAT RECOVERY UNIT DATA SHEET REVISION: 0

1 EXHAUST DUCT AND WHRU CASING Main duct Main duct


2 WHRU upstream downstream By-pass
3 casing of WHRU of WHRU duct
4 Max. temp on casing surface °C * * * *
5 Length m * * * *
6 Dimensions light opening m * * * *
7 Dimensions outside m * * * *
8 Material Thickness mm * * * *
9 Insulation thickness mm * * * *
10 Liner thickness mm * * * *
11
12 HEADER
13 Flange size and rating * / CL 300
14 MANIFOLDS
15 Outside diameter mm
16 MATERIALS
17 Material standard Thick mm Cert type MDS
no.
18 Tubes SA 106 GR B (VTC)
19 Fins *
20 Exhaust duct *
21 Expansion joint *
22 Exhaust support *
23 Stack *
24 Header box plate *
25 Header box insulation *
26 Header box anchoring *
27 WHRU support beam *
28 WHRU support hangers *
29 WHRU casing support *
30 Return bends *
31 Header *
32 Manifolds *
33 Tube supports *
34 WHRU CASING
35 Internal lagging plate SS 316 (Minimum) *
36 Internal insulation *
37 Casing plate CS (SA 516 Gr. 60)
38 Casing flange CS
39 Casing bolts CS
40 Casing gaskets CS
41 External insulation (Thermal) *
42 External lagging plate *
43 Liner *
44 MAIN DUCT UPSTREAM OF WHRU
45 Internal lagging plate SS 316 (Minimum) *
46 Internal insulation *
47 Casing plate *
48 Casing flange *
49 Casing bolts *
50 Casing gaskets *
51 External insulation (Thermal) *
52 External lagging plate *
53 Liner *
54 MAIN DUCT DOWNSTREAM OF WHRU
55 Internal lagging plate SS 316 (Minimum) *
56 Internal insulation *
57 Casing plate *
58 Casing flange *
59 Casing bolts *
60 Casing gaskets *
61 External insulation (Thermal) *
62 External lagging plate *
63 Liner *
D.S. NO.: 5691-CPP-ME-DS-0001 PAGE : 11 OF 17
SPEC. NO.: 5691-CPP-ME-SP-0013 BY : Jean Kuan
DATE : _ 06 SEPTEMBER 2011___
WASTE HEAT RECOVERY UNIT DATA SHEET REVISION: 0

Material standard Thick mm Cert type MDS


no.
1 BY-PASS DUCT
2 Internal lagging plate *
3 Internal insulation *
4 Casing plate *
5 Casing flange *
6 Casing bolts *
7 Casing gaskets *
8 External insulation (Thermal) *
9 External lagging plate *
10 Liner *
11 DIVERTER DAMPER
12 Frame *
13 Plate *
14 Shaft *
15 Lining *
16 STACK
17 Stack material SS 316 (Minimum) * * *
18 Stack thickness * * *
19 Stack insulation material * * *
20 Stack liner material * * *
21 Insulation thickness * * *
22
23 NOTES :
24 1) VENDOR SHALL REFER PAGE 3 TO PAGE 6 FOR PROCESS PARAMETERS.
25 2) * DENOTED TO BE FILLED IN BY VENDOR. COMPLETED DATA SHEET SHALL BE SUBMITTED BY THE VENDOR ALONG
26 WITH THE BID.
27 3) VENDOR TO CONFIRM BASED ON GAS TURBINE MODEL SOLAR TAURUS 70.
28 4) DIVERTER DAMPER SHALL BE ABLE TO MODULATE WITH 4-20mA SIGNAL FROM DCS IN CCR AND SHALL BE
29 PROVIDED WITH SOLENOID VALVE FOR TRIPPING. OPEN/CLOSE LIMIT SWITCHES (PROXIMITY TYPE) FOR POSITION
30 INDICATION SHALL BE PROVIDED.
31 5) AIR SUPPLY SHALL BE PROVIDED AT ONE POINT IN THE PACKAGE FOR THE DISTRIBUTION BY VENDOR.
32 6) FLOW RATE AND HEAT DUTY INDICATED IS FOR ONE UNIT OF WHRU.
33 7) VTC = VENDOR TO CONFIRM
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
CENTRIFUGAL FAN DATA SHEETS
PAGE : 12 OF 17
ITEM NO. : HOLD
Front-End Engineering Design (FEED) Services DATA SHEET NO. : 5691-CPP-ME-DS-0001
For Thien Ung Fixed Platform REVISION : 0 DATE :06-September-11

1 EQUIPMENT Centrifugal fan DUTY Continuous


2 SERVICE Atmospheric Air No. required
3 OPERATING CONDITIONS
Design Nor/Max Min Design Nor/Max Min
4 Start-up Start-up
5 Total Flow * m3/min Compression Ratio *
0
6 Suction Temperature * C Molecular Weight *
7 Suction Pressure * kg/cm2 Compressibility Factor (Suc. Condition) *
2
8 Discharge Pressure * kg/cm Cp/Cv Suction Conditions (Ideal Gas) *
2
9 Differential Pressure * kg/cm Density (Suction Conditions) * kg/m3
0
10 Sution Design Temperature * C Suction / Discharge Design Pressure * kg/cm2
11 Static efficiency * % Shaft power * kw
12 Total efficiency * % Casing design pressure * kg/cm2
13 GAS COMPOSITION
14 GAS COMPOSITION (Vol. %) Design (Start-up) Nor./Max. Min
15 Ambient Air
16
17
18
19 PERFORMANCE AND MECHANICAL DATA
20 Manufacturer * Bearing type axial/radial *
21 Size and type No.of stages : Bearing lubrication greased force oil
22 Type of impeller Diam. (mm) : Bearing life time
23 Blade angle (inlet/outlet) o Position of casing (facing driven end)
Critical Casing split vertically horizontally
Speed

24
(RPM)

Operating
25 Tip impeller (norm/max. allowable) m/s Nozzle diameter (suction / discharge) mm
26 Moment of inertia kg.m2 Flanges acc.to rating
27 Shaft power req. curve (norm./max.) kw Inlet guide vane yes no make
28 Max.total diff.pressure (bar) surge point (m3/h) Adjustment Req. pressure (bar)

29 Temp.rise during compression,norm./max.allow.(°C) Control signal


30 Direction of rotation(facing driven end) CCW CW Safe position open close
31 Shaft sealing Sound pressure level at 1 m distance dB(a)
32 Purge gas rate (Nm3/h) req. pressure (kg/cm2g) Casing sound power level dB(a)
33 MATERIAL SPECIFICATION (asbestos free) ACCESSORIES
34 Casing Intake filter yes no Silencers at suction disch.(Note 2,Page 9

35 Impeller Inlet box yes no Dampers yes no


36 Shaft/hub Drain yes no Inspection cover yes no
37 Shaft sleeve Diffuser yes no Insulation yes no
38 Plate thickness Coolers Cooling water Dt
39 Side mm Flexibles connections yes no suction disch.
Casing
40 Scroll mm DRIVE AND TRANSMISSION
41 Cover mm Driver Electric motor Steam turbine
42 Impeller Backplate mm Transmission type
43 Blades mm Flex. coupling: yes/no/spacer type make
44 Anti-vibrating pads Yes No Coupling guard (non sparking) yes no Shaft guard yes no

45 NOZZLE SCHEDULE
46 MAIN NOZZLES SIZE RATING(lb) FACING ORIENTATION PIPING SPEC
47 SUCTION
48 DISCHARGE
49 MOTOR AND ELECTRICAL DATA CONTROL
50 Make Frequency Controller yes no

51 Model Range of Speed rpm


52 Voltage (V) 400 Phase 3 Cycle (Hz) 50
53 Speed RPM
54 Rated power output KW
55 Area classification Zone 2, IIB, T3
56 Enclosure Ex"e" Ex"de"
57 Refer to Datasheet for LV Motor Page 14 DRAWINGS
58 Cross sect.drawing Required Outline dwg Required
59 Fan or blower performance curve Required
CENTRIFUGAL FAN DATA SHEETS
PAGE : 13 OF 17
ITEM NO. : HOLD
Front-End Engineering Design (FEED) Services DATA SHEET NO. : 5691-CPP-ME-DS-0001
For Thien Ung Fixed Platform REVISION : 0 DATE : 06-September-11

1 AUXILIARY EQUIPMENT
2 ⌧ Suction filter ⌧ Vendor Other
3 ⌧ Suction silencer (Note 2,Page 13) ⌧ Vendor Other
4 ⌧ Suction elbow ⌧ Vendor Other
5 Discharge filter Vendor Other
6 Discharge silencer Vendor Other
7 Safety valve (if required) Vendor Other
8 Non return valve (if required) Vendor Other
9 ⌧ Acoustic hood Vendor Other
10 Anti vibration pads ⌧ Vendor Other
11 Anchor bolts Vendor ⌧ Other
12 ⌧ Flexible connection ⌧ Vendor Other
13 ⌧ Grease system ⌧ Vendor Other
14 Buffer gas supply regulation and piping with FI and RO Vendor Other
15 Pressure control station, with presure control valve and make up valve. Vendor Other
16 ⌧ Dampeners ⌧ Vendor Other
17 INSPECTION - TEST Witnessed by Technip ⌧ Client
18 ⌧ Inspection
19 Hydrostatic test at shop Test pressure (kg/cm³)
20 ⌧ Mechanical running test at shop Duration (hours) ⌧ 4 hours
21 ⌧ Performance measurement
22 ⌧ Vibration measurement
23 ⌧ Static / Dynamic balance test
24 Special test :
25 INLET FILTERS
26 Cartridge type * Material *
27 Pressure drop kg/cm³ (clean) * Corrosion Allowance mm
28 kg/cm³dirty) *
29 Filtration requirement *
30
31 WEIGHT AND SIZES
32 Weight without motor kg * Length mm *
33 Weight of motor kg * Width mm *
34 Total weight kg * Height mm *
35
36 Notes
37 1. VENDOR TO COMPLETELY FILL THE DATASHEET.
38 2. * DENOTED THAT VENDOR TO ADVISE.
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
DATA SHEET FOR
LV MOTORS

DOCUMENT/ DATASHEET NO. REVISION


5691- CPP ME DS- 0001 0
PROJECT : FEED SERVICE FOR THIEN UNG FIXED PLATFORM PAGE
CLIENT: VIETSOVPETRO JOINT VENTURE 14 OF 17

1 ITEM: MOTOR FOR SEALING AIR FAN QUANTITY NOTE 4 Page 15 MR: 5691-CPP-ME-RQ-0005
2 LV Motors specification: 5691-GEN-EL-SP-0008 Standards, codes: IEC / NEMA
3 Supplier: WHRU VENDOR Manufacturer: HOLD
4
5 ENVIRONMENTAL CONDITIONS
6 Installation (indoor/outdoor) / Ambient Type Outdoor Offshore, salt laden & tropical
7 Ambient Design Temperature Max: 40 °C Min: °C
8 Altitude (if > 1000m)/Relative Humidity a.s.l.: <100 m 98 %
9 Area Classification ZONE 2, GAS GROUP IIB, T3
10
11 DRIVEN MACHINE DATA (NOTE 5 PAGE 15) b
12 Manufacturer/Machine Type (fan, pump, compressor,...) FAN
13 Maxi shaft power / Shaft power at operating point kW kW
14 Coupling type / To be designed for restarting Yes No
15 Thrust (vertical) Up/Down Up kg Down kg
16 Driven Machine Inertia (WR2) kg.m2
17 Brake torque curve / Required starting brake torque N.m
18
EN MACHINE SUPPLIER

19 MOTOR GENERAL CHARACTERISTICS


20 Rated power / Poles number NOTE 5 Page 15 kW N°: NOTE 5 Page 15
21 Voltage/Frequency/Phases 400 V 50 Hz N°: 3
22 Service condition (S1,S2,...) S1
23 Mounting (IM1001,3001,3011,1011,...) NOTE 5 PAGE 15
24 Protection degree: Enclosure / terminal box IP: 56 IP: 56
25 Protection Ex(n), Ex(d), Ex(e): Motor / terminal box Ex 'n' (Minimum) Ex 'n' (Minimum)
26 Gas group (IIB,...) / Temperature class (T3,...) IIB T3
27 Enclosure cooling (fan cooled,
cooled air to air
air, air to water
water,...)) HOLD
TO BE COMPLETED BY PURCHASER & BY DRIVE

28 Starting Method (loaded, unloaded / DOL, soft start,...) HOLD HOLD


29 Starting voltage (full, reduced x%) / Max. voltage drop at starting 100% / 80% 20 %
30 Nb of consecutive starts within 1 hour Cold 3 Hot 2
31 Min.Insulation Class (B,F,...)/Max Temperature Rise F B
32 Direction of Rotation (looking at motor coupling) CW CCW Bidirectionnal
33 Position of Main / Auxiliary terminal box Main HOLD Auxiliary HOLD
34 Cable Type and Size on main terminal box Type NOTE 4 Page 15 Size NOTE 4 Page 15 mm²
35 Terminal boxes provided with cable glands Yes No
36 Terminal Box Material Cast Iron / Steel
37 Motor Housing Material Cast Iron / Steel
38 Winding Material Copper
39 Cooling Fan Material Brass / Anti-static material & corrosion resistant type
39 Painting (Mfr standard,... / color) Refer to 5691-GEN-PI-SP-0005
40 Noise Level at 1 m <85 dB(A)
41
42 ACCESSORY EQUIPMENT
43 Winding temperature detectors
44 Type / Quantity PT 100, 3-Wire N°: NOTE 5 Page 15
45 Set for alarm / shut down NOTE 5 Page 15 °C NOTE 5 Page 15 °C
46 Bearing temperature detectors
47 Type / Quantity NOTE 5 Page 15 N°: NOTE 5 Page 15
48 Set for alarm / shut down NOTE 5 Page 15 °C NOTE 5 Page 15 °C
49
50
51
52
53
54
55
56
57
58
59
60
61
62
DATA SHEET FOR
LV MOTORS

DOCUMENT/ DATASHEET NO. REVISION


5691- CPP ME DS- 0001 0
PROJECT : FEED SERVICE FOR THIEN UNG FIXED PLATFORM PAGE
CLIENT: VIETSOVPETRO JOINT VENTURE 15 OF 17

63 MOTOR VENDOR'S DATA


64 Manufacturer type / Frame Size / -
65 Winding Connection (star, delta)/Nb terminals brought out N°:
TO BE COMPLETED BY MOTOR VENDOR

66 Full Load Speed rpm


67 Rated Current / No load current / Locked Rotor Current A A %
68 Starting Time (% of Voltage) at full load 100%: s 80%: s
69 Allowable Locked Rotor withstand Time Cold: s Hot: s
70 Thermal Time Constant Cooling: s Heating: s
71 Efficiency 4/4 % 3/4 % 2/4 %
72 Power Factor 4/4 3/4 2/4
73 Locked Rotor Power Factor
74 Full load Torque N.m
75 Locked/Pull Up/Breakdown Torque L % PU % BD %
76 Rotor Motor Inertia (WR2) kg.m2
77 Bearing Type (Drive End/Non Drive End) DE: NDE:
78 Lubrication Type/Interval hours
79 Anticondensation heaters (power / voltage) Yes No W 230 V
80 Ground lug size mm²
81 Motor Weight kg
82 Certifying authority / certificate Nr
83
84
85
86

NOTES

1. VENDOR shall supply as a minimum the following data for the purpose of evaluation, approval and record.
a) All physical drawings showing all dimensions, location of terminal boxes and size, connection diagrams, methods of
terminations, couplings, keyways, etc.
b) A complete set of installation, operating and maintenance data.
c) Surface preparation and painting.
d) A list of recommended spares (seperately priced).

2. Cable entry size for terminal boxes shall be suitable for CONTRACTOR's cable termination. VENDOR shall recheck/confirm
with CONTRACTOR the cable entry size requirement during BID.

3. When motors are furnished with the driven equipment as a package, the torque characteristics and speed shall be the
responsibility of the driven equipment VENDOR.

4. To be determined / specified during detailed design.

5. To be completed by VENDOR.
DOCUMENT No 5691-CPP-ME-DS-0001

Revision: 0 Page 16 of 17
WEIGHT/ C.G. CONTROL
DATA SHEET
UNITS
APPLICABLE TO: PROPOSAL PURCHASE AS BUILT
FOR FEED FOR THIED UNG FIXED PLATFORM
SITE OFFSHORE VIETNAM
SERVICE WASTE HEAT RECOVERY UNIT
TAG NO. 56A105A/B/C
TYPE ESTIMATED % CONTINGENCY WEIGHT STATUS
WEIGHT WEIGHT ALLOWANCE
DATA DRY INQUIRY INFORMATION
(Tonnes) LIFT VENDOR INFORMATION
OPERATING WEIGHED INFORMATION
TEST
"A" = Note 4

N "A" "B" =

"X" "C" =

0.00 DATUM POINT "X" =

C OF G
"Y" =
"B"

"Z" =
"Y"

PLAN

C OF G
"C"

"Z"

SUPPORT STEEL
ELEVATION

NOTE:

1.) ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE NOTED.


2.) SKETCH IN SOME IDENTIFYING ITEM ABOVE TO HELP ORIENT THE "X" & "Y" DIMENSIONS.
3.) ONE SHEET SHALL BE COMPLETED FOR EACH SEPARATELY INSTALLED SKID OR ITEM.
4.) AS SUPPLIED EQUIPMENT SHALL BE WEIGHTED BY VENDOR TO PROCEDURE APPROVED BY COMPANY/ CONTRACTOR AND
WITNESS BY COMPANY/ CONTRACTOR OR NOMINEE.
5.) VENDOR SHALL SUBMIT DESIGN UPDATE FOR SIGNIFICANT CHANGES IN WEIGHT.
6.) MAXIMUM SIZE OF THE SKID SHALL NOT EXCEED 5m (L) X 5m (W) X 10m (H).

WEIGHT CHECK LIST


INCLUDED IF NOT INCLUDED AND
ITEM APPLICABLE IN WEIGHT APPLICABLE - ESTIMATED
DATA WEIGHT
FACTORY SKID / STEEL WORK YES NO NO YES
FIRE PROOFING YES NO NO YES
THERMAL INSULATION YES NO NO YES
FACTORY / SKID INSTRUMENTS YES NO NO YES
FACTORY / SKID ELECTRICS YES NO NO YES
FACTORY / SKID PIPEWORK YES NO NO YES
DOCUMENT No 5691-CPP-ME-DS-0001
Revision 0 Page 17 of 17
EQUIPMENT NOISE
DATA SHEET

1 APPLICABLE TO: PROPOSAL PURCHASE AS BUILT


2 FOR FEED FOR THIEN UNG FIXED PLATFORM
3 SITE OFFSHORE VIETNAM
4 SERVICE WASTE HEAT RECOVERY UNIT
5 TAG NO. 56A105A/B/C

6 THE OVERALL MAXIMUM PERMISSIBLE SOUND LEVEL FOR THE EQUIPMENT IS SPECIFIED IN THE TABLE BELOW.
7 VENDOR SHALL COMPLETE THE TABLE BELOW.
8 ALL SOUND DATA FOR THIS TABLE IS:
9 SOUND PRESSURE LEVELS IN dB dBA (RE 0.0002 MICROBAR)
10 AT 1 METERS FROM MAJOR EQUIPMENT BOUNDING SURFACES.
11 SOUND POWER LEVELS IN dB dBA (RE 10^-12 WATT)

12 OVERALL SOUND LEVEL DATA


13 OVERALL MAXIMUM VENDOR'S ESTIMATED MAXIMUM VENDOR'S GUARANTEED MAXIMUM
14 PERMISSIBLE NORMAL SPECIAL WITH ACOUSTIC NORMAL SPECIAL WITH ACOUSTIC
15 SOUND LEVEL DESIGN DESIGN TREATMENT DESIGN DESIGN TREATMENT
16 85
17
18 VENDOR SHALL COMPLETE THE TABLE BELOW.
19 ALL SOUND DATA FOR THIS TABLE IS:
20 SOUND PRESSURE LEVELS IN dB dBA (RE 0.0002 MICROBAR)
21 AT METERS FROM MAJOR EQUIPMENT BOUNDING SURFACES.
22 SOUND POWER LEVELS IN dB dBA (RE 10^-12 WATT)
23

24 OCTAVE BAND SOUND LEVEL DATA


25 OCTAVE BAND VENDOR'S ESTIMATED VENDOR'S GUARANTEED
26 CENTER MAXIMUM MAXIMUM
27 FREQUENCY
28 (HZ) NORMAL SPECIAL WITH ACOUSTIC NORMAL SPECIAL WITH ACOUSTIC
29 DESIGN DESIGN TREATMENT DESIGN DESIGN TREATMENT
30 63
31 125
32 250
33 500
34 1000
35 2000
36 4000
37 8000
38
39 DESCRIPTION OF SPECIAL DESIGN
40
41
42
43
44 NOTES:
45 (1) THE MAXIMUM PERMISSIBLE SOUND LEVELS APPLY TO THE EQUIPMENT OVER ITS ENTIRE NORMAL OPERATING RANGE
46
47
48
49
50
51
52