Sei sulla pagina 1di 7

CONTINUING AIRWORTHINESS MANAGEMENT ORGANISATION

MAINTENANCE PLANNING, CONTROL & RECORDS SECTION

FORM NO. AI/744-01/5


ISSUE NO.3, REV 1, MAY 2018.

SECTION BOEING 747-437 AIRCRAFT


BASE TRANSIT CHECK- ELECTRICAL & INSTRUMENT

SR. DESCRIPTION
NO.
1. ENSURE THAT ALL ARRIVAL & FLT SNAGS IN SECTOR REPORT, BASE PAGE
AND MEL/CDL ARE ACTIONED AND RECORDED IN SNAG SHEETS.

2. CHECK FOR “STATUS MESSAGES” ON EICAS AND ACTION AS REQUIRED.


ENTER DETAILS IN SNAG SHEETS.
3. CHECK INSTRUMENTS AND CONTROL PANELS IN THE CONTROL CABIN FOR
GENERAL CONDITION, CLEANLINESS AND SECURITY.

4. PERFORM OPERATIONAL TEST OF ALL CONTROL CABIN LIGHTS.

5. CHECK SPARE BULBS, FUSES AND ACCESSORIES AND REPLENISH.

6. PERFORM OPERATIONAL TEST OF ENGINE FIRE/OVERHEAT APU & WHEEL


WELL FIRE DETECTION, CARGO SMOKE AND WING L/E OVERHEAT SYSTEMS.

7. PERFORM SQUIB TEST FOR ENGINE, APU AND CARGO FIRE EXTINGUISHERS.

8. CHECK THAT NO. 1, 2, 3 & 4 FUEL TANK BOOST PUMP LOW PRESS LIGHTS
ARE ILLUMINATED WHEN THEIR CONTROL SWITCHES ARE IN OFF POSITION.

9. CHECK THAT NO.2, 3 & CENTER TANK OVERRIDE / JETTISON PUMP LOW
PRESS LIGHTS ARE ILLUMINATED WHEN THEIR CONTROL SWITCHES ARE IN
“ON” POSITION AND PUMPS NOT POWERED. PULL OUT RELEVANT CIRCUIT
BRAKERS ON P414 & P415 TO REMOVE POWER TO PUMPS. PUSH IN CBS
AFTER THE CHECK.
10. PERFORM BITE TEST ON CONFIGURATION WARNING CARD TO VERIFY
CORRECT OPERATION BY CYCLING CB “MAWEA PWR A/B.” CHECK THAT THE
LEDS ON THE CONFIG WARNING CARD IN MAWEA DO NOT ILLUMINATE.
CHECK OPERATION OF CENTRAL WARNING SYSTEM MODULE (MAWEA &
AURAL WARNING).
11. CHECK CAPTAIN’S & CENTER INST PANEL STDBY LIGHTING SYSTEM FOR
PROPER OPERATION WITH AC BUSES UNPOWERED.

12. PERFORM OPERATIONAL TEST OF MASTER DIM & TEST MODULE USING “IND
LTS; TEST SWITCH.
13. CARRY OUT GCU & BCU OPERATIONAL TEST AS PER MM
Approved by C.A.M. Vide letter no. QC/OAP/B747/2045 dated 2nd May, 2018.
Page 1
CONTINUING AIRWORTHINESS MANAGEMENT ORGANISATION
MAINTENANCE PLANNING, CONTROL & RECORDS SECTION

14. PERFORM OPERATIONAL TEST OF THE 115V “AC” STANDBY POWER SYSTEM.
15. VERIFY BOTH CMC’S ARE OPERATIONAL.
16. PERFORM OPERATIONAL TEST OF STALL WARNING SYSTEM USING CMC
CONFIDENT TEST.
17. PERFORM OPERATIONAL CHECK OF ALL PAX CABIN LIGHTS INCLUDING SELF
TEST OF PAX SERVICES SYSTEM READING LIGHTS, CALL LIGHTS & CHIMES.

18. PERFORM OPERATIONAL CHECK OF EMERGENCY LIGHTS INCLUDING


EMERGENCY ESCAPE PATH LIGHTS SYSTEM USING SWITCHES FROM
COCKPIT & L2 DOOR ATTD PANEL.
19. PERFORM OPERATIONAL CHECK OF PAX INFORMATION SIGNS ON MAIN & U/D
INCLUDING CREW REST AREAS & LAVATORIES.
20. CHECK THE CONDITION OF THE 6 VOLT BATTERY OF THE LH & RH U/D DOOR
EMERGENCY OPENING SYSTEM USING THE TEST SWITCH,

21. CHECK SERVICEABILITY OF ALL EXTERIOR LIGHTS INCLUDING LANDING,


RUNWAY TURN-OFF, TAXI, BEACON, STROBE, WING ILLUMINATION, LOGO &
W/W LIGHTS.
22. CHECK OPERATION OF CART LIFTS.
23. CHECK POWER SUPPLY AT HOT CUP POINT IN GALLEYS.
24. CHECK OPERATION OF WATER BOILERS IN GALLEYS.
25. CHECK OPERATION OF OVENS IN GALLEYS.

26. CHECK OPERATION OF CHILLERS IN GALLEYS.

27. CHECK OPERATION OF TRASH COMPACTOR.

28. CHECK OPERATION OF SHAVER OUTLETS.

29. CHECK LIGHT IN GALLEYS, TOILETS, COAT COMPARTMENT AND STAIRWAYS.

30. CHECK AND ENSURE THE SERVICEABILITY OF EMERGENCY FLASH LIGHT


P/N: P2-07-001-101 AT ALL ATTENDANT SEAT LOCATION.(QTY 10 ON MAIN
DECK AND QTY 3 ON UPPER DECK.
NOTE: WHILE REPLACING FOLLOWING LRU’S MAKE SURE THAT CORRECT
PART NO. SOFTWARE IS LOADED. THE SOFTWARE P/NO ALSO SHOULD BE
REFLECTED ALONG WITH COMPONENT CHANGE DETAILS IN THE SECTOR
REPORT.
LRU’S- FMS, ACESS, CMC, ND, PFD, EICAS etc.

**** END****

Approved by C.A.M. Vide letter no. QC/OAP/B747/2045 dated 2nd May, 2018.
Page 2
CONTINUING AIRWORTHINESS MANAGEMENT ORGANISATION
MAINTENANCE PLANNING, CONTROL & RECORDS SECTION
AIRCRAFT: _______________________________
CHECK: __________________________________
DATE: ___________________________________
ALL AMEs/INSPECTORS WORKING ON THIS AIRCRAFT DURING THIS CHECK ARE REQUESTED TO ENTER THEIR
NAMES AND SIGNATURES IN THIS FORM.

NO. NAME LIC/APP/AUTH.NO INITIALS FULL SIGN DATE

10
CONTINUING AIRWORTHINESS MANAGEMENT ORGANISATION
MAINTENANCE PLANNING, CONTROL & RECORDS SECTION

FORM NO.: AI/744-01/2


ISSUE NO.3, REV 1, MAY 2018.

BOEING 747-400
BASE TRANSIT CHECK- ELECTRICAL & INSTRUMENT

DESCRIPTION: ELECTRICAL & INSTRUMENT

AIRCRAFT: …..................... Routine: Base Transit Check STATION: …...........................


DATE............................

Note: 1) WHERE EVER TECH. SIGNATURE IS NOT REQUIRED 'X' SHOULD BE PUT IN THAT
COLUMN.
2) PREFERENCE FOR SNAG ON CONT SHEET SHOULD BE GIVEN IN THE COLUMN
PROVIDED

NO. TECH INSP. DATE No. TECH INSP DATE


1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.

Cont. Sheet test no.

ITEM No.
C.F.SNAG NO.
CR.F. No.

INSPECTION COMPLETED A.M.E: ________________

AUTH NO: _____________________ DATE: __________________

Approved by C.A.M. Vide letter no. QC/OAP/B747/2045 dated 2nd May, 2018.
CONTINUING AIRWORTHINESS MANAGEMENT ORGANISATION
MAINTENANCE PLANNING, CONTROL & RECORDS SECTION

FORM NO. A/747/ A310/158


ISSUE NO.5, REV 1, MAY 2018

BOEING 747/A300/A310
SNAG SHEET COMPLETION CERTIFICATE & CHECK OUT SLIP
ELECTRICAL & INSTRUMENT

Check _________________ Aircraft : VT-_________________ Date : ______________

A. TO BE FILLED BY A.M.E. / APPROVED PERSONNEL

COMPLETION CERTIFICATE

No. Description Signature Date


1. Checked by A.M.E. / Approved personnel signing out for discrepancies
2. Aircraft Snag Book Checked and Actioned.
3. Log Book entries marked.
4. All snag sheets handed over to Inspection Office.
5. Number of Continuation Sheets used.

I certify that the above aircraft are ready for flight and that all items on the routine and on
snag sheets have signed or C/F by authorisation.

Signature ____________ Auth No :____________________

Date : _____________ Time : ________________

( Note :Must be signed before signing the certificate of Flight Release / Endorsing Flight
Report Book.)

B : INSPECTION OFFICE CHECK LIST

No. Description Signature Date


1. B/ Forward snags from previous routine entered on snag sheet.
2. Number of continuation sheets issued.
3. Log Book entries made.
4. Major Item entries made.
5. Snag Sheet scrutinized by Technical Officer.

Approved by C.A.M. Vide letter no. QC/OAP/B747/2045 dated 2nd May, 2018.
CONTINUING AIRWORTHINESS MANAGEMENT ORGANISATION
MAINTENANCE PLANNING, CONTROL & RECORDS SECTION

DOCUMENT COMPLETION CHECK SHEET

ELECTRICAL & INSTRUMENT

Aircraft : VT-_______ Routine : Check - BTC Date :___________

Prior to handling over Electrical & Instrument sheets to Airframe AME, following checks to be
carried out. Particular attention should be give to :-

1. C/F items are signed by authorised persons & next routine indicated for compliance.
2. Technicians’ column signed where applicable.
3. All routine Basic / Additional checks are completed and duty certified in all respect.
4. All continuation sheets are completed in all respect.
5. All CFR’s are completed in all respect.

Checked by AME / Inspector Name : _________________

Auth No : _________________

Signature : _________________

Date : _________________

Time : _________________

Approved by C.A.M. Vide letter no. QC/OAP/B747/2045 dated 2nd May, 2018.
CONTINUING AIRWORTHINESS MANAGEMENT ORGANISATION
MAINTENANCE PLANNING, CONTROL & RECORDS SECTION
Date :
Mechanic’s Inspector’s Auth. Date
VT - Initial Initial / No.
stamp

ADDITIONAL CALLOUT – BTC ELECTRICAL B747-400

1. Callout 1090-96 Ensure all flight snags for last flight


(BOM-BOM) are entered snag sheet and
appropriately actioned.

2. Callout 1043/03: Check flight report section A booklet


MEL section for any Open MEL/CDL: Release and
record the same in defect record continuation sheet
for action.

3. Callout 1009/95carry out downloading of ACMS, CMC


and FMC BITE Data.
Note : Floppy discs for downloading are Available
at insp. Office.

4. Callout 1085/94 Access QAR thru ACMS and Check


for “QAR tape Low.” If QAR tape low found SET,
replace the QAR Tape.

5. Callout 1025/96 Takeout Take-off Report and Take-off


Trend report from ACMS and attach with snag sheets.

6. Callout 1030/99 Autoland book :


a. Ensure Validity of Autoland Test.
(Autoland test is DUE within 30 days after the
previous successful autoland /autoland test
/autoland confidence check.)
b. Ensure availability of sufficient pages for next flight.
c. Remove Blue copies for previous flights and attach
with snag sheets.

7. Callout 1001/04 Perform operational test of GCU and


BCU. Perform power up replacement test (PURT) –
Generator & Bus control Units. (Ref AMM 24-23-01,
Pages 503)

8. Call out No. Multi/2010/1046 revised 6 Aug ’15


MANDATORY INSPECTION – CDCCL ITEM-FAA AD
2008-10-06
Whenever any work is performed related to fuel tank, fuel
system and its components action callout.
Note: Contact Inspection Office for copy of the Call Out.

Approved by C.A.M. Vide letter no. QC/OAP/B747/2045 dated 2nd May, 2018.

Potrebbero piacerti anche