Sei sulla pagina 1di 6

BUI

LDI
NGANDTECHNOLOGYSTUDI
O
THEHUB
PROFESSORS:Mas
ASSI
STANT:Feder
ic
si
mil
ianoNas
aRomus s
i
t
ri
,Li
mongel
l
iMar
iaGi
useppi
na,Gui
l
ler
moAr
anda-
Mena 001.
..
..
..
..
..
..
..
..
..
..
..
STUDENT:Nahi
dMous av
i 20/
2/2017

Locat
i
on:Mi
l
an,
It
alyVi
aGi
useppeVer
di,7,20121ocat
ion: Sol
arAnal
ysi
s

Thi
sProj
ectneedanewdesigntohavemorenaturall
ightandopenspacet
owor
kingandmeet
ing.
Theidea
oft
hedesi
gnistocr
eatgreenareawit
hdom court
yardinordert
ohavemorenat
urall
i
ghtandmeeti
ngarea
BEFOR aswel
lasopenworkplacewit
hcafeareaneari
ntrance.

Dayl
i
ghtAnal
ysi
s Sef
air
aAppl
i
cat
ionGui
dance

Dayl
i
ghtGui
dance:

-Cont
orol
sfordayli
ghti
ngsides
-Cont
rol
sfordayl
ighti
ngtop
-Cont
rol
sfordayl
ightshel
vesshowl
ess

Ener
gyGui
dance:

Annualdayl
i
ght
ing 1-
Managelight
ingloads
-
Manageinter
nalloads
-
Light
i
ngfi
tureslecti
on
-
Formfordaylight
ing

2-
Reduceheat i
ngLoads
-
Formforeff
ici
entheati
ng
-
Cli
materesponsivebuil
dingfacad
-
Envel
opeopt i
mizati
ons:Highi nsul
ati
on
-
Envel
opeopt i
mizati
ons:GlazingU- f
actor
-
Envel
opeopt i
mizati
ons:Inf
il
trati
onrate
Under
li
tandover
li
t -
Passi
veli
ghtandheat :Clerestori
esandskyl
i
ght

3-
Manageequi
pmentloads
-
Managei
nter
nall
oads:Ef
fi
ci
entequi
pment

4-
Reducecoolingloads
-
Formforeff
icientcool
i
ng
-
Cli
mteresponsivebuil
dingfacades
-
Passi
veli
ghtandheat :Solarshadi
ng

Dayl
i
ghtf
act
or

AFTER

Dayl
i
ghtAnal
ysi
s Modi
fi
cat
ionwi
t
hopt
imi
zedval
ues

UsingThi sEl ementPer formancediagram isshowi ng


ourdesi gnhasl ar
geloadst otheheatingsyst em due
tothewal lconduct i
onTheEner gyUseI nt
ensi t
yoft he
buil
ding( 91kWh/ m2/yr)nearlymeet2030Chal lenge
tar
get s(90kWh/ m2/yr)
.
Toar chi
vet hebet t
ereffecti
veinusingener gy,Sef ai
ra
gave some i nformati
on i n ordertoi mpr oving the
designofbui lding.Suchasusi nginsulat
i
onf orwal l
s
orchangi nggl asstogl azedlayerandaddi ngi nsul
a-
ti
ont other oofandot herparts.

Annualdayl
i
ght
ing Usingst andardinsulat
ionwi ndowsl eadstoreduced
25t o45per centofener gyconsumpt i
onandusi ng
glassdomei nopengr eenar eapr ovi
demor enat ural
l
ightbecauseoft her i
ghtanglewhi chcancontrolsun-
l
ight.Furthermore,thisleadst otohaveexcellentai r
f
low ismai nt
ainedeveni nwar m,stil
lweathercondi -
t
ions.The heati nside is dist
ri
buted evenly atal l
points.

Under
li
tandover
li
t

Dayl
i
ghtf
act
or
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

1
A
6

Green wall

85
B 1626 B

405
Glass Panel System 1

6 5°
th,=6.6 mm
h=270
14

300
MR 1:Tables
Glass Panel System Material: legs in extruded
2 340
35 th,=6.6 mm aluminium polished or painted. Tops in HPL
h=270 60 60
211
540

60
340
60 60 FR 3
60 60

220
C C

49 50
211

60
113

R4
211

60
FR 1

6
0
FR 2

5,
2 119

R4
R

220

60
128

220
60

80
60

,6

80
5
R4


3 133
30,01 341,08 225 181 122


5

200
103
L4 60

700
60
112

6021160


FR 6
4 2 60 60

60
60 60

220
211 211
D 60 FR 5 D

60

2090
80
60
165 FR 4 5
R4
0
Ø98

220

220

80
60
60
130 135 60 60

80

R4
5
380

R4

5
12 182
0


H=270
559

540

432
280

76
E E
6
28

MR 1

190
167
280
2438

3
470

Partition Plaster wall 3: Material: frame in steel tube


(th . = 100mm) chromed or painted in epoxy resin. 2: Material: base in stainless steel. Seat
297 200 220
Seat in synthetic mesh (shape in
250

100

MR 2 retaining) with surround in air-moulded standard injection-moulded ABS.


100

polypropylene with glass fibre added. Wheels in polyamide.


480 Glass Panel System
Arms in self-skinning textured
(th . = 6.6 mm)

452,87
211 256 polyurethane.
558

F h=270 F
137

PB PB
300
210

600
85 85
80

L3 200
85
5
85
250 10 482 298 10 420
MR - 21 mq
FR 1- 4.40 mq
MR 1 - 18 mq
ST - 3.54 mq
2 2
175

FR 2 - 4.40 mq
137

PB PB - 4 mq
ST
2 FR 3 - 4.40 mq PB -2.8 mq
480 130 280 130 660 525 FR 3 - 4.40 mq PB - 2.7 mq
G G
FR 4 - 4.40 mq MR 2 - 12.56 mq
150
1490
FR 5 - 4.40 mq
AREA
LOUNGE 360 FR 6 - 4.40 mq
665

170

AREA SOCIAL

617
615
550

550

350

1000
LOUNG - 56 mq
600
AREA SOCIAL - 87.74
240

H H
1000 3030

1 1
120 272 87,53

Executive designer: NAHID MOUSAVI Title: HUB OFFICE


I I
1
A

Technical analysis:
453 554 414 1288 260

2800 Technical drawings:


L1 horizontal Section A1 (1:100) (A-H;2-10),
1
A B C D E F
L L
Day:20/02/2017 File: HUB PLAN

PIANTA PIANO TERRA 1


1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Steel circular joint
Ø= 400 mm
Laminate wood beam

210
160*160 mm 400
A A
A1 Pressure joint 2700

200 130
4000
Covering
3 Double Glazing
Screed 30mm
waterproofing sheet
5400
Panel (th. = 20 mm) (th. = 4 mm)

240
thermal/ acoustic layer
6800 (th. = 80 mm)

850,66
851,91
waterproofing sheet

112,5
(th. = 4 mm)

240
Aluminum sheet
B Structural slab B
8100
(th. = 300 mm)

125
4400 4400

9300 Reinforcement
Ø= 20 mm
C Wood beam C
Wood Panel Laminated veneer lumber mullion
Halfen L shape steel profile 30mm
(40*22 mm) Structural Beams
(100* 150 mm)
Horizontal wood beam

Irrigation

green panel

waterproofing
D D

2000
E E

wooden panel

750
Drainage area with gravel
F F
Drainpipe

wooden panel Ground

FILTER FABRIC
G G

GRAVEL DRAINAGE

9800
Double Glazing WATERPROOFING

B Panel (th. = 20 mm)


Steel Sheet (th. = 3 mm)
SEPARATION LAYER
C
Aluminum sheet
SLAB OF SLOPE
H H

Covering
Screed (th. = 30 mm) Executive designer: NAHID MOUSAVI Title: HUB OFFICE
waterproofing sheet (th. = 4 mm)
I thermal/ acoustic layer (th. = 80 mm) I
waterproofing sheet (th. = 4 mm) Halfen Technical analysis:
Structural slab (th. = 300 mm) (40*22 mm)

Technical drawing:
Reinforcement
Ø=20 mm
Wood beam horizontal Section A1 (1:20) (A-F;1-15)
technical drawing A2 (1:10) (G-L ;2-6)
A2 L shape steel profile 30mm
L L
3 Day: 20/02/2017 File: HUB SECTION
B 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

200
A A

500
5 3 700 1 80 12.5

600

2400
600
Water proofing membrane Thermal insulation
(th. = 80 mm)
Bond coat

600
B Tile stone (th. = 5 mm) Internal cladding plaster board B
panel (th. = 12.5 mm) Stone frame
(th. = 100 mm)

400

600

300 300 300 300 300 300

300 300 300 300 300 300


GROUT JOINT
Stone tile (th. = 5 mm)

600
300

2100

2100

2100
350

600
A 10

300 300
300
5
C C

120
300
2000
300

500
1100 1200 2500 1200 2500 1200 2500

10000
300

A3
D 5 A B C D
300

100 80 12.5
450
Stone plate (th, = 5 mm)
Thermal insulation
Thermal insulation (th. = 80 mm)
(th. = 80 mm) INTERNAL CLADDING

80 12.5
(th. = 12,50 mm)
Water proofing membrane
1
600

E E

500
35

400
180
300

51
1
F F

5
400 200 400 400 200 400 200 400 200 400 200 300
1200 850 2700 850

INTERNAL CLADDING
(th. = 12.5 mm)
A THERMAL INSULATION
(th. = 80 mm)
B
G Water proofing membrane G

Bond coat
A4 A5 GROUT JOINT
5 5 Tile stone (th. = 5 mm)
A
H H
600

Exterior stone veneer


400
Sealant & Backer rod
Executive designer: NAHID MOUSAVI Title: HUB OFFICE
10

Expansion bolt
I I
300

Technical analysis:
S.S.Z. strap anchor

Technical drawings:
elevation A3 (1:50) (A-G; 7-13)
horizontal Section A4 (1:20) (A-G;1-5), vertical Section A5 (1:20)(D-F ;6-14) ,
60
0 technical drawing A6 (G-L;5-7)
L
A6 L
Day: 20/02/2017 File: HUB SECTION
5
5
5

5
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Double Glazing
A Panel (th= 20 mm) A
Laminate wood beam
160*160 mm

B B

C C

270
20
D D

270
35

A7

350
5

1200
E E
65

300
95 Covering
Screed 30mm

250
F Structural slab 300 mm F

50
109

Reinforcement
Wood beam
400
L shape steel profile 30mm

200200
G G
980
80

980
980
80
80 980

H C H
A6 Laminated veneer lumber mullion

5 Wooden Cladding Profiles

Horizontal wood beam Structural Beams


(100* 150 mm)

Executive designer: NAHID MOUSAVI Title: HUB OFFICE


I I
Technical analysis:

Technical drawings:
PERSPECTIVE A6 (B-H; 1-10)
PERSPECTIVE A7 (B-E; 9-14)

L L
Day: 20/02/2017 File: HUB SECTION

5
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Laminate wood beam 160*160 mm

Double Glazing
Covering
Panel (th. = 20 mm) 400
A Screed (th. = 30 mm) A
Pressure joint 2700
4000 thermal/ acoustic layer
Concrete plate 5400 (th. = 80 mm)
Suspended ceiling 6800
Structural slab
+ 4900 mm 300 8100 (th. = 300 mm)

+ 4600 mm 4400 4400

Wood beam 9300


Wood Panel Laminated veneer lumber mullion
B B

1200
L shape steel profile (th. = 30 mm) Structural Beams Irrigation
(100* 150 mm) Horizontal wood beam
2000

green panel

waterproofing

5500 100 1370 100 1100 100 1400 100 4000 300 10000
+ 2600 mm
Thermal insulation
4900

4500
Plaster bond and skim
C Acoustic installation 60MM C

3300
2000

2000

Stone plate

+ 600 mm 2000
350

750
600

D 0,00 mm 340 D
Drainage area with gravel
Drainpipe

wooden panel wooden panel Ground


FILTER FABRIC
GRAVEL DRAINAGE
WATERPROOFING
1430 980 SEPARATION LAYER
SLAB OF SLOPE
E 2400 E

L 2
2 B
A 1:50
C

1
A
F F
Partition wall Glass Panel System
2 PB
(th,= 6.6 mm)
ST 4 h=270

2000 2500

255
300


10
°

Plasterboard (th. = 12 mm) Partition wall STEEL FRAMING


87

Plaster bond & skim (th. = 10 mm) Steel Framing


PLYWOOL + ABS Laminate panels
G G

450
AREA

450

0
R
180
165

LOUNGE FR

650
R
18
00
1264,05

500

4 CARPET COVERING
5500

5500

H H

650
R1
80
0
2200
800

18 R
00
1:500

1
A
450
Executive designer: NAHID MOUSAVI Title: HUB OFFICE
450

450
650
I 650 I
INTERNAL CLADDING (th.= 12.5 mm) 450 2100
THERMAL INSULATION (th. = 80 mm) Technical analysis:
93
°
1 2000 5400 2000

Technical drawings: vertical Section L2 (1:50) (A-E ;1-14)


horizontal Section A3 (1:50) (F-L;2-5),
C horizontal Section A4 (1:20) (F-I;6-10)
Key plan (1:500) (G-H;11-13)
L L 3 4530
L 4 Day: 20/02/2017 File: HUB SECTION
L
2
2
1:50
2 A B 1:20

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Potrebbero piacerti anche