Rebar, Formwork & Concrete Check Sheet

CONSTRUCTION Project POUR NO CONTRACTORS/SUBCONTRACTOR

LOCATION

Check Applicable NC C SIGN DATE REMARKS


ITEMS TO BE CHECKED
Yes No
A. Pre-pour Checks
A1. Drawing Check
A1.1 Drawing status “Good for Construction”

A2. Pre-pour Survey Check


A2.1 Excavation level checked
A2.2 Lean concrete as built level checked
A2.3 Slab level checked
A2.4 Column base level checked
A2.5 Slab soffit level after erecting formwork checked
A2.6 Formwork level / line / verticality / position checked
A2.7 Starter bar location / level checked

A3. Rebar Check


A3.1 Bard dimension (dia, length) checked
A3.2 Bar share, bend checked
A3.3 No. of bars checked
A3.4 Position & spacing of bars checked
A3.5 Rebars securely tightened / bound by tie wires
A3.6 Chairs / supports of correct height
A3.7 Rebar surface free form rust, mortar, grease, oil, dirt etc.
A3.8 Gap for vibrators checked
A3.9 Splice length / location checked
A3.10 Coupler and bar arrangement checked
A3.11 Bar schedule checked, marked off and attached
A3.12 Addl. Bars at openings

A4. Formwork Check


A4.1 Forms made as per approved drawing
A4.2 Formwork alignment / verticality / plumbness checked
A4.3 Cleanliness checked
A4.4 Release oil application checked
A4.5 Blockouts / openings checked
A4.6 Form Tightness / Sealing checked
A4.7 Stability of Staging checked (bracings & ties)
A4.8 Waterstop checked
A4.9 Embedded items position/level/dimension checked
A4.10 Cover to rebar checked
A4.11 Molding strip position/level/dimension checked
A4.12 Concrete joint checked
A4.13 Construction joint checked
A4.14 Form ties/separators/shoring supports checked

A5. Safety check


A5.1 All edges blockouts & openings protected with Hand rails &
Guard rails
A5.2 Working area / Lighting / platforms adequate
A5.3 Access platforms / ladders / ramps adequate
A5.4 Fall protection available (Material & Personal)
A5.5 Proper PPE provided

A6. Machines, Tools and Materials Check


A6.1 Concrete pump & pipes condition checked
A6.2 Hopper/Chutes checked
A6.3 Vibrator-nos, condition checked
A6.4 Sleeve/sunny hose position and clearance checked
A6.5 No. and condition of scoops, floats, rakes, finishing screeds,
etc. checked
A6.6 Lighting arrangement checked
A6.7 Materials for curing (e.g. curing mat / compound) checked

Page 1 of 2
Rebar, Formwork & Concrete Check Sheet

CONSTRUCTION Project POUR NO CONTRACTORS/SUBCONTRACTOR

LOCATION

POUR APPROVAL GIVEN NO YES ________________________________


Check Applicable NC C SIGN DATE REMARKS
ITEMS TO BE CHECKED
Yes No
B. During Concrete Check
B1 Approved mix design / mix proportions used
B2 Slump checked complies with IS456 / MS-3
B3 Temperature checked complies with site quality Plan / MS-3
B4 Cube sampling checked complies with Site Quality Plan /
MS-03

C. Post Concrete Check


C1 Splashed concrete cleaned
C2 Starter bars not bent during form removal
C3 Concrete surface checked
C4 Laitance removed from the construction joint surface
C5 Concrete curing complies with Site Quality Plan / MS-3

D. All Records attached

Note : Tick both boxes (for NC & C) if initial Inspection is unsatisfactory. C: Complies NC: Not Comply

Contractor / Sub-Contractor Representative ___________ _____________ _______________


Name Signature Date

Prepared by : (Site Engineer) ___________ _____________ _______________


Name Signature Date

Verified by : (Site QC Engineer) ___________ _____________ _______________


Name Signature Date

Client ___________ _____________ _______________


Name Signature Date

Page 2 of 2