Sei sulla pagina 1di 1

Halaman 34

LAPORAN KERJA LEMBUR BULANAN

MONTHLY WORKING REPORT Revisi


FORM 1-Apr-13

MONTHLY WORKING REPORT


PT. NESINDO INTEGRATION

N A M E : Hafizh Afriza Project Name : OBC TELKOMSEL


PERIOD : 21 November - 20 Desember 2019

TIME DEDUCT PROJECT SITE SUPERVISOR


DATE TIME OVERTIME CODE NAME ACTIVITY SIGN
IN OUT
- Install OBC Antenna Main Polarisasi Vertical & Horizontal
21-Nov-19 8:12 20:00 Bacan 2 - Install OBC Antenna SD Polarisasi Vertical & Horizontal
- Lifting
Upgradecoaxial
frimware from 5.00.23 to 5.10.18
22-Nov-19 8:12 19:00 Bacan 2
- install clem coax
23-Nov-19 8:12 18:00 Bacan 2 connect
- install coaxial to
grounding clem, wave guide
indoor
- install grounding OBC to grounding bar tower
24-Nov-19 8:12 17:30 Bacan 2
- rubber connection coax to ODU
- finishing instalasi outdoor & indoor
25-Nov-19 8:12 18:30 Bacan 2 - connect coaxial to clem
- waiting pointing direction Mandioli
- install grounding Kit
26-Nov-19 8:12 19:00 Bacan 2 -- setting
PointingQOS, Jumbo
Antenna MainFrame
& SD VR-10 Bacan-2
Direction & Mandioli
Mandioli
- inject License VR-10
27-Nov-19 8:30 20:00 Bacan 2
- Setting VR-10 base on config
28-Nov-19 8:30 5:00 Bacan 2 - Troble shotting OBC integrasi

29-Nov-19 8:30 18:30 Bacan 2 - Migrasi kabel coaxial existing

30-Nov-19 9:30 17:30 Bacan 2 - troble shotting OBC

1-Dec-19 8:30 17:30 Bacan 2 Monitoring OBC collect data ATP

2-Dec-19 8:30 18:00 Bacan 2 - Labelling & dokumentasi foto

3-Dec-19 8:30 19:00 Bacan 2 to madopolo - Travelling


- Update License VR#1 & VR#2 (VR#2 kurang license AMR)
4-Dec-19 8:30 19:30 Madopolo assembling
- trace powerOBC, lifting
source OBC,
DC --> adamounting OBC,
power colar coaxial,
cell & Powerclem
- Update License VR#1 & VR#2 (VR#2 kurang license AMR)
-rectifier
Cut overGenset
ODU Subband D 8GHz to OBC 8GHz polarisasi
5-Dec-19 8:30 19:00 Madopolo - trace power source DC --> ada power colar cell & Power
- Install grounding OBC
Horizontal
rectifier Genset
6-Dec-19 14:00 0:00 Madopolo - Solving
Update ODU
data koneksi
OBC 8GBzAntenna
not macth
ke ODU
with(cek
Core
polararisasi
Unit (karenadan
- Install grounding OBC
Freqkuensi
ada kesalahan
ODU)desain
direction
dari gambar
Mandioli
Pakdan
Arif
Wanatiara
W)
7-Dec-19 0:01 5:00 Madopolo Update data
- Connect Dual koneksi
Source Antenna
VR#2 toke ODU
PDP (cek
Solar polararisasi dan
cell
- Pindah koneksi coaxial dari VR#1 ke VR#2, karena di VR#1
-Freqkuensi ODU)from
Migrasi VLAN direction
iPASOMandioli
1000 todan
VR#2Wanatiara
8-Dec-19 20:00 8:00 Madopolo belum ada license AMR
- Back to Back patchcord from iPASO to VR
-- Pindah koneksi coaxial
Receive Local Material New from VR#2 to iPASO 1000 slot
9-Dec-19 0:01 0:00 Madopolo - Change connection Coaxial from iPASO 1000 to VR
13,14 existing 8GHz
- cek stability CH-8
Link OBC Polarisasi Horizontal
10-Dec-19 8:30 17:30 Madopolo - Koordinasi wanatiara

11-Dec-19 8:30 19:30 Madopolo - Konek OBC vertical, labelling

12-Dec-19 8:30 19:00 Madopolo to DMT Wanatiara - Travelling & Cek Material
- Coordination
13-Dec-19 8:30 17:30 Office Wanatiara
-- Assembling
induction K3OBC
with staf K3
14-Dec-19 7:30 17:00 DMT Wanatiara - Coordination space VR-10
- install OBC Main & SD
-- CO
Install
FromMounting OBC to
Transducer Main & SDPolaristion Vertical at
Hybrid
15-Dec-19 7:30 16:30 DMT Wanatiara Coordination
- Upgrade to Reposisi UPS Wanatiara for Space iDU VR
firmware
Antenna Main & SD direction Madopolo
insert VR-10
- Install to Rack
grounding OBCBTS
Main & SD
16-Dec-19 7:30 17:30 DMT Wanatiara - Connect Subband J & H 7GHz to Hybrid at Antenna Main &
- Install Clem Coaxial
SD
17-Dec-19 7:30 20:00 DMT Wanatiara - Clem Coaxial
- Connect OBC to Tranducer Polarisation Horizontal at
- Labelling
18-Dec-19 7:30 17:30 DMT Wanatiara Antenna Main & SD
Configure Coax existing
- Troubleshooting From
2 Channel iPASO1000
7GHz existing, to
dueVR-10
RSL Main /
- Inject License AMR
19-Dec-19 7:30 17:30 DMT Wanatiara SD Blank, check konector Ant main kabel no 4
- Setting VR-10
20-Dec-19 7:30 17:30 DMT Wanatiara - troble shooting 2 channel

TOTAL

Note : Overtime calculation base on Working Day and Holiday


(see attachment list)

Checked by, Approved by,

(Dept. Manager) (Direktur)

Potrebbero piacerti anche