Resetting: Correct deficiencies indicated by tests and completely retest work affected
by such deficiencies. Verify by the system test that the total system meets the
specifications and complies with the applicable standards.
3.8 Training
Training shall be carried out to an approved training manual Separate training shall be
provided on the hardware and software. Each training shall have both class room
session and hands on session. Contractor shall allow for 6 trainees each in both the
trainings.
1.0 GENERAL
2.0 PRODUCT
2.1 General
2.2 Ceiling mounted loudspeaker
2.3 Wall mounted loud speaker
2.4 Sound Processor
2.5 Power Amplifier
2.6 Desktop Paging Station (PSD)
2.7 Life Safety Interface
2.8 Message Server
2.9 Networking Components
3.0 INSTALLATION
1.0 GENERAL
This section describes the basic requirements for the supply, installation, testing and
commissioning of fully functional Public address & voice evacuation system for the
project.
The system is to be supplied with all equipment, hardware, software, cabling and
ancillary services as required to provide an integrated system complete and
functional in all respects. The tenderers are to familiarize themselves with all matters
related to such requirement and to account for such in the tendered price.
The response shall clearly detail all pricing for components, cabling, installation,
engineering,
Training, commissioning, setting to work, and 12 months comprehensive warranty.
The following minimum standards are referred to in this Part, and shall be
complied with:
BS 6840 Sound system equipment
BS 7671 Requirements for electrical installations
ISO 9000 Quality management and assurance standards
1.2 Documentation
The following are the list of documentations required as minimum under this
contract.
The Contractor shall include a detailed list of recommended spare parts required
for 2 years.
1.2.2 Workshop Drawings
Lay out drawings shall have complete details with cable sizing, cable routing,
containment sizing, location of equipment, power requirements for system
components, etc.
Descriptive data of all operating, user and application software including complete
operators manuals, programmers manuals, and alphanumeric point name
convention sheet.
Shall include CV's of trainers, brief description of the installed system, preventive
and breakdown maintenance procedures and training mode.
The manufacturer shall be ISO-9002 and ISO 9001 certified for Quality Assurance
in Production, Installation and Servicing.
The specialist shall obtain and submit a written undertaking from the manufacturer
that the spare parts of the system proposed will be made available upon request for
at least 10 years from the date of substantial completion. In addition, the
manufacturer shall undertake to ensure forward Compatibility of the proposed
equipment for at least 15 years
2.0 PRODUCTS
All components of the proposed system shall be from one of the approved
manufacturers. In the event of unavoidable use of a third party product, the base
manufacturer shall undertake the responsibility for the same and include the said
third party component in the 20 year certification.
2.1 General
All the speakers shall be listed to ANSI/UL 1480-2005 & shall be approved by
QCDD
These loudspeaker shall be used for installation on walls and other flat, solid
surfaces.
When used with optional junction boxes (wall- mount bracket variant only), ceramic
terminals and thermal fuse, the loudspeaker shall meet numerous standards for
combination music and evacuation systems around the world.
All the speakers shall be listed to ANSI/UL 1480-2005 & shall be approved by
QCDD
The amplifier shall contain all solid-state circuitry, using MOSFET output devices
employing Class-D topology and a current and voltage feedback loop circuit. The
amplifier shall incorporate a switch-mode power supply with fast-tracking power
factor correction (PFC) that will allow full-rated power from AC outlets ranging from
100 - 240 V, 50/60 Hz. The amplifier shall have an IEC 60320-C20 16/20-amp
electrical power inlet and shall be equipped with a removable power supply cord.
The amplifier shall include protection from shorted and open loads, general
overheating, DC, high-frequency overloads, under/over voltage and internal faults.
The amplifier shall contain eight independent amplifier channels, which can be
configured to allocate the 4000 watts total rated output power between 2 and 8
channels. The amplifier shall contain variable speed fans, which are automatically
controlled to minimize acoustic noise. Fan airflow direction will be from the front
panel to the rear panel and should not require air filtering.
Rack mounting of multiple amplifiers shall be possible without extra rack spacing
for ventilation. The amplifier shall be capable of continuous operation at 1/3 of rated
power into 4-ohm loads, in ambient temperatures up to 104° F (40° C). The typical
current draw at 1/3-rated power shall be 15 amps with 20 VAC and 7.5 amps with
230 VAC.
Must have Ethernet connectivity for network control and monitoring of multiple
version amplifiers.
dB/octave
- Loudspeaker EQ 9-band PEQ (+/- 20 dB), shelving, high
pass, low
pass
- Maximum Output Delay 3s
- Output Limiter Peak and RMS voltage
- Operating Temperature 0 °C - 40 °C
- Cooling System Microprocessor-controlled, variable-
speed fans,
front to rear airflow
Each PSD shall be Power over Ethernet (PoE), Class‐3, and wired to the CobraNet
VLAN.
Each PSD shall have ten buttons (0 through 9, telephone‐style), for the purposes of
entering three digit page codes and security codes. PSD10 shall also include a
large round push‐to‐talk button and LEDs to indicate “wait” and “talk now.”
Each PSD shall be equipped with a high quality dynamic cardioid (unidirectional)
element, with integral secondary element for signal path testing, mounted on a
flexible gooseneck.
Each PSD shall have integral DSP functions: 5‐band parametric filters and
compressor/limiter.
Each PSD shall have internal memory, sufficient to store delayed pages of up to
120 seconds duration, as well as four preamble WAV files.
Each PSD shall have a backlit LCD display, indicating page code (program)
selected, availability of destination zones and security code entry, as well as other
optional information.
Each PSD shall be capable of storing a live page message, when some destination
zones are busy. The PSD shall release the message when all destination zones
become available.
Each PSD shall have the ability to report and log any and all failure conditions
associated with its operation.
Each PSD shall have the ability to be used for infinite live paging.
Each PSD shall have the ability to store a message from the microphone input and
give the end user the ability to replay the message with an adjustable repetition
count and/or repetition length.
Each PSD will provide an auxiliary port that can be used to input audio, control data
(RS-232), relay input for triggering page codes and support for auxiliary
microphones (AM) and Paging Station Interfaces (PSI).
2.7 Life safety Interface
The life safety interface shall be designed exclusively for use with Biamp® Vocia
systems. The life safety interface shall provide a networked emergency interface to
third-party emergency and alarm systems. It shall have redundant power supply
and network connections. The life safety interface shall be powered from a certified
24V DC power source or over Ethernet (PoE) via either of two network ports. The
life safety interface shall have eight monitored I/O and eight control inputs. The life
safety interface shall offer up to 20 discrete emergency inputs, 16 of which shall be
programmable to play an emergency message, enable a zone reset or zone
silence. The life safety interface shall provide up to 10 inputs per emergency zone.
The life safety interface shall be UL listed and shall be compliant with the RoHS
directive. Warranty shall be minimum five years.
The Message Server is a device that supports advanced paging functionality such
as prerecorded message storage, scheduled events, third party control interfacing,
storage of logged system data, auto configuration of replacement devices, inter PS
paging & control, time server support and VoIP telephone paging.
Each MS shall have a hard drive with minimum capacity of 80 GB, for storage and
playback of recorded announcements and preambles.
Each MS shall act as a Configuration Server for the entire PS, and have the ability
to automatically program replacement devices, as needed.
Each MS shall include a VoIP Trunk Server, and support SIP (Session Initiation
Protocol) calling, for purposes of telephone based paging.
Switches, PA racks, cables, mounting equipment’s etc. and all other equipment’s
required to achieve the complete functioning of public address/voice evacuation
system shall be provided by the specialist employed by the contractor for the
system design, execution & commissioning.
3.0 INSTALLATION
2 Wiring shall be carried out using multi-core and twisted pair conductors as
indicated on the drawings. Wires/cables shall be enclosed in conduits
and/or trunking. Vertical cable distribution cabling shall be on cable ladders.
Cabling, conducting and trunking shall be in conformity with the relevant
Specifications.
3 Cable terminations, components and junction boxes shall have identification tags,
indicating polarity and function in a consistent manner throughout the system so
that it can be cross- referenced with the ‘AS-BUILT’ drawings and
MANUFACTURER's diagrams.
4 Signaling cables shall be electrically and physically separated and isolated from
the mains voltage cables. Microphone cables shall be separated from the
2 The test instruments and personnel to conduct the test shall be provided by the
CONTRACTOR.
1 The CONTRACTOR shall be responsible for the system maintenance and repair
of any fault for a period of 400 days starting from the provisional handing over.
During this period the CONTRACTOR shall replace and/or repair any fault
with all spare parts without any cost to the EMPLOYER.
2 The CONTRACTOR shall guarantee the system for a period of 400 days.
During this period the CONTRACTOR shall clear any failure due to
design problems or poor installation and workmanship.
3.4 Training
2 The CONTRACTOR shall submit a detailed training program which shall include
theoretical and practical training for 1 month for personnel to be deputed by the
EMPLOYER, at the end of the guarantee period, in addition to the Employer’s
personnel participation in the installation and testing stages as specified earlier,
and maintenance during the GUARANTEE period of 400 days.
1.0 General
1.1 Scope of Supply
1.2 Essential functions of BMS System
1.3 The Management Level
1.4 The Automation Level
2.0 Products
2.1 General
2.2 Hardware Requirement
2.3 Networking features
2.4 DDC Controller
2.5 Portable Operator terminal
2.6 Temperature Sensors
3.0 Execution
3.1 Documentation
3.2 Services
3.3 Engineering/Planning