Sei sulla pagina 1di 8

Latest construction rates for house and material prices

February 23, 2018 By Mohsin Munir In Construction Materials, House Construction cost, House construction guide 27 Comments

June 2018 Market Latest Construction Rates


In this sticky blog, our team will regularly update latest construction rates along with main material prices
for house construction in and around Lahore and Islamabad region.
Lahore construction market
Labor contracts

Labor Cont Electrician Plumber Wood work Polish work Painter


Steel
Covered Covered area Covered Covered Covered Covered
fixer
area rate rate area rate area rate area rate area rate

280 Rs/ft² 20 Rs/ft² 20 Rs/ft² 6000 60 Rs/ft² 30 Rs/ft² 50 Rs/ft²


Rs/ton

June 2018 Market Construction Rates with Material contracts

Grey structure Grey structure with finish Grey structure with finish
Grey structure
basement Covered A grade Covered area A+ grade Covered area
Covered area rate
area rate rate rate

1400 Rs/ft² 2100 Rs/ft² 2600 Rs/ft² 2900 Rs/ft²

June 2018 Market Construction Material Rates

Bricks Awwal Cement/bag Sand Chenab Steel Grade 60 Crush Sargodha plant

Rs 9000/1000 Rs 550 – Rs 575 29 Rs/ft³ Rs 98000/ton 78 Rs/ft³

Islamabad construction market


Labor contracts

Labor Cont Electrician Plumber Wood work Polish work Painter


Steel
Covered Covered area Covered Covered Covered Covered
fixer
area rate rate area rate area rate area rate area rate

260 Rs/ft² 18 Rs/ft² 18 Rs/ft² 5000 50 Rs/ft² 25 Rs/ft² 45 Rs/ft²


Rs/ton
June 2018 Market Construction Rates with Material contracts

Grey structure Grey structure with finish


Grey structure Grey structure with finish
basement Covered A+ grade Covered area
Covered area rate A grade Covered area rate
area rate rate

1550 Rs/ft² 2100 Rs/ft² 2600 Rs/ft² 2900 Rs/ft²

June 2018 Market Construction Material Rates

Bricks Awwal Cement/bag Sand Ghazi Steel Grade 60 Crush Margalla

Rs 9500/1000 Rs 500 – Rs 535 26 Rs/ft³ Rs 97000/ton 43 Rs/ft³


Share this:

 Click to share on Twitter (Opens in new window)


 34Click to share on Facebook (Opens in new window)34
 Click to share on Google+ (Opens in new window)

Like this:

Related

Cost for Grey structure house construction


October 20, 2017
In "House Construction cost"

Construction guide 5 Labor & Material procurement for your dream house
September 29, 2017
In "Construction Materials"
Construction cost difference in economical and premium grade grey structure
June 10, 2018
In "House Construction cost"

About The Author

Mohsin Munir
Holding a degree in BS EE (Electrical engineering) and astounding knowledge of house construction business since 2010,
wide experience and relevant expertise in the construction business. Believe in research based strategy while holding a
distinguished position in the construction market. Started at a small scale in 2010 and recognised among the top builders
and contractors in Pakistan now, especially among the expatriates and overseas Pakistanis who always trusted in our
commitment and services.

27 Comments

Arfan on May 14, 2018

Which is better bricks or blocks for home construction

Loading...

Reply

Mohsin Munir on May 14, 2018

Dear Arfan,
Both are fine. However if you talk about superior, then it is definitely good quality bricks.

Loading...

Reply

Adnan Mir on May 2, 2018


what are the finished in simple and a class finish (Rs 2100/ft2 & Rs 2600/ft2)

Loading...

Reply

Aehtisham Shah on April 19, 2018

Really appreciate your work n videos of construction would like to talk in details with you if I can have your number
regards aehtisham 03477372777

Loading...

Reply

Mohsin Munir on April 19, 2018

Thanks Aehtisham shb for kind words.

Loading...

Reply

Raza on April 12, 2018

What all is included in Rs.3000 per square foot construction rate in Islamabad?

Loading...

Reply

Mohsin Munir on April 12, 2018

Turnkey Grey + complete finish.

Loading...

Reply

Raza on April 12, 2018


That’s what I want to know that what all accessories are included in Turnkey Grey + complete finish.

Loading...

Reply

Mohsin Munir on April 12, 2018

It is a long list of around 70 to 75 materials/items/specifications. In blogs section you can


find a sample bill if material in one of the blogs under heading “turnkey contract builder
selection and agreement”

Loading...

Reply

Raza on April 13, 2018

I have gone through the blog, thanks. Kindly guide me what all electric appliances
might be included in this rate as it is the highest rate of construction in market. I
mean like Gas heaters etc etc…..
Regards

Loading...

Mohsin Munir on April 13, 2018

Every builder has its own bill of material. Electric appliances in the highest market
rate must include all exhaust fans, branded hobs and hoods, branded builtin micro
and elec+gas oven, fans.

NAKKASH on April 11, 2018

ASSALAM O ALEKUM Dear sir i want to know the estimate cost of grey struacture + finishing work of 520 square
feet covered area with ground and first floor (A grade).

Reply

Mohsin Munir on April 11, 2018

We already have detailed blogs on grey structure and finishing costs


Reply

Muhammad Raihan on March 30, 2018

I tried to contact you at mentioned numbers of Isamabad and Lahore but no one picks the phone. Any personal
mobile number to contact.

Reply

Mohsin Munir on March 30, 2018

You can contact me directly at 00923334852240

Reply

Zaheer on March 26, 2018

Dear Mohsin since you are not operating in karachi, could you recommend professional construction company like
yours ?
Thank you
Zaheer

Reply

Mohsin Munir on March 26, 2018

Sir i follow kamdar realtors and rizwan sadiq architects on facebook and i think there work is quite
professional.

Reply

Zaheer on March 26, 2018

Thank you Mohsin. I will connect with them. Best Regards

Reply


Ahsan on March 21, 2018

I Must Thank you for amazing information Videos full of knowledge and guidance. Jazaka’Allah

Reply

Mohsin Munir on March 21, 2018

Thanks a lot Ahsan for kind words. Share within your family and friends circle too who are willing to
construct their houses in near future.

Reply

Shakeel on March 15, 2018

What will be labor rate if the house has already been constructed upto dpc level. Please guide.

Reply

Mohsin Munir on March 16, 2018

Should be around 225 to 235 Rs /sq.ft

Reply

Nadeem abbas on March 14, 2018

Pls send me good rate

Reply

Mohsin Munir on March 14, 2018

Good rate for?

Reply


Zain ul Abidin on March 3, 2018

Mohsin, is this the construction rate that we will incur or the rate at which you guys will build the house for us?
Thanks. And u guys are doing an amazing job Masha Allah!

Reply

Mohsin Munir on March 5, 2018

Dear Zain ul Abidin.


As mentioned these are prevailing market rates currently. However out of these rates, we only provide
turnkey contract services. And yes we will work approximately at these rates too. Final rates are decided
after lengthy meetings and in depth reading of working and structural drawings.

Potrebbero piacerti anche