Sr.

Equipment / Material
1 Dehumidifier
2 AHU
3 Centrifugal fan for AHU / Dehumidifier
4 Copper Pipe (VRF)
5 Hard PVC Pipes (VRF)
6 G.I. Sheet
7 Grille / Diffuser / Jet Nozzle
Insulation Material:
8 a) Nitrile Rubber
b) Exp. Polystyrene
(Thermocol)
Electrical:
a) Motor
b) Motor starter / Power switch
c) Multi function meter
d) Push Button
e) Selector Switches
g) Cable
1) Armored Cable
2)Flexible Cable
h) PVC rigid conduits & Accessories

i) Main Distribution Boards


j) Miniature Circuit Breaker
9
k) ELMCB/RCCB
l) Adhesive Tape
m) Cable Lugs
n) Cable gland Single/Double
Compression

o) Cable gland FLP Double Compression


p) Switch gears
q) HRC fuses
r) MCCB / ACB
s) Indicator lamps (LED Type)
t) Cable Tray
u) Misc. Hardware

10 Fan Motor VFD


11 Filter Make
Temperature & Humidity Display - duct
12 mounted
13 Gauges
14 MS / GI pipe
15 Butterfly valve
16 Brass Ball valve
17 Non return valve
18 Pot / Y strainer
19 Balancing Valve
20 Pressure & temperature Gauge
21 Pre-charged expansion Tank assembly
22 Auto Air vent valve
23 Motorized Control valve
24 Thermostat / Temp. Controller
25 Pressure sensor & controller
Makes
Bry-Air / Appidi
Edgetech / Citizen
Nicotra / Kruger
Mexflow / Rajco / Totaline
Supreme / Prince
SAIL / Jindal / Nippon / Llyod Steel
Air product / Fair flow / RTI

Armacell Class 0
Beardsell / Cooline

ABB / Siemens / CG
ABB / Siemens / L&T / Schneider
Conserve/ Siemens / L & T / Schneider
Siemens / L&T / Schneider / Hansu / Baliga
L & T / Salzer / Kaycee

Finolex / Universal / Polycab / RR Kabel


Finolex / Universal / Polycab / RR Kabel
2.0mm thick Precision Plastic Co. ISI and FIA
approved
ABB/MOS/L&T/Merilin Gerin
ABB/MOS/L&T/Merilin Gerin
ABB/MOS/L&T/Merilin Gerin
Bhor (Steel Grip) or approved equivalent
Dowell / Lotus / Jaioson
HMI / Comet / Central Hardware Ind

HMI / Comet / Central Hardware Ind

ABB / Siemens / L&T


ABB / Siemens / L&T
ABB / Siemens / L&T
Teknic / Predifine / Binay
Associated Industries / Globe / Indiana / BG
As approved by EIC / Client / Consultants
Danfoss / Schnider / ABB
Freudenberg / AAF / Dyna
Honeywell / Siemens / JCI
Dwyer
Tata / Jindal / Zenith
Audco / Keystone / Kitz / Honeywell
Leader / Sant / Kitz / Honeywell
Trishul / Audco / Advance / Honeywell
Emerald / Trishul
Advance / Honeywell / Danfoss
Fiebeg / H.Guru / Gluck / GIC
KD / Emerald /Anergy
Rapid / RBM
Honeywell / Siemens
Honeywell / Jhonson / Siemens
Honeywell / Jhonson / Siemens
Project : 2914, GFL, DAHEJ
Subject: HVAC Work -R0

Sr.No Appendix

1 Appendix-A – (Pre Cooling / Cooling / packing area) - AHU-1


2 Appendix-B – (Air Cooled Chiller)
3 Appendix-C – (Oven passage area & connecting passages) - AHU-2
4 Appendix-D – (AHU Cum Dehumidifer -01 for Attic Area )
5 Appendix-E – (Clean Room Partition )
Total

** Electrical Incomer Power to all HVAC electrical panel will be Client scope.
** Epoxy floring in Client scope.
Basic Supply Basic Instalaltion GST Amount
Appendix-A – (Pre Cooling / Cooling / packing area) - AHU-1
Bill of quantities & Price Bid

Rates quoted shall be inclusive of Packing, insurance, transportation, supply, handling at site, installation, testing, co
services, etc, conforming to technical specification & other terms of this Tender.(GST to be given separately )

Note: 1. All type of Loading, Unloading related to HVAC system erection is in Vendor’s scope.
2. Vendor Strictly follows Client's Safety Rules.
Rate
Item No. Item Description Quantity Unit
Supply
1 Section 1: High Side Work

1.01 Supply, installation, testing & Commissioning of air-


cooled condensing units for above AHUs. (Suitable
for operation with R22 refrigerant gas.)

1.01.01 Capacity: 11.0 TR (Scroll type compressor) along 0 Nos


with topping-up of refrigerant gas.

1.01.02 Capacity: 8.5 TR (Scroll type compressor) along 2 Nos


with topping-up of refrigerant gas.

1.01.03 Capacity: 5.5 TR (Scroll type compressor) along 0 Nos


with topping-up of refrigerant gas.

SITC of Factory built and Site assembled floor


1.02 mounted as mentioned below, Chw type double skin
2- tier air handing units complete as per specifications
and of following capacities.

Double skin construction : Inner skin 0.8 mm GI and


outer skin 0.6 mm thk precoated GI. Thickness of
insulation- 45 mm CFC free PUF injected with density
of 40+/-42 kg/cum.
Frame work: Thermal break aluminium profile with
thermal barrier & Coving.
Unit Base ; Heavy Duty GSS
FA Al Damper: Manual Gear operated FA Damper
with 10 micron filter. ( for Dehumidifer 4000 CFM
inlet)

RA Al Damper: Manual Gear Operated RA damper.


Mixing Box for RA & FA
10 micron pre filter.

Drain pan : 18 G stainless steel duly insulated with 13


mm thick nitrile rubber / cross linked polyethylene
4 row deep Chw cooling coil + 4 raw deep chw
cooling coil . ( Coil dia min. 15 mm) (Coil Surface
area ≤ 500 FPM)
Fan Section: DIDW Backward Curved centrifugal fan
Single Blower only), Suitable to operate on variable
frequency drive, EFF-1 motor, v-belts EFF-1
motor(The Fan Section to be provided with double
glass view window, light fixtures and Limit switch),
Screen protection door, fire proof double canvass
connections (Fungal Resistant and Lint free).
Fine Filter: Washable Fine filter section with 5 micron
filter ( 99% down to 5 micron) .

SA Section after Fine Filter : SA section with manual


gear operated SA damper.
The cable to run in a PVC conduit neatly dressed. All
the Cable entry shall have Cable Glands. No
Penetration of the AHU Panel at site is permitted.
All dampers shall be gear type with lock & graduation
arrangement.
Complete Units shall be mounted on suitably rated
neoprene pads.
The details to be read as AHU Tag No. Supply air
Blower CFM, Cooling coil capacity, Minimum no. of
rows, Total static Pressure.
AHU - 1 - 20000 CFM @ 150 mm WG ( Chw Inlet - 0
deg C) Cooling Capacity 26 TR ( 15 TR room Load + 1 Nos
11 TR dehumidifier Load)

Engineering DEHUMDIFIER along with Pre-


1.03 Cooling Coil (8 RD (4 RD+ 4 RD) Face Velocity
across the cooling coil max 500FPM):
For 20000 cfm AHU:
Total appx. 4000 cfm through dehumidifier (Fresh
Air intake through dehumidifier pre-cooling coil
2000 cfm & circulation air appx. 2000 cfm through
return air duct)

External static pr. required at Dehumidifier supply air


damper will be 15-20 mm st.pr. (i.e fan static suitable
for 15-20 mm st. WG + dehumidifier internal air
pressure drop)
Motor Kw Appx: - As per Vendor
Reactivation Air – As per Vendor
Motor Kw Appx: - As per Vendor
Rotor Drive Motor appx. – As per Vendor
Pre cooling coil – 8.5 TR Dx x 2 nos
Reactivation Electrical Heaters – 48 KW
Heater must operate on Thyrister controller.
Along with inbuilt Control panel as per specification.

Inside parameter 15+/-1 deg C Temp & 55+/-5% Rh.


Double skin construction : Inner skin 0.8 mm GI and
outer skin 0.6 mm thk precoated GI. Thickness of
insulation- 45 mm CFC free PUF injected with density
of 40+/-42 kg/cum.
Deh - 01 - Appx 4000 CFM 1 Nos

Supply, installation, testing & commissioning of


weather proof (IP-55) Compartmental type Electrical
panels for catering electrical power supply to all Air
1.04 cooled Condensing units (8.5 TR x 2 nos) and AHU, 1 Nos
dehumidifier, 3way Chilled water valve .Incomer to
panel will be terminated by other agency. Panel should
be complete with main MCCB, MCB,rotary switch,
indicating lamps, bus-bar, ELCB & 1 phase preventer
for each outgoing feeder, 1-Phase switch socket, and
Panel Light shell be provided with panel door
interlock. etc.
Sub Total of Section 1

2 Section 2: Low Side Work


M.S. Structure:
2.01 M.S Structure duly painted for installing above 300 Kg
outdoor unit.

For AHU Cond. system, all refrigerant piping between


AHU & outdoor units duly insulated as per
specifications. All piping inside the room shall be
properly supported with hanger and exposed piping
2.02 shall be properly supported in GI Perforated tray.
Exposed piping insulation to be covered with 1
layer of glass cloth and 2 layers of UV paint and all
the insulation joints must be covered with EPDM
Rubber Tape.

2.02.01 For 11 TR 0 Rmt


2.02.02 For 8.5 TR 20 Rmt
2.02.03 For 5.5 TR 0 Rmt

2.03 Supply & Installation of Insulated UPVC drain piping.

2.03.01 For 32 mm dia piping 20 Rmt


2.04 Electrcial Work:-

All Cu armored power cable / control cable / GI


earthing strip between electrical panel to AHUs /
Dehumdifier & Cond ODU’s located in drawings.
1 Lot
This cabling should be properly supported in G.I
Cable trays where-ever required. (distance between
equipment to panel max. 15 Mtr)

Ducting As per IS-655:

2.05
As per IS-655- Ducting complete with hangers, anchor
2.05 fasteners, MS structure for supports of ducting,
guiding vanes, MS angle frame work (TDF flanges
not allowed) only,RTV silicon sealant ducting.

2.05.01 24 G (0.63 mm) 100 Sq.m


2.05.02 22 G (0.80 mm) 250 Sq.m
2.05.03 20 G (1.00 mm) 0 Sq.m
2.05.04 18 G (1.20 mm) (Plenum & bigger size duct) 0 Sq.m
SA Grilles / RA Grilles VCD / Diffuser/ Dampers,
2.06
etc:
S.A/R.A grille with VCD in aluminum extruded
2.06.01 0 Sq.m
construction duly powder coated
S.A/R.A grille without VCD in aluminum extruded
2.06.02 0 Sq.m
construction duly powder coated.
S.A/R.A Diffuser with VCD in aluminum extruded
2.06.03 0 Sq.m
construction duly powder coated
S.A/R.A Diffuser without VCD in aluminum extruded
2.06.04 0 Sq.m
construction duly powder coated.
2.06.05 G.I. duct dampers 4 Sq.m
2.06.06 Aluminum VCD 0 Sq.m
Supply/ Installation / Testing / Commissioning of Fire
2.06.07 2 Set
Retardent Rexin Duct Flexible Connection.

Supply & installation of 18 G GI pre-coated return air


riser with return air filter (10 micron), Al. p1erforated
2.06.08
grille, VCD, etc. Bottom of riser should be with
suitable coving.(consider riser height 3.6 m)

2.06.08.01 18 G GI sheet 0 Sq.m


RA Assembly : Al. p1erforated grille, Air Filter(10
2.06.08.02 8 Sq.m
micron) & VCD.
2.06.09 Hepa Filter box

HEPA filter box fabricated from M.S. powder coated


along with following size of 0.3 micron Super HEPA
12 Nos
filter, SS-304 perforated sheet, VCD, test point, rexin
conn., etc. (with Super Hepa 600 x 600 x 300 mm )

2.07 Thermal & Acoustic Insulation of ducting:


Thermal Insulation of ducting with fire-retardant
Class-O nitrile rubber as per specifications given.
(Armacell Only)
2.07.01 57 mm thick ( 32 mm + 25 mm ) 400 Sq.m
Supply & installation of 50 mm thk ‘TF’ quality
thermocole for exposed duct insulation with send
2.08 0 Sq.m
cement plaster along with UV paint. (Thermocole
Density : 16-18 Kg/m3)
Refrigerant piping accessories & instruments like
thermostatic expansion valves filter drier, solenoid
2.09 2 Lot
valve, thermostat, humidistat, safety thermostat, angle
valve, etc. required for above AHUs.
Magnahelic type diff. pressure gauge required in
2.10 3 Nos
weather proof box across the filter / Room.
DQ / IQ / OQ / PQ / SOP document for all above AHU
2.11 1 Lot
system

Third party validation for complete HVAC system.


2.12 1 Lot
( 15+/-1 deg C, 55+/-5%Rh & ISO Class -7)

Sub Total of Section 2

Basic Total of Section-1 + 2:-


Basic Total Supply + Installation:-

GST Amount:-

Grand Total Supply + Installation including all Taxes & Duty:-


te, installation, testing, commissioning & warranty
given separately )

ope.

Rate Amount
Installation Supply Installation Remark

For Dehumidifier Fresh Air


cooling coil.
Appendix-B – (Air Cooled Chiller)
Bill of quantities & Price Bid

Rates quoted shall be inclusive of Packing, insurance, transportation, supply, handling at site, installation, testing, comm
services, etc, conforming to technical specification & other terms of this Tender.(GST to be given separately )

Note: 1. All type of Loading, Unloading related to HVAC system erection is in Vendor’s scope.
2. Vendor Strictly follows Client's Safety Rules.
Item No. Item Description Quantity Unit

1 Section 1: High Side Work


1.01 Air cooled Scroll chiller (Brine Water ):
Chiller shall consist of multiple scroll compressor, motor, shell &
tube chiller, condenser, refrigerant piping, controls, microprocessor
panel etc. ( including all required chemicals) 1 Nos
Refrigerant : R-22 / Eq
Ref. Capacity : 20 M3/ Hr Flow Rate
Chw temp in/out : 05 / 0 deg C
1.02 0 deg C Chilled Water Pumps:
End Suction back pull out pumps with drive motor EFF-1,
coupling, base frame. (Insulated with 25mm thk Nitrile Rubber)
1.02.01 Flow / Head : 20 M3/ Hr @ 20 M
2 Nos
- Speed : ≤ 2950 RPM
1.03 Expansion Tank:
“Sintex Make” expansion tank insulated with 25 mm thk Nitrile
rubber along with 28 G Al cladding & complete with ball, float 1 Set
valve & other accessories.
Capacity: 500 Ltr
1.04 Electrical Panels:
1.04.01
Supply, installation, testing & commissioning of weather proof (IP-
55) Compartmental type Electrical panels for catering electrical
power supply to all 1 nos. of 22 M3 / Hr @0 deg C flow rate
chillers ,2 nos. (1 working + 1 st.by provision) of chilled water
pumps. Incomer to panel will be terminated by other agency. Panel 1 Nos
should be complete with main MCCB, MCB, multi functional
meter, rotary switch, indicating lamps, bus-bar, 1 phase preventer
for each outgoing feeder, 1-Phase switch socket, and Panel Light
shell be provided with panel door interlock. etc.
. No fuse link allowed in control as well as power use only
MCB/MCCB.
Sub Total of Section 1
PART-II
2.01 Insulated Chilled water piping:
2.01
M.S. ERW class “C” piping including all fittings, flanges, nut bolts
etc. (Insulation (factory fabricated tube shape up to available size)
should cover with help of 28 G Al cladding)
2.01.01 65 mm dia (45 mm thk) 50 Rmt
2.01.02 50 mm dia (32 mm thk) 0 Rmt
2.01.03 40 mm dia (25 mm thk) 0 Rmt
2.01.04 32 mm dia (25 mm thk) 0 Rmt
2.01.05 25 mm dia (19 mm thk) 0 Rmt
2.02 Insulated Valve / strainer for Chw piping: (Insulation should
cover with help of 28 G Al cladding)
2.02.01 C.I. Butterfly valves
2.02.01.01 65 mm dia (45 mm thk) 8 Nos
2.02.01.02 50 mm dia (32 mm thk) 0 Nos
2.02.01.03 40 mm dia (25 mm thk) 0 Nos
2.02.01.04 32 mm dia (25 mm thk) 0 Nos
2.02.01.05 25 mm dia (19 mm thk) 0 Nos
2.02.02 C.I. non-return valve (wafer type)
2.02.02.01 65 mm dia 2 Nos
2.02.03 Balancing valves
2.02.03.01 65 mm dia 1 Nos
2.02.04 “Y” Strainers
2.02.04.01 65 mm dia 3 Nos
2.02.05 Brass type ball valve
2.02.05.01 40 mm dia 0 Nos.
2.02.05.02 32 mm dia 0 Nos.
2.02.05.03 25 mm dia 4 Nos.
2.02.06 Automatic Air Purge valve
2.02.06.01 15 mm dia 2 Nos.
2.02.07 Pressure gauge complete with siphon & cock, S.S. working parts
8 Nos.
(4” dia, 0-7 Kg/cm2)
2.02.08 Mercury-in-steel type temp. Gauge with capillary & s.s. thermo
4 Nos.
well (4” dia & range 0-50 deg C)
2.02.09 Flow Switch 1 Nos.
2.02.10 Temp. Control package for AHU:
Each consists of Globe type 3 way motorized modulating valves
with controller, sensor, wiring and accessories.
Maximum line pr.: 3 Kg/cm2.
Max. pr. drop across valve: 0.4 Kg/cm2
2.02.10.01 Chw flow 20 M3 / Hr appx. valve size 50 mm dia. 1 Nos
2.03 Electrical Work:
Cu armoured power & control cabling work with double
compression gland as per specification. (with Suitable G.I
perforated cable trays with necessary structural supports, anchor
bolts, etc. for the above work & GI strip / wire earthings work )
2.03.01 For 20 m3 / Hr flow rate Chiller 1 Lot
2.03.02 For Pump x 2 Nos 1 Lot
2.04 M.S. Structure:
400 Kg
Duly painted M.S. structure for supports and stands
Sub Total of Section 2
.
Basic Total of Section-1 + 2:-
Basic Total Supply + Installation:-

GST Amount:-

Grand Total Supply + Installation including all Taxes & Duty:-


e, installation, testing, commissioning & warranty
given separately )

ope.

Rate Amount
Supply Installation Supply Installation Remark
otal of Section-1 + 2:-
upply + Installation:-

GST Amount:-

ng all Taxes & Duty:-


Appendix-C – (Oven passage area & connecting passages) - AHU-2
Bill of quantities & Price Bid

Rates quoted shall be inclusive of Packing, insurance, transportation, supply, handling at site, installation, testing, comm
services, etc, conforming to technical specification & other terms of this Tender.(GST to be given separately )

Note: 1. All type of Loading, Unloading related to HVAC system erection is in Vendor’s scope.
2. Vendor Strictly follows Client's Safety Rules.
Rate
Item No. Item Description Quantity Unit
Supply
1 Section 1: High Side Work
Supply, installation, testing & Commissioning of air-
1.01 cooled condensing units for above AHUs. (Suitable
for operation with R22 refrigerant gas.)

1.01.01 Capacity: 11.0 TR (Scroll type compressor) along 5 Nos


with topping-up of refrigerant gas.

1.01.02 Capacity: 8.5 TR (Scroll type compressor) along 0 Nos


with topping-up of refrigerant gas.

1.01.03 Capacity: 5.5 TR (Scroll type compressor) along 0 Nos


with topping-up of refrigerant gas.

SITC of Factory built and Site assembled floor


1.02 mounted as mentioned below, Dx type double skin 2-
tier air handing units complete as per specifications
and of following capacities.

Double skin construction : Inner skin 0.8 mm GI and


outer skin 0.6 mm thk precoated GI. Thickness of
insulation- 45 mm CFC free PUF injected with density
of 40+/-42 kg/cum.
Frame work: Thermal break aluminium profile with
thermal barrier & Coving.
Unit Base ; Heavy Duty GSS
FA Al Damper: Manual Gear operated FA Damper
with 10 micron filter. ( for Dehumidifer 4000 CFM
inlet)

RA Al Damper: Manual Gear Operated RA damper.


Mixing Box for RA & FA
10 micron pre filter.

Drain pan : 18 G stainless steel duly insulated with 13


mm thick nitrile rubber / cross linked polyethylene
4 row deep Chw cooling coil + 4 raw deep chw
cooling coil . ( Coil dia min. 15 mm) (Coil Surface
area ≤ 500 FPM)
Fan Section: DIDW Backward Curved centrifugal fan
Single Blower only), Suitable to operate on variable
frequency drive, EFF-1 motor, v-belts EFF-1
motor(The Fan Section to be provided with double
glass view window, light fixtures and Limit switch),
Screen protection door, fire proof double canvass
connections (Fungal Resistant and Lint free).
Fine Filter: Washable Fine filter section with 5 micron
filter ( 99% down to 5 micron) .

SA Section after Fine Filter : SA section with manual


gear operated SA damper.
The cable to run in a PVC conduit neatly dressed. All
the Cable entry shall have Cable Glands. No
Penetration of the AHU Panel at site is permitted.
All dampers shall be gear type with lock & graduation
arrangement.
Complete Units shall be mounted on suitably rated
neoprene pads.
The details to be read as AHU Tag No. Supply air
Blower CFM, Cooling coil capacity, Minimum no. of
rows, Total static Pressure.
AHU - 1 - 20000 CFM @ 160 mm WG (11 TR X 2 1 Nos
nos working + 1 St.by)

Supply, installation, testing & commissioning of


weather proof (IP-55) Compartmental type Electrical
panels for catering electrical power supply to all Air
1.03 cooled Condensing units (11 TR x 5 nos ( 4 working + 1 Nos
1 st.by) with schedule timer and AHU, . Incomer to
panel will be terminated by other agency. Panel should
be complete with main MCCB, MCB,rotary switch,
indicating lamps, bus-bar, ELCB & 1 phase preventer
for each outgoing feeder, 1-Phase switch socket, and
Panel Light shell be provided with panel door
interlock. etc.
Sub Total of Section 1

2 Section 2: Low Side Work


M.S. Structure:
2.01 M.S Structure duly painted for installing above 600 Kg
outdoor unit.
For AHU Cond. system, all refrigerant piping between
AHU & outdoor units duly insulated as per
specifications. All piping inside the room shall be
properly supported with hanger and exposed piping
2.02 shall be properly supported in GI Perforated tray.
Exposed piping insulation to be covered with 1
layer of glass cloth and 2 layers of UV paint and all
the insulation joints must be covered with EPDM
Rubber Tape.

2.02.01 For 11 TR 50 Rmt


2.02.02 For 8.5 TR 0 Rmt
2.02.03 For 5.5 TR 0 Rmt

2.03 Supply & Installation of Insulated UPVC drain piping.

2.03.01 For 32 mm dia piping 10 Rmt


2.04 Electrcial Work:-

All Cu armored power cable / control cable / GI


earthing strip between electrical panel to AHUs &
Cond ODU’s located in drawings. This cabling should
1 Lot
be properly supported in G.I Cable trays where-ever
required. (distance between equipment to panel max.
15 Mtr)

Ducting As per IS-655:

As per IS-655- Ducting complete with hangers, anchor


2.05 fasteners, MS structure for supports of ducting,
guiding vanes, MS angle frame work (TDF flanges
not allowed) only,RTV silicon sealant ducting.

2.05.01 24 G (0.63 mm) 300 Sq.m


2.05.02 22 G (0.80 mm) 250 Sq.m
2.05.03 20 G (1.00 mm) 0 Sq.m
2.05.04 18 G (1.20 mm) (Plenum & bigger size duct) 0 Sq.m
SA Grilles / RA Grilles VCD / Diffuser/ Dampers,
2.06
etc:
S.A/R.A grille with VCD in aluminum extruded
2.06.01 0 Sq.m
construction duly powder coated
S.A/R.A grille without VCD in aluminum extruded
2.06.02 0 Sq.m
construction duly powder coated.
S.A/R.A Diffuser with VCD in aluminum extruded
2.06.03 0 Sq.m
construction duly powder coated
S.A/R.A Diffuser without VCD in aluminum extruded
2.06.04 0 Sq.m
construction duly powder coated.
2.06.05 G.I. duct dampers 4 Sq.m
2.06.06 Aluminum VCD 0 Sq.m
Supply/ Installation / Testing / Commissioning of Fire
2.06.07 1 Set
Retardent Rexin Duct Flexible Connection.

Supply & installation of 18 G GI pre-coated return air


riser with return air filter (10 micron), Al. p1erforated
2.06.08
grille, VCD, etc. Bottom of riser should be with
suitable coving.(consider riser height 3.6 m)

2.06.08.01 18 G GI sheet 0 Sq.m


RA Assembly : Al. p1erforated grille, Air Filter(10
2.06.08.02 8 Sq.m
micron) & VCD.
2.06.09 Hepa Filter box

HEPA filter box fabricated from M.S. powder coated


along with following size of 0.3 micron Super HEPA
2.06.09.01 8 Nos
filter, SS-304 perforated sheet, VCD, test point, rexin
conn., etc. (with Super Hepa 600 x 600 x 300 mm )

HEPA filter box fabricated from M.S. powder coated


along with following size of 0.3 micron Super HEPA
2.06.09.02 8 Nos
filter, SS-304 perforated sheet, VCD, test point, rexin
conn., etc. (with Normal Hepa 600 x 600 x 300 mm )

2.07 Thermal & Acoustic Insulation of ducting:


Thermal Insulation of ducting with fire-retardant
Class-O nitrile rubber as per specifications given.
(Armacell Only)
2.07.01 32 mm 600 Sq.m
Supply & installation of 50 mm thk ‘TF’ quality
thermocole for exposed duct insulation with send
2.08 0 Sq.m
cement plaster along with UV paint. (Thermocole
Density : 16-18 Kg/m3)

Refrigerant piping accessories & instruments like


thermostatic expansion valves filter drier, solenoid
2.09 5 Lot
valve, thermostat, humidistat, safety thermostat, angle
valve, etc. required for above AHUs.
Magnahelic type diff. pressure gauge required in
2.10 2 Nos
weather proof box across the filter / Room.
DQ / IQ / OQ / PQ / SOP document for all above AHU
2.11 1 Lot
system

Third party validation for complete HVAC system.


2.12 1 Lot
( 24+/-1 deg C, NMT 70%Rh & ISO Class -8)

Sub Total of Section 2

Basic Total of Section-1 + 2:-


Basic Total Supply + Installation:-
GST Amount:-

Grand Total Supply + Installation including all Taxes & Duty:-


te, installation, testing, commissioning & warranty
given separately )

ope.

Rate Amount
Installation Supply Installation Remark

For Dehumidifier Fresh Air


cooling coil.
Appendix-D – (AHU Cum Dehumidifer -01 for Attic Area )
Bill of quantities & Price Bid

Rates quoted shall be inclusive of Packing, insurance, transportation, supply, handling at site, installation, testing, comm
services, etc, conforming to technical specification & other terms of this Tender.(GST to be given separately )

Note: 1. All type of Loading, Unloading related to HVAC system erection is in Vendor’s scope.
2. Vendor Strictly follows Client's Safety Rules.
Rate
Item No. Item Description Quantity Unit
Supply
1 Section 1: High Side Work
Supply, installation, testing & Commissioning of air-
1.01 cooled condensing units for above AHUs. (Suitable
for operation with R22 refrigerant gas.)

1.01.01 Capacity: 11.0 TR (Scroll type compressor) along 0 Nos


with topping-up of refrigerant gas.

1.01.02 Capacity: 8.5 TR (Scroll type compressor) along 0 Nos


with topping-up of refrigerant gas.

1.01.03 Capacity: 5.5 TR (Scroll type compressor) along 1 Nos


with topping-up of refrigerant gas.
1.02 AHU cum Engineering DEHUMDIFIER

Supplying of Factory built and Site assembled


floor mounted as mentioned below, Dx type
double skin AHU cum Engineering DEHUMDIFIER
units complete as per specifications and of
following capacities.

Double skin construction : Inner skin 0.6 mm GI


and outer skin 0.8 mm thk precoated GI.
Thickness of insulation- 45 mm CFC free PUF
injected with density of 40+/-42 kg/cum.
Frame work: Thermal break aluminium profile
with thermal barrier & Coving.
Unit Base ; Heavy Duty GSS
FA Al Damper: Manual Gear operated FA Damper
with 10 micron filter.

RA Al Damper: Manual Gear Operated RA damper


Mixing Box for RA & FA
Filtration bank : 10 Micron Only
DESICCANT ROTOR with servo motor as per
specification.
Reactivation Air Chamber with 90% down to 10
Micron filter DIDW Backward Curved centrifugal
fan Single Blower only), Suitable to operate on
variable frequency drive, EFF-1 motor, v-belts
EFF-1 motor(The Fan Section to be provided with
double glass view window, light fixtures and Limit
switch), Screen protection door

Heater Bank : Heater must be operating on


Thyrister controller.Along with inbuilt Control
panel as per specification. ( Microprocessor
based PLC with HMI for Fault indication)
Reactivation Air FA & Exhaust Air Al Damper
Drain pan : 18 G stainless steel duly insulated
with 13 mm thick nitrile rubber / cross linked
polyethylene
Post Cooling Coil 6 row deep Dx cooling coil –
Multiple distributors. (Coil Surface area ≤ 500
FPM)

Fan Section: DIDW Backward Curved centrifugal


fan Single Blower only), Suitable to operate on
variable frequency drive, EFF-1 motor, v-belts
EFF-1 motor(The Fan Section to be provided with
double glass view window, light fixtures and Limit
switch), Screen protection door, fire proof double
canvass connections (Fungal Resistant and Lint
free).
SA Section after fine filter: SA section with
manual gear operated SA damper.

The cable to run in a PVC conduit neatly dressed.


All the Cable entry shall have Cable Glands. No
Penetration of the AHU Panel at site is permitted.
All dampers shall be gear type with lock &
graduation arrangement.
Complete Units shall be mounted on suitably
rated neoprene pads.
1.02.01 For Attic Area Nos 1

Supply Air Qty : 1800 CFM External static pr.


required at Dehumidifier supply air damper will
be 25 mm st.pr. (i.e fan static suitable for 25 mm
st. WG + dehumidifier internal air pressure drop)
Supply Air Blower Motor :EFF-1 ( Motor RPM <
1450 )
Return Air Qty : Appx. 1800 CFM
Reactivation Air – As per Vendor ( Motor RPM <
1450 )
Post Cooling Coil 6 row deep : Appx. 5.5 TR
Reactivation Heaters – Appx. 12 KW Heater must
be operating on Thyrister controller.
Along with inbuilt Power & Control panel as per
specification. ( Microprocessor based PLC
with HMI for Fault indication)

Note: Single incomer given from HVAC local


electrical panel to dehumidifer power panel.
( rest all dehumidifier internal isolation switch
(i.e. for primary fan, reactivation fan, heater bank,
3 way control valve for pre & post cooling coil
with temperature contoller / sensor etc ), power
& control cabling are part of the dehumidifier)

Dehumidifer Active Air - Appx. 600 CFM + ( 1200


CFM By pass air). Room Set Point 28+/-2deg C &
45+/-5%Rh.

Supply, installation, testing & commissioning of


weather proof (IP-55) Compartmental type Electrical
panels for catering electrical power supply to all Air
1.03 cooled Condensing units (5.5 TR x 1 nos) and AHU 1 Nos
cum dehumidifier.Incomer to panel will be terminated
by other agency. Panel should be complete with main
MCCB, MCB,rotary switch, indicating lamps, bus-
bar, ELCB & 1 phase preventer for each outgoing
feeder, 1-Phase switch socket, and Panel Light shell
be provided with panel door interlock. etc.
Sub Total of Section 1

2 Section 2: Low Side Work


M.S. Structure:
2.01 M.S Structure duly painted for installing above 200 Kg
outdoor unit.
For AHU Cond. system, all refrigerant piping between
AHU & outdoor units duly insulated as per
specifications. All piping inside the room shall be
properly supported with hanger and exposed piping
2.02 shall be properly supported in GI Perforated tray.
Exposed piping insulation to be covered with 1
layer of glass cloth and 2 layers of UV paint and all
the insulation joints must be covered with EPDM
Rubber Tape.

2.02.01 For 11 TR 0 Rmt


2.02.02 For 8.5 TR 0 Rmt
2.02.03 For 5.5 TR 10 Rmt

2.03 Supply & Installation of Insulated UPVC drain piping.

2.03.01 For 32 mm dia piping 10 Rmt


2.04 Electrcial Work:-

All Cu armored power cable / control cable / GI


earthing strip between electrical panel to AHUs /
Dehumdifier & Cond ODU’s located in drawings.
1 Lot
This cabling should be properly supported in G.I
Cable trays where-ever required. (distance between
equipment to panel max. 15 Mtr)

Ducting As per IS-655:

As per IS-655- Ducting complete with hangers, anchor


2.05 fasteners, MS structure for supports of ducting,
guiding vanes, MS angle frame work (TDF flanges
not allowed) only,RTV silicon sealant ducting.

2.05.01 24 G (0.63 mm) 120 Sq.m


2.05.02 22 G (0.80 mm) 0 Sq.m
2.05.03 20 G (1.00 mm) 0 Sq.m
2.05.04 18 G (1.20 mm) (Plenum & bigger size duct) 0 Sq.m
SA Grilles / RA Grilles VCD / Diffuser/ Dampers,
2.06
etc:
S.A/R.A grille with VCD in aluminum extruded
2.06.01 1 Sq.m
construction duly powder coated
S.A/R.A grille without VCD in aluminum extruded
2.06.02 0 Sq.m
construction duly powder coated.
S.A/R.A Diffuser with VCD in aluminum extruded
2.06.03 0 Sq.m
construction duly powder coated
S.A/R.A Diffuser without VCD in aluminum extruded
2.06.04 0 Sq.m
construction duly powder coated.
2.06.05 G.I. duct dampers 0 Sq.m
2.06.06 Aluminum VCD 0 Sq.m
Supply/ Installation / Testing / Commissioning of Fire
2.06.07 1 Set
Retardent Rexin Duct Flexible Connection.

Supply & installation of 18 G GI pre-coated return air


riser with return air filter (10 micron), Al. p1erforated
2.06.08
grille, VCD, etc. Bottom of riser should be with
suitable coving.(consider riser height 3.6 m)

2.06.08.01 18 G GI sheet 0 Sq.m


RA Assembly : Al. p1erforated grille, Air Filter(10
2.06.08.02 0 Sq.m
micron) & VCD.
2.06.09 Hepa Filter box

HEPA filter box fabricated from M.S. powder coated


along with following size of 0.3 micron Super HEPA
0 Nos
filter, SS-304 perforated sheet, VCD, test point, rexin
conn., etc. (with Super Hepa 600 x 600 x 300 mm )

2.07 Thermal & Acoustic Insulation of ducting:


Thermal Insulation of ducting with fire-retardant
Class-O nitrile rubber as per specifications given.
(Armacell Only)
2.07.01 25 mm thk 120 Sq.m
Supply & installation of 50 mm thk ‘TF’ quality
thermocole for exposed duct insulation with send
2.08 0 Sq.m
cement plaster along with UV paint. (Thermocole
Density : 16-18 Kg/m3)

Refrigerant piping accessories & instruments like


thermostatic expansion valves filter drier, solenoid
2.09 1 Lot
valve, thermostat, humidistat, safety thermostat, angle
valve, etc. required for above AHUs.
Sub Total of Section 2

Basic Total of Section-1 + 2:-


Basic Total Supply + Installation:-

GST Amount:-

Grand Total Supply + Installation including all Taxes & Duty:-


te, installation, testing, commissioning & warranty
given separately )

ope.

Rate Amount
Installation Supply Installation
Appendix-E – (Clean Room Partition )
Bill of quantities & Price Bid

Rates quoted shall be inclusive of Packing, insurance, transportation, supply, handling at site, installation, testing, comm
specification & other terms of this Tender.(GST to be given separately )

Note: 1. All type of Loading, Unloading related to HVAC system erection is in Vendor’s scope.
2. Vendor Strictly follows Client's Safety Rules.
Item No. Item Description Quantity

CLEANROOM PART
1.01
100 mm thick Double Skin Partitions with 0.74 mm thk. PPGI sheets
protected by plastic film on both side Filled with Puff insulation of density 850
40 kg/m3 ±2. All neccessory joints will be filled by silicon sealant.Internal
structure will be of GI extruded sections. All neccessory predesigned cutouts
are inclusive.
1.02
50 mm thick Double Skin Partitions with 0.74 mm thk. PPGI sheets
protected by plastic film on both side Filled with Puff insulation of density 275
40 kg/m3 ±2. All neccessory joints will be filled by silicon sealant.Internal
structure will be of GI extruded sections. All neccessory predesigned cutouts
are inclusive.
50 mm thick Walkable Double Skin ceiling. All
neccessory joints will be filled by silicon sealant.Internal structure will be of
1.03 GI extruded sections. All neccessory predesigned cutouts are inclusive. 325

1.03 Coving Part


1.03.01 Aluminum specially designed snap fit coving for wall to wall ceiling. 200
1.03.02 3-Way Corner Coving 100
1.03.03 2D corner Vertical section 350
Flush type 50 mm Double skin door with 1.0 mm PPGI sheets on both side.
Internal structure will be of GI. Section and Door Frame Aluminum Extruded
with 1.4 mm thick section. Puf insulation of Density 40 kg / m 3± 2 with
1.04 flushed double glassed view panel. Door will be fitted with pin type hinges. 30

1.05 Door Accessories


1.05.01 Door Closer 13
1.05.02 Door Lock 13
1.05.03 Door Handle with Push Plate 13
1.05.04 Automatic Drop Seal 13
1.05.05 Kick Plate for Door 13
1.06 VIEW PANELS 30
Double glazed view panels with flush design , with 4mm thick clear glass,
VHB tape, with 1” wide border in black fixed in the partition panel with all
necessary arrangements for moisture control etc.
1.07 Cutout & finishing charges in Clean room ceiling for Lighting fixture /AC 60
outlets & Piping (As per site requirement) (max each Cutout size 650 x 650
mm )
Basic
Basic Total Supply + Insta

GST A

Grand Total Supply + Installation including all Taxes &


ng at site, installation, testing, commissioning & warranty services, etc, conforming to technical

dor’s scope.

Rate Amount
Unit
Supply Installation Supply Installation

Sqm.

Sqm.

Sqm.

Rmt
Nos.
Rmt

Sqm.

Nos.
Nos.
Sets
Nos.
Nos.
Sqm.
Nos

Basic Total :-
Basic Total Supply + Installation:-

GST Amount:-

+ Installation including all Taxes & Duty:-