Survey Date: May-2019 Surveyed By: Habib-ur-Rehman Sr. Associate Engineer (Corr)
ii PSP (Bond) - -
0.52/Miss 0.47/Miss
2 MP-0.10 cc rail x-ing
1.18 1.18
ii PSP (Bond) - -
i PSP (Open) - -
ii PSP (Bond) - -
ii PSP (Bond) - -
MP-24 CP Station
28 1.30/1.30 1.30/1.30
Thana
i Voltage 10 8
PIPE TO SOIL POTENTIAL
(-Volts)
S.No LOCATION Previous Present REMARKS
Nov-18 May-19
ii PSP (Bond) - -
ii PSP (Bond) - -
REMARKS
HABIB UR REHMAN
SURVEYED BY SR. ASSOCT ENGINEER (CORR)
AYISHA SALEEM
VERIFIED BY ENGINEER (CORR),GR III
M.JAVED FAISAL
REVIEWED BY EXEC.TECH.OFFICER (CORR)
SUI NORTHERN GAS PIPELINES LIMITED
CORROSION CONTROL – DEPARTMENT
SUMMARY OF PIPE TO SOIL POTENTIAL
SURVEY
STATUS:
DESCRIPTION PREVIOUS STATUS (Nov-18) PRESENT STATUS (May-19)
Cathodic Protection Level Protected Protected
PSP Spread “ON” Potential (-V) MAX 1.32 MIN 0.85 MAX 1.49 MIN 0.80
Current Drained 0.50 Amps. 0.55 Amps.
Current Density 0.0010 mA/Sq.Ft. 0.0011 mA/Sq.Ft.
Coating Condition Excellent Excellent
Coating Type 3 Layer Polyethylene Coated
Construction Year 2002
COMMENTS:
REMARKS:
HABIB UR REHMAN
SURVEYED BY SR. ASSOCT ENGINEER (CORR)
AYISHA SALEEM
VERIFIED BY ENGINEER (CORR),GR III
M.JAVED FAISAL
REVIEWED BY EXEC.TECH.OFFICER (CORR)