bill of Channa -formworks-2018.10.

17
Formwork to the sides
of 300x400mm tie beams Length Width
Times (m) Area (m2) Unit Rate Amount
(m)

G1 to G4 2.00 9.687 0.400 7.750 m2


G1 to A1 2.00 9.195 0.400 7.356 m2
C1 to C2 2.00 3.037 0.400 2.430 m2
A1 to A3 2.00 7.350 0.400 5.880 m2
G2 to A2 2.00 9.195 0.400 7.356 m2
D2 to D3 2.00 4.013 0.400 3.210 m2
D3 to A3 2.00 6.625 0.400 5.300 m2
C3 to C4 2.00 2.037 0.400 1.630 m2
G4 to C4 2.00 4.748 0.400 3.798 m2
Sub Total of Tie Beam and Columns Unit 01 44.710 m2 808.50 36,147.71

Add Labour Days


for concreting Tie Beam & columns -Unit 1 4.00 Days 1,050.00 4,200.00
Sub total of Tie Beam 40,347.71
Less Advance 11,550.00
Total amount for tie beam & Columns at unit-01 28,797.71
bill of Wahab -Masonary-2019.04.09
Brick Work
Length Hight Area
Times (m) Unit Rate
(m) (m2)

Unit-01
Ground Floor
Living & Dining 1.00 14'-5" ft2
1.00 16'-9" ft2
1.00 16'-0" ft2
Garage 1.00 6'-11" ft2
Kitchen 1.00 8'-9" ft2
1.00 10'-3" ft2
Pantry 1.00 15'-3" ft2
1.00 2'-0" ft2
Servant Barthroom 1.00 3'-4" ft2
1.00 8'-3" ft2
Servant Room 1.00 8'-2" ft2
1.00 6'-10" ft2
Master Bed 1.00 10'-7" ft2
1.00 14'-5" ft2
Bath Room 1.00 2'-9 ft2
1.00 6'-11" ft2
Stair Case 1.00 6'-11" ft2
1.00 16'-0" ft2
0.000
Less for Openings
W1 1.00 ft2
DW1 1.00 ft2
FL1 1.00 ft2
FL2 1.00 ft2
W2 1.00 ft2
0.000
0.000
First Floor
m2
m2
Sub Total of Brick Work- Unit 01 - m2 808.50
DDt. Labour Days
Labour Days for Material Head Transport 31.00 Days 1,500.00
Sub total of Tie Beam
Less Advance
Total amount for BrickWork at unit-01
Amount

46,500.00
(46,500.00)
11,550.00
(58,050.00)
Nos of
Date Rate Amount
Labours

3/11/2019 1.00
3/12/2019 1.00
3/13/2019 1.00
3/14/2019 1.00
3/15/2019 1.00

3/16/2019 1.00

3/17/2019 1.00
3/18/2019 1.00
3/19/2019 1.00
3/29/2019 2.00
3/30/2019 2.00
3/31/2019 2.00
4/1/2019 2.00
4/2/2019 2.00
4/3/2019 2.00
4/4/2019 2.00
4/5/2019
4/6/2019 2.00
4/7/2019 2.00
4/8/2019 4.00
31.00 1,500.00 46,500.00

Total amount for Labour Days 46,500.00


bill of Channa -2019/10/31
Project:Garage Extension at WWTP
1.Formwork to the sides
of 300x300mm tie beams Length Width Height Weight
Times (m) Area (m2) (Kg) Unit Rate
(m) (m)

A1 to A10& B1 to B10- 2.00 54.400 0.300 32.640 m2


External
A1 to A10& B1 to B10- 2.00 53.800 0.300 32.280 m2
Internal
Less for beams 16.00 0.300 0.300 (1.440) m2
A1- B1 to A10-B-10 18.00 3.550 0.300 19.170 m2
Cross beams
A1 to B1 & A10 to B10 2.00 4.150 0.300 2.490 m2
External
Total Formwork Area 85.140 m2 1,000.00

2.Concret for 300x300


mm Tie Beam
A1 to A10/B1 to B10 2.00 54.400 0.300 0.300 9.792 m3
A1- B1 to A10-B-10 10.00 3.550 0.300 0.300 3.195 m3
Cross beams
Total Concrete Volume 12.987 m3 5,000.00
3.Rebar for Beams
T16 6.00 61.900 586.812
60.00 4.150 393.420
T10-Stirrup 983.00 0.800 484.422
Total of Rebar Weight 1,464.65 Kg 25,000.00
Add Labour Days
for Cleaning works and other works 30.00 Days 2,000.00
Sub total of Tie Beam
Less Advance
Total amount for tie beam
Amount

85,140.00

64,935.00

36,616.36

60,000.00
246,691.36

246,691.36