Sei sulla pagina 1di 22

KEY PLAN

DRAWING LIST

DWG.No DRAWING NAME REV ISSUE DATE

PWIB-CV-DWG-221-000 DRAWING LIST 0 21/09/2019

PWIB-CV-DWG-221-200 GENERAL NOTES 1 21/09/2019

PWIB-CV-DWG-221-210 ANCHOR BOLT PLAN 1 21/09/2019

PWIB-CV-DWG-221-211 ANCHOR BOLT DETAILS 1 21/09/2019

PWIB-CV-DWG-221-212 ROOF PLAN 1 21/09/2019

PWIB-CV-DWG-221-216 DIRECTION OF ELEVATION 1&2 1 21/09/2019

PWIB-CV-DWG-221-217 DIRECTION OF ELEVATION 3&4 1 21/09/2019

PWIB-CV-DWG-221-221 ROOF FRAMING PLAN 0 21/09/2019


NOTE
PWIB-CV-DWG-221-213 F1 FRAME @G.L 2 TO 20 1 21/09/2019

PWIB-CV-DWG-221-222 F2 FRAME @G.L 1 & 21 0 21/09/2019

PWIB-CV-DWG-221-223 F2 FRAME @G.L 1 & 21 @ WITH GIRT 0 21/09/2019

PWIB-CV-DWG-221-215 FRAME CONNECTION DETAIL 1 21/09/2019

PWIB-CV-DWG-221-224 SIDEWALL ELEVATION FRAMING @G.L A & G.L C 0 21/09/2019


SIDEWALL ELEVATION FRAMING @G.L B
PWIB-CV-DWG-221-225 0 21/09/2019
FASCIA ELEVATION FRAMING

PWIB-CV-DWG-221-226 PORTAL DETAIL 0 21/09/2019


ROOF MONITOR FRAMING PLAN
PWIB-CV-DWG-221-227 0 21/09/2019
ROOF MONITOR ELEVATION FRAMING

PWIB-CV-DWG-221-228 CRANE BEAM PLAN 0 21/09/2019

PWIB-CV-DWG-221-218 CRANE BEAM DETAIL (1) 1 21/09/2019

PWIB-CV-DWG-221-219 CRANE BEAM DETAIL (2) 1 21/09/2019

PWIB-CV-DWG-221-229 GRATING DETAIL 0 21/09/2019

PWIB-CV-DWG-221-230 OPEN FRAMING DETAIL FOR DOOR & WINDOW; LOUVER DETAIL 1 21/09/2019

PWIB-CV-DWG-221-220 CONNECTION DETAIL (TYP) 0 21/09/2019

TOTAL DRAWING : 22
EPCC PEMBANGUNAN WORKSHOP
PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

DRAWING LIST

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-000 0

CIVIL 1:1 1 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

"X"

"X"
LEG SIZE

NOTE

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

I PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
I Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510
£

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

GENERAL NOTES

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-200 1

CIVIL 1:1 2 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

A4 A4
A1

A5 A5

A3 A3

A2

NOTE

A5 A5

A1
A4 A4

ANCHOR BOLT PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
ANCHOR BOLT PLASTIC CAP NO. PROYEK : 022/EPCC/INKA/2018
BOLT WITH NUT
d DIMEMSIONS (mm)
SIZE COMPONENT
QTY. SYM. THREAD
(d) ID L T1 T2 Th dh hw PRO H PT. INDUSTRI KERETA API (Persero)
PITCH Jl. Yos Sudarso No.71
PRO

Madiun 63112
M24 AB-24 530 160 35 20 42 8 100 395 3 Ø60
T1

M30 AB-30 645 180 40 25 50 9 130 475 3.5 Ø76 PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
H+T2 (MIN 12d)

PLASTIC PIPE & CAP PVC Ø...


PT. ADHI KARYA (Persero) Tbk.
DEPARTEMEN EPC
L

Jl. Raya Pasar Minggu KM.18


Jakarta 12510
PRO
2 THREAD PITCH

50

SIKAGROUT REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL


(NOT BY ATAD)
RC COLUMN
T2

(NOT BY ATAD)

TACK WELD ANCHOR BOLT PLAN


@ 2 POINT
Note : Installations must correct according the table above for projection

NOTE : I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-210 1

CIVIL 1:500 3 of 22
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

NOTE

DETAIL A1 DETAIL A2 DETAIL A3

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

STIFFENER DETAIL PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
DETAIL A5 Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DETAIL A4
REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ANCHOR BOLT DETAIL

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-211 1

CIVIL 1:10 4 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

NOTE

EPCC PEMBANGUNAN WORKSHOP


ROOF PLAN PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

2 PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112
3 4
1
PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
DIRECTION OF ELEVATION Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ROOF PLAN

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-212 1

CIVIL 1:500 5 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

NOTE

DIRECTION OF ELEVATION 1

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
DIRECTION OF ELEVATION 2 Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

DIRECTION OF ELEVATION 1 &2

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-216 1

CIVIL 1:500 6 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

NOTE

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
DIRECTION OF ELEVATION 3 & 4 NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

DIRECTION OF ELEVATION 3 & 4

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-217 1

CIVIL 1:140 7 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

DETAIL X (TYP.)

NOTE

ROOF FRAMING PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112
CABLE BRACING DETAIL (TYP.)

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DETAIL X SECTION 1-1


REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL
³

ROOF FRAMING PLAN

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-221 0

FLANGE STAY WITH LAP FOR ROOF FLANGE STAY WITH LAP FOR ROOF CIVIL 1:500 8 of 22
³ ³
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

DETAIL 1 DETAIL 1

NOTE

EPCC PEMBANGUNAN WORKSHOP


F1 FRAME @G.L 2 TO 20 PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

1
2
PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

ST DETAIL @ HAUNCH (TYP.) SECTION 1-1 ST DETAIL @ INTER RAFTER SECTION 2-2

3 REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

F1 FRAME @G.L 2 TO 20

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-213 1


TYP.
ST @ RIDGE DETAIL 1 (TYP.)
SECTION 3-3 CIVIL 1:140 9 of 22
(FOR RAFTER)
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

DETAIL 3

DETAIL EW DETAIL EW
DETAIL EW DETAIL EW

DETAIL 2

DETAIL 1 DETAIL 1

NOTE

PORTAL 1 PORTAL 1

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
F2 FRAME @G.L 1 & 21
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510
4

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

F2 FRAME @G.L 1 & 21

³
I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-222 0

ST @ RIDGE DETAIL 2 (TYP.)


SECTION 4-4
(FOR ROOF MONITOR)
DETAIL EW (TYP.) SECTION B1-B1 CIVIL 1:140 10 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

F2 FRAME @G.L 1 & 21 WITH GIRT


PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

F2 FRAME @G.L 1 & 21 WITH GIRT

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-223 0

CIVIL 1:140 11 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

DETAIL 3
DETAIL 2

DETAIL 1 (FASCIA)

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

FRAME CONNECTION DETAIL

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-215 1

CIVIL 1:10 12 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
PORTAL 2 PORTAL 1 PORTAL 1 PORTAL 1 PORTAL 2

makam

0+425

0+125
SIDEWALL ELEVATION FRAMING @G.L A

NOTE

PORTAL 2 PORTAL 1 PORTAL 1 PORTAL 1 PORTAL 2

SIDEWALL ELEVATION FRAMING @G.L C EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
A Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

TYP.

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

SIDEWALL ELEVATION FRAMING @G.L A & G.L C

SECTION A-A I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-224 0


FLANGE STAY WITH LAP FOR SIDEWALL
³
CASE 1 CASE 2
ENDWALL BRACING GIRT DETAIL (TYP.) CIVIL 1:500 13 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
PORTAL 2 PORTAL 1 PORTAL 1 PORTAL 1 PORTAL 2

makam

0+425

0+125
SIDEWALL ELEVATION FRAMING @G.L B
NOTE

FASCIA ELEVATION FRAMING


(G.L A&C +1.500m) EPCC PEMBANGUNAN WORKSHOP
PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


A Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

SECTION 1-1 PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
BACK UP-PLATE Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DOUBLE CABLE BRACING DETAIL (TYP.)


REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

SIDEWALL ELEVATION FRAMING @G.L B


FASCIA ELEVATION FRAMING

SECTION 2-2
I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-225 0
SECTION A-A
CASE 1 CASE 2 DIAGONAL BRACING - DOUBLE ANGLE (TYP.)
CIVIL 1:500 14 of 22
ENDWALL BRACING GIRT DETAIL (TYP.)
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

PORTAL DETAIL 1 PORTAL DETAIL 2

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

PORTAL DETAIL

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-226 0

CIVIL 1:500 15 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

ROOF MONITOR FRAMING PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

ROOF MONITOR ELEVATION FRAMING PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
(G.L B ±5.000m) Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

PURLIN ARRESTOR BRACE DETAIL (TYP.)


REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ROOF MONITOR FRAMING PLAN


ROOF MONITOR ELEVATION FRAMING
TYP.

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-227 0

FLANGE STAY WITH LAP (FOR ROOF MONITOR)


CIVIL 1:500 16 of 22
³

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

CRANE BEAM PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

CRANE BEAM PLAN

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-228 0

CIVIL 1:500 17 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
DETAIL C1
(TYP.)

CRANE BEAM DETAIL 1 SECTION 1A-1A NOTE


SECTION 1C-1C
(G.L 2 TO G.L 20) SECTION 1B-1B

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

CRANE BEAM DETAIL 2 SECTION 2A-2A SECTION 2C-2C


SECTION 2B-2B PT. INDUSTRI KERETA API (Persero)
(G.L 1 & G.L 21) Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

CRANE BEAM DETAIL (1)


SECTION A-A
DETAIL C1 I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-218 1
CB SECTION
CIVIL 1:20 18 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
CRANE BEAM DETAIL 3
SECTION 3A-3A NOTE
(G.L 2 TO G.L 20) SECTION 3B-3B SECTION 3C-3C

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI

SECTION 4A-4A SECTION 4B-4B


SECTION 4C-4C NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


CRANE BEAM DETAIL 4 Jl. Yos Sudarso No.71
Madiun 63112

(G.L 1 & G.L 21)


PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

CRANE BEAM DETAIL (2)

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-219 1

CIVIL 1:20 19 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

GRATING PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DETAIL
DETAIL GRATING GRATING SUPPORT
REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

GRATING DETAIL
GRATING DETAIL (TYP.)

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-229 0

CIVIL 1:500 20 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
1
SECTION 1-1 (TYP.)

0+675
makam

0+425

0+125
NOTE

ROLLING DOOR RD1& RD2 DETAIL EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

OPEN FRAMING DETAIL FOR DOOR & WINDOW


LOUVER DETAIL

PWIB-CV-DWG-221-230 1
LOUVER DETAIL (TYP.) I2-COMPONENT MANUFACTURE: (150 x 50 m)

ALU WINDOW FRAMING DETAIL


CIVIL 1:20 21 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
³

0+675
makam

0+425
SE2-X Y D
KP1-X Y D PL - tp
PL - tp A - A
³

0+125
A - A ³
³ ³
³ SIGN SIGN ³

KNEE-MOMENT CONNECTION BETWEEN RAFTER TO COLUMN ENDWALL COLUMN & RAFTER CONNECTION (OR LIGHT FRAME)
VE3 KP1 SE2 SPLICE-MOMENT CONNECTION BETWEEN RAFTER TO INTERIOR COLUMN

NOTE

SPLICE BETWEEN
SPLICE BETWEEN COLUMN TO COLUMN
RAFTER TO RAFTER

SE1-X Y D
PL - tp
A - A
³
EPCC PEMBANGUNAN WORKSHOP
SIGN ³
³ PT. INKA (PERSERO) DI
BANYUWANGI
SE1 RAFTER CONNECTION / COLUMN CONNECTION NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

£ >
PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

£
£
> REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

CONNECTION DETAIL (TYP)

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-220 0

CIVIL 1:1 22 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing

Potrebbero piacerti anche