Project: - Construction / Rehabilitation of Existing Terminal Building

Job Hazard Analysis


PROJECT / TASK: tiles setting CONTRACTOR: VTLC JOB No.:

SUPERVISOR: LOCATION: Gensan City international Airport DATE: 11-18-19

JOB STEP. HAZARDS CONTROL MEASURES ACTION BY

Fall of tiles causing  Restrict height of stack of tiles


Storage of tiles injury to 1.5 m.
 Wear safety shoes.

a) Fall of tiles causing  Tiles should be stacked in cross


Loading, injury. tier in the truck/tractor/ trolley.
transportation and  Speed limit should be observed.
unloading of tiles to  Use safety shoe.
site b) Cut injury due to  Tiles should be handled carefully
edges of tiles with gloves to avoid injury.

a) Improper handling of  Training for handling method


Preparation of adhesive cement should be imparted.
adhesive cement bags.
 Use gloves and dust mask while
b) Adhesive cement dust handling adhesive cement bags.
causing  Wash eyes with clean water if
allergy/eye/injury adhesive cement enters in eyes.

a) Fall of platform/fall of  Working platform should be


Laying of Tiles materials adequate (at least 900mm wide)
and securely tied with the
scaffolding.
 No worker should be allowed to
work under the area where
masonry work is in progress.
 Loose tiles should not be left on
the wall or on working platform
at the end of the day. All placed
tiles should be joined with
adhesive cement.

b) Allergy to hand due to  Gloves should be used to protect


use of adhesive hand.
cement.

a) Tiles dust  Wear a dust mask.


Cutting of Tiles b) Hit by grinding  Install grinder guard.
machine  Use appropriate PPE (Face
shield, apron, gloves and dust
musk) for cutting.
 Training for handling and
operating the grinder machine.

c) Cut injury due to  Tiles should be handled carefully


edges of tiles with gloves to avoid injury

Prepared by: Remon Ma R. Ealdama Reviewed by: Engr. Rey Acabal Date