Sei sulla pagina 1di 5
Enpnomtg fi9712/2019) [Design Engineer Hila Naing [Calculation for [S01 (1) : [Typical Storey Input Data Composite deck type =| Composite deck gage = Deck steel yied, ‘Tak. of topping, ty, Tolal slab thickness, Concrete unit Wt, Concrete strength, f Deck clear span, L = Siab span conditior Neg. Mom. Rent, yy witb ‘Note: 0 ‘assumed to odd to flexural moment ' copacity of slab, by functioning os positive moment Depth to Ast, ; reinforcing. Composite deck sheor copacity is included Reinforcing viel, in total beam shear capacity. UDL Live Load, Wh) Concentrated load, Pa, Loaded area width, bs = Loaded area width, b Results: Properties and Dat Thy= deck ri height = deck rib pitch (center to center distance be ‘w deck ib bearing width (rom SDI table) = deck rib top opening with (from SDI table) «= average deck rib width (rom SDI table) y= deck thickness (inches equivalent of gage) A.g= area of steel deck/ft. width (from SDI table) a= inertia of steel deck. width (rom SDI table) Ya C.G of deck S, = positive section modulus of steel deck width (from SDI table) S, = negative section modulus of steel deck. width (rom SDI table) 1, hehg= thickness of slab above top of deck ribs Wea wieight of steel deck perf. width (rom SDI table) ‘Wise = Weight of concrete per ft. width Vion = We + We total dead weight of deck + concrete [Design Engineer q structural Engineering al Engineering fi9712/2019) Hla Naing [Calculation for 20) 50) 31.35) 0.82] 0.46) 025] 21.20) 0.36) Os) 0:33] 2121 IBeam Shear in Deck as a Me 4.16) 0.496] IShear and Ne Stress Ratio [Typical Storey Pi.= 150 pounds per man ona 1 foot width uniform construction five load > 20psf combined with fluid concrete uniform construction lve load > S0psf combined with bare deck = O.95h4 (1.6*Wdort 2°Widd)/1000°L"2"(0.096)+1.4*PictL*(0.203) Weld+1.4°Vte)/1000L"2"(0.096) dv 1.4"Weul)/1000°L"2"(0.086) ive Mu(max)"12iSp = (1.6°Wedo+1.2°Weld)/1000°L"2"(0.063)+1.4*Pc"L"(0.094) jo+4.2°Wed+4.4*VWle)/1000°L"2"(0.125) @Ru= beam shear capacily of deck alone (LRFD value from SDI table) Ry = (1.6'Wdo+ 1 2°Wedd+1.4°WLcy/1000°L"(1.25) ‘ou = (0.0054) (Wae+Wad)/12000"(L"12)*4/(28000"1d) “ive M,, 1.80)f-kipsit [Beam Shear for Wooy plus Way: “4-t6)kips 4.00}i EC 3.87]kips 774) kips 1.50)kips Wve (Mi, = (O851,,S.) 12 +ive M, = (1.2(0L)+1.6¥V(LL))/1000°L"2"(0.096) “Wve (M, = (0.98, ive M, = (1.2(DL)+1.6WW(LL))/1000°L42"(0.125) earayte {WV,= beam shear capacity of deck alone (LRFD value from SDI table) by = Top Width (Slab) =rv(ret-rw)*(hihd) Ac = 2¢h*((rvee(rvt-ru) (hind) +nv/2 WV. = 0.85(2"1.0*SART(Pe*1000)*Ac/1000) Ma = MetiVe < 0:85*4*SQRT(Fe"1000)"Ac!1000) (without studs) Ve = (1 2°WiDL}+1.6°WLL)/1000°L"(0.625) (continued) HOTEL CALIFONIA [COMPOSITE STEEL DECK SYSTEM WITHOUT STUDS 7 fi971272019) [Design Engineer Ni Ni Aung Hla Naing [Calculation for [S01 (1) : [Typical Storey SR= (Vita) HM/cvelM.)) Wajiy = allowable live load = [{M, (1/0,070L"2) “1.2 WOLT. Ay = (0.0054*W(LL)*(L*12)M4)(12000Es*lav) (Es=29000 ksi) Nata = LZ X= (Dy 12 (assumed for bending) #20) Mingorn+(4/3)-af(.*12)x ; (man) n= Es/Ee =29000/(w,'*33(F'e*1000)°"/1000), rounded d= byy pn= A(ny(t26) Yeo afsqrt((2pn}+(pn)")-pn] = te (1208 nye *Aases He Se* ledlb-Yed In-kipsmt | +ive gM, = (0.85%,,8.)/12 Jnccipsm [tive nt, = 1.2*(0.096-W(DL)/1000°L72)+1.67(0. 203°P(LL)"L)"(12/b6) Strong Axis Negative Moment for Wo u 36] (U2"12 (assumed for bending) byA2+ep) 375lin. = Mingorne(4/3)(1-xL*12))x ; be(max)] 43lin. b= 12ip*tyay = Width for negative bending 4 d= hd, a= Af /(0.85"") -ive (M, = (OS0*Asn'ty*(d-a/2))12 ve M, = 1.2°(0.125°W(DL)/1000"L"2)+1.6°(0.094°P(LL)"L)"(12/be) h @ssumed or benang) bs#2tetten) b= Mingbme(1-x/(*12)x ; be(max)] {Mg beam shear capacity of deck alone (LRFD value from SDI table) b, = Top Width (Slab) =r (tn) "(vhd) Ac = 2h" (e+ (ot-n thd) vi dV, = 0.85*@"1.0SQRT(Fe"1000)"Ac/1000) Wp = Wer iVe £ 0.85°4*SQRT(Fe"1000)"Ac/1000) (without studs) VY. = (1-2°W(DL)/1000°L4(0.625}+(1.6"P(LL)*12/be) HOTEL CALIFONIA ian Fecntngree aa acta [Calculation for {SDI (1) c [Typical Storey {Shear and Negative Moment Interaction for Wo. plus Concentrated Load Pi): SRE (VJ/iV a) +(M,/CiveiM))” Punching Shear for Concentrated Load Puy: by = 2(b;+bs*21) Ace bite kips {Ve = 0.85%(2"1.0°SQRT("'o*1000)*Ac!1000) Kips Vuz 16°? a Dettection for Concentrated Load Pays: 5.15}in. heyy 2.817 in. Yoo [(1/2)1217+nA sd avg (h-0.Shy)(12/p))[12t, +A, eave Me(12/P)] 2.333] Yur® Oe 23.16) hoe = (12S VC12*n)#(12t IN) _-O.5t,) 1 jtAsY Ss Hava FAM py hg 2)+(h-y-0.5h] 17.454] lor = (litle)/2 (average of cracked and uncracked) 0.018) Awe = 0.015*P(LL)*(12/be)*LA3/(Es*tav) (Es=29000 ks!) Seeaoy=|__L/4068]} IWeak Axis Moment for Concentrated. 0.000758, (L12)22 (assumed for bending) #2tteHap) Mingbr+(4/9)(1-x(L*12)) ; be(emax)] Ws (L712) 240, <1 a= (Ash )|O.85F.0), (May = O85*ALS)E-al2))N2 Mug = {(1.6Py, be“12)/(15H0/12 TOP OF y- CONCRETE “(ov STEEL DECK COMPOSITE SECTION Page No. HOTEL CALIFONIA [Job No. [COMPOSITE STEEL DECK SYSTEM WITHOUT STUDS Date: fi9712/2019) [Design Engineer Ni Ni Aung JApproving Engineer: [Hla Naing [Calculation for [S01 (1) [Location: [Typical Storey ‘CURVED LUNES REPRESENT DISTRIBUTION OF FORCE CONCENTRATED LOAD DISTRIBUTION FOR SLAB ON METAL DECK

Potrebbero piacerti anche