AKSHAR ELECINFRA PVT. LTD.
Page |2
POLARITY CHECK : OK
GENERAL CHECK-UP : OK
MAKE OF PT : MEHRU ELECTRICAL & MECHANICAL ENGINEERS PVT. LTD.
CONTINUITY CHECK : OK
REMARKS : TESTED OK.
Sign
Date
AKSHAR ELECINFRA PVT. LTD.
Page |3
Sign
Date
AKSHAR ELECINFRA PVT. LTD.
Page |4
INJECTED
PRIMARY 1a-1n 2a-2n 1a-1n 2a-2n 1a-1n 2a-2n
VOLTAGE (V)
R-N 241.5 0.806 0.806 0.805 0.805 0.12 0.12
Y-N 244.0 0.810 0.810 0.813 0.813 -0.37 -0.37
B-N 242.5 0.808 0.808 0.808 0.808 0.00 0.00
POLARITY CHECK : OK
GENERAL CHECK-UP : OK
MAKE OF PT : MEHRU ELECTRICAL & MECHANICAL ENGINEERS PVT. LTD.
CONTINUITY CHECK : OK
REMARKS : TESTED OK.
Sign
Date
AKSHAR ELECINFRA PVT. LTD.