Project Name

Probable Completion
Sr BG Last Date of Tender Departme
State Cost Period
No. (in Cr.) Submission Pattern nt
(in Cr.) (In Year)

1 Maharasht RFQ For Development of Marathwada Water Supply Grid along with Associated Infrastructure for the
08-Jan-2019, PPP-BoT-
ra District of Beed Package 2 on Hybrid Annuity Mode of Public Private Partnership 4755.00 3.50 Years 23.78 COJAL
05:00 PM HAM
2 Himachal Rehabilitation and Upgradation to 4-Lane configuration and Strengthening of Punjab/HP Border to 1087.42 3.0 Years 10.87 09-Dec- EPC NHAI
Pradesh Sihuni from km 10.808 to km 47.950 (Design Length 37.142 km) of NH-20 (New NH-154) of Pathankot 2019, 11:00
Mandi Section in Himachal Pradesh on EPC mode(Pkg-I) AM
3 Arunachal Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 to Km 206.66 (Package- 19-Dec-
Not
Pradesh 5) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and 387.49 3.0 Years 2019, 11:00 EPC MoRTH
Required
Highways of SARDP-NE AM
4 Arunachal Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 117.56to Km 163.59 (Package- 19-Dec-
Not
Pradesh 4) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and 466.94 3.0 Years 2019, 11:00 EPC MoRTH
Required
Highways of SARDP-NE AM
5 Arunachal Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 206.66 to Km 247.05 (Package- 19-Dec-
Not
Pradesh 6) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and 418.49 3.0 Years 2019, 11:00 EPC MoRTH
Required
Highways of SARDP-NE AM
6 Arunachal Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 77.95 to Km 117.56 (Package- 19-Dec-
Not
Pradesh 3) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and 362.41 3.0 Years 2019, 11:00 EPC MoRTH
Required
Highways of SARDP-NE AM
7 Tripura Construction of Sub Structure of Viaduct (Up to Abutment Pier Cap level) from Chainage 241.852 to 09-Dec-
Chainage 3390.960 in connection with Agartala Akhaura New Rail Link Project. 178.69 545 days 0.96 2019, 03:00 IRCON
PM
8 Uttar BID For Balance work of Construciton of Ring Road for Raebareli City on eastern side of NH-24B(Phase- 09-Dec-
Pradesh I) in the state of Uttar Pradesh on EPC Basis. 114.05 540 Days 0.00 2019, 03:00 EPC MoRTH
PM
9 Delhi Construction of Peripheral S.W. drains and culverts in Sector G2-G6, Narela. (Part-1) 09-Dec-
88.77 1.0 Years 0.99 2019, 03:00 Item Rate
PM
10 Uttar Transformation of Arterial Road Smart Roads package 1 of 9.45 kms 11-Dec-
Percentag
Pradesh 100.20 540 Days 1.26 2019, 03:00 JSCL
e
PM
11 Madhya Ghogri Multi Village Rural Water Supply Scheme, Distt. Betul 09-Dec-
Pradesh 200.01 720 Days 0.50 2019, 05:30 Lump-sum MPJNM
PM
12 Madhya Machagora Multi Village Rural Water Supply Scheme, Distt. Chhindwara 09-Dec-
Pradesh 846.68 900 Days 0.50 2019, 05:30 Lump-sum MPJNM
PM
13 Madhya Wardha Multi Village Rural Water Supply Scheme, Distt. Betul 09-Dec-
Pradesh 114.46 720 days 0.50 2019, 05:30 Lump-sum MPJNM
PM
14 Chandigar WORK SERVICES FOR CONSTRUCTION OF INFRASTRUCTURE FOR MLH UPGRADE AT AF STATION 09-Dec-
Not
h CHANDIGARH 62.76 2.0 Years 2019, 06:00 Item Rate MES
Required
PM
15 Telangana Four laning of NH-363 from Repallewada (Design Km 42.000-Existing Km 288.510) to Telangana- 10-Dec-
Maharashtra Border (Design Km 94.602 Existing Km 342.000) (Design Length 52.602 Km) in the State 903.10 2 Years 9.03 2019, 11:00 HAM NHAI
of Telangana under NH (O) on HAM AM
16 Delhi Design and Construction of Twin Tunnel by Shield TBM,... and one Underground station namely Krishna 10-Dec-
Park Extn. with Entry/Exits ... including Architectural Finishing, ... of Janakpuri West to R.K.Ashram 478.12 3.0 Years 4.78 2019, 03:00 DMRC
Corridor ...of Phase-IV of Delhi MRTS PM
17 Delhi C/O 352 THREE BHK, 526 TWO BHK and 329 EWS houses (Design and Built model) in Pkt-GH-3, Sector- 10-Dec-
29, Rohini. i/c internal development and electrification (Turnkey Project) 590.53 4.0 Years 6.01 2019, 03:00 Turn-key DDA
PM
18 Delhi C/O 352 THREE BHK, 526 TWO BHK and 329 EWS houses (Design and Built model) in Pkt-GH-3, Sector- 10-Dec-
29, Rohini. i/c internal development and electrification (Turnkey Project) 590.53 4.0 Years 6.00 2019, 03:30 Turn-key DDA
PM
19 Rajasthan Construction of 6-lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh- 675.74 2.0 Years Bid 11-Dec- EPC NHAI
Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC Declaratio 2019, 11:00
mode under BM (Ph-I) (AJ/DRGB-Package-6) n AM
20 Rajasthan Construction of 6-lane access controlled Greenfield highway from km 150.000 to km 180.000 of 501.15 2.0 Years Bid 11-Dec- EPC NHAI
Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan Declaratio 2019, 11:00
on EPC under BM (Ph-I) (AJ/DRGB-Package-7) n AM
21 Rajasthan Construction of 6-lane access controlled Greenfield highway from km 180.000 to km 207.100 of 599.76 2.0 Years Bid 11-Dec- EPC NHAI
Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan Declaratio 2019, 11:00
on EPC under BM(Ph-I) (AJ/DRGB-Package-8) n AM
22 Rajasthan Construction of 6-lane access controlled Greenfield highway from km 72.000 to km 97.000 of Deogarh- 437.47 2.0 Years Bid 11-Dec- EPC NHAI
Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC Declaratio 2019, 11:00
mode under Bharatmala Pariyojana (Ph-I)(AJ/DRGB-Pkg-4 n AM
23 Rajasthan Construction of 6-lane access controlled Greenfield highway from km 97.000 to km 125.000 of Deogarh- 433.77 2.0 Years Bid 11-Dec- EPC NHAI
Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC Declaratio 2019, 11:00
under BM(Ph-I) (AJ/DRGB-Package-5) n AM
24 Delhi Construction of CBSE Head Quarter Office Building at Sector-23 Dwarka, New Delhi. 18-Dec-
271.55 660 Days 2.72 2019, 11:00 NBCC
AM
25 Uttar design construction of following packages as junction improvment, drainage, smart road 11-Dec-
Pradesh 213.00 548 Days 2.23 2019, 05:00 Item Rate DOLBU
PM
26 Madhya Construction of Houses, Commercial Complex and Development of Infrastructure for Urban Poor in 11-Dec-
Percentag
Pradesh Ujjain, M.P, Under PMAY at Kanipura, Manchaman, Maksi Road And Alakh Dham. 89.28 2.0 Years 0.45 2019, 05:30 UAD
e
PM
27 Maharasht PROVISION OF DEFICIENT IN-LIVING OFFICER ACCOMMODATION INCLUDING ADMIN AND 11-Dec-
Not
ra ASSOCIATED MESS FACILITIES BY DEMOLITION OF EXISTING BUILDING AT WNC O MESS, COLABA 109.69 912 Days 2019, 06:00 Item Rate MES
Required
PM
28 Haryana Construction of proposed Rewari Bypass (NH-11) as Feeder Route in Rewari district in the state of 372.80 710 Days 3.73 12-Dec- HAM NHAI
Haryana (Design length 14.40 km) on Hybrid Annuity Mode (HAM) (Pkg-IV) 2019, 11:00
AM
29 Uttar Rehabilitation and Upgradation from 2 lane to 4 lane of NH stretch under Bharatmala Pariyojana for 1437.33 2.0 Years 14.37 12-Dec- HAM NHAI
Pradesh Unnao-Lalganj section of NH-232A on Hybrid Annuity Mode in the State of Uttar Pradesh and Design 2019, 11:00
chainage Km 0-000 to 70.000 AM
30 Tamil Four Laning of Neraluru-Thorapalli Agraharam section of NH-844 from Km 0.000 to Km 23.350 (Design 429.02 2.0 Years 4.29 12-Dec- HAM NHAI
Nadu Chainage) under Bharatmala Pariyojana Phase I (National Corridor) on HAM in the States of Karnataka- 2019, 11:00
Tamil Nadu Pkg-I AM
31 Tamil Construction of Additional Structures in Kerala-Tamil Nadu Border-Kanyakumari section (From 491.9 2.0 Years 4.92 12-Dec- EPC NHAI
Nadu Km.43.000 to Km.96.714) of NH-47 in the State of Tamil Nadu on EPC mode 2019, 11:00
AM
32 Gujarat Construction of civil works upto formation from DFC Ch 176.240 Between Bordi to Umbergaon to DFC 12-Dec-
Percentag
Ch 195.265 Bhilad and DFC Ch1.028 Bhilad to DFC Ch. 19.813 Bagwada in connection with construction 112.73 390 Days 0.63 2019, 05:00 IRCON
e
of WDFC Phase II Vaitarna Sachin Section. PM
33 Gujarat Construction of civil works up to formation double line railway from DFC Ch.151.000 to DFC Ch 12-Dec-
Percentag
162.600, excluding one Km an DFC Ch 162.600 to DFC Ch. 176.240 in connection with construction of W 91.68 390 Days 0.52 2019, 05:00 IRCON
e
DFC,Phase II Vaitarana Sachin Section for sub pkg SS2B_C PM
34 Delhi Construction of New Block For Medicine, Maternity And Advanced Pediatric Centre (Composite Steel +
RCC framed 2B+G+22 Storyed building) At L.N Hospital including internal water supply, Sanitary 13-Dec-
installation , External Development works, Drainage, rain water harvesting, Horticulture, EI works, Sub 487.67 2.50 Years 4.98 2019, 03:00 PWD
stations, Lifts, DG Sets, Fire Fighting & fire larm, HVAC, Stack parking and Medical services. PM

35 Maharasht Rehabilitation and up gradation of Kolha to Nasratpur. section from Km 444/400 to Km 463/545 and 13-Dec-
ra from Km 481/000 to Km 513/990 of NH 222 to Two lane with paved shoulder in the state of 192.63 540 Days 1.93 2019, 05:30 EPC MoRTH
Maharashtra under NHDP IV (Balance Work) PM
36 Manipur Construction of New Integrated Terminal Building, Control Tower Cum Technical Block and Associated 14-Dec-
Works Including Maintenance, Operation and AICMC at Imphal International Airport, Imphal (Manipur) 513.27 3.0 Years 5.39 2019, 03:00 AAI
India PM
37 Madhya Four laning of Katni-Bypass of NH-7 old from km 359.500 to km 378.500 length 20 km in the State of 16-Dec-
Pradesh Madhya Pradesh on EPC Mode 213.73 2.0 Years 0.00 2019, 11:00 EPC NHAI
AM
38 Uttar Four Lanning of Jagdishpur-Faizabad Section from km 47.930 (Design Chainage 47.800) to km 107.680 1051.50 2.0 Years 10.52 16-Dec- HAM NHAI
Pradesh (Design Chainage 108.020) of NH-330A in the state of Uttar Pradesh on HAM mode under Bharatmala 2019, 11:00
Pariyojana AM
39 Rajasthan Construction of Eight Lane access controlled Expressway starting near Start of RoB (Ch.214.260- 903.42 2.0 Years Bid 16-Dec- EPC NHAI
247.310) section of Delhi-Vadodara Green field Alignment on EPC Mode under Bharatmala Pariyojana in Declaratio 2019, 11:00
the State of Rajasthan. Pkg-8 n AM
40 Rajasthan Construction of 8 Lane Carriageway start near Junction with MDR-1 to end of interchange on NH-166 Bid 16-Dec-
near village Mui (Ch. 247.310 TO 292.950) section of Delhi - Vadodara Access Controlled Green field 1198.93 2.0 Years Declaratio 2019, 11:00 EPC NHAI
Alignment (NH-148N) under BM in Rajasthan on EPC. Pkg - 9 n AM
41 Bihar Construction of New 4-lane Bridge (Parallel to the Existing MG Setu) with its approaches from km 16-Dec-
0/000 to km 14/500 across river Ganga on NH-19 at Patna in the State of Bihar on EPC mode. 2411.50 3.50 Years 24.12 2019, 11:00 EPC MoRTH
AM
42 Andhra Six laning of Vijaywada Bypass from Gollapudi (Design Ch. 30.000) to Chinnakakani(DESIN Ch. 47.881) 16-Dec-
Pradesh including major bridge across river Krishna in Vijayawada Gundugolanu section of NH 16 in AP under 1133.85 2.5 Years 11.34 2019, 11:00 HAM NHAI
Bharatmala Pariyojana on Hybrid Annuity Mode (PkgIV AM
43 mizoram widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement
from km 298.000 to km 339.000 (Package- 7) on Aizawl-Tuipang Section of NH-54 in the State of 06-Jan-2020,
Mizoram on EPC mode with JICA loan assistance. 497.71 3.50 Years 4.98 EPC NHIDCL
11:00 AM

44 Bihar Redevelopment of Patna Medical College AND Hospital PMCH Patna Bihar 16-Dec-
4831.77 7.0 Years 48.42 2019, 03:00 EPC BMSICL
PM
45 Delhi C/O 318 THREE BHK, 476 TWO BHK and 298 EWS houses (Design and Built model) in Sector-11 Ext, 16-Dec-
Rohini. i/c internal development and electrification (Turnkey Project) 530.15 4.0 Years 5.41 2019, 03:00 Turn-key DDA
PM
46 Madhya Implementation of Smart water management components 1. 24 X 7 Potable Water Supply System 2. 16-Dec-
Pradesh Recycled Water Supply System 3. Polishing Water Treatment Plant, 4. Sewage Collection System 5. 78.68 720 Days 0.50 2019, 05:00 Item Rate UAD
Sewage Treatment Plant STP 1 -5.6 MLD Sewage PM
47 Uttar 4-laning of Aligarh-Kanpur section from Km 289.000 (Design chainage 302.108) to Km 356.000 (Design 1947.92 2.5 Years 19.48 17-Dec- HAM NHAI
Pradesh chainage 373.085) (Package-IV from Naviganj- Mitrasen) of NH-91 in the state of Uttar Pradesh on 2019, 11:00
Hybrid Annuity mode under Bharatmala Pariyojana AM
48 Uttar 4 laning of Aligarh-Kanpur section from Km 356.000(Design chainage 373.085) to Km 414.000(Design 1614.95 2.5 Years 16.15 17-Dec- HAM NHAI
Pradesh chainage 433.728)(Package-V from Mitrasen-Kanpur) of NH-91 in the state of Uttar Pradesh on Hybrid 2019, 11:00
Annuity mode under Bharatmala Pariyojana AM
49 Andhra Rehabilitation and Re-Construction of Devarapalli to Jeelugumilli (NH 516D ) from Km0.000 to Km 17-Dec-
Pradesh 20.000 to two lane with paved shoulders in the State of Andhra Pradesh on EPC Basis under Annual 82.79 540 Days 0.83 2019, 05:00 EPC MoRTH
Plan 2019-20 PM
50 Arunachal Construction of Access roads to Project Dam Site, Left Bank Road Network, Dibang Bridges, Dam site
Pradesh Right Bank Road Network and temporary haulage road to Pathar Camp from ADC Morh including all 17-Dec-
Civil and HM works of Diversion Tunnel NA 3.0 Years 10.00 2019, 05:00 NHPC
PM

51 Madhya Construction of a pressurised Pipe irrigation system under Jharbida Lift Irrigation Scheme 17-Dec-
Pradesh 157.86 3.50 Years 0.50 2019, 05:30 Turn-key WRD
PM
52 Maharasht Collection of user fee through toll collection agency(on the basis of competitive bidding on e-tender 17-Dec-
ra basis) at Kamothe and Kopra toll Station on Sion-Panvel Highway. 174.91 3.0 Years 0.88 2019, 05:30 Lump-sum PWSPM
PM
53 Madhya Execution of ISP - KALISINDH Phase II Lift Micro Irrigation Project on Turnkey basis for irrigation in 1, 17-Dec-
Pradesh 00,000 ha up to 2.5 ha.chak as per detail scope of work. 4284.71 1460 Days 0.50 2019, 05:30 Turn-key NVDA
PM
54 Madhya Execution of ISP - PARWATI Phase- III and IV Micro Lift Irrigation Scheme on Turnkey basis for 17-Dec-
Pradesh irrigation in 1, 00,000 ha up to 2.5 ha.chak as per detail scope of work. 4026.30 1460 Days 0.50 2019, 05:30 Turn-key NVDA
PM
55 Uttar 4 laning of Meerut-Nazibabad section from Km 11.500 to Km 39.240 and from Km 86.590 to Km 1075.09 2.0 Years 10.75 18-Dec- HAM NHAI
Pradesh 112.545 (Design Length 53.950 Km) of NH-119 (New NH-34) in the state of Uttar Pradesh under 2019, 11:00
Bharatmala Pariyojana on Hybrid Annuity Mode AM
56 Assam Providing Solar Hybrid Street Lighting system on Dhola Sadiya Bridge over the river Brahmaputra 18-Dec-
including approach roads 57.84 180 Days 0.00 2019, 11:00 Lump-sum MoRTH
AM
57 Gujarat Construction of New Road,Regrade and Resurface work at different roads of Ahmedabad Municipal 18-Dec-
Corporation 400.03 2.0 Years 4.03 2019, 05:00 fixed rate AMC
PM
58 Uttar PROVN OF TECH INFRASTRUCTURE AND PAVEMENT FOR CERTAIN UNIT AT TANDA UNDER GE P 18-Dec-
Not
Pradesh TANDA 52.63 2.50 Years 2019, 06:00 Lump-sum MES
Required
PM
59 Uttar Construction and Development of 4-6 lane divided carriageway for THDCIL bypass for Re-routing of 19-Dec-
Pradesh Ghaziabad-Aligarh NH-91 project in THDCIL area on EPC mode under NHDP Phase-IV in the State of UP 219.70 2.0 Years 2.20 2019, 11:00 EPC NHAI
AM
60 Uttar Widening and Strengthening for improvement and up-gradation of NH709A Garhmukteshwar 940.68 2.0 Years 9.41 19-Dec- EPC NHAI
Pradesh (Chainage-83.200 of NH24) to Meerut (Chainage 9.860 of NH-235) including connector to NH-119 2019, 11:00
Package XII in Uttar Pradesh AM
61 Gujarat Construction of 4 lane expressway from start of DSIR zone of Ahmedabad district to Adhelai village of 964.68 2.0 Years 9.65 19-Dec- HAM NHAI
Bhavnagar district ch. 71.00 to ch. 109.019 section of Ahmedabad Dholera Greenfield alignment NH751 2019, 11:00
on HAM in Gujarat PackageIV. AM
62 Uttar Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana-Shamli- 209.97 2.0 Years 2.10 19-Dec- EPC NHAI
Pradesh Muzaffarnagar Miranpur Bijnor at Kotawali to two-four lane in the State of UP on EPC Mode Pkg-IV 2019, 11:00
(Bijnor to Kotawali NH-709AD) AM
63 Uttar Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana Shamli 619.11 2.0 Years 5.58 19-Dec- EPC NHAI
Pradesh Muzaffarnagar Miranpur Bijnor and terminating at its junction with NH-74 at Kotawali to 2-4 lane 2019, 11:00
configuration in State of UP on EPC Mode Pkg-III NH-709AD AM
64 Gujarat Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District 744.38 2.0 Years 7.44 19-Dec- HAM NHAI
from km 48.520 to km 71.060 section of Ahmedabad-Dholera Greenfield Alignment NH-751 on HAM 2019, 11:00
under BMP in the State of Gujarat PKG-III AM
65 Gujarat Construction of Four Lane Expressway from Sindhrej Village to Vejalka village of Ahmedabad District 894.60 2.0 Years 8.95 19-Dec- HAM NHAI
from km 22.000 to km 48.520 of Ahmedabad-Dholera Greenfield Alignment NH-751 on HAM under 2019, 11:00
BMP in the State of Gujarat PKG-II AM
66 Gujarat Construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad 793.54 2.0 Years 7.94 19-Dec- HAM NHAI
District from km 0 to km 22.000 of Ahmedabad-Dholera Greenfield Alignment (NH-751) on Hybrid 2019, 11:00
Annuity Mode under Bharatmala Package I AM
67 Uttar Special Repair and Maintenance of Ghazipur Ballia UP/Bihar section from km. 405.030 to km. 535.300 19-Dec-
Pradesh and on NH31 in the state of Uttar Pradesh 143.73 1.0 Years 1.43 2019, 11:00 Item Rate NHAI
AM
68 Maharasht Engineering, Procurement and Construction ( EPC) tender for construction of PDN System for LIS no. 7 19-Dec-
ra and 8 for cultivable command area 28,036 Ha. Of Jigaon Project, tal. Nandura Dist. Buldana 564.35 3.0 Years 2.82 2019, 05:00 EPC CEWRA
PM
69 Maharasht Engineering, Procurement and Construction ( EPC) tender for construction of balance work of LIS 2 and 19-Dec-
ra PDN System for LIS no. 1, 2, 3, 4, 5, 6, 10, 11 and 12 for cultivable command area 54,902 Ha. Of Jigaon 1133.77 3.0 Years 5.67 2019, 05:00 EPC CEWRA
Project, Tal. Nandura Dist. Buldana PM
70 Maharasht Engineering, Procurement and Construction (EPC) tender for Construction of LIS and PDN System for 19-Dec-
ra LIS No. 13,14 and 15 for cultivable command area 14,477 Ha of Jigaon Project Taluka Nandura, Dist. 389.48 3.0 Years 1.95 2019, 05:00 EPC CEWRA
Buldhana . PM
71 Maharasht Engineering, Procurement and Construction ( EPC) tender for construction of PDN system for LIS no. 9 19-Dec-
ra for cultivable command area 19,355 Ha. Of Jigaon Project, Tal. Nandura Dist. Buldana 388.74 3.0 Years 1.94 2019, 05:30 EPC CEWRA
PM
72 Andaman COMPLETION OF INCOMPLETE WORK OF RESURFACING OF RUNWAY AT INS UTKROSH PORTBLAIR
and 19-Dec-
Not
Nicobar 200.00 3.0 Years 2019, 06:00 Item Rate MES
Required
Islands PM

73 Maharasht PROVISION OF DEFICIENT SINGLE SAILORS ACCOMMODATION INCLUDING FOREIGN TRAINEE 19-Dec-
Not
ra SAILORS AND DEMOLITION AND RECONSTRUCTION OF IN-LIVING OFFICERS SERVANT QUARTERS AT 65.00 810 Days 2019, 06:00 Lump-sum MES
Required
INHS ASVINI MUMBAI PM
74 Kerala A/A AND RESURFACING OF RUNWAYS DISPERSAL AND ASSOCIATED PAVEMENTS AT INS GARUDA 130.00 870 Days Not 19-Dec- Item Rate MES
KOCHI Required 2019, 06:00
PM
75 Andhra Six laning of Vijayawda bypass from Chinna Autupalli (Design Ch. 0.000) to Gollapudi (Design Ch. 20-Dec-
Pradesh 30.000) in Vijayawada Gundugolanu section of NH 16 in the state of Andhra Pradesh under Bharatmala 1119.06 2.0 Years 11.20 2019, 11:00 HAM NHAI
Pariyojana on HAM AM
76 Delhi C/O 318 THREE BHK, 476 TWO BHK and 298 EWS houses (Design and Built model) in Sector-11 Ext, 20-Dec-
Rohini. i/c internal development and electrification (Turnkey Project) 530.15 4.0 Years 5.40 2019, 03:30 Turn-key DDA
PM
77 Delhi Construction of Peripheral S.W. drains and culverts in Sector G3-G4, at Narela. 20-Dec-
59.41 1.0 Years 0.70 2019, 03:30 Item Rate DDA
PM
78 Uttar DEVELOPMENT OF SHRI KASHI VISHWANATH DHAM AND ITS BEAUTIFICATION INCLUDING ALL 20-Dec-
Pradesh DEVELOPMENT WORKS CIVIL ELECTRICAL PLUMBING FIRE FIGHTING HVAC AND ELV AT VARANASI 300.00 547 Days 3.20 2019, 05:00 Lump-sum PWD
UP PM
79 Maharasht Balance work of Rehabilitation and Up-gradation of Akola Akot section of NH-161A (34.766 Km) Two 20-Dec-
ra lane with paved shoulders Configuration on EPC mode in the state of Maharashtra. 222.15 540 Days 2.22 2019, 05:30 EPC MoRTH
PM
80 Maharasht Balance Work of Rehabilitation and Upgradation of DigrasDarwha-Karanja National Highway from km 20-Dec-
ra 0/00 to 46/00 to Two lanes/Four lane with paved shoulder configuration on EPC mode in the state of 195.51 540 Days 1.96 2019, 05:30 EPC MoRTH
Maharashtra. PM
81 Maharasht Balance Work of Rehabilitation and Upgradation of Ajanta Buldhana section of National Highway 753E 20-Dec-
ra (49.130Km) to two lane with paved shoulder configuration on EPC Mode in the State of Maharashtra 213.39 540 Days 2.13 2019, 05:30 EPC MoRTH
PM
82 Maharasht PROVISION OF DEFICIENT IN LIVING OFFICER ACCOMMODATION INCLUDING ADMIN AND
ra ASSOCIATED MESS FACILITIES BY DEMOLITION OF EXISTING BUILDING AT WNC O MESS COLABA 20-Dec-
Not
109.69 2.50 Years 2019, 06:00 Item Rate MES
Required
PM

83 Assam RESURFACING OF RUNWAY AND ALLIED WORKS UNDER GE(AF) CHABUA 21-Dec-
Not
425.00 3.0 Years 2019, 06:00 Item Rate MES
Required
AM
84 Jharkhand Augmentation Supply Construction Commissioning and five years of Operation and Maintenance of 21-Dec-
Water Supply System in Ranchi 492.49 3.0 Years 5.10 2019, 04:30 Item Rate JUADB
PM
85 Delhi Development of Road Link (from Km 0 to 29.900) between Bawana Industrial Area Delhi (from 764.89 2.5 Years 7.65 23-Dec- HAM NHAI
Km7.750 of UER 2) till bypass of NH-352A at Village Barwasani Sonipat in Haryana as spur of Urban 2019, 11:00
Extension Road -2 (NH 344 M.) under HAM AM
86 Karnataka 4 laning from km. 42.000 to km. 80.00 of Dodaballapur Bypass to Hoskote section of NH-648 (Old NH- 23-Dec-
207) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Package-II) 890.58 2.0 Years 8.91 2019, 11:00 HAM NHAI
AM
87 Karnataka 4 Laning from km 0.00 to km 42.00 of Dobaspet to Dodaballapur Bypass section of NH-648 ( Old NH- 23-Dec-
207) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Package-I) 1017.23 2.0 Years 10.17 2019, 11:00 HAM NHAI
AM
88 Chhattisga 4 lane with paved shoulder configuration of Pathrapali-Kathghora Km. 53.300 to Km. 92.600 Pkg II of 23-Dec-
rh Bilaspur-Kathghora section of NH-111 New NH-130 in the State of Chhattisgarh under Bharatmala on 575.10 2.0 Years 5.75 2019, 11:00 HAM NHAI
Hybrid Annuity Mode AM
89 Maharasht Proposed Construction and improvement of road from Jessal Park to Ghodbunder road in MBMC Area. 23-Dec-
ra (Phase 2) 169.68 3.0 Years 0.85 2019, 12:00 Item Rate MBMC
PM
90 Maharasht Working Survey, Construction Approach Channel, Jack Well an Pump House, Approach Bridge, 23-Dec-
Percentag
ra Approach Bund, Raw Water Rising Main, Conventional Water Treatment Plant, Drainage Arrengement, 1308.23 3.0 Years 6.54 2019, 02:00 CE (MJP)
e
Recirculation Sump, Pure Water Rising main, MBR, Pure Water Gravi PM
91 Maharasht Rehabilitation and up gradation of Barasgaon Rahatee Bu. section from Km 558/200 to Km 615/000 of 23-Dec-
ra NH-222 to Two lane with paved shoulder in the state of Maharashtra under NHDP IV on EPC Basis 191.38 540 Days 1.92 2019, 05:30 EPC MoRTH
Balance Work PM
92 Maharasht Up Gradation of Nanded Kinwat Mahur Arni Road Section from Sarsam Budruk to Kothari (Design Ch 23-Dec-
ra 33.000 Km to Ch. 90.000 Km) to Two Lanes With Paved Shoulder of NH 161 A in the State of 323.96 2.0 Years 3.24 2019, 05:30 EPC MoRTH
Maharashtra On EPC Mode (Balance work) PM
93 Tamil RESURFACING OF RUNWAY AND TAXI TRACK AT INS RAJALI ARAKKONAM 23-Dec-
Not
Nadu 245.81 660 Days 2019, 06:00 Item Rate MES
Required
PM
94 Maharasht Improvement to Kanhan Tarsa Aroli (SH-345 Total length Km. 31.00) Tah. Parshioni.Distt. Ramtek.
ra Improvement to Ramtek Musewadi Road (MDR-19) Kandri Borda Nimkheda Nagardhan MDR-21A Total 23-Dec-
Length Km. 45.50 Tah. Parshioni.Distt. Ramtek. Improvement to Dahega. 390.29 2.0 Years 3.91 2019, 06:00 HAM PWD
PM

95 West Development of Integrated vehicular and Pedestrian Safety Measures using Smart Techniques- 3rd 24-Dec-
Percentag
Bengal Intersection of Biswa Bangla Sarani New Town, Kolkata 68.67 1.0 Years 0.50 2019, 11:00 HIDCO
e
AM
96 Haryana Construction of Office Building for Municipal Corporation Gurugram, At Vypaar Sadan, Sec-14, On 24-Dec-
Municipal
Approx. 2-acres of Land 111.22 1170 Days 2.23 2019, 12:00
Council
PM
97 Bihar Strengthening work from Km 0.00 Paswan chowk to 58.450 Mushrigharari of NH103 New no322 on 24-Dec-
Not
EPC Mode in state of Bihar for the year 2019-20 68.66 548 Days 2019, 05:00 EPC MoRTH
Required
PM
98 Madhya Construction of balancing reservior-II, Balance work of BR-III gravity main, Outlet,Buildings and SCADA, 24-Dec-
Pradesh etc as per detail scope of work. 85.61 2.0 Years 0.43 2019, 05:30 Turn-key NVDA
PM
99 Maharasht CONSTRUCTION OF MAJOR BRIDGE AT RIVER PARLKOTA KM143/300 TO KM.144/400 24-Dec-
ra (CONSTRUCTION PACKAGE-4) AT ALAPALLI-BHAMRAGAD-LAHERI TO STATE BORDER NH130D IN 66.02 2.0 Years 0.67 2019, 05:50 EPC MoRTH
THE STATE OF MAHARASHTRA ON EPC MODE PM
100 Tamil 4 laning of Jittandahalli-Dharampuri Section of NH-844 (existing chainage Km 63.500 to Km 100.600) 611.88 2.0 Years 6.12 26-Dec- HAM NHAI
Nadu from Km 60.100 to Km 94.460 under BM Pariyojana Phase-I on HAM (Package-III of Hosur-Dharmapuri 2019, 11:00
Section) 2nd Call. AM
101 Tamil Four laning of Thorapalli Agraharam-Jittandahalli Section of NH-844 from Km 23.350 to Km 60.100 26-Dec-
Nadu under Bharatmala Pariyojana Phase-I on Hybrid Annuity Mode in the State of Tamil Nadu (Package-II of 696.06 2.0 Years 6.96 2019, 11:00 HAM NHAI
Hosur Dharamapuri Section) (3rd Call) AM
102 Tamil Four laning of Mamallapuram to Mugaiyur Section of NH-332A from Km.0.000 to Km 31.000 (Design 26-Dec-
Nadu Chainage) under Bharatmala Pariyojana Phase-I (Feeder Routes) on Hybrid Annuity Mode in the State of 604.43 2.0 Years 6.04 2019, 11:00 HAM NHAI
Tamil Nadu 3rd call AM
103 Tamil Four Laning of Mugaiyur to Marakkanam Section of NH-332A from Km 31.000 to Km. 62.000 (Design 26-Dec-
Nadu Chainage)(Feeder Routes) on Hybrid Annuity Mode in the State of Tamil Nadu (Package-II of 596.00 2.0 Years 5.96 2019, 11:00 HAM NHAI
Mahabalipuram-Puducherry section) 3rd call AM
104 Kerala Six Laning of Chengala to Neeleshwaram section of NH-17 (New NH66) from Ch. 56.200 (existing km 26-Dec-
57.200) to Ch. 93.468 (existing km 95.650) (Total length 37.268 km) in the State of Kerala on HAM 1243.57 2.50 Years 12.44 2019, 11:00 HAM NHAI
under BP in the category of residual works under NHDP AM
105 Kerala Six Laning of Thalapady to Chengala section of NH-17 New NH-66 from Ch. 17.200 existing km 17.200 26-Dec-
to Ch. 56.200 existing Km 57.200 Total length 39.00km in the State of Kerala on HAM under BMP in the 1281.45 2.50 Years 12.81 2019, 11:00 HAM NHAI
category of residual works under NHDP AM
106 Maharasht Design and Construction of 6 lane 5 Nos. i.e. 4 LVUPs and 1 Flyover Stand alone Grade Separated 27-Dec-
ra structures on Gonde Vadape Km 440 to Km 539.5 section of NH 3 New NH 848 in the State of 89.11 2.0 Years 0.90 2019, 11:00 EPC NHAI
Maharashtra on EPC Mode AM
107 Uttarakha CONSTRUCTION OF SINGLE LINE BG TUNNEL NO. 11 9050 M, MAJOR and MINOR BRIDGES,
nd FORMATION WORKS AND OTHER ANCILLARY WORKS FROM CHAINAGE 73plus489 KM TO 83plus899 27-Dec-
KM UNDER PACKAGE6 IN CONNECTION WITH NEW SINGLE BG LINE BETWEEN RISHIKESH AND 1496.89 1200 days 2.00 2019, 11:00 RVNL
KARANPRAY AM

108 Arunachal Rehabilitation of Penstock-II (Partly Underground and partly Over ground) of Kameng Hydro Electric
Pradesh Project (600 MW) located at Kimi, Arunachal Pradesh, India using a combination of Glass Fiber 27-Dec- tender
Reinforced Polymer and Carbon Fiber Reinforced Polymer 235.00 200 Days 4.00 2019, 02:00 cum NEEPC
PM auction

109 Haryana Construction of Bank Square Building at Ambala Cantt 27-Dec-


Municipal
94.00 2.0 Years 1.88 2019, 05:00
Council
PM
110 Goa CONSTRUCTION OF DEFICIENT MD ACCN FOR OFFICERS EPS AND DSC PERSONNEL AT CHICOLNA 27-Dec-
Not
GOA 64.67 750 Days 2019, 06:00 Lump-sum MES
Required
PM
111 Rajasthan PROVISION OF OTM ACCN AT JAISALMER (JOB NO. S/2950) 28-Dec-
Not
52.77 2.50 Years 2019, 06:00 Lump-sum
Required
PM
112 Multi CONSTRUCTION OF FOUR LANE BRIDGE INCLUDING APPROACHES OVER RIVER BRAHMAPUTRA 30-Dec-
Not
Location BETWEEN DHUBRI ON NORTH BANK AND PHULBARI ON SOUTH BANK IN THE STATE OF ASSAM / 3548.50 2825 Days 2019, 11:00 EPC NHIDCL
Required
MEGHALAYA ON NH-127B AM
113 Delhi Re-development of Safdarjung Railway Station along with Office Building near Moti Bagh at New Delhi 30-Dec-
on Engineering Design, Procurement and Construction (EPC) basis including Operation and 358.20 2.0 Years 1.85 2019, 03:00 EPC IRCON
Maintenance for 1 year during DLP Period PM
114 Jammu PROVISION OF TECHNICAL FACILITY AT SITE LK 30-Dec-
and 230.46 4.0 Years 2.40 2019, 05:30 Item Rate DRDO
Kashmir PM
115 Uttarakha RFP for REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDERFROM EXISTING 391.50 2.0 Years 3.92 31-Dec- EPC MoRTH
nd KM. 195.175 TO KM. 220.000 (DESIGN CHAINAGE KM. 71.300 TO KM.95.947) EXCLUDING EXISTING 2019, 11:00
CHAINAGE KM 200.300 TO KM 202.400 (DESIGN CHAINAGEKM 76.400 TO KM 78.400) ON DHARASU AM
TO YAMUNOTRI ROAD OF NH- 134 (OLD NH-94) IN THE STATE OF UTTARAKHAND on EPC mode
UNDER IMPROVEMENT TO NH CONNECTIVITY TO CHARDHAM.

116 Multi Request For Annual Qualification for Public Private Partnership DBFOT Toll
02-Jan-2020,
Location 448 Days DBFOT NHAI
11:00 AM
117 Telangana Construction of 4 lane Access Controlled Greenfield Highway Section of Khammam-Devarapalle NH of 890.96 2.0 Years 8.91 02-Jan-2020, HAM NHAI
length 44.937 km from Ramanujavaram to TS/AP Border Design Ch 44.937 to 89.874 under ICR under 11:00 AM
Bharatmala Pariyojana, Phase-I on HAM in Telangana
118 Telangana Construction of 4 lane Access Controlled Greenfield Section of Khammam-Devarapalle NH of length 1012.10 2.0 Years 10.12 02-Jan-2020, HAM NHAI
44.937 km from Thallampadu to Ramanujavaram Design Ch. 0.00 to 44.937 under Inter Corridor Route 11:00 AM
under Bharatmala Pariyojana Phase I on HAM in Telangana
119 Andhra Construction of 4 lane Access Controlled Greenfield Highway Section of Khammam-Devarapalle NH 660.31 2.0 Years 6.60 02-Jan-2020, HAM NHAI
Pradesh from Telangana-AP Border to Borrampalem village Design Chainage 89.874 to 126.000 under Inter 11:00 AM
Corridor Route under BMP Ph-I on HAM in the state of AP
120 Andhra Construction of 4 lane Access Controlled Greenfield Highway Section of Khammam-Devarapalle NH 843.28 2.0 Years 8.43 02-Jan-2020, HAM NHAI
Pradesh from Borrampalem village to Devarapalle village Design Chainage 126.000 to 162.126 under Inter 11:00 AM
Corridor Route under BMP Ph-I on HAM in the state of AP.
121 Uttarakha CONSTRUCTION OF TUNNELS, BRIDGES AND FORMATION WORKS FROM CHAINAGE 91 plus 228 to
02-Jan-2020,
nd 101 plus 339 UNDER PACKAGE-7B IN CONNECTION WITH NEW BG LINE BETWEEN RISHIKESH AND 1583.51 4.50 Years 2.00 RVNL
11:00 AM
KARANPRAYAG IN STATE OF UTTARAKHAND, INDIA
122 Delhi Development of 6-lane access controlled in Delhi portion of Delhi-Saharanpur Highway from 1112.04 2.0 Years 11.12 02-Jan-2020, EPC NHAI
Akshardham NH-9 Junction to Delhi-UP border(Ch.0.00 to Ch.14.750)in the State of Delhi on EPC mode 11:00 AM
under Economic Corridor in phase-1 of Bharatmala Pariyoja
123 Uttar Development of six lane access controlled in Uttar Pradesh portion of Delhi Saharanpur Highway from 1703.04 2.0 Years 17.03 02-Jan-2020, EPC NHAI
Pradesh Delhi/UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in Uttar Pradesh on EPC mode under 11:00 AM
Economic Corridor in phase1 of Bharatmala Pariyojana
124 Bihar Construction of Four Lane Elevated Road as part of under construction Ganga Path Digha to Deedarganj
from Dulli Ghat Ch 13-525.79 Km to Nuruddin Ghat Ch 16- 975.79Km, from Dharamshala Ghat Ch 19-
890 Km to Old NH-30 along with connectivity to Ashok Rajpath at Kangan Ghat Ch 15-700 Km and Patna 02-Jan-2020,
593.00 2.50 Years 5.93 EPC BSRDC
Ghat Ch 16-600 Km. with allied facilities at Patna in the State of Bihar on EPC Mode 03:00 PM

125 Bihar Construction of Four Lane Elevated Road for an Exclusive Connectivity from PMCH to under
02-Jan-2020,
construction Ganga Path at CH. 7- 400 Km.at Patna in the State of Bihar on EPC mode 146.00 270 Days 1.46 EPC BSRDC
03:00 PM
126 Gujarat Construction of Eight lane access controlled Expressway from Km 103.400 to Km 128.000 of Vadodara
03-Jan-2020,
Mumbai Expressway (Talasari to Karvad Section) in the State of Gujarat UT of DNH and Maharashtra on 980.74 2.0 Years 9.81 HAM NHAI
11:00 AM
HAM under Bharatmala Pariyojana (Phase IPackage X).
127 Gujarat Construction of Eight lane access controlled Expressway from Km 217.500 to Km 254.430 of Vadodara
03-Jan-2020,
Mumbai Expressway Ena to Kim Section in the State of Gujarat on HAM under BMP I Pkg VI 1526.86 2.0 Years 15.27 HAM NHAI
11:00 AM
128 Gujarat Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara
03-Jan-2020,
Mumbai Expressway Jujuwa to Gandeva Section in the State of Gujarat on HAM under BMP Phase I-Pkg 1407.42 2.0 Years 14.07 HAM NHAI
11:00 AM
VIII
129 Gujarat Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara
03-Jan-2020,
Mumbai Expressway (karvad to jujuwa section) in the state of Gujarat on Hybrid Annuity mode under 973.14 2.0 Years 9.73 HAM NHAI
11:00 AM
Bharatmala Pariyojna (Phase I-Package IX)
130 Gujarat Construction of Eight lane access controlled Expressway from Km 190.000 to Km 217.500 of Vadodara
03-Jan-2020,
Mumbai Expressway (Gandeva to Ena Section) in the State of Gujarat on Hybrid Annuity Mode under 1129.30 2.0 Years 11.29 HAM NHAI
11:00 AM
Bharatmala Pariyojana (Phase I-Package VII)
131 Uttarakha CONSTRUCTION OF TUNNELS and BRIDGES WORKS FROM CHAINAGE 83 plus 899 to 91 plus 228
04-Jan-2020,
nd UNDER PACKAGE-7A IN CONNECTION WITH NEW BG LINE BETWEEN RISHIKESH AND KARANPRAYAG 1063.43 1140 Days 2.00 RVNL
11:00 AM
IN STATE OF UTTARAKHAND, INDIA
132 Madhya Rehabilitation and Upgradation of Package 52 Siddikganj-Hatpipaliya Road, Bhaukhedi-Amlaha-
04-Jan-2020,
Pradesh Dhamanda Road and Toomda-Patania-BarkhedaSaalam road 127.65 2.0 Years 1.28 Lump-sum MPRDC
11:30 AM
133 Madhya Rehabilitation and Upgradation of Package 16 Aavan Road Maksudangadh to Janjali
04-Jan-2020,
Pradesh 94.69 2.0 Years 0.95 Lump-sum MPRDC
11:30 AM
134 Madhya Rehabilitation and Upgradation of Package 1 Bhabra-Katthiwada-Kheda road and Bhabra-Udaigarh road
04-Jan-2020,
Pradesh 184.72 2.0 Years 1.82 Lump-sum MPRDC
12:30 PM
135 Madhya Rehabilitation and Upgradation of Package 14 Aaron Via Vidoriya-Raghogarh and Ashoknagar-Aaron
04-Jan-2020,
Pradesh Road (Upto Sindh River) 146.86 2.0 Years 1.47 Lump-sum MPRDC
12:30 PM
136 Madhya Rehabilitation and Upgradation of Package 15 Mohna-Patai Road, Chitauli-Ranighati Road and
04-Jan-2020,
Pradesh Bhitarwar-Karera Road 110.37 2.0 Years 1.10 Lump-sum MPRDC
12:30 PM
137 Madhya Construction of 8 Lane access-controlled Expressway carriageway from Kandarwasa village to Bawadi 1022.22 2.0 Years 10.22 06-Jan-2020, EPC NHAI
Pradesh village of Ratlam district section of Delhi- Vadodara Greenfield Alignment (NH-148-N) under 11:00 AM
Bharatmala in MP on EPC. Pkg - 22
138 Karnataka 4 laning of Channarayanpatna Bypass from km 140 449 to km 149 596 and providing Grade Separator 412.31 2.0 Years 4.12 06-Jan-2020, EPC NHAI
Structures Service Road and other safety measures in Devihalli to Channarayanpatna (km 150 000) 11:00 AM
section of NH75 (old NH48) on EPC Basis in Karnataka
139 Karnataka 4 Lanning of Hassan Bypass from Km 175 935 to Km 185 684 and providing Grade Separator, 340.99 2.0 Years 3.41 06-Jan-2020, EPC NHAI
Structures, Service Road and other Road Safety Measures in Channarayanapatna To Hassan section of 11:00 AM
NH75 (Old NH-48) on EPC basis in Karnataka Package II.
140 Punjab Four laning of Dhillon Nagar (Moga) to Bajakhana (Lambwali) section of NH-105B (Greenfield 493.84 2.0 Years 4.94 06-Jan-2020, HAM NHAI
Alignment) from design chainage Km 0.000 to Km 38.440 under Bharatmala Pariyojana in the state of 11:00 AM
Punjab on HAM
141 Maharasht Balance works for Four Laning of Amravati-Chikhli section of NH-6 Pkg III from km 270.000 Near
06-Jan-2020,
ra Shelad to km 315.000 Near Nandura in the state of Maharashtra to be executed on HAM under BMP 560.01 2.0 Years 5.60 HAM NHAI
11:00 AM
142 Maharasht Balance works for four laning of Amravati Chikhli section of NH 6 Pkg IV from km 315.000 Near
06-Jan-2020,
ra Nandura to km 360.000 Near Chikhli in the state of Maharashtra to be executed on HAM under BMP 563.61 2.0 Years 5.64 HAM NHAI
11:00 AM
143 Maharasht Balance works for Four Laning of Amravati Chikhli section of NH6 PackageII from km 220.000 ((Near
06-Jan-2020,
ra Kurankhed) to km 270.000 (Near Shelad) in the state of Maharashtra to be executed on HAM under 613.70 2.0 Years 6.14 HAM NHAI
11:00 AM
Bharatmala Pariyojna
144 Maharasht Balance work for Four Laning of Amravati Chikhli section of NH6 Package1 from km 166.000
06-Jan-2020,
ra (Amravati) to km 220.000 (Near Kurankhed) in the state of Maharashtra to be executed on Hybrid 693.07 2.0 Years 6.93 HAM NHAI
11:00 AM
Annuity mode under Bharatmala Pariyojna.
145 Andaman Rehabilitation of section from Km 298.00 to Km 330.662 Karala to Kalipur of NH04 to Intermediate lane
and with hard shoulder in the Union Territory of Andaman and Nicobar Islands Total Length 32.36 km on 07-Jan-2020,
Nicobar EPC Mode Package-VIII Re-Tender 126.45 2.0 Years 1.27 EPC NHIDCL
03:00 PM
Islands
146 Gujarat Construction of Eight Lane expressway starting from Junction with NH-47 near Bhamaiya village and
08-Jan-2020,
ending at Junction with SH-175 in Baletiya village of Delhi-Vadodara Greenfield Alignment on EPC 781.08 2.0 Years 7.81 EPC NHAI
11:00 AM
MODE under BMP in the State of Gujarat. Pkg - 29
147 Gujarat Construction of 8 Lane access controlled expressway starting from junction with SH63 Pratap Nagar
08-Jan-2020,
village ending junction with NE1 near Dodka of Vadodara District section Delhi Vadodara Greenfield 801.80 2.0 Years 8.02 EPC NHAI
11:00 AM
Alignment on EPC Mode under BM Pariyojana in Gujarat. Pkg - 31
148 Gujarat Construction of 8 Lane access-controlled expressway from junction near Baletiya to junction with SH-63
08-Jan-2020,
near Pratap Nagar (Ch.803.420 to 824.920 design Ch.351.000 to Ch.372.500) section of Delhi- 826.13 2.0 Years 8.26 EPC NHAI
11:00 AM
Vadodara(NH-148N) on EPC Mode under BP in Gujarat. Pkg - 30
149 Maharasht RFQ for Development of Marathwada Water Supply Grid along with Associated Infrastructure for the
08-Jan-2020, PPP-BoT-
ra Districts of Aurangabad and Jalna (Package-1) on Hybrid Annuity Mode of Public Private Partnership 4251.00 3.50 Years 21.26 COJAL
05:00 PM HAM
(PPP)
150 Manipur Widening and Improvement of Imphal-Moreh section from Km 395.680 to Km 425.411 to Two (2) lane
10-Jan-2020,
with paved shoulders on NH-39 in the State of Manipur (Package-3) on EPC mode under ADB (SASEC) 339.82 3.0 Years 0.00 EPC NHIDCL
05:00 PM
loan
151 Uttarakha CONSTRUCTION OF TUNNELS , BRIDGES, YARD AND FORMATION WORKS FROM CHAINAGE 117+365
13-Jan-2020,
nd TO 125+320 (FLS) UNDER PACKAGE–9 IN CONNECTION WITH NEW BG LINE BETWEEN RISHIKESH 1354.15 3.70 Days 2.00 RVNL
11:00 AM
AND KARANPRAYAG (125KM) IN STATE OF UTTARAKHAND, INDIA.
152 Karnataka Four Laning of Tumkur-Shivamogga section from Km 119.790 (Design Km 121.900) to Km 166.100
13-Jan-2020,
(Design Km170.415) Banwara to Bettadahalli section of NH-206 in the State of Karnataka on Hybrid 906.69 2.0 Years 9.07 HAM NHAI
11:00 AM
Annuity Mode under Bharatmala Priyojana (Package-III) 2nd CALL
153 Delhi Construction of the Elevated Viaduct from end of the Ramp at IDPL Complex to Start of Ramp at Rajiv
13-Jan-2020,
Chowk and three nos. of Elevated Stations viz., Udyog Vihar, Sector-17 and Rajiv Chowk of Delhi- SNB 588.00 2.5 Years 5.88 BOQ NCRTC
03:00 PM
Regional Rapid Transit System (RRTS) Corridor.
154 West PROVN OF TECH AND OTM ACCN (PH-III) FOR BH AT TEZPUR UNDER GE (S) TEZPUR
Not 13-Jan-2020,
Bengal 79.00 3.50 Years Item Rate MES
Required 06:00 PM
155 Multi RFP for Projects comprising of 7 National Highway stretches Bundle 4 on Toll Operate Transfer TOT
14-Jan-2020,
Location Mode 4170.31 30.0 Years 41.70 TOT NHAI
11:00 AM
156 Odisha Execution of Rural Piped Water Supply Project pertaining to the Kasinagar and Gumma block of Gajapati
14-Jan-2020,
district including 5 years Operation and Maintenance on EPC contract under the package 153.38 2.0 Years 1.54 Lump-sum RWSS
05:00 PM
157 Odisha Execution of Rural Piped Water Supply Project pertaining to the Mahanga Block of Cuttack district
14-Jan-2020,
including 5 years Operation and Maintenance on EPC contract under the package 207.36 2.0 Years 2.08 Lump-sum RWSS
05:00 PM
158 Odisha Execution of 03 Nos Individual Rural Piped Water Supply Project pertaining to the uncovered villages of
14-Jan-2020,
Bhogorai block Phase 2 of Balasore District and GB Nagar and saraskana Block of Mayurbhanj District 235.70 2.0 Years 2.36 Lump-sum RWSS
05:00 PM
including 5 years Operation and Maintenance on
159 Odisha Execution of 03 Nos Individual Rural Piped Water Supply Project pertaining Malkangiri and Koraput
14-Jan-2020,
District including 5 years Operation and Maintenance on EPC contract under the package 236.74 2.0 Years 2.37 Lump-sum RWSS
05:00 PM
160 Kerala Construction of 4 lane Minor Bridge (Paloli Palam) at Km 203.160, Major Bridge (Moorad) at Km
15-Jan-2020,
204.895 and allied works like 4lane Main Carriageway with Service Road Km.203.000 to Km.205.100 of 51.66 550 Days 0.52 EPC NHAI
11:00 AM
NH-17 (New NH-66) under BM in Kerala on EPC
161 Himachal Rehabilitation and Upgradation to 2-lane/2-lane with paved shoulders/4-lane
Pradesh configuration of Paonta Sahib-Hewna Section (km 000.000 to km 25.000) of
NH-707 in the State of Himachal Pradesh under Green National Highways 15-Jan-2020,
204.21 2.0 Years 0.00 EPC MoRTH
Corridor Project (GNHCP) with the loan assistance of World Bank on EPC 11:00 AM
mode.
162 Himachal Rehabilitation and Upgradation to 2-lane configuration of Hewna-Ashyari Section km 25.000 to km
15-Jan-2020,
Pradesh 50.000 of NH-707 in the State of Himachal Pradesh under Green National Highways Corridor Project 185.68 2.0 Years 0.00 EPC MoRTH
11:00 AM
GNHCP with the loan assistance of World Bank on EPC mode
163 Maharasht RFQ for Development of Marathwada Water Supply Grid along with Associated Infrastructure for the
15-Jan-2020,
ra Districts of Latur and Osmanabad Package 3 on Hybrid Annuity Mode of Public Private Partnership PPP 3092.00 3.50 Years 15.46 HAM PPP COJAL
05:00 PM
164 Madhya Construction of Elevated corridor fly over from damoh naka to Ranital Chowk to madan Mahal chowk
15-Jan-2020,
Pradesh up to medical road in the jabalpur city of madhya Pradesh 594.42 3.0 Years 5.95 Lump-sum PWD
05:30 PM
165 Himachal Rehabilitation and Upgradation to intermediate lane configuration of Shri Kyari-Gumma Section (km
16-Jan-2020,
Pradesh 75.000 to km 94.900) of NH-707 in the State of Himachal Pradesh under GNHCP with the loan 269.33 2.0 Years 0.00 EPC MoRTH
11:00 AM
assistance of World Bank on EPC mode.
166 Himachal Rehabilitation and Upgradation to 2-lane configuration of Ashyari-Shri Kyari Section km 50.000 to km
16-Jan-2020,
Pradesh 75.000 of NH-707 in the State of Himachal Pradesh under Green National Highways Corridor Project 264.78 2.0 Years 0.00 EPC MoRTH
11:00 AM
GNHCP with the loan assistance of World Bankon EPC
167 Multi Manufacture, Supply, transportation and delivery of 22,000 MT of UIC 60/60E-1/60KG 1080 Grade
16-Jan-2020,
Location Head Hardened Rails Class-A conforming to IRS T-12-2009 (latest amendment) for Delhi-Ghaziabad- NA 2.0 Years 3.00 Supply NCRTC
11:00 AM
Meerut Regional Rapid Transit System (RRTS) Corridor in India
168 Uttar Stage strengthening from km. 0.000 to km. 43.750 Mohanganj to Lalgopalganj section and km. 52.200 to
Pradesh km. 96.600 Muratganj to Mahewaghat section of NH-731A in Uttar Pradesh on EPC mode 17-Jan-2020,
53.32 1.0 Years 0.53 EPC MoRTH
11:00 AM

169 Madhya CONSTRUCTION OF ELEVATED CORRIDOR BRIDGE IN INDORE CITY FROM LIG SQUARE TO
17-Jan-2020,
Pradesh NAVLAKHASQUARE (OLD NH-3) A-B ROAD IN INDORE DISTRICT IN THE STATE OF MADHYA PRADESH 272.66 2.0 Years 2.73 EPC PWD
05:30 PM
170 Madhya Strengthening work of Rajegaon Balaghat Stretch, Balaghat Lamta Nainpur stretch, Nainpur Mandla Bid
17-Jan-2020,
Pradesh stretch, Dindori Sagartola stretch and Sagartola Shahdol stretch total length 138km on NH 543 under 53.01 330.00 Days Declaratio EPC MoRTH
05:30 PM
NH division Jabalpur in the state of Madhya Pradesh. n
171 Rajasthan Construction of Eight Lane access controlled Expressway starting near Junction with SH-37A to Junction 940.95 2.0 Years Bid 20-Jan-2020, EPC NHAI
with NH-76 (Ch.359.170-388.420) section of Delhi-Vadodara Green field Alignment on EPC Mode under Declaratio 11:00 AM
Bharatmala Pariyojana in the State of Rajasthan. Pkg-13 n
172 Rajasthan Construction of 8 Lane Carriageway start at interchange on NH-116 at village Mui and end at Bid
20-Jan-2020,
Hardevganj village near Indergarh(Ch.292.950- 319.400)section of Delhi-Vadodara Access Controlled 916.46 2.0 Years Declaratio EPC NHAI
11:00 AM
Green field Alignment (NH-148N) under BM in Rajasthan on EPC. Pkg - 10 n
173 Rajasthan Construction of 8 Lane access controlled Expressway from Hardeoganj village near Indergarh to Major 986.06 2.0 Years Bid EPC NHAI
20-Jan-2020,
Bridge on Mej river (Ch. 319.400 - Ch. 331.030) section of Delhi - Vadodara Green field Alignment (NH- Declaratio
11:00 AM
148N) under BM in Rajasthan on EPC. Pkg - 11 n
174 Rajasthan Construction of 8 Lane Carriageway starting near Junction with NH-76 to Junction with NH-12 near 794.51 2.0 Years 7.95 EPC NHAI
20-Jan-2020,
village Ummedpura (Ch. 388.420 to Ch. 419.000) section of Delhi-Vadodara Access Controlled Green
11:00 AM
field Alignment (NH-148N) under BM in Rajasthan on EPC. Pkg - 14
175 Rajasthan Construction of Eight Lane Carriageway starting from Major bridge over Takli river near Nayagaon 650.24 2.0 Years 6.50 EPC NHAI
20-Jan-2020,
Jageer village to Rajasthan-MP Border (Ch.427.300 to Ch.452.425) section of Delhi-Vadodara (NH-
11:00 AM
148N) under BMP in the State of Rajasthan on EPC mode. Pkg - 16.
176 Rajasthan Construction of Eight Lane Carriageway starting near Major Bridge on Mej River to Junction with SH-
20-Jan-2020,
37A (Ch. 331.030-359.170) section of Delhi-Vadodara Access Controlled GFA (NH-148N) on EPC Mode 1052.98 2.0 Years 10.53 EPC NHAI
11:00 AM
under Bharatmala Pariyojana in Rajasthan
177 Tripura Improvement and Widening to two lanes with paved shoulders of Jolaibari Belonia (from km 0.000 to
20-Jan-2020,
km 21.412) section of NH-108A in the state of Tripura on EPC mode 149.14 2.50 Years 0.00 EPC NHIDCL
11:00 AM
178 Andhra Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Paderu to Gondiguda
21-Jan-2020,
Pradesh section (Km 2/400 to Km 27/480 ) of NH-516E in the State of Andhra Pradesh under (GNHCP) with the 168.32 2.0 Years 1.68 EPC MoRTH
11:00 AM
loan assistance of World Bank on EPC mode.
179 Andhra Rehabilitation and Upgradation to 2 lane with paved shoulders configuration of Bowdara to
21-Jan-2020,
Pradesh Vizianagaram section Km 0/000 to Km 26/937 of NH 516E in the State of Andhra Pradesh under GNHCP 97.53 1.5 year 0.97 EPC MoRTH
11:00 AM
with the loan assistance of World Bank on EPC mode.
180 Maharasht Development and Maintenance of Inter Modal Station at Ajni Railway Station, Nagpur in the State of 994.38 2.50 Years 9.94 22-Jan-2020, EPC NHAI
ra Maharashtra on EPC mode under Bharatmala Pariyojana 11:00 AM

181 Uttar Improvement and Up gradation to two lane with paved shoulder/Four lane configuration of NH No 321 212.93 2.0 Years 2.13 23-Jan-2020, EPC NHAI
Pradesh G Section From Agra to Jalesar design chainage from km 0.00 to 36.00 in UP on Engineering 11:00 AM
Procurement and Construction EPC Mode
182 Gujarat Construction of 6-lane access controlled GH from km67.000-km 99.000 of Rajasthan-Gujarat Border to
23-Jan-2020,
Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat 595.27 2.0 Years 0.00 EPC NHAI
11:00 AM
on EPC mode under BMP(Phase-I)AJ-RGBS-Package-3
183 Gujarat Construction of 6-lane access controlled GH from km99.000-km130.073 of Rajasthan-Gujarat Border to
23-Jan-2020,
Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat 619.78 2.0 Years 0.00 EPC NHAI
11:00 AM
on EPC mode under BMP(Phase-I)AJ/RGBS-Package-4
184 Tamil Strengthening and Widening Four Lane of Tirunelveli Sengottai Kollam Road of SH39 from Km 5000 to
23-Jan-2020,
Nadu Km 50600 in the State of Tamil Nadu under TNRSPII to be executed on DBFOMT on modified Annuity 426.20 2.0 Years 0.00 DBFOMT PWD
11:00 AM
basi
185 Gujarat Construction of 6-lane access controlled GH from km4.888 to km35.000 of Rajasthan-Gujarat Border to
23-Jan-2020,
Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat 516.57 2.0 Years 0.00 EPC NHAI
11:00 AM
on EPC mode under BMP (Phase-I)AJ-RGBS-Package-1
186 Gujarat Construction of 6-lane access controlled GH from km35.000 to km67.000 of Rajasthan-Gujarat Border to
23-Jan-2020,
Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat 566.80 2.0 Years 0.00 EPC NHAI
11:00 AM
on EPC mode under BMP(Phase-I)AJ-RGBS-Package-2
187 Andhra Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Gondiguda to Araku (up
Pradesh to Bhallaguda) section (Km 27/480 to Km 51/772) of NH 516E in the State of Andhra Pradesh under 23-Jan-2020,
GNHCP the loan assistance of World Bank on EPC mode 227.59 2.0 Years 0.00 EPC MoRTH
11:00 AM

188 Delhi Package 4 Design and Construction of Tunnels by TBM from near New Ashok Nagar DN Ramp to
27-Jan-2020,
Sahibabad UP Ramp NA 3.0 Years 12.00 Lump-sum NCRTC
03:00 PM
189 Maharasht Construction of formation in Embankment and Cutting, Blanketing, Rock cutting, Construction of Major
27-Jan-2020,
ra and Minor Bridges, RUBs, ROBs, Construction of Drain, Retaining wall, Ballast Supply and Removal of NA 3.0 Years 0.98 Item Rate MRVC
03:00 PM
Infringements in Panvel Karjat section in 2 LOTs
190 Maharasht Construction of Major bridges, Minor Bridges, Drains, retaining wall, extension of Limited height
ra Subway/RUB, Ballast supply and Earthwork in the section from Ch. 32100 to Ch. 61400 between 27-Jan-2020,
Palghar Station (Excluding) and Dahanu Road Station (Excluding) RFB :- MRVC/W/101/R1/LOT II NA 3.0 Years 0.91 Lump-sum MRVC
03:00 PM

191 Maharasht “Construction of Road bed, Major bridges, minor bridges, ROBs & RUBs including road approaches,
ra Station Buildings, Staff Quarters, Other Service Buildings, HL Platforms, COPs, FOBs, General 24-Feb-
Electrification & other Works related to Construction of New BG Line From km 78 (Excluding Yavatmal 680.08 3.50 Years 2.00 2020, 11:00 RVNL
Station) to km 110 of Central Railway in Maharashtra State, India.” AM

192 Maharasht “Construction of Road bed, Major bridges, minor bridges, ROBs & RUBs including road approaches,
ra Station Buildings, Staff Quarters, Other Service Buildings, HL Paltforms, COPs, FOBs, General 24-Feb-
Electrification & other Works related to Construction of New BG Line From km 110 to km 157 (Near 581.75 3.50 Years 2.00 2020, 11:00 RVNL
Digras Station) of Central Railway in Maharashtra State, India. AM