Detailed BarBending schedule

PROJECT Madukkarai compound wall


STRUCTURE Entrance arch pedestal detail
PARTICULARS :RCC FOR FOOTINGS & RAFT

Various Diameters of Reinforcement bars


No. of bars Number
Sr. Bar Dia of Cutting Total
Member Bar Shape in a of 8mm 10mm 12mm 16mm 20mm 25mm
No. Description bar length length
member members

A Footing jali for Footing__


C1 Short Bar 12mm 2.67 14 8 299 - - 299.04 - - -
Long bar 12mm 2.17 16 8 277.8 - - 277.76 - - -
0
C2 Short Bar 8mm 2.80 16 2 89.6 89.60 - - - - -
8mm 0.80 32 2 51.2
Long bar 12mm 2.80 32 1 89.6 - - 89.60 - - -
-

Total length of bars dia wise 89.60 - 666.40 - - -


Wt. / m (Kg/m) 0.40 0.62 0.89 1.58 2.47 3.86
Weight of bar Dia wise 35.84 - 593.10 - - -
Total weight of bars (in Kg) 628.936

Prepared By Verified By
Page 1 of 8
S.R.M.E.C.C.Ltd. CLIENT
Various Diameters of Reinforcement bars
No. of bars Number
Sr. Bar Dia of Cutting Total
Member Bar Shape in a of 8mm 10mm 12mm 16mm 20mm 25mm
No. Description bar length length
member members

A Columns upto Plinth level


- - - - - -
Main Column bars 12mm 3.800 12 4 182.4 - - 182.40 - - -
Stirrups 8mm 2.680 15 4 160.8 160.80 - - - - -
Hook 8mm 0.600 45 4 108 108.00 - - - - -

- - - - - -
tie beam
bottam bars 16mm 5.900 6 2 70.8 - - - 70.80 - -
Stirrups 8mm 1.650 23 2 75.9 75.90 - - - - -

Total length of bars dia wise 344.70 - 182.40 70.80 - -


Wt. / m (Kg/m) 0.40 0.62 0.89 1.58 2.47 3.86
Weight of bar Dia wise 137.88 - 162.34 111.86 - -
Total weight of bars (in Kg) 412.080

No. of bars Number


Sr. Bar Dia of Cutting Total
Member Bar Shape in a of 8mm 10mm 12mm 16mm 20mm 25mm
No. Description bar length length
member members no of rods

A Footing jali for Footing__


C1 Short Bar 8mm 1.02 10 4 40.8 40.80 - - - - - 11.8 1.36
Long bar 0 - - - - - -
0
SLAB Short Bar 8mm 2.80 16 2 89.6 89.60 - - - - - 4.3 0
8mm 0.80 32 2 51.2 51.20 15.0 0
Long bar 12mm 2.80 32 1 89.6 - - 89.60 - - - 4.3 0
-

Prepared By Verified By
Page 2 of 8
S.R.M.E.C.C.Ltd. CLIENT
Various Diameters of Reinforcement bars
No. of bars Number
Sr. Bar Dia of Cutting Total
Member Bar Shape in a of 8mm 10mm 12mm 16mm 20mm 25mm
No. Description bar length length
member members
Total length of bars dia wise 181.60 - 89.60 - - -
Wt. / m (Kg/m) 0.40 0.62 0.89 1.58 2.47 3.86
Weight of bar Dia wise 72.64 - 79.74 - - -
Total weight of bars (in Kg) 152.384

Various Diameters of Reinforcement bars


No. of bars Number
Sr. Bar Dia of Cutting Total
Member Bar Shape in a of 8mm 10mm 12mm 16mm 20mm 25mm
No. Description bar length length
member members

A Columns upto Plinth level


- - - - - -
Main Column bars 12mm 6.000 4 4 96 - - 96.00 - - - 8.00
Stirrups 8mm 0.700 25 4 70 70.00 - - - - - 5.83
Hook 8mm - - - - - - 0.00
0.00
- - - - - - 0.00
tie beam
bottam bars 16mm - - - - - - 0.00
Stirrups 8mm - - - - - - 0.00
0.00
Total length of bars dia wise 70.00 - 96.00 - - -
Wt. / m (Kg/m) 0.40 0.62 0.89 1.58 2.47 3.86
Weight of bar Dia wise 28.00 - 85.44 - - -
Total weight of bars (in Kg) 113.440

Prepared By Verified By
Page 3 of 8
S.R.M.E.C.C.Ltd. CLIENT
Prepared by 12/20/2019 Page 4
RAK INDO KOVAI TOWN SHIP LID
MADUKKARAI COMPOUND WALL WORK STATUS ON

S Designation of Total Back Block Angle not


no Location unit Length Length PCC FOOTING Wall filling Column work fixing Coping Plaster Strated REMARKS

NORTH SIDE - Burial


ground mtr 481.85

E mtr 86.12 86.12 86.12 86.12 86.12 86.12


F mtr 108.58 108.58 108.58 108.58 108.58 108.58
J mtr 68.95 58 38.5 38.5
M mtr 148.00 148 90.1 25.1
U mtr 42.40 42.4 42.4 42.4
V mtr 27.81 27.81 27.81 27.81
SOUTH SIDE -
arevoli nagar 466.84

A mtr 63.06 55.1 55.1 55.1 55.1 55.1 55.1 55.1


B mtr 63.25
C mtr 35.12
D mtr 126.53
D1 mtr 110.05 110.05 110.05 110.05 110.05 110.5 110.5
S mtr 68.82
EAST SIDE
APPROACH MAIN
ROAD - T mtr 140.00 140
WEST SIDE mtr 263.07

N mtr 177.00 174 174 174 174 174 174 174 174
P mtr 86.07

Boundray wall
around legth 1352
810.1 732.7 667.7 368.7 533.9 339.6 339.6 229.1
work completion in
percentage 60 54 49 27 39 25 25 17
Boundary wall Contractor details :

Page 4 madu compound wall work particulars


Prepared Location
Value by 12/20/2019
of Page 5
Contractor name Scope of work of work Boundary wall
Sri sundrasan Enterprises with material contract 84 lacs north side wall

Entrance Arch detail estimate


Sl.
no Description of Item Unit nos length Breadth Depth Qty Qty Rate Amount

1 Excavation

Footing cm 4 2.7 2.2 2.2 52.27

Tie beam cm 2 1.8 0.6 0.5 1.08


53.35 58.69 125 7335.9

Back filling available


2 earth in site

Footing pit 53.35


PCC below footing 4 2.7 2.2 0.1 -2.38
RCC footing concrete 4 2.5 2 0.3 -6.00

44.98 49.47 105 5194.7

3 PCC 1:3:6 concrete

below footing 4 2.7 2.2 0.1 2.38

below tie beam 2 4.4 0.6 0.1 0.53


2.90 3.19 3150 10062.4

RCC M25 grade of


4 concrete
Page 5 madu compound wall work particulars
Prepared by 12/20/2019 Page 6
Footing 4 2.5 2 0.3 6.00 6.60 3920 25872.0

Pedestal 4 1 0.5 2.5 5.00 5.50 3950 21725.0

Tie beam 2 4.4 0.4 0.5 1.76 1.94 4000 7744.0

5 Shuttering work

Footing 4 9.4 0.3 11.28 12.41 280 3474.2

Pedestal 4 3 2.5 30 33.00 300 9900.0

Tie beam 4 4.4 0.5 8.8 9.68 280 2710.4

Steel Fe 415 supply


and bending binding
6 inculding posioning MT 1.5 1.65 42000 69300.0

M.S plates for Anchor


bolt postion 16mm
7 thick

kg 4 0.8 0.4 160.768 176.84 60 10610.7

TOTAL AMOUNT 173929.3

Security kiosk

Sl.
no Description of Item Unit nos length Breadth Depth Qty Qty Rate Amount

Page 6 madu compound wall work particulars


Prepared by 12/20/2019 Page 7
1 Excavation
Footing cm 4 1.1 1.1 1.3 6.29 6.92 105 726.7

Back filling available


2 earth in site

Footing pit 4 1.1 1.1 1.3 6.29


PCC below footing 4 1.1 1.1 0.1 -0.48
RCC footing concrete 4 0.9 0.9 0.2 -0.65
5.16 5.68 105 596.0

3 PCC 1:3:6 concrete

below footing 4 1.1 1.1 0.1 0.48

below tie beam 4 2.5 0.4 0.1 0.40


Flooring 1 2.8 2.8 0.15 1.18
2.06 2.27 3150 7137.9

RCC M25 grade of


4 concrete

Footing 4 0.9 0.9 0.2 0.65 0.71 3920 2794.2

stup column 4 0.2 0.2 1.2 0.19 0.21 3950 834.2

Tie beam 4 2.5 0.2 0.23 0.46 0.51 4000 2024.0

Column 4 0.2 0.2 3.2 0.51 0.56 4000 2252.8

Roof salb 1 2.8 2.8 0.125 0.98 1.08 4000 4312.0

5 Shuttering work

Footing 4 3.6 0.2 2.88 3.17 280 887.0

stup column 4 0.8 1.2 3.84 4.22 300 1267.2

Tie beam 8 2.5 0.23 4.60 5.06 280 1416.8

Page 7 madu compound wall work particulars


Prepared by 12/20/2019 Page 8
Column 4 0.8 3.2 10.24 11.26 300 3379.2

Roof salb 1 2.8 2.8 7.84 8.62 300 2587.2


1 11.2 0.125 1.40 1.54 300 462.0

Providing and
constructing 200mm
thk solid block
masonry with cement
6 mortar 1:5

around wall 4 2.1 3.3 27.72 30.49 750 22869.0

7 Plastering
8 2.5 3.5 70 77.00 180 13860.0

Rcc surface plaster 2 2.8 2.8 15.68 17.25 180 3104.6