Date : 02.08.2017
S No Discripation Responsablitiy
Irfan + Ameresh +
1 Blow pipe changing Alok + santosh
25
Cushioning tank discharge side plate fixing east
Mash roller hopper door opening for cleaning
26 east
27 Blowing Box Nozzles cleaning west side
Sarang + amit
mishra
Mash roller hopper door opening for cleaning Sarang + amit
28 east mishra
7.00
Vasanta Engg.Group 2
GB Group Raju
Pradumna + 4 6.00
Sagar + 3 6.00
4.00
Piping Group 4
6.00
5.00
Piping Group 5
2.00
10.00
10.00
S No Discripation Responsablitiy
36 SGP East - GB1A Belt Replacement - 14 Hrs Job Ravi reddy + Sarang
DAY SHIFT
1 RANJAN SAHU F
2 RANJIT NAYAK F
3 JITENDRA BEHERA W
4 RASMANA PATRA R
5 BALWANT KUMAR R
6 SURESH SAHU H
7 PINTU PRADHAN R/FO
8 JITENDRA KUMAR DHIR R
9 PRABHAT SAMAL JF
10 SHISIRAKANTA SAHU H
11 SRUTIRANJAN SAHU F
12 PRAKASH BEHERA H
13 PRABHAT THANAPATI F
14 MANAS RANJAN DAS H
15 NAROTTAM SAMAL R
16 AJAY BEHERA AF
17 GULSHAN KUMAR F
18 JITENDRA PRADHAN W
19 JITENDRA KUMAR SWAIN R
20 BIKASH PRADHAN H
21 SUBHRAKANT BARIK F
22 GOBIND CHANDRA SAHU W
23 DHRUBA CH DEHURY R
24 TEJPRATAP SINGH R
25 PRASHANT BISWAL F
26 SUSHANT SAMAL W
27 DILIP SAMAL W
28 BENUDHAR BISWAL R
29 DAMBRUDHAR SAHU R
30 PURUSOTTAM PRADHAN H
31 TUNA SAHU Jr.Tech
32 SATYAPRIYA SAHU Jr.Tech
hut down Job List - 06 Shut Down Duration 12 Hr.
Piping Group -1 NA
Vasanta Engg.Group 1 NA
vasanta Group 1 NA
Piping Group -2 NA
Piping Group - 3 NA
GULSHAN KUMAR(F), JITENDRA
PRADHAN(W), Jitendra Kumar Swain®,
BIKASH PRADHAN(H)
GB Group khan NA
HIREN PRADHAN,GOPABANDHU
Vasanta Engg.Group 2 BISWAL,BISHNU NAYAK,SUDAM BEHERA
NA
GB Group Sanatan NA
GB Group Sanatan NA
GB Group Raju NA
Vasanta Engg.Group 2
NIGHT SHIFT
CH 1 PRABIN PANDA
CH 2 AKHILESH THAKUR
CH 3 LALBIHARI BEHERA
CH 4 BISHNU PRADHAN
CH 5 DHARMENDRA PAL
CH 6 HEMANT BISWAL
CH 7 DEEPAK PATRA
BLT 8 RAKESH RANJAN DAS
BLT 9 SIRAJ ANSHARI
BLT 10 BINOD KU BARIK
HYD 11 RAJENDRA KU BISWAL
HYD 12 PRAKASH SAHU
HYD 13 BHAGABAN REDDY
HYD 14 SAROJ NANDA
HYD 15 MANOJ SAHU
HYD 16 SATYABRATA SAHU
WHRS 17 PRABHAT ROUL
WHRS 18 MAHENDRA DEBTA
WHRS
WHRS
BH
BH
BH
BH
SGP
SGP
SGP
SGP
SGP
SGP
SGP
SGP
Duration Remarks
(HRS)
2.00
8.00
3.00
4.00
6.00
4.00
4.00
2.00
7.00
4.00
5.00
4.00
8.00
4.00
4.00
3.00
8.00
5.00
8.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
12.00
F CH
F CH
W CH
W CH
R CH
R CH
H CH
H CH
F CH
W CH
R/FO CH
H CH
F CH
F HYD
H HYD
H HYD
Jr.F BH
H BH
Mechanical
S No Area
FURNACE
1 PROPER
CAST HOUSE
5
7
8
9
FURNACE
10 PROPER
11
12
13
14
15
CAST HOUSE
16 DE DUSTING
17
HYDRAULICS
18
19
20
21
22
PUMP HOUSE
23
24
25
26
27
28
SGP
SGP
29
30
31
32
33
34
35 CYCLONE,GCP
36 & STOVES
37
STOVES
38
39
40
41
42
STOCK HOUSE
43
44
45
46
47
48
49
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Mechanical Shut down Job
Discripation
NIGHT SHIFT
JSPL:
INCHARGE: VISHESH SINHA, MANISH YADAV, KIRAN KUMAR,AMLESH KUMAR,RAVI AGR
REDDY,ANURAG KUMAR
TPL:
KUMUD RANJAN SAHOO, BIKASH PUHAN
TECHNICIANS:
PRABIN PANDA
AKHILESH THAKUR
LALBIHARI BEHERA
BISHNU PRADHAN
DHARMENDRA PAL
HEMANT BISWAL
DEEPAK PATRA
RAKESH RANJAN DAS
SAROJ NANDA
MANOJ SAHU
SIRAJ ANSHARI
BINOD KU BARIK
RAJENDRA KU BISWAL
PRAKASH SAHU
MANAGOBINDA BEHERA
SANTOSH KUMAR SAHU
NARENDRA KU. BEHERA
PRADYUNMA DEHURY
DAMODAR SENAPATI
SUMANT PAL
DEPAK ROUT
DHRUBA CH DEHURY
TEJPRATAP SINGH
PRAMOD KUMAR
CHANDAN PANDEY
GANESWAR BISWAL
RANJIT SAHU
MITHUN PARIDA
SUSHANT AMANTA
BANKANIDHI DALEI
LOKESH BEHERA
SUNIL MAHANTY
DWARIBANDHU MAHARANA
PRADEEP BEHERA
Mechanical Shut down Job List Shut Down Duration 12 Hr.
Date : 28.08.2017
JSPL
Responsiblitiy ManPower MANPOWER
Night Shift
Vishesh (Night) Manpower +TPL
( Ansari +3 (Day)
TPL(Thakur +3 &
Gulshan +3)
Nitin+Irfan + Anup+Amarjeet
GB Group (3 Groups)
Spire group
Prakash Majhi +
Team & TPL PRAKASH
MAJHI,
Nitin+JK Nath+Alok PRADYUMNA
KU NAYAK,
ALEKH BEHERA
Hiren +3
Vasanta Engg.Group
Nitin+Brijesh+Ashok satpathy 2
Vasanta Engg.Group
3 + MSP SANDEEP
SINGH, ROHIT
Brijesh+Bishnu das+ Shahnawaj BARIK(TR),
UMASHANKAR
Sandeep singh + HOTA(TR)
TEAM
TPL(Prashant Samal
Vishnu+Amit Mishra+Dilip +3 & Subhojit + 3) Lachhu +
PRAHALLAD CH
Pandit+Yogesh SINGH
TPL(Prashant Samal
Vishnu+Amit Mishra+Dilip +3 & Subhojit + 3) Lachhu +
PRAHALLAD CH
Pandit+Yogesh SINGH
GB Group (2 Group)
TPL(Bhagwan
Santosh+Venkatesh Reddy+team)
payasi+Shanawaj Malick
Piping Team (M V
Group
Santosh+M R Mishra+ Gauri Vasanta Group 1
Mohanty Gulshan Team
AREA
CH
CH
CH
CH
CH
CH
CH
CH
HYD
HYD
CH
CH
CH
PH
PH
PH
PH
PH
PH
PH
PH
BH
BH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
uration 12 Hr.
Duration
TPL MANPOWER TOOLS REQUIRED (HRS)
SIRAJ ANSHARI, BINOD KU BARIK, RAJENDRA KU BISWAL, Pnematic torque & socket
2.00
PRAKASH SAHU M30 & M36
GULSHAN KUMAR, JITENDRA PRADHAN, JITENDRA KU Pnematic torque & socket 1.50
SWAIN, BISHNU NAYAK, THAKURDAS MAHATA, MAFIZ M32 & hammer spanner
ANSHARI, RANJIT BISWAL, PINTU PRADHAN M65, grinding m/c
As per req.
12.00
1.00
Complete Tool Box
6.00
PRABHAT SAMAL, RANJAN SAHU,
2.00
Complete Tool Box
2.00
2.00
BHAGABAN REDDY, CHANDRAKANT NAYAK, AKSHAY 4.00
SAMAL, RAJ KISHORE BEHERA, SOMNATH LAGURI,
DIPTIRANJAN SAMAL 2.00
1.00
6.00
Date : 13.09.2017
S JSPL TOOLS Duration Remarks
Area Discripation Responsiblitiy ManPower TPL MANPOWER
No MANPOWER REQUIRED (HRS)
Furnace Lance Pipe Erection Santosh + Vishesh Sashikant + Thakur
1 Proper Sinha + Alok Project 10 + TPL +6 3
3 Furnace Proper AB Temp. Probe Changing & Removal of old Probe 2 Anup Kumar Jha Vasanta G 1
nos.
4 Hatch door removal for castable fixing Munna kishan Vasanta G 2
Hiren, Bikash Pradhan, Prakash
5 Pr. Probe cleaning Electrical Team Sahu
6 Mudgun Hydraulic 1 checking Bishnu Das Saroj Nanda, Manoj Sahu
7 Tuyere cooling pipe modification as per site Jitendra mishra Piping Team 1
27 GB 1B Scrapper provision
35 SGP East S/D Slag tube Liner refractory on dammaged area. Refractory
Kundu + Deepak
Jobs-
SGP East S/D Kundu + Deepak
Jobs-
Prashant Biswal, Sushan Samal,
Rasa Filter discharge hopper pipeline (Suction of Mud Dilip Samal, Benudhar Biswal,
36 Lacchu + Damburu Sahoo, Purshotam
water pumps) re-routed
Prashant + 7 Pradhan, Satyapriya Sahoo
37 HWP -2 NRV Replacement
38 SGP East- Chute erection GB 5 to GB 1A GB G - 2
S No Area
Furnace Proper
1
3 Furnace Top
6
Hydraulic
7
9
Cyclone
10
11
12
13
14
15
SGP West S/D
Jobs-
16
17
18
19
20
21
24
25 TLRS
26
27 CH-Dedusting
28
29
30
Blower House
31
32
Mechanical Shut down Job List - 09 Shut Down
Descripation
All slow cycle grease distributor cleaning and feed line checking to ensure healthiness.
Pug mill discharge Chute & Emergency line Water Spray Arrangement
Cushion tank front wall of Slag tube 30 mm Plate fitting & welding
Chute erection GB 1A to GB 7
LADLE (TLC) PM
Cleaning of cell of cast house dedusting bin (need to open rotary air valve if required)
3.10.2017
Piping Group Jitender Mishra
3.10.2017
3.10.2017 TPL
3.10.2017 GB Group
3.10.2017 GB Group
7
Bleeder auxiliary tank old pipe cutting &
shifting. TPL-
Bishnu +
Hydraulic Hydraulic
8 LSV cylinder time checking Manish Group
9.00 Manipulator pressure line valve fixing
10
Snort valve hydraulic line leakage
checking.
11 Stove Snort valve PM & Silancer net tighting Jitendra PCI Team
mishra
12 Cyclone Pug mill inspection
19
Hot water Tank - Pump Installation ,
Cleaning & Re-Installation at GB5 Tailend.
GB Team 2
20
Mesh Roller Hopper - Door Opening ,
Cleaning & Re-Fitment
Hemant/v
SGP Chute GB-01A to GB07 - Erection ( GB
21.00 yankatesh/ GB Team 1
East S/D Manpower ) amit
Jobs- mishra
Hemant/v
SGP yankatesh/
East S/D amit
Jobs- mishra
Hot water Tank - Makeup line
22
Piping
Pneumatic valve & Manual Valve - Team
Passing Arresting.
Screw Conv - Tail end - Door Opening - Prashant +
23 Submersible Bearing Assly check for Team
grease leakage at gland and tighten.
24
GB 01 A/B ,05 A/B ,07 A/B ,104 A/B , 11
A/B Damaged Idler Replacement.
25.00
Installation of Self Cleaning Idlers in GB07,
SGP GB 104 A & B
Transpo
Greasing of Takeup Pulleys , Wire Rope Vasanta
26 rt Vishesh Team 2
System ( Clamp Tightening
Belts )
27 Belt Scrapper Adjustment.
S No Area
Furnace Proper
Furnace Top
7
Hydraulic
Stove
9 Cyclone
Water System
PCI
11
21
22
24
SGP Transport
System ( Belts )
25 TLRS
Mechanical Shut down Job List - 12 Shut Down Duratio
Descripation
GB Team 2
Hemant/vyankatesh/a GB Team 1
mit mishra
Piping Team
Hemant/vyankatesh/a
mit mishra
Prashant + Team
Shashi
Blow pipe group+
Irfan/JK
Furnace replacement nos. Nath/Maj Ansari Gulshan +
Proper (8,9,14,36,37,38,1,2 hi group+Gul team
) shan
group
Tuyere changing
no.19
Downleg
replacement 34no.
And 14no.
Prakash
Bleeder seat Majhi +
2 inspection and Ranjan +
cleaning Prabhat +
Furnace SLI-3 inspection Irfan/JK Team
Top Nath/
Top firing
GB Team
Transformer shed 1
5
6
7 TPL-
Bishnu + Hydraulic
Hydraulic Manish Group
8
Stove Jitendra PCI Team
9 Cyclone mishra
VP Pump
Water Shrivastav House
System a Team
Jitendra Piping
PCI mishra Team
11 SGP Dilip
12 West S/D Pandit
TPL/Shift A/B/C - 4 NOS
Jobs- Ashok
SGP Dilip
West S/D Pandit
TPL/Shift A/B/C - 4 NOS
13 Jobs- Ashok
21 GB Team
22 2
Hemant/v GB Team
23 SGP East yankatesh 1
S/D /amit
Jobs- mishra Piping
Team
24 Prashant + Team
SGP
Transpor Vasanta
Vishesh
t System Team 2
( Belts )
Electric
13 al Transformer shadde Vishesh GB Group 1 8
Building
Stock House
Fines
22 Convey
or Take-up locking arrangement to be done Debasish Chandan+3 8
STC-01
23 Convey
or Rod Fixing below return Idler S C Nayak Sai Group 8
STC-01
& CTC-
24 01
Convey
or Stone Box to be fitted in the incoming Chute S C Nayak Sai Group 8
STC-01
25 Convey
or Grizzly fitting to be done below Drive Pulley S C Nayak Bandhan+3 4
CFC-01
26 Convey Sushant(M/F
or Stand by drive alignment to be done Ravi Agireddi )+3 8
Coke
27 Radial Sunil+2
Gate PM of Coke Radial Gates (6nos) Ravi Agireddi 4
OGC-
01 &
CGC-
28 Discharge chute support to be given Dayanidhi Ganesh+3 8
01
Convey
or
MCC-
01,OG
C-01 &
29 CGC- Greasing of Gear Coupling Dayanidhi Sunil+2 2
01
Convey
or
MCC-
01,OG
C-01 &
30 CGC- Heat Exchanger Cleaning Dayanidhi Sunil+2 1
01
Convey
or
De-
31 dusting Chain Conveyor Inspection Kiran Kumar Ganga+2 4
System
Sinter
Skirt board to be extended for De-dusting Suction hood Kartik,Ganga
32 Fines in Ferrous Fines Building Debasish
+2
4
Circuit
2
Electrician / 1 hrs
3 Opening inspection Cover. (3 nos. manholes) Sandipan 1 Mech
Motor 1 Technician
Motor 1
2
Electrician /
4 General checks inside the Motor. Sandipan 4
1 Mech
Technician
2
5 Normalisation after all Checks Sandipan Electrician 1 hrs
Isolation of Motor 1 from Electrical Supply, and 2
6 Sandipan
Lock out. Electrician 1 Hr
2
7 Discharge of Motor 1 Sandipan Electrician 15 min
2
Electrician / 1 hrs
8 Opening inspection Cover. (3 nos. manholes) Sandipan 1 Mech
Technician
Motor 2
2
Electrician /
9 General checks inside the Motor. Sandipan 4
1 Mech
Technician
2
10 Normalisation after all Checks Sandipan Electrician / 1 hrs
EOT Crane
TIME STUDY & STEPS FOR DOWNLEG REPLACEMENT
S No. Activity Duration
1 Position of forklift to remove desired blow pipe and
remove the blowpipe 30min
2 Position of downleg zig on forklift 15min
3 Shifting of scafolding platform for bolt opening 15min
4 De-torquing of downleg bolts 45min
5 Removing of DP points bolts and flange 15min
6 Shifting of Forklift alongwith zig to jammed downleg and
its positioning 15min
7 Removing of downleg turn buckle 15min
8 Cutting of bolts fouling in plate position 15min
9 Removing of old downleg and keeping in casthouse floor 15min
10 Placing of downleg zig(alogwith new downleg) on the
forklift 15min
11 Position and erection of downleg below goose neck 30min
12 Fixing of bolts on downleg 15min
13 Torquing of blots on downleg (2 round) 75min
14 Fixing of turn buckle of downleg 15min
15 Fixing of DP point flange and bolting 15min
16 Welding of DP point nipple with downleg 15min
17 Erection of blowpipe to position 45min
S No Area Descripation
1) Blow pipe changing 36, 3 & 21 ,2) Tuyere cooller leakage 20
1
Furnace Proper
Tuyere cooler 4 grouting
Refractory
Top firing
Majhi + 4 12
Required
Vishesh Vasanta G 1 12
Manish Sandeep + 3 3
Electrical 8
8
2
8
Dilip Pandit SGP Group 6
2
2
Bhawani
Blower team 2
SE
Ravi Agireddi/Kiran 16
Ravi Agireddi/Kiran 4
Ravi Agireddi/Kiran 6
Srinivas Rao/ S C Nayak 30min
Srinivas Rao/ S C Nayak 20
Srinivas Rao/ S C Nayak 8
S K Sethy/Abhishek/Daya 6
S K Sethy/Abhishek/Daya 4
S K Sethy/Abhishek/Daya 1
S K Sethy/Abhishek/Daya 4
Devasis 4
Srinivas Rao 8
Srinivas Rao 20
Mechanical Shut down Job List - 16 Shut Down Duration 12 h
S No Area Descripation
Cast
10 house Spark trap chain conveyor repair
Dedusting
11 Hydraulic
General inspection
12 s
13 Stove Waste gas valve bellow ceramic blanketting
16 Water DG Tuyere LP PM
17 System
Electrical
18 Transformer sheeting
Building
19 Settling tank Slurry pump installation for cleaning
20 SGP
West S/D Screw conveyor tail end inspection
21 Jobs- RASA filter - Internal inspection & Screen repairing
22 Emergency tank Pneumatic valve By-pass line provision
23 HWP 2 - Pneumatic valve Support & internal Inspection of Gate valve
24 Damaged Brackets replacement
25 GB 07 Discharge Stone box - Fabrication & Erection
26 SGP East Skirt Board provision Hopper No 4
27 S/D Jobs- HWP-1 Alignment & Belt Tensioning
2 Feeder
Sinter Weigh Hopper Feeder -1,3 & 8 suspended sling to be tightened
3 SFC-02 Discharge chute Skirt rubber adjustment
Fines Conveyor
4 Guide roller fixing in CFC-01 & OFC-1
Fines Conveyor
5 SFC-03 Drive area housekeeping
6 PFC-05 drive lubrication.
7 CGC-01 CGC-01 take-up pulley right side Plummer block to be checked.
8 CGC-01 Discharge chute additional support to be provided.
9 MCC-1 Tail end Skirt rubber adjustment.
10 CFC-2 Head pulley changing
11 CGC01 Tail pulley lagging
6 Shut Down Duration 12 hr.
Date : 21.11.2017
Duration Remark
Responsiblitiy ManPower
(HRS) s
Gulshan+3 & 1
Jatin+Kundu+Manish Panda+3 4
Gulshan+3 8
Thakur+3 8
8
Irfan+Anup+Bishnu
Majhi+TPL-4 2
2
Jatin+Kundu+Manish 8
Ansari+3
Jatin+Kundu+Manish 3
Vishesh+Alok Bhavesh+Hiren+3 8
4
Bishnu Sandeep + 4
4
Vishesh+Alok Hiren+3 4
PCI TEAM+vasanta
Jitendra +Munna 8
grp
VP Shrivastava+Shanawaz 6
Pump House team
mallick
EMC Group 8
Kiran 15min
Pramod+3
Kiran 3 Hrs
Chandan+3
Kiran 4Hrs
Anil Plange 1Hr
Moharana+3
Anil Plange 4Hrs
Moharana+3
Anil Plange 2Hrs
Anil Plange 1Hr
S K Sethy Sushant(M/F)+5 5Hrs
S K Sethy Sai Group 6Hrs
S K Sethy Sumanta+2 2Hrs
S K Sethy Sumanta+2 4Hrs
S K Sethy Sumanta+2 4hrs
Mechanical Shut down Job List - 17 Shut Down Duration 8 hr.
14 Steam Line Steam drain valve & vent valve changing Sarada
Sandeep + 3 4
Akhilesh + 4 8
Panda + 3
Vasanta G 2 /
8
Ranjeet
Piping team 8
8
SGP Group 1
8
EMC 8
GB G1 8
2
Pump house group A
8
/ B shift.
8
Blower team 2
Ganesh+3 8
Ganga+3 8
Sushant+3 4
Ganga+3 8
M/S Sai Engg. 8
Sumanta+1 4
Sushant (M/F)+4 8
Maharana+3 2
Maharana+3 3
PAPL 8
Sushant+2 4
Mechanical Shut down Job List - 18 Shut Down Duration 4 hr.
2
Mechanical Shut down Job List - 19 Shut Down Duration 4 h
S No Area Descripation
Tuyere Cooler 13 leakage checking & blow pipe 22 changing
1
2 Furnace Proper Grauting Point making in Tap hole
3 SLI 3 Gear box seal changing & boxup
Bishnu das 3
Dayanidhi Patel 3
Dayanidhi Patel 1
Dayanidhi Patel 2
Kiran 4
Devasis 3
Mechanical Shut down Job List - 20 Shut Down Duration 4 hr.
Date
Respon
S No Area Descripation
siblitiy
1 Tuyere Cooler 20 leakage arresting.
Furnace Anup
2 Tuyere No, 02 replacement
Proper
3 SLI 3 Gear box leakage arresting & jam cleaning Irfan
3
Pump House group 4
4
4
SGP Group
4
4
3
1
Stock House Group 2
4
3
Mechanical Shut down Job List - 21 Shut Down Duration 4 h
Majhi + 3 4
hyd. Team 4
S
Area Discripation
No
1 Top Firing
3
4 Cooling Plate leakage arresting above 19 & 20 blow pipe
Furnace Proper
5 Grouting Valve Fixing 50 nos
6 Pr. Probe cleaning
Above blow pipe 7 stave cap leakage arresting & blow pipe 7
7
removal
8 All pci lance removal & inspection of all blow pipe
11 SLI 3 checking
12
Furnace Top
13
32
33
SGP transport
system
SGP transport
34 Bin Building Hopper Bellows Replacement - 3 Nos.
system
35 GB 07 & 08 - Idler replacement & Belt Patching
Tuyere Body Pump 02 sustion valve ,Discharge NRV, & Bearing
36
changing.
37 Throat cooling pump 2 NRV changing
38 Emergency water ckt Trial
39 Overhauling of Tuyere HP and Copper Stave DG Sets
GCP cooling tower nozzle cleaning & Basin over flow pipe
40 Water System extention
41 Tar Seperator installation at flare stack.
42 COG orifice installation
43
Flare stack burner cleaning.
Steam leakage arresting near PCI & blast furnace top near USV,
44
steam darin reruting .
Cast House
45
Dedusting Damper Manhole erection & Damper inspection
46 Blower 1 & 2 susction filter checking & replacment
Blower
47 Water line stainer cleaning
Duration
Responsiblitiy Manpower Remarks
(HRS)
Anurag Night shift
1
manpower
Ansari + 5 & EMC
3
Group
External Group 4
Ansari + 5 3
Anup jha, Reedy + 1 8
Munna
Pintu +1 8
3
Ansari + 5
1
2
Majhi + Bhawesh +
6
8
Vasanta Engg 5
Unique Group 6
JK Nath, Irfan
Vasanta Engg 6
Majhi + Bhawesh +
4
6
Vasanta Engg 4
Majhi + Bhawesh +
2
6
Bishnu das,
Trinath + 6 12
Manish
Bara lachu + 5 5
Vishesh,Kundu
Gulashan + 3 4
12
10
GB Group 1
8
Dilip 4
GB Group 2 10
Dilip
8
GB Group 3
6
8
Sagar + 7
5
Hemant 1
Pump House 6
Operator + 2
3
Piping Group 1 8
Piping Group 2 8
Jitendra mishra Pump House 8
Operator + 1
Piping Group 2 6
GB Group 4 &
Alok 7
Hirean + 2
4
Blower team Blower team
1
Vasanta Engg
8
Anil Plange+
Devasis Vasanta Engg 16
Vasanta Engg 6
Vasanta Engg 16
Abhishek TATA 3
Sharma+ Patel PAPL 22
TATA
16
Ravi Agireddi+ TATA
Kiran
TATA 10
TATA 8
S C Nayak ADE 24
Mechanical Shut down Job List - 24 Shut Down
S No Area
1
Furnace Proper
3
4 Furnace Top
5
6
7
8
9
10 Hydraulic System
11
12
13
14
Stove
15
16
WHRS
17
18
Scrubber
19
20
21
22
SGP East
23
24
25
26
27
SGP West
28
29
SGP transport system
SGP transport system
30
31
32
33
34 Water System
35
36
37
38
Cast House Dedusting
39
40
Blower
41
MCC Drive House
42 /Junction House
43 Fines Conveyor
44 Fines Conveyor
45 STC-01 Conveyor
46 De Dusting
47 De Dusting
48 De Dusting
Discripation
Snort Valve PM
Waste gas line blank removal1. Before mixing chamber 2. Main line blanking
BF Gas inlet Water Nozzle fixing
Pump No. 1 Discharge valve replacement by Modification in Pipeline.
Axial ,Radial nozzle checking
Cooling Tower Hopper 1 & 2 Opening for Slag & Coke Cleaning
Steam leakage arresting near PCI & blast furnace top near USV, steam darin reruting .
O 8PM
O 6AM
Unique Group 6
Vasanta Engg 8
5
Datta + 4
Munna,Deepak 1
sahu T&T Cont. 20
Gulashan + 4 12
5
Bara lachu + 5
4
12
10
GB Group 1 8
8
Vyankatesh 8
Payasi,Dilip
4
Bara lachu + 5
16
16
16
GB Group 2
10
GB Group 2
8
8
Sagar + 7
5
Hemant
1
Pump House Operator + 2
3
Piping Group 1 8
Piping Group 2 6
Ansari + 5 3
Alok
GB Group 4 & Hirean + 2 7
4
Blower team Blower team
1
Abhishek PAPL
Sharma+ Patel 22
Ravi Agireddi+ Susanta(M/F)+3
Kiran
16
Ravi Agireddi+ Bandhan+3
Kiran
S C Nayak ADE+ Baba Ananta Group 24
Anil Plange+ Vasanta Engg
Devasis 8
Anil Plange+ Vasanta Engg
Devasis 16
Anil Plange+ Vasanta Engg
Devasis 16
ar,Gneshwer + 4
Mechanical Shut down Job List - 25 Break Down Duration 3 hr
S No Area
1 Furnace
2 Proper
3 stove
Mechanical Shut down Job List - 25 Break Down Duration 3 hr Hr.
Date :
Discripation Responsi
JK blitiy
Nath,
Blow pipe 24 pucher Irfan,Kun
du
PCI Lance change 24 no. Blow pipe
Stove 1 & 2 waste gas bellow repairing.
on 3 hr Hr.
Date : 22.02.2018
Manpow Duration Remarks
er (HRS)
3
Ansari + 5
3
Mechanical Shut down Job List - 26 Shut D
S No Area
2 Furnace Proper
3
4
5
6
7
Furnace Top
8
9
10
11
12
13 Stove
14
15
16
Flare Stack
17
18 PCI
19 Cyclone
20
21
22
23 Hydraulic System
24
25
26
27
Scrubber
28
29
30
31 SGP West
32
33
34
35
36
SGP East
37
38
39
40 SGP transport
41 system
42
43
44 Water system
45
Cast House
46
Dedusting
47
Blower
48
49 MCC-01, OGC-01 &
50 CGC-01
51
Weighing Hopper
52
53
54
Fines Conveyor
55
56
57
De-dusting System
58
Discripation
Tuyere cooler 21, 22,24 & 31 leakage arresting ( With specical putty ) & Down leg 27
changing, downleg 28 DP point gasket changing.
Grouting Valve Fixing 50 nos
All pci lance removal & inspection of all blow pipe ( 5 nos lance with new fittings)
Pr. Probe cleaning
Gear Box inside broken bolt removal.
SLI 3 checking
Both Cyclone manhole leakage arresting
Lower chain door bolt tigthing
Bleeder Inspection
Upper seal valve inside chain fixing & Seal inspection
Waste gas bellow stove 3 repairing
Snort valve PM
All 3 Stove thermocouple at 31 meter level modification.
WHRS mixing chamber manhole opening for refractory
Hot Blast Valve bottom flange opening
Steam Trape cleaning near flare stack
Flare stack nozzle cleaning
Mixing Tee reducer spool changing
1 NO steam valve to be provided in riser of steam line near cylone
BLT Pump pressure line filter changing
Stove accumlator leakge arresting.
Slow cycle EOL Pressure checking
GCP power pack accumulator Nitrogen chargeing.
BLT & burden probe pressure line connection with isolation valve to make BLT main pump
redundancy
Cast house 4 line A13 leakage arresting
Mag flow of cone 1 & 3 to be open for cleaning
Shutoff valve before lounder path B valve cleaning
Cond Tower Manhole opening for Internal Coating Inspection.
( Middle Manhole )
8
6
Vyankatesh Payasi / Dilip SGP Team , 4
8
5
3
4
8
6
GB Group 1 + GB Group 2 8
Dilip
+ Vasanta Gr2 3
8
6
6
Pump House Team 5
Hemant ,Shahnwaz Mallick 1
Pump House Operator + 2
5
Alok Hirean + 2 7
4
Blower team Blower team
1
Prakash+1 6
Bankanidhi+2 6
Moharana+2 5
Chandan+2 4
Susanta(M/F)+4 7
Susanta(M/F)+2 6
Vasanta Engg 5
Pramod+2 4
Vasanta Engg 7
Bandhan+1 6
Mechanical Shut down Job List - 27 Shut Down
S No Area Descripation
Gulashan+Seraj+Bhabesh+Hiren+
4
Anup Jha + Manish + Alok Praveen + 13
Pintu Pradhan + 1 4
Vasanta Group 1 4
Reddy + 1 2
Vishesh 1
Vasanta Group 2 + Reddy + 1
4
2
Jitender EMC 5
Munna PCI Group 4
Pump house team 1 & 2 4
Hemant
Pump house team 1
SGP Team 5
Dilip / Kundu/ Lachu
2
GB Group -1
3
2
Bhawani Blower house team 2
3
S K Sethy Vasanta Group 2
S C Nayak Moharana+2 4
Vishesh,Anup,Irfan,Hemant,Yogesh,Kundu,Alok,Dilip
Date : 29.03.2018
Remarks
Mechanical Shut down Job List - 28 Shut Down
S No Area Descripation
1 Blowpipe No 10 removal
2 Tuyere No 10 changing
Cushion Tank Door Opening and Slag Tube repairing (Anchoring &
19
Refractory)
20
Screw Conveyor Door Opening for Slag Cleaning.(Monthly PM)
21 SGP East
RASA - Damaged Mesh Replacement.
22
Settling tank cleaning & RASA Hopper Cleaning
Mud Water Suction & Discharge Spool Piece Modification.
23
Cushion Tank Door Opening and Slag Tube repairing ( Anchoring &
24
Refractory )
25
Screw Conveyor Door Opening for Slag Cleaning.( Monthly PM )
26
RASA - Damaged Mesh Replacement.
27 SGP West
RASA Hopper Cleaning
28
Mud Water Suction & Discharge Spool Piece Modification.
SGP West
29
GB1B-Additional Takeup Wire Rope Provision.
30
Cooling Tower - Cells Slag Cleaning
31 Blower House Filter cleaning
32
Scoop Coupling oil cooling line filter Cleaning .
41
Additional 500kg plate to be given in STC-01 Counter weight .
42 Duct puncture to be repaired on Silo top .
43 De-dusting System SS-04 & SS-05 dedusting duct puncture to be repaired .
44 Duct puncture to be repaired near OTC-01 tail end .
45 SFC-03 drive changing .
46 Fines Conveyor NCS-01 feeding chute to be repaired .
47
Scuction hood to be ercted on CFF-01 in Coke fines Building .
Night Shift - 8 PM to 6 AM
** Night Shift Team will stay upto 8 AM on 01.04.2018 **
wn Job List - 28 Shut Down Duration 14 hr.
Date : 01.04.2018
Majhi +
JK Nath + Anup Jha + Gulashan+Seraj+ 12
Bishnu das + hemant + Akhilesh+ Hiren + 10
Amlesh
Pintu Pradhan + 1 8
10
GB Manpower -
Group)
Vyankatesh
Payasi/Dilip / yogesh/ 12
Lachu
S C Nayak Bandhan+Ranjit+2 4
Kiran Pramod+1 2
Kiran Pramod+1 2
Kiran Sunil+1 1
Ravi Agireddi Susanta +Bijay+Sudhir 2
Anil Bhagwan+Bijay+Sudhir 4
JK Nath,Anup,Irfan,Bishesh,Hemant,Jitender,Vyankatesh,Yogesh,Kundu,Alok,Dilip
Anurag,Vishesh,Amit,Ashok,Manish,Md. Shahnawaj
Mechanical Shut down Job List - 29 Shut Do
S No Area Descripation
1 Blowpipe No 5 nos removal
Furnace PCI lance replacement
2
Proper
3 Hatch door gasket changing
Furnace
4 Bleeder valve seat inspection
Top
5 Mill inside inspection
13 Cushion Tank Door Opening and Slag Tube repairing (Anchoring & Refractory)
14 Screw Conveyor Door Opening for Slag Cleaning.(Monthly PM)
15 SGP East RASA - Damaged Mesh Replacement.
16 Settling tank cleaning & RASA Hopper Cleaning
Mud Water Suction & Discharge Spool Piece Modification.
17
18 Cushion Tank Door Opening and Slag Tube repairing ( Anchoring & Refractory )
19 Screw Conveyor Door Opening for Slag Cleaning.( Monthly PM )
20 RASA - Damaged Mesh Replacement.
21 SGP West RASA Hopper Cleaning
22 Mud Water Suction & Discharge Spool Piece Modification.
23 GB1B-Additional Takeup Wire Rope Provision.
24 Cooling Tower - Cells Slag Cleaning
25 Blower HouseFilter cleaning
26 Scoop Coupling oil cooling line filter Cleaning .
27 MCC- Greasing of Bend & Snub Pulley in MCC-01 Conveyor, which are not possible in
01,OGC- running condition .
01 & CGC-
28 01 OGC-01 skirt rubber adjustment/ changing .
29 CGC-01 skirt rubber adjustment/ changing near Coke-5 discharge chute .
30 Weighing Hopper
All weighing hopper liner plate inspection .
31 STC-01 take-up safety sling to be fixed .
32 OTC-01 skirt rubber adjustment/ changing .
STC-01,
33 OTC-01 & One supporting beam to be erected in OTC-01 Bend Pulley frame for lifting of Take-
CTC-01 up Counter weight .
Conveyor
34 OTC-01,CTC-01,CCC-01 & NCC-01 gear coupling greasing
35 Additional 500kg plate to be given in STC-01 Counter weight .
36 Duct puncture to be repaired on Silo top .
37 De-dusting System
SS-04 & SS-05 dedusting duct puncture to be repaired .
38 Duct puncture to be repaired near OTC-01 tail end .
39 SFC-03 drive changing .
40 Fines Conveyor
NCS-01 feeding chute to be repaired .
41 Scuction hood to be ercted on CFF-01 in Coke fines Building .
Job List - 29 Shut Down Duration 8 hr.
Date : 01.04.2018
Duration Remark
Responsiblitiy ManPower
(Hrs) s
GB Manpower - Group)
S No Area
3 Furnace Proper
9
Furnace Top
10
11
12
13
14
15
16 Water System
17
18
19
20
21
22 Hydraulic
23
24
25
26 Stove
27
GCP
28
29
PCI
30 PCI
31
32
33
SGP Transport
34 system
35
36
37
38
39
SGP East
40
41
42
43
44
45
46
SGP West
47
48
49
50 Blower House
51 TRT
52
53
54
MCC-01, OGC-01
55 & CGC-01
56
57
58
59
60
61 Fines Conveyor
62
63
64
Vibrating Screen
65
66
67
STC-01, OTC-01
& CTC-01
STC-01, OTC-01
68
& CTC-01
69
70
71
De Dusting
72
73 Weighing
74 Hopper
Descripation Responsiblitiy
Top firing
GB 07 Belt replacement.
Bin Building Damaged Bellow replacement.
GB 05B - Belt Replacement
GB 11B - West SGP - Tail end Modification & Belt Changing.
HWP 1 & HWP 2 Damaged Spool Piece Replacement and Drain point in HWP1
hift - 8 PM to 6 AM Anup,Amit,Ashok,Manish,Jitendra,Md. S
t Shift Team will stay upto 8 AM on 11.04.2018 **
Sashikant,R
own Duration 16 hr.
Date : 11.05.2018
Duratio
ManPower Remarks
n (Hrs)
Pintu Pradhan + 1 8
14
Vasanta Group
12
6
Majhi, Sanjay,Panda, + 8
EMC Group 8
14
Pump house Group 1
12
Trinath + 4
12
MSP Group
MAHABIR ENGINEERING 16
Bhagwan Reddy + 2 12
Hiren + 4 8
GB Manpower - Group
16
GB Manpower - Group)
8
Blower house team
12
Sunil+2 2
Sunil+2 4
Sunil+2 2
Sudhir+Prakash 2
Sushant (M/F)+3 4
Sunil+2 3
Sunil+2 1
Sushant (M/F)+3 10
Saroj+3 6
Vasanta Group 3
Sudhir+Prakash 4
4
Vasanta Group 8
2
Bandhan+2 2
Bandhan+2 1
Bandhan+2 2
Bandhan+2 3
Bandhan+2 2
Subash+1 2
Subash+1 4
Subash+1 4
Subash+1 2
n,Vishesh,Hemant,Vyankatesh,Bishnu,Munna,Yogesh,Kundu,Alok,Dilip,Amlesh
Ashok,Manish,Jitendra,Md. Shahnawaj
S No Area
1 Furnace Proper
2 Furnace Top
3 Pump House
4 Hydraulic
6 Stove
7 GCP
8
SGP Transport
9
system
10
11 SGP East
12 SGP West
13 TRT
14
MCC-01, OGC-01
15
& CGC-01
16
17
Fines Conveyor
18
19 Vibrating Screen
STC-01, OTC-01
20
& CTC-01
21 De Dusting
Mechanical Shut down Job List - 31 Shut Down Duration h
Descripation
Above
burden
probe
no.-1
Hemant
changed
(dismentl
e and
erection)
ABP
no.2
Hemant
dismentl
ed
Seconda
ry
equalizin
g valve
no.2 Bishnu
changed Das
with
emergen
cy relief
valve-1
SLI-3 &
4 check
VP
Pump
3 srivastav 4
House
a
4 Hydraulic Trinath + 3
Bishnu
2
6 Stove 1
7 GCP JitenderVasanta Group 4
8 SGP
9 Transpor
10 t system
Dilip /
SGP TPL - SGP Group 6
11 Lachu
East
Dilip /
TPL - SGP Group 6
Lachu
SGP
12
West
13 TRT Blower house team4
Bhawani
14 MCC-01, DayanidhiGanesh+1 3
OGC-01
15 DayanidhiGanesh+1 1
& CGC-
16 01 DayanidhiPrakash+ 2
17 Fines Kiran Sushant+ 4
Conveyo
18 Abhishek Prakash+ 4
r
19 Vibrating Screen Kiran Gangadha 2
STC-01,
OTC-01
20 Saroj+6
& CTC-
01 S C Naya 6
21 De Dusting Abhishek Gangadha 2
Mechanical Shut down Job List - 33 Shut Down
Duration hr. 8
Date : 25.07.2018
Descrip Respon ManPow Duration Remark
S No Area
ation siblitiy er (Hrs) s
Blowpipe
TPL
Furnace replacem
1 (Ansari + 8
Proper ent
5)
Tuyere
no. 36 &
9 change
( checkin
g
pressure
test of
tuyere by Vishesh
operatio sinha +
n Amlesh
Peep
sight
flange
change
(with
new
valves)
Above
burden
probe -2
Vasanta
erection 8
Group-2
& ABP-3
dismentli
ng
Anurag +
Manish
LSV-1 &
LSV-2
seal
change
8
and
steam
pipe Anurag +
welding Manish
Majhi +
Akhilesh
Seconda +2 + TPL
ry General
Equalizin shift 6
g valve-1 team (6
changing nos.)
Dust
discharg
e valve-1 2
stopper
welding
Bleeder
valve
seal
inspectio Ranjit +2 4
n/
overhauli
ng
Cast
house
Accumul
ator
stand-2
3 Hydraulic 2
leakage
arrest of
Mudgun
power
pack
Casthou
se EP2
near
3
NRV
leakage
arrest
Bishnu Hydraulic
Das team
BLT
Relief Bishnu Hydraulic
valve -2A Das team 2
leakage
arrest
Relief
valve
fitting
checking 2
(ball
valve
side)
Mudgun
-2
swelling
cylinder
2
cushioni
ng block
leakage
arrest
Hot blast
valve
4 Stove 8
-1,2&3
torquing
BF gas
duct Amit Gulshan
4
support Mishra +3
welding
Snort
Valve
6
PM and
torquing
5 GCP GCP Magfl 7
Ashok SatpathyReddy +2
GCP sump 2
6 PCI PCI nitrog
Jitendra Mishra
PCI general group 8
7 SGP GB 104 B
Transpor
t system
Dilip
SGP SGP general group6
8 Pandit
East
SGP
9
West
Deflector
pulley
10 bolt Sushant
replacem
ent 4
MCC1
Greasing of Gear coPrakash+1 2
Gear box
oil Sushant
checking
1
11 Lagging of Take up p 6
Ganesh+banka+ gang
Lagging of Tail pulle 6
OGC -01
Grizzly repairing 4
Saroj
V-plow scraper adju 2
12 SFC-03 Belt jointing Bijay+Prashant +2 6
Fines
13 Prakash+1
conveyor
All gear coupling gr 4
Coke
14 radial Pramod
gateCoke radial gate no. 2
15 NCS-01 PM 2
Ganga
Inspection door cutt 1
ID Fan-1
inlet
damper
16Dedusting system Sunil
checking
& link
greasing 4
S No Area
Furnace Proper
Furnace Top
6
8
Stove
9
10
11
15
16 Hydraulic
17
18
19
20
21 PCI
23
Cyclone
Cyclone
24
25
27 GCP
28
29
30
PUMP HOUSE
31
36
37
38 SGP East
39
40
41
42
43
44
45
SGP West
46
47
48
49
50
51
TRT / Blower
52
53
54
55
56 MCC-01, OGC-01 & CGC-01
57
58
59
Fines Conveyor
60
Fines Conveyor
61
62
63
Vibrating Screen
64
65 Feeding Conveyor
66
67 De Dusting
68
69
Weighing Hopper
70
71
72
Descripation
Date : 080.08.2018
Duration
Responsiblitiy ManPower
(Hrs)
Sashikant + Akhilesh + 6
Irfan + Vishesh+ Kundu 10
Anshari + Ranjeet + 5
Pintu + 1
Putty Group Devcon
Vasanta Group 1 8
4
JK Nath + Alok Majhi + bhabhwash + 7
7
4
2
5
Mahabir Group 1
5
Hydraulic Group 3
3
Anup Jha Sanjay + 3
8
PCI Group 5
2
1
3
3
2
Tapan Group 1 24
Shiv shakti 2
EMC Group 2 10
8
Vasanta Group 1
Amit Mishra + Amlesh
Vasanta Group 1
Amit Mishra + Amlesh 8
GB Group 1 6
Unique Group 2 8
Pump House Group 1 8
Pump House Group 2 10
Tapan Group 2
SGP Group
SGP Group
Unique Group 2
GB Group 2
Mahbir Group 2
SGP Group
Vyankatesh + Deepak + Dilip 10
SGP Group
SGP Group
Unique Group 3
GB Group 3
Mahbir Group 2
SGP Group
SGP Group
6
4
3
2
8
2
6
2
3
3
1
1
2
4
5
4
2
4
Date : 080.08.2018
Remark
s
Mechanical Shut down Job List - 35 Shut Down
S No Area
1
2 Furnace Proper
3
4
STOVE
5
6
Hydraulic System
7
8 Cyclone
9 GCP
10 PUMP HOUSE
11
12
13 SGP Transport system
14
15
16
SGP East
17
18
19 SGP West
20
21 Blower
22
23
24
25 MCC-01, OGC-01 & CGC-01
26
27
28
29
30 Fines Conveyor
31
32
Vibrating Screen
33
34
Weighing Hopper
35
Mechanical Shut down Job List - 35 Shut Down Duration hr. 11 ( From 9 PM )
Descripation
Jitendra
Anup, Irfan,kundu
Amit ,Dilip
Blower team
Ravi Agireddi 1
Bibhuti 0.5
Bibhuti 0.5
Ravi Agireddi 2
Ravi Agireddi 0.5
Ravi Agireddi 0.5
Ravi Agireddi 2
Bibhuti 0.5
Bibhuti 4
Bibhuti 0.5
Anil Plange 1
Anil Plange 1
Anil Plange 2
Anil Plange 6
Mechanical Shut down Job Li
S No Area
Furnace Proper
2
Furnace Top
4
6
Stove
7
8
9 Hydraulics
10
11
PCI
12
13
14
15
16
17
18 Pump House
19
20
21
22
23
24 SGP East
25
26
27
28
29
SGP West
SGP West
30
31
32
33
34
35 SGP -Transport System
36
37 Dedusting
38
39
TRT / Blower
40
41
42
43
44
45 MCC-01/OGC-01/CGC-01
46
47
48 Screen
49 Weighing Hopper
50
Fines Conveyor
51
Descripation
Responsiblitiy ManPower
Jitender
M/S Netpro
TPL
M/S Netpro
Vyankatesh/Dilip pandit
Vyankatesh/Dilip pandit
TPL
M/S Netpro
Tapan
Vasanta Team
TPL
Vasanta Team
3 hrs
3 hrs
3 hrs
3 hrs
3 hrs
2 hrs
3 hrs
3 hrs
1
2
3
2
3
3
1
2
Mechanical Shut
S No Area
1
2
3
4 Furnace Proper
5
6
7
9
10
11
12
13
14 Furnace Top
15
16
17
18
19
20
21
22
23
24
Stove
25
26
27
28
29
30 Hydraulics
31
32
33
34
35 PCI
36
37
38
39
40
41
42
43
Pump House
44
45
46
GCP
47
48
49
50
51 Dedusting
52
53
TRT / Blower
54
55
56
57
58
59
60
61
62 MCC-01/OGC-01/CGC-01
63
64
65
MCC-01/OGC-01/CGC-01
66
67
68
69 De-dusting System
70 Screen
71 Weighing Hopper
72
73
74
Fines Conveyor
75
76
77
78
79 Feeding Conveyor
80
81
SGP East
82
84
85
86
87
88 SGP West
90
91
92
93
94
SGP Transport System
95
Mechanical Shut down Job List - 38 Shut Down
Descripation
Done
Tuyere no. 11, 12, 15, 16, 17 & 35
replaced. Gulshan,Akhilesh,Gopa
Additional Job: badhu,Jitendra
Tuyere cooler 32 body supply and Swain,Bishnu Nayak,
return hose and nose return hose Chotu, Sunil, Bikash
changed. Pradhan, Hemant
Biswal
Replaced Anurag + Ashok
+Amlesh (Day) +
Provided Vishesh Sinha +Amit+
Done (Night) Pintu Pradhan +
Sushnat Amanta
Under Progress Shiv Shakti
Done Mahabir/Shiv Shakti
197 nos. Flange tightening at + 5
mtr. Hiren,Suresh
All flanges between Taphole 1 - 4 Nayar,Rakesh
and Taphole 2 - 3 tightening done
Done
Done
Done
Done
Vyankatesh (Day) EMC
Done
Done
Done
07 nos manhole provided Vasanta Group
Done
Done
netpro
Sashi,
Ranjit,Panda,Subodh,Lalbihari,
Shishirkant,Rasman,Ranjit
Pabitra
Parida,Manoj,Shruti,Suresh
Reddy,Jitendra,Balwant,Chand
an
Pump House Night team
S No Area Descripation
Furnace
1
Proper
Tuyere No. 01,05,38,33 changing
2
S No Area Descripation
Furnace
3
Proper
Tuyere no. 3,30,31,13 changing
4
S No Area Descripation
Furnace
3
Proper
Tuyere no. 2,24,34,36 changing
4
S No Area Descripation
Furnace
5
Proper
Tuyere no. 9,21,25 changing
6
S No Area Descripation
Furnace
7
Proper
Tuyere no. 4,22,32,37
8
ob List - 39 Shut Down Duration 03 hrs
Date : 06.12.18
ManPow
Respon ManPow Duration Remark
Compliance Status er
siblitiy er (Day) (Hrs) s
(Night)
S No Area
1
2
3 Furnace Proper
4
8
9
10
Furnace Top
11
12
13
14
15
16
17 Stove
18
19
20
21
22
23
Hydraulics
24
25
26
27
28
29
30
PCI
PCI
31
32
33
34
35
36
37
38 Pump House
39
40
41
42
43 Cyclone
44
GCP
45
46
47 TRT / Blower
48
49
50
51
MCC-01/OGC-01/CGC-
52
01
53
54
55
56
De-dusting System
57
58
Screen
59
60
Weighing Hopper
61
62
63
Fines Conveyor
64
65
66
67 Feeding Conveyor
68
69 Coke Drying System
70
71
72
73 SGP East & West
74
75
76
77
78
79 SGP Transport System
80
Descripation
Snort valve PM
BF Gas support welding 03 nos
GB07 , 08, 104 A & B Dammaged idler replacement, PM and Gearbox oil replacement
ManPower
Compliance Status Responsiblitiy
(Day)
Done,16 nos blow pipe changed
19 Done Anshari +
Ranjeet + 5
35 nos fixing done
Amit ,Amlesh,Ashok
01 nos done Shiv shakti
Done Pintu / Rohit +
1
Done
SLI 03 Bob, chain & sealing ,SLI 04 Bob & chain Santosh ,Anup Majhi + 3 +
changed Vasanta
Done
Done
Done
( Parida + 3 ), (
done
Nitin,Alok, Sanjay + 2 )
Done and position changed now it it broken
valve changed
01 nos done Hiren + 2
Shiv sakti +
done
Mahabir
done PCI Team
Jitendra / Munna
not done EMC
Abhay + 2 +
done
M/S GB
done
done
done
done PCI Team
done Shiv sakti
Santosh/Munna /
Jitendra
Santosh/Munna /
Jitendra PCI Team 02
done
FAB. 2018
done Tapan
done
done
done
done
done
done VP / Hemant / Pump House
Mallick team + EMC
done
not done
02 nos done
02 nos done
not done
done Sarang,Ashok EMC + Tapan
done
done
done
done
done
done
done
done
done
done
Stock House
done Stock House Team Team
done
done
done
done
done
done
done
done
done
done
done
not done
done
done
done
Netpro + SGP
done Sarang,Dilip team
done
done
done
done
done
Date : 01.02.2019
ManPower Duration
Remarks
(Night) (Hrs)
1.5
3
2
8
24
Sashikant +
6
Panda +
Reddy + 12
3
6
2
6
8
8
2
10
1
4
4
6
2
3
8
2
2
1
2
4
6
4
8
4
2
2
4
3
10
2
4
5
2
4
8
10
4
3
4
3
1
3
2
6
2
2
4
4
2
3
3
4
4
3
3
3
3
6
15
24
12
14
6
8
8
24
8
6
10
8
Mechanical Shut down Job List - 45 Shut Down
S No Area Descripation
39
Riser no#04 damage pipe relaced with the 6 mt . Hardfacing pipe
40 Settling tank cleaning by goodwin pump
Screw Conv Tailend Bearing Assly Inspection and Gland Rope
41 SGP West
Replacement Bolt Tightening ,
42
HWP header and KWP Header magflow meter opening for inspection
600 NB Pneumatic valve opening for inspection near blowning box
43
area.
44 SGP CT Cell No 3 - Manhole removal & cleaning
45 Settling tank cleaning by goodwin pump
Bishnu Sandeep + 4
5 hrs
EMC
VP srivastava 6 hrs
Pump House Team
3
1
4
2
Stock House Team Stock House Team
3
6
4
6
TPL (4 manpower), operation (4 manpower) 6
TPL (4 manpower) 8
TPL (5 manpower) 5
TPL (5 manpower) 5
Operation (5 members) 5
TPL(03 manpower) 5
Netpro 10
Vyankatesh Netpro 5
Payasi/Dilip Pandit
Netpro 8
Operation (5 members) 10
TPL(04 manpower) 8
EMC 8
EMC 8
TPL ( 2 manpower) 10
Operation (5 members) 10
jitendra Tapan 6
Mechanical Shut down Job List - 46 Shut Down
S No Area Descripation
S No Area
1
2
3 Feeding
Conveyors(STC-
4
01, CGC-
5 01,OTC-
01,CCC-01)
6
7
8
9 Charging &
10 Gathering
Conveyors
11
(MCC-01,OGC-
12 01 & CGC-01
13 Conveyor)
14
15
16
Weigh Hopper
17
18
19
20
21 Fines Conveyor
22
23
24
25
26
Screen & Feeder
27
28
29
30
31 De-Dusting
32 System
33
34
35
36 OGC-01
37
OGC-01
38
39
CGC-01
40
41
42
43 OTC-01
44
45
46
47
CTC-01
48
49
STC-01
50
Mechanical Major Shut down
Descripation
All 23 Weighing Hopper Liner plate inspection & Changing (If required)
Duration
Responsiblitiy ManPower Remarks
(Hrs)
32
36
36
72
Srinivas Rao/Bibhuti S C Nayak
24
12
8
8
27
27
Sanjay/Dayanidhi Ravi Agireddi 12
4
6
6
24
24
Sanjay Anil
6
16
48
48
Sanjay/Kiran Abhishek 48
6
6
72
48
24
Sanjay/Devasis Abhishek
24
24
12
12
Sanjay Anil
12
60
10
10
12
Sanjay/Dayanidhi Ravi Agireddi 12
Sanjay/Dayanidhi Ravi Agireddi
12
12
12
8
8
10
8
12
10
8
12
12