INTRODUCTION
The policy was passed by the government after realizing the fact that early
childhood education leaves an imprint in the child’s mind and it is a significant
factor in the mental and social development of children. The government puts
stress on this type of education in its effort to develop the country’s human
resources.
It is from this need that Redeemed Education Centre builds its foundation to
explore this opportunity by coming up with a vision of setting up the Centre for
early childhood to access which will help to prevent stunted cognitive development
of child and is reputed for facilitating better future performance in school.
As mentioned earlier, the scope of this project proposal will be to construct the
education centre within five years, whereby pre-primary school and primary school
will start simultaneously in one year while building construction will be
progressing. Ordinary secondary school is planned to commence in year three and
advanced level in year four.
The general goal of this school is to have a school centre which will offer
education of high quality basing on the Ministry of Education curriculum. This
centre will provide accommodation to those who are coming from a distant area
and also provide tea as well as lunch to those who stay at home.
The education centre has its plan in future to have branches in different regions
depending on availability of fund as it is in the process of requesting grants. The
subject combinations are tailored towards what is offered in tertiary and higher
education
Project location
Project buildings will be constructed at Kubase Village which is situated five (5)
kilometres from Ejiso-juaben Municipality
Electricity from the main grid at the rural passes through the village and is about
five hundred (500) meters from the site where the school buildings will be
constructed.
Project Area
The total area made available one and half acre(1 ½) hectares and this will be used
for the constructions of buildings, basketball, netball court, football pitch, short
put, high jump, long green areas and gardens land is not a problem around the area
and if the school will need more land it will have to apply for such land and it will
not be difficult at all to be allocated such land.
Problem statement
Priority need
The priority need of this project proposal is to have an education institution which
will join hand with the ministry of education’s effort of having a nation with high
level of education at all levels; a nation which produces the quality and quantity of
educated people sufficiently equipped with the requisite knowledge to solve the
society’s problems in order to meet the challenges of development and attain
competitiveness at regional and global at large at affordable costs.
Project objectives
`This project proposal has two main objectives as mentioned here under:
To respond to the needs of a rapidly growing business and education sector in the
municipality by producing the quality and quantity of educated people sufficiently
equipped with the requisite knowledge to solve the society’s problems in order to
meet the challenges of development and attain competitiveness at regional and
global at large at affordable costs.
The following objectives will be implemented after getting approval from the
Ministry of Education and Vocational Training.
. The School will provide subsidized healthy meals daily to children attending this
Centre School.
This Centre will continue to raise funds for running the operation of the school by
requesting sponsorship for educating the children attending this centre.
Target group
The children who currently attend normal Kindergarten, Primary School and
Secondary school, as well as the children living in Kubease community who need
to improve their education level;
The teachers who instruct the children according to the Syllabus provided by the
Ministry of Education and Vocational Training;
The supporting administrative and ancillary staff who will facilitate the operation
of the
school.
Parents and guardians in the community who are interested in giving their
Project results
Key project of Centre will include field activities, building design and construction
supervision..
Some other activities will include: title Deed follow – up, topographical survey,
master plan preparation. It will also involve location position of buildings. Streets,
green areas, open spaces, play grounds etc. Location positioning of storm water,
foul water, sewage system in relation to septic tank and sock pits. Setting out
dimensions will involve building lines, setbacks and detailed dimensions between
one building and the other.
This covers all aspects of the project, describing in details all activities and
finances involved.
Project budgets
In our project this will be our projection of source of income and our plan how are
we going to spend this limited resources as expenses over a specified period of
time. 1. Secondary School
Local Church
Primary School
Secondary school
. Sports Arena
Grand Total Costs The main activities and cost estimate involved are summarized
below as:-
Project costs are divided into various types namely: investment costs which fall
into several categories:
These are costs incurred in the construction of school buildings and infrastructure.
Total costs
These are furniture and equipment which will be purchased to furnish the schools.
Offices furnish and equipment will be purchased in phases as more classes and
offices are constructing red to completion. No definite phasing has been put in
place because the phasing will depend on availability of funds. Total costs to
purchase furniture and equipment stand at Laboratory Equipment costs
Every secondary school worth the name must have facilities for laboratories where
laboratory equipments are a necessity. Agape Love Education Secondary school
will have Biology laboratory, Physics laboratory and Chemistry laboratory which
will be equipped appropriately.
Total costs
A van will have to be bought for the school so as to cater for all transport
requirements of the school.
This will cater for washing all the school bed sheets etc
Other costs are for the purchase of furniture and Equipment estimated at
Laboratory equipment for Physics, Chemistry and Biology laboratories will cost
about
Project duration
The project proposal duration will be for five years which will be preceded with
final evaluations that will be conducted at the end of five years. This evaluation
intends to make an extensive review of the whole project to see its sustainability
for its the long run.
The project has also involved some experts especially for works like, conducting
project feasibility study, design and drawings, buildings constructions, risk
analysis, project evaluation etc.A registered construction firm with the registrar of
companies under the Companies Ordinance , but its staffs are backed up with vast
experience in the building design and construction industry as well as projects
planning; project appraisal and financial management acquired while working with
other firm:-
Goals
The project goal is mainly for the construction of buildings for the pre-school,
primary school and secondary school for the purpose of providing education. The
buildings will cater for learning and boarding requirement of all pupils and
students; plus the accommodation requirements of the teachers other school staff.
The students and pupils physical fitness requirements will be met by having a
sports arena in the school and grounds.
The main objective is to respond to the needs of a rapidly growing business and
education sector in Kubease municipality by producing the quality and quantity of
educated people sufficiently equipped with the requisite knowledge to solve the
society’s problems in order to meet the challenges of development and attain
competitiveness at regional and global at large at affordable costs. This will be met
by having Agape Love Education Centre in place.
Project Appraisal
Every project proposal should pass through this criterion for appraisal. In our
education centre, this analysis will assist to determine the merit and acceptability
of our school centre in accordance with under laid established criteria. This will be
the final step before our project is accepted for financing. It helps us know that our
project is feasible against the situation on the ground that the objectives set remain
appropriate and that costs are reasonable.
Social appraisal
A social appraisal will help us review the project design and the process of project
identification by implementing and monitoring its progress, from a social
perspective. Particular attention will be paid to the likely impact of the project on
different stakeholders, their opportunities for participation, and the project’s
contribution to poverty reduction.
Institutional appraisal
This will help us ensures that the supporting institutions are in place and that they
can operate effectively within the existing legislative and policy environment. This
project has identified opportunities for institutional strengthening and capacity
building at a relative cost.
This helped our project to make an analysis of economic soundness of the project
and quantification and valuation of costs and benefits that ensured our financial
viability.
Environmental appraisal
The plan was made to invite the government specialists in environmental appraisal
Environmental Assessment (EA) will assist us to meet one of our goals of having a
school centre with a conducive academic environment. Most countries have
environment impact assessment (EIA) policy and supporting legislation.
Traditionally, EIA will be designed to operate at our project level to help us
identify impacts and mitigation measures for this project.
Technical appraisal
• To prove or test the technology that will be used to implement the entire tasks.
• To have a list of equipment and machinery to be installed with their cost and
specifications.
Fund solicitation
.Buildings constructions
Laboratory equipment
Risk analysis
Budget preparation
Management arrangement
Project personnel
In every project human resource is very important to ensure that tasks are
performed as planned. This includes project manager and project team.
1Individual roles
In our project, every project team member will have a certain role assigned to
perform at a specified period of time so as to accomplish our goal.
Communication mechanisms
In our project this mechanism will help Create a document showing the needs to be
kept informed about the project and how they will receive the information. The
most common mechanism is a weekly or monthly progress report, describing how
the project is performing, milestones achieved and work planned for the next
period.
Project timing and scheduling
In carrying out project tasks resources have been allocated to meet activities
scheduled so as meet the allocated time. This ha been helped us to determine
schedule dates on which activities should be performed this goes hand by hand
with resource scheduling. This involves many considerations such as logistics and
customer needs.
Project budget
According to Dr. Magigi & Mwaitete lecture notice, a budget is a financial plan
that is prepared and approved prior to the budget period and may show income,
expenditure and the capital to be employed. A budget may be for the business as a
whole departments function such as sales and production.
Balance sheet
Income statement
According to Burke (2008) Cash flow statement is a document which models the
flow of money in and out of the project reported in a monthly basis. (Refer Table
5)
Monitoring
According to Choudhury S (2004) monitoring is referred to as checking how much
has been done and what needs to be done for accomplishments of the project tasks.
Evaluation
In most likely any project may be faced by some of these risks: Legal (patents and
lawsuits), changes in technology (does your software project need to support
Windows Vista?), natural hazards and conditions (have you seen the latest volcano
news?), eenvironmental (does a protected or rare species lie in your freeway path?)
In our project we have looked at this part critically from the planning stage. Under
this part we carried out the quantitative analysis by involving different experts
brainstorming with them, and consulting other skilled people to ensure that we
review a history of our project where necessary to make the proper judgments. As
a result we listed some risks prioritized by probability and impact for us to avoid,
ignore, or accommodate different impacts likely to happen.
CONCLUSION