PHASE II
ESTERN PROVINCE
TRINCOMALEE DISTRICT
SUBMITTED TO
February 2017
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
TRANSECT WALK RECORDS ‐ CONSULTATION WITH AFFECTED PERSONS
# Description Details
1 Name of Road 11th Track Road[1]
2 Villages traversed by the Road PadaviSripura
3 GND 31 D
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016 (Monday)‐ 11.00 AM
Total No of Participants in the Transect
6 10
Walk
Numbers of persons in each of following
7
categories participated in the meeting
i. Indigenous Persons
8 Name & Designation of the Key Participants:
From RDA/PIU/ESD (Social &
i. N/A
Environment)
ii. From PS/DSD/GND GND Head
Community Representatives (may
include representations from Schools,
iii. N/A
Religious Organizations)/
Representatives of Displaced Persons
9 Issues raised/ Suggestions made bythe Participants
Road alignment existing as well as
i. No need to change the road alignment
design in general
Road width (carriageway and
No need to change existing road width (20 ft
ii. overall) existing , Land availability if
now)
improvement required
Land owned/used by vulnerable Roadside land use is of Government lands and
iii.
groups of people hence no impact of land acquisition
Sensitive locations (forests, cultural/
iv. Not special
archeological/ historical sites, etc.)
Water‐related issues ( drainage
v. paths, rivers and stream crossings, Need to some culvert at drainage side
Flooding Sections, irrigation canals,
# Description Details
other water bodies, etc.)
Suggestion on location of There is an empty land near the road for this
vi.
Contractor’s camp site purpose
Suggestions on alternate routes that
vii. None
may be used during construction
Road safety‐related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school, It’s a main road to (Trincomalee, Pulmottai) from
viii.
Temple, Church, Kovil, Mosque, Sripura
Cemetery Cultural /Community
Centers etc.)
Other suggestions (such as animal
ix. None
crossings, borrow pits, etc.)
10 Major Outcomes of the Transect Walk (Summary)
Changes/inputs to be incorporated
in the design (alignment, road
i. safety, drains, irrigation water Need to some culvert at drainage side
crossing, Retaining walls, Guard
Stones etc.)
Extent of land acquisition that may
be involved and willingness/
ii. Want to extend the road for 2 tracks
unwillingness of land owner/users
for donation
Environmental issue to be resolved
iii. (Ponds, water logging, etc). None
Environmental Sensitive Area
iv. Other issues Not special issues found
11 Brief Summary of Consultation held during Transect Walk
Major Issues discussed during the This is a main road to Pulmottai, want build quick
i.
consultation (Bus road)
Recommendations of the Social
ii. None
Safeguard
Acceptance of the Project /
alignment by the community
iii. Accepted the Project in general
(determine whether acceptance is
conditional)
Figure 1 ‐ Road condition was inspected Figure 1.2 ‐ Road condition was inspected
SIGNATURE FORMS – OFFICIALS
SIGNATURE FORMS – COMMUNITY
Road Name : 11th Track Road
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Branch Channel Road[2]
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016 (Monday)- 1.00 PM
Total No of Participants in the Transect
6 5
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of There are vacant lands near the road for this
vi.
Contractor’s camp site purpose
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 - Road condition was inspected Figure 1.2 - Road condition was inspected
Province : Eastern
District : Trincomalee
2 114 End[02]
3
10
11
12
13
14
15
16
17
18
19
20
21
22
23
# Description Details
1 Name of Road 7th Mile Post To Jayanthiwewa[3]
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016- (Monday) ,10.40 AM
Total No of Participants in the Transect
6 6
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available (Jayanthiwewa, Seewalipura)
may be used during construction
Figure 1 Community discussion was held Figure 1.2 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Sugar Factory Road[4]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016- (Saturday) 2.10PM
Total No of Participants in the Transect
6 8
Walk
i. Indigenous Persons
# Description Details
water bodies, etc.)
Suggestion on location of
vi. Vacant lands exist near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Not special
may be used during construction
Province : Eastern
District : Trincomalee
39
# Description Details
1 Name of Road MeankamamKanguweli[5]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016- (Tuesday)11.40AM
Total No of Participants in the Transect
6 8
Walk
i. Indigenous Persons
MeankamamKanguweli Page 1
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
MeankamamKanguweli Page 2
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
Figure 1 - Community meeting was held Figure 1.1 - Road condition was inspected
MeankamamKanguweli Page 3
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
MeankamamKanguweli Page 4
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
MeankamamKanguweli Page 5
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
Province : Eastern
District : Trincomalee
16
MeankamamKanguweli Page 6
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
MeankamamKanguweli Page 7
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
1 Name of Road ThoppoorKaddapamchan Road[6]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016- (Sunday)
Total No of Participants in the Transect
6 14
Walk
i. Indigenous Persons
# Description Details
Flooding Sections, irrigation canals,
other water bodies, etc.)
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Salli Main Road, Ward 02[7]
4 District Trincomalee
5 Date/ Time of Transect Walk 12.20PM
Total No of Participants in the Transect
6 7
Walk
i. Indigenous Persons
# Description Details
water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. School road and Sea side street
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road conditions were inspected
Province : Eastern
District : Trincomalee
1 084 Start[07]
2 085 Lagoon Lagoon LHS
Geometry/
26 109 Curve/By road LHS
Social(Religious)
Geometry/
27 110 Curve/By road
Social(Religious)
31
32
# Description Details
1 Name of Road Selvanayagapuram Road[8]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 9.45 AM
Total No of Participants in the Transect
6 6
Walk
Sensitive locations (forests, cultural/ Safety at places such as Temple, school, hospital
iv.
archeological/ historical sites, etc.) and elder care must be considered
Water-related issues (drainage Flooding has damaged te road, culvert must be
v. paths, rivers and stream crossings, constructed, drainsprovided
Flooding Sections, irrigation canals,
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. School road and Sea Side Street
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Sampbathivu Main Road[9]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 10.30PM
Total No of Participants in the Transect
6 8
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. There are an empty lands near to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. School road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Sangama Road –Sinhapura[10]
2 Villages traversed by the Road Short cut to Trinco, Colombo Kandy Road
3 GND 243H, Singapura
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 13.48 PM
Total No of Participants in the Transect
6 6
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available (Sangam Road)
may be used during construction
Province : Eastern
District : Trincomalee
Waypoint
# Detail / Type Name Remarks
No.
1 391 Start[10]
2 392 Geometry By roads Both sides
3 393 Geometry By road RHS
Waypoint
# Detail / Type Name Remarks
No.
26 415 Social(Religious) Religion place
40
41 429 Inventory culvert Start[10.2]
42 430 Geometry By road LHS
43 431 Inventory Electric post LHS
44 432 Geometry By road RHS
Waypoint
# Detail / Type Name Remarks
No.
53 444 Start[10.4]
61
62 452 Inventory culvert Start[10.5]
# Description Details
1 Name of Road Paththinipuram Road[11]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 (Saturday) 14.35PM
Total No of Participants in the Transect
6 9
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. PathinipuramMainStreet
may be used during construction
Figure 1 - Community discussion was held Figure 1.1 -Damaged road section
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road KudddikaruchiAlankerny Road[12]
4 District Trincomalee
5 Date/ Time of Transect Walk 15..10.2016 (Saturday)
Total No of Participants in the Transect
6 6
Walk
Sensitive locations (forests, cultural/ A section of the existing road passes through a
iv.
archeological/ historical sites, etc.) people living
Water-related issues ( drainage Culvert constructed along the road but need
v. paths, rivers and stream crossings, more culverts
Flooding Sections, irrigation canals,
# Description Details
other water bodies, etc.)
Many lands are available for the contractor to
Suggestion on location of
vi. set up camp site. A specific land could be
Contractor’s camp site
finalized once the contractor makes selection.
Suggestions on alternate routes that
vii. Not required
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. School, Kovil are available
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Province : Eastern
District : Trincomalee
32
# Description Details
1 Name of Road Kaivaikal Kakamunai Road[13]
4 District Trincomalee
5 Date/ Time of Transect Walk 12.55
Total No of Participants in the Transect
6 7
Walk
iv. Women -
8 Name & Designation of the Key Participants:
# Description Details
Suggestion on location of
vi. Yes
Contractor’s camp site
Province : Eastern
District : Trincomalee
Inventory/
32 287 By road/Transformer LHS
Geometry
33 288 Geometry Curve
34 289 Geometry By road RHS
# Description Details
1 Name of Road Gomarankadawela Road, Rottuwewa road[14]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.1.2016 11.57 AM
Total No of Participants in the Transect
6 6
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. People agree to give their land to store materials
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Kallarawa Road[15]
4 District Trincomalee
5 Date/ Time of Transect Walk 19.10.2016 2.00 PM
Total No of Participants in the Transect
6 8
Walk
iv. Women 4
8 Name & Designation of the Key Participants:
# Description Details
Suggestion on location of
vi. Yes
Contractor’s camp site
Figure 1 - Road condition was inspected Figure 1.1 - Road condition was inspected
Province : Eastern
21 292 End[15]
22
23
# Description Details
1 Name of Road MawadiChenai Road[16]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016
Total No of Participants in the Transect
6 6
Walk
i. Indigenous Persons
ii. Disabled 1
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 2
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
31 106 End[16]
32
# Description Details
1 Name of Road MorawewaNochikulam Road[17]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 1.30 PM
Total No of Participants in the Transect
6 6
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many vacant land near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road D 6 Road[18]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 12.00 AM
Total No of Participants in the Transect
6 6
Walk
i. Indigenous Persons
D 6 Road Page 1
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
D 6 Road Page 2
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
D 6 Road Page 3
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
D 6 Road Page 4
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
D 6 Road Page 5
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
Province : Eastern
District : Trincomalee
12
13
14
15
16
17
18
19
20
21
22
23
D 6 Road Page 6
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
D 6 Road Page 7
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
1 Name of Road 4th Lane, Orris Hill[19]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 2.15 PM
Total No of Participants in the Transect
6 8
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 2
# Description Details
Water-related issues ( drainage
paths, rivers and stream crossings,
v. Drains required
Flooding Sections, irrigation canals,
other water bodies, etc.)
Suggestion on location of
vi. Land not available in the immediate vicinity
Contractor’s camp site
Suggestions on alternate routes
vii. that may be used during Yes, roads are available
construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. Church, Community center
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Other suggestions (such as animal
ix. -
crossings, borrow pits, etc.)
Figure 1 Existing drain Figure 1.1 Poor road conditions were recognized
# Description Details
1 Name of Road Gandinagar Main Road[20]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 10.30 AM
Total No of Participants in the Transect
6 8
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Selvanayagam Street
may be used during construction
Province : Eastern
District : Trincomalee
23
# Description Details
1 Name of Road Mihindapuram Main Road[21]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 11.00 AM
Total No of Participants in the Transect
6 6
Walk
i. Indigenous Persons 6
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available many places
Contractor’s camp site
Suggestions on alternate routes that Not available , but its only houses they can
vii.
may be used during construction managed
Province : Eastern
District : Trincomalee
16
17
18
19
20
21
22
23
# Description Details
1 Name of Road Jamaliya Road[22]
i. Indigenous Persons 10
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 4
Suggestion on location of
vi. Yes
Contractor’s camp site
Province : Eastern
District : Trincomalee
31
32
33
# Description Details
1 Name of Road Central Road[23]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 10.00AM
Total No of Participants in the Transect
6 4
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 3
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes. There are two bypasses
may be used during construction
Province : Eastern
District : Trincomalee
16
17
18
19
20
21
22
23
# Description Details
1 Name of Road Sea View Road[24]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 11.10AM
Total No of Participants in the Transect
6 3
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 2
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. No land available in the close vicinity-
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes. There are routes
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
1 201 Start[24]
2 202 Social(Religious) Kovil RHS
32
33
# Description Details
1 Name of Road Green Road[25]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 12.14 PM
Total No of Participants in the Transect
6 3
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes, There is contractor’s camp site
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Al Irfan School Main Road[26]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 1.30 PM
Total No of Participants in the Transect
6 4
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 3
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Faizal Nagar Main Road[27]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016
Total No of Participants in the Transect
6 16
Walk
i. Indigenous Persons
Sensitive locations (forests, cultural/ A section of the existing road passes through a
iv.
archeological/ historical sites, etc.) people living
Water-related issues ( drainage
v. paths, rivers and stream crossings, None
Flooding Sections, irrigation canals,
# Description Details
other water bodies, etc.)
Many lands are available for the contractor to
Suggestion on location of
vi. settle. A specific could be finalized once the
Contractor’s camp site
contractor makes his selection
Suggestions on alternate routes that Not required as the ROW is sufficient for any
vii.
may be used during construction temporary diversion
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. Two Mosque, need culvert so many junction
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Navavipalli Road to Palapali Road[28]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 11.30 AM
Total No of Participants in the Transect
6 7
Walk
Sensitive locations (forests, cultural/ A section of the existing road passes through a
iv.
archeological/ historical sites, etc.) people living
Water-related issues ( drainage
v. paths, rivers and stream crossings, None
Flooding Sections, irrigation canals,
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. -No land is available
Contractor’s camp site
Suggestions on alternate routes that Not required as the ROW is sufficient for any
vii.
may be used during construction temporary diversion
Province : Eastern
District : Trincomalee
19
20
21
22
23
# Description Details
1 Name of Road Alim Road to Jalaliya Main Road[29]
4 District Trincomalee
5 Date/ Time of Transect Walk
Total No of Participants in the Transect
6 5
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes (beach)
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes (Arlimst)
may be used during construction
Figure 1 - Road condition was inspected Figure 1.1 - Road condition was inspected
Province : Eastern
District : Trincomalee
23
24 530 T junction Start at junction Start[29.1]
25 532 Social Playground LHS
26 533 Geometry By road RHS
41
42
43
# Description Details
1 Name of Road Dipo Road to LathifHajiya Road[30]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 11.00 AM
Total No of Participants in the Transect
6 7
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that
vii. Not required
may be used during construction
Province : Eastern
District : Trincomalee
15 090
# Description Details
1 Name of Road Arai Acre Veethy[32]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 11.30 AM
Total No of Participants in the Transect
6 5
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Nadutheevu Main Road[33]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 1.00 PM
Total No of Participants in the Transect
6 5
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women -
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 Existing road condition was inspected Figure 1.1 Damaged road surfaces were identified
Province : Eastern
District : Trincomalee
16
17
18
19
20
21
22
23
# Description Details
1 Name of Road V C Ground Road[34]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 3.15 PM
Total No of Participants in the Transect
6 4
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 2
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
23
# Description Details
1 Name of Road NedunTheevu Road[35]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 2.40 PM
Total No of Participants in the Transect
6 4
Walk
i. Indigenous Persons -
ii. Disabled 1
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 1
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes, vacant land available
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 Poor road conditions were recognized Figure 1.1 Existing culvert
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road MaajithulAahira Road[36]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 2.00 PM
Total No of Participants in the Transect
6 12
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women -
Land owned/used by vulnerable People ownroadside land but have not become
iii.
groups of people vulnerable
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
23
# Description Details
1 Name of Road Kakamunai Central Road[37]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 5.20 PM
Total No of Participants in the Transect
6 4
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women -
Land owned/used by vulnerable People ownroadside land but they are not
iii.
groups of people vulnerable
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes, Vacant land available
Contractor’s camp site
Suggestions on alternate routes that
vii. No alternate routes
may be used during construction
Figure 1.1 Road condition was inspected Figure 1.1 Sharp bend
Province : Eastern
District : Trincomalee
16
17
18
19
20
21
22
23
# Description Details
1 Name of Road Pattiya Nagar Road[38]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 6.00 PM
Total No of Participants in the Transect
6 6
Walk
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. -
(No family is losing structures)
iv. Women 2
Land owned/used by vulnerable People own land but they are not vulnerable
iii.
groups of people due to project
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
3 GND Kurincherkerny
4 District Trincomalee
i. Indigenous Persons -
ii. Disabled -
Households losing structure: None
iii. 8
(No family is losing structures)
iv. Women -
8 Name & Designation of the Key Participants:
Land owned/used by vulnerable People have their own land but are not
iii.
groups of people vulnerable
Sensitive locations (forests, cultural/
iv. -No such sensitive locations
archeological/ historical sites, etc.)
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Figure 1 Road condition was inspected Figure 1.1 Damaged road sections were recognized
Province : Eastern
District : Trincomalee
22
23
# Description Details
3 GND Kinniya
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 3.30 PM
Total No of Participants in the Transect
6 5
Walk
Numbers of persons in each of following
7
categories participated in the meeting
Road alignment existing as well as It was suggested to maintain the same road
i.
design in general alignment as there is sufficient ROW
# Description Details
other water bodies, etc.)
Many lands are available for the contractor to
Suggestion on location of
vi. settle. A specific could be finalized once the
Contractor’s camp site
contractor makes selection
Suggestions on alternate routes that
vii. Not required
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. Mosque available
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Province : Eastern
District : Trincomalee
# Description Details
3 GND Naduoothu
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 4.10 PM
Total No of Participants in the Transect
6 3
Walk
Numbers of persons in each of following
7
categories participated in the meeting
i. 3 None
ii. Disabled None
Households losing structure: None
iii. None
(No family is losing structures)
iv. Women 2
8 Name & Designation of the Key Participants:
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 - Road condition was inspected Figure 1.1 - Damaged road sections were
recognized
Province : Eastern
District : Trincomalee
16
17
# Description Details
1 Name of Road 4th Cross Road[42]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 10.20 AM
Total No of Participants in the Transect
6 5
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land is available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. 3rd cross road
may be used during construction
Province : Eastern
District : Trincomalee
Road surface
23 041 Macadam - Gravel
Change
24 042 Inventory Culvert
25 043 Geometry By road RHS
34
35
# Description Details
1 Name of Road Aathimottai school Road[43]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 11.05 AM
Total No of Participants in the Transect
6 5
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty land near to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. APC road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Vadal Pillayar Kovil Road[44]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 11.55 AM
Total No of Participants in the Transect
6 6
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands are available
Contractor’s camp site
Suggestions on alternate routes that
vii. Routes are available
may be used during construction
Province : Eastern
District : Trincomalee
23
# Description Details
1 Name of Road Linga Nagar Main Road[45]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 1.00 PM
Total No of Participants in the Transect
6 4
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Province : Eastern
District : Trincomalee
Waypoint
# Detail / Type Name Remarks
No.
1 231 T junction Start at junction Start[45]
2 232 Social(Religious)/Geometry Kovil/Curve LHS
3 233 Social(Educational) School
# Description Details
1 Name of Road KarumalaiyoothuVeethy[46]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 11.05 AM
Total No of Participants in the Transect
6 15
Walk
i. Indigenous Persons
KarumalaiyoothuVeethy Page 1
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
KarumalaiyoothuVeethy Page 2
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
KarumalaiyoothuVeethy Page 3
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
KarumalaiyoothuVeethy Page 4
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
KarumalaiyoothuVeethy Page 5
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
KarumalaiyoothuVeethy Page 6
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
Province : Eastern
District : Trincomalee
KarumalaiyoothuVeethy Page 7
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
KarumalaiyoothuVeethy Page 8
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
1 Name of Road Madco Aproach Road[47]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 2.04 PM
Total No of Participants in the Transect
6 13
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land is not available close to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes ,there are roads that can be used
may be used during construction
Figure 1 - Existing road condition was inspected Figure 1.1 -Existing drains
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Sangama Road, China Bay[48]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 13.30 PM
Total No of Participants in the Transect
6 10
Walk
i. Indigenous Persons
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land is available
Contractor’s camp site
Suggestions on alternate routes that
vii. Ice factory road
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Damaged road section
# Description Details
1 Name of Road ChampaLane,Andankulam[49]
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 9.30 AM
Total No of Participants in the Transect
6 10
Walk
i. Indigenous Persons
ChampaLane,Andankulam Page 1
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land is Available
Contractor’s camp site
Suggestions on alternate routes that
vii. not required
may be used during construction
ChampaLane,Andankulam Page 2
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
ChampaLane,Andankulam Page 3
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
ChampaLane,Andankulam Page 4
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
ChampaLane,Andankulam Page 5
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
Province : Eastern
District : Trincomalee
Waypoint
# Detail / Type Name Remarks
No.
1 381 Midway of road Start at midway of road Start[49]
2 382 Inventory Manhole RHS
3 383 Inventory Culvert
ChampaLane,Andankulam Page 6
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
ChampaLane,Andankulam Page 7
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
1 Name of Road Karuthikuda Road[50]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 12.11 PM
Total No of Participants in the Transect
6 10
Walk
i. Indigenous Persons -
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 Community meeting was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
23
# Description Details
1 Name of Road Jamiah Road, Pala Nagar[51]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016
Total No of Participants in the Transect
6 13
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many lands are available for the contractor
Contractor’s camp site
Suggestions on alternate routes that Not required at the ROW is sufficient for any
vii.
may be used during construction temporary diversion
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Al Hamra School Road[53]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 12.00 PM
Total No of Participants in the Transect
6 20
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
14
15
16
17
18
19
20
# Description Details
1 Name of Road Al Hairiya School Road[54]
4 District Trincomalee
5 Date/ Time of Transect Walk 6.00 PM
Total No of Participants in the Transect
6 8
Walk
i. Indigenous Persons 5
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
13
14
15
# Description Details
1 Name of Road R D S Road[55]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 14.50 PM
Total No of Participants in the Transect
6 6
Walk
R D S Road Page 1
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available
may be used during construction
R D S Road Page 2
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
R D S Road Page 3
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
R D S Road Page 4
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
R D S Road Page 5
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
Province : Eastern
District : Trincomalee
16 269 F/O
17 270 Geometry By road LHS
18 271 Geometry By road RHS
19 272 End[55.1]
20
R D S Road Page 6
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
R D S Road Page 7
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
1 Name of Road Vedha Theevu Main Road[56]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 3.00 PM
Total No of Participants in the Transect
6 13
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
10
# Description Details
1 Name of Road Ammanveli Road[57]
4 District Trincomalee
5 Date/ Time of Transect Walk 13.10.2016 2.45 PM
Total No of Participants in the Transect
6 6
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. None (farming land)
Contractor’s camp site
Suggestions on alternate routes that
vii. Thehiratha road
may be used during construction
Province : Eastern
District : Trincomalee
10
# Description Details
1 Name of Road Coprative Road, Irudhayapuram[58]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 2.45 PM
Total No of Participants in the Transect
6 8
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. -
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Manachenai Central Road[59]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016
Total No of Participants in the Transect
6 12
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Damaged road sections were recognized
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Malikaitheevu to Mengamam Road[60]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 4.00 PM
Total No of Participants in the Transect
6 8
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Bahriya Road[61]
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.2016 5.30 PM
Total No of Participants in the Transect
6 7
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available
may be used during construction
Figure 1 Community discussion Figure 1.1 Existing road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
1 Name of Road Cemetery Road[63]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 5.00 PM
Total No of Participants in the Transect
6 7
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Poor road surfaces were recognized
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Poor road conditions were identified
Province : Eastern
District : Trincomalee
10
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that
vii. Not required
may be used during construction
Province : Eastern
District : Trincomalee
19
20
21
22
23
# Description Details
# Description Details
Flooding Sections, irrigation canals,
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. Church
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Province : Eastern
District : Trincomalee
10
11
12
13
14
15
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
15
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that
vii. Alternate routes are available
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many lands available
Contractor’s camp site
Suggestions on alternate routes that
vii. Not required
may be used during construction
Figure 1 Existing road condition was inspected Figure 1.1 Existing road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that Not required as the ROW is sufficient for any
vii.
may be used during construction temporary diversion
Province : Eastern
District : Trincomalee
39
40
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many lands are available for the contractor
Contractor’s camp site
Suggestions on alternate routes that
vii. Not required
may be used during construction
Province : Eastern
District : Trincomalee
5
6 181 Midway of road Start at midway of road Start[71]
7 182 Inventory Electric post RHS
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of Many lands are available for the contractor to
vi.
Contractor’s camp site set camp sites
Suggestions on alternate routes that
vii. Not required
may be used during construction
Province : Eastern
District : Trincomalee
10 243 Flood
11 244 Inventory Lake RHS/ LHS
12 245 End[72]
13
14 246 T junction Start at junction Start[72.1]
15 247 Inventory Electric post LHS
# Description Details
1 Name of Road Campus Road[73]
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 10.30 AM
Total No of Participants in the Transect
6 7
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty lands near to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Iqbal Nagar road
may be used during construction
Province : Eastern
District : Trincomalee
19
20
# Description Details
4 District Trincomalee
5 Date/ Time of Transect Walk 18.10.2016 9.45 AM
Total No of Participants in the Transect
6 7
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. KannayammanTemple Road
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. Required Pedestrian crossing at the junction
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
17 363 End[74]
18
19
20
21
22
23
# Description Details
3 GND Irakakandi
4 District Trincomalee
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Province : Eastern
District : Trincomalee
13
14 343 Start at junction Start[75.1]
15 344 Geometry By road RHS
18
19
20
21
22
23
# Description Details
1 Name of Road Kumburupiddy East (Gandhi Nagar)[76]
# Description Details
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. Kovil, church
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Changes/inputs to be incorporated
in the design (alignment, road
i. safety, drains, irrigation water Irrigation canals
crossing, Retaining walls, Guard
Stones etc.)
Province : Eastern
District : Trincomalee
19 328 End[76.2]
20 329 Geometry By roads Both sides
21 330 Start[76.2]
22
# Description Details
1 Name of Road Sinhala M V Road[78]
4 District Trincomalee
5 Date/ Time of Transect Walk 19.10.2016
Total No of Participants in the Transect
6 7
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi.
Contractor’s camp site
Suggestions on alternate routes that
vii.
may be used during construction
Province : Eastern
District : Trincomalee
17
18
19
20
21
22
23
# Description Details
1 Name of Road Thennamaravadi Koddady Road[79]
4 District Trincomalee
5 Date/ Time of Transect Walk 19.10.2016
Total No of Participants in the Transect
6 5
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes, lankaaaaaaaaa are va
Contractor’s camp site
Suggestions on alternate routes that
vii. No route
may be used during construction
Province : Eastern
District : Trincomalee
Inventory/
10 141 Culvert /Curve Under construction
Geometry
11 142 Geometry Curve
12 143 End[79]
13
14
15
16
17
18
19
20
21
22
23
# Description Details
1 Name of Road 98 Main Road, Galmitiyawa South[81]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 11.06 AM
Total No of Participants in the Transect
6 7
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available many bare land
Contractor’s camp site
Suggestions on alternate routes that
vii. 99 main road Galmitiyawa
may be used during construction
Province : Eastern
District : Trincomalee
10
11
12
13
14
15
16
17
18
19
20
21
22
23
# Description Details
1 Name of Road Ulpothuwewa Main Road[83]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 3.05 PM
Total No of Participants in the Transect
6 8
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available (Pansala Road)
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
10
11
12
13
14
15
16
17
18
19
20
21
22
23
# Description Details
1 Name of Road Sippithidal Street[84]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 13.55 PM
Total No of Participants in the Transect
6 7
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available
may be used during construction
Province : Eastern
District : Trincomalee
15
16
17
18
19
20
# Description Details
1 Name of Road Potkeny Road, Puthukkudiruppu[85]
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 13.30 PM
Total No of Participants in the Transect
6 11
Walk
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available (Navalar street)
may be used during construction
Province : Eastern
District : Trincomalee
16
17
18
19
20
21
22
23
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Majial road
may be used during construction
Major Issues discussed during the Flooding culverts and drainage must be
i.
consultation constructed
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Alexa internal road
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
10 669 End[87]
11
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Shirajiah Arabic College 1st cross
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
# Description Details
iv. Women 2
8 Name & Designation of the Key Participants:
# Description Details
Suggestion on location of
vi. Available
Contractor’s camp site
Figure 1 Community discussion Figure 1.1 Existing road condition was inspected
Province : Eastern
District : Trincomalee
10
# Description Details
iv. Women 3
8 Name & Designation of the Key Participants:
From RDA/PIU/ESD (Social &
i.
Environment)
ii. From PS/DSD/GND
Community Representatives (may
include representations from Schools,
iii.
Religious Organizations)/
Representatives of Displaced Persons
9 Issues raised/ Suggestions made bythe Participants
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Jabbar street
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
Sensitive locations (forests, cultural/ Templeis are there though not be affected
iv.
archeological/ historical sites, etc.) during development
# Description Details
other water bodies, etc.)
Suggestion on location of Available in many locations as the population is
vi.
Contractor’s camp site very low
Suggestions on alternate routes that
vii. Not available
may be used during construction
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available
may be used during construction
Recommendations of the Social Sign boards are required at curves and speed
ii.
Safeguard breakers at some points
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available bare lands close to the road
Contractor’s camp site
Suggestions on alternate routes that By pass can be constructed and also main road
vii.
may be used during construction available
Recommendations of the Social Need to put sign boards curves and near
ii.
Safeguard playground
Province : Eastern
District : Trincomalee
# Description Details
Sensitive locations (forests, cultural/ School and temple, playground exist by roadside
iv.
archeological/ historical sites, etc.) but will not be affected during development
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available bare lands for this purpose
Contractor’s camp site
Suggestions on alternate routes that
vii. Available by pass can be provided
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available many bare lands
Contractor’s camp site
Suggestions on alternate routes that By pass can be constructed because the road is
vii.
may be used during construction wider
Province : Eastern
District : Trincomalee
4
5 185 Start[97.1]
6 186 Inventory Tree on road
7 187 Inventory Electric post
8 188 Social(Religious) Right side kovil
9 189 End[97.1]
10
# Description Details
Water-related issues ( drainage Flooding over road, the existing culvert is not in
v. paths, rivers and stream crossings, good condition. Expected 4 more culverts to be
Flooding Sections, irrigation canals, constructed.
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available many bare lands
Contractor’s camp site
School road may be used, by pass also can
Suggestions on alternate routes that
vii. provide space as the road is wide in some
may be used during construction
sections.
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. Need to erect more sign boards
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Province : Eastern
District : Trincomalee
17
18
19
20
21
22
23
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many empty lands near to the road.
Contractor’s camp site
Suggestions on alternate routes that
vii. Kalyanapura 1st lane
may be used during construction
Province : Eastern
District : Trincomalee
33
34
35
# Description Details
# Description Details
paths, rivers and stream crossings, constructed
Flooding Sections, irrigation canals,
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Major Issues discussed during the Regular Elephant crossing . Culvert and bridge must
i.
consultation be constructed
Province : Eastern
District : Trincomalee
Inventory
4 296 Culvert/ Curve
/Geometry
Geometry
5 297 Curve /Culvert
/Inventory
6 298 Inventory Culvert
7 299 Inventory Culvert
8 300 Junction Junction
9 301 Inventory Culvert
10 302 Geometry Curve
Inventory
11 303 Culvert/ Curve
/Geometry
12 304 Geometry Curve
13 305 Inventory Culvert
20
21
22
23
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands are availablecloser to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 Railway crossing with safety gate Figure 1.1 Poor road condition
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of There is vacant land among Farming lands near
vi.
Contractor’s camp site the road
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Existing poorly placed culvert
Province : Eastern
District : Trincomalee
19
20
21
22 .
23
# Description Details
iv. Women 2
8 Name & Designation of the Key Participants:
From RDA/PIU/ESD (Social &
i.
Environment)
ii. From PS/DSD/GND
Community Representatives (may
include representations from Schools,
iii.
Religious Organizations)/
Representatives of Displaced Persons
9 Issues raised/ Suggestions made bythe Participants
# Description Details
Flooding Sections, irrigation canals,
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands available
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. None
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty lands available near to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Main road
may be used during construction
Province : Eastern
District : Trincomalee
16
17
18
19
20
21
22 .
23
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Land available close to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. SripuraGamunu guru road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many empty lands
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty lands near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. None (walking path only)
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
10
11 218 T junction Start at junction Start[112.1]
12 219 Inventory Culvert
13 220 Geometry Curve
Rocks on road
14 221 Rocks on road surface
surface
15 222 Social(Educational) School RHS
16 223 T junction End at junction End[112.1]
17
# Description Details
3 GND 31 –L Tissapura
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016 13.00 PM
Total No of Participants in the Transect
6 5
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Nearest road available
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
3 GND 31 –P
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016 12.50 PM
Total No of Participants in the Transect
6 7
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty land near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 Community meeting was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
1 096 Start[115]
2 097 Geometry By road LHS
# Description Details
3 GND 31 –M Samanpura
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016 11.55AM
iv. Women 1
8 Name & Designation of the Key Participants:
From RDA/PIU/ESD (Social &
i.
Environment)
ii. From PS/DSD/GND
Community Representatives (may
include representations from Schools,
iii.
Religious Organizations)/
Representatives of Displaced Persons
9 Issues raised/ Suggestions made bythe Participants
Road alignment existing as well as
i. not required to change Alignment
design in general
Road width (carriageway and
ii. overall) existing , Land availability if (03 m and 06 m) to be widened
improvement required
Land owned/used by vulnerable
iii. None
groups of people
Sensitive locations (forests, cultural/
iv. None
archeological/ historical sites, etc.)
# Description Details
Flooding Sections, irrigation canals,
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii.
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. Need culverts , traffic sign boards must be fixed
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Province : Eastern
District : Trincomalee
10
# Description Details
3 GND 31 –J
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016 1.20 PM
Total No of Participants in the Transect
6 6
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. There are empty lands
Contractor’s camp site
Suggestions on alternate routes that
vii. Thekkawatta road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
3 GND 31 –D
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016 10.50 AM
Total No of Participants in the Transect
6 8
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty lands near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
3 GND 31 –D
4 District Trincomalee
5 Date/ Time of Transect Walk 17.10.2016 10.15 AM
Total No of Participants in the Transect
6 7
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty lands near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Main road
may be used during construction
Figure 1 Community meeting was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
3 Inventory Culvert
4 Geometry By road LHS
5 Social(Educational) School
6 Inventory Culvert
7 Social(Educational) Preschool
8 Inventory Culvert
9 Geometry By roads Both sides
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many empty lands near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. River road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
3 GND 230/C
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 1.30 PM
Total No of Participants in the Transect
6 12
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many places in near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Santhipuram road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
3 GND 231/D
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 3.10 PM
Total No of Participants in the Transect
6 7
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty land available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
# Description Details
3 GND 215/B
4 District Trincomalee
5 Date/ Time of Transect Walk 14.10.2016 3.10 PM
Total No of Participants in the Transect
6 5
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Mayavaadi road, Thambinana Road
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
# Description Details
3 GND 217/G
4 District Trincomalee
5 Date/ Time of Transect Walk 13.10.2016 12.20 AM
Total No of Participants in the Transect
6 5
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land near the road available
Contractor’s camp site
Suggestions on alternate routes that
vii. Cemetery Road
may be used during construction
Figure 1 Community meeting was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
3 GND Seruvila
4 District Trincomalee
5 Date/ Time of Transect Walk 13.10.2016 16.40 PM
Total No of Participants in the Transect
6 8
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available several bare lands
Contractor’s camp site
Suggestions on alternate routes that
vii. Samagipura Road (bypass arrange not possible)
may be used during construction
# Description Details
3 GND 215 G
4 District Trincomalee
5 Date/ Time of Transect Walk 13.10.2016 1.30 PM
Total No of Participants in the Transect
6 5
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Boundary road
may be used during construction
Figure 1 - Community discussion was held Figure 1.1 - Poor road condition
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Can be arranged many barelands
Contractor’s camp site
Suggestions on alternate routes that As bypass construction is not possible. Public
vii.
may be used during construction may use the nearest road next to it.
Figure 1 Community meeting was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
10 331 End[131.1]
11
12 332 T junction Start at junction Start[131.2]
13 333 Inventory Culvert
14 334 Inventory Culvert End[131.2]
15
# Description Details
iv. Women -
8 Name & Designation of the Key Participants:
# Description Details
Suggestion on location of
vi. None
Contractor’s camp site
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Near to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Lingapuram back road (RDS road)
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes, alternate route available
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Unit 14 road
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of People are willing to donate minimum of their
vi.
Contractor’s camp site lands as required
Suggestions on alternate routes that
vii. Provide Light on the road
may be used during construction
Province : Eastern
District : Trincomalee
16
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Piyantha Mawatha road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant landsavailable near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Sugar factory road
may be used during construction
Figure 1 Ongoing development activities were Figure 1.1 Damaged road section
recognized
Province : Eastern
District : Trincomalee
Waypoint
# Detail / Type Name Remarks
No.
1 857 Start[138]
2 858 Inventory Culvert
3 860 Social(Educational)/Inventory Preschool/Culvert
Waypoint
# Detail / Type Name Remarks
No.
25 882 Inventory Pot holes
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty lands near to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Bavriyal road
may be used during construction
Province : Eastern
District : Trincomalee
1 912 Start[139]
2 913 Inventory Electric post RHS
41 952 End[139]
42
43 953 Start[139.1]
44 954 Inventory Bridge
45 955 End[139.1]
46
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land is available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Unit 34 road
may be used during construction
Province : Eastern
District : Trincomalee
22
23
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant landsavailable near t the road
Contractor’s camp site
Suggestions on alternate routes that
vii. Nagarasaba Mawatha
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Figure 1 Existing road condition was inspected Figure 1.1 Damaged culvert
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
16
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available (Jayanthiwewapura)
may be used during construction
Figure 1 Community discussion was held Figure 1.1 During transect walk
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many empty land near to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. 3rd cross road
may be used during construction
Province : Eastern
District : Trincomalee
10
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. -
Contractor’s camp site
Suggestions on alternate routes that
vii. -
may be used during construction
Province : Eastern
District : Trincomalee
10 156 End[147]
11
12 157 Start[147.1]
13 158 Geometry Curve
14 159 Geometry Curve
15 160 End[147.1]
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. -
Contractor’s camp site
Suggestions on alternate routes that
vii. -
may be used during construction
Province : Eastern
District : Trincomalee
10 156 End[147]
11
12 157 Start[147.1]
13 158 Geometry Curve
14 159 Geometry Curve
15 160 End[147.1]
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Available
may be used during construction
Recommendations of the Social Sign boards and drainage system must be done
ii.
Safeguard properly.
Province : Eastern
District : Trincomalee
1 637 Start[151]
2 638 Inventory Electric post RHS
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
3 115 Paddy
4 116 Inventory Culvert
5 117 Geometry By road LHS
6 118 Inventory Electric post LHS
7 119 Geometry By road
8 120 Inventory Culvert
9 121 Social(Educational) School
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
Province : Eastern
District : Trincomalee
41
# Description Details
iv. Women
8 Name & Designation of the Key Participants:
From RDA/PIU/ESD (Social &
i.
Environment)
ii. From PS/DSD/GND
Community Representatives (may
include representations from Schools,
iii.
Religious Organizations)/
Representatives of Displaced Persons
9 Issues raised/ Suggestions made bythe Participants
# Description Details
Flooding Sections, irrigation canals,
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that
vii. Not required
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. No junction, Mosque
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Figure 1 Road condition was inspected Figure 1.1 Poor road conditions were recognized
Province : Eastern
District : Trincomalee
1 1789 Start[155]
2 1790 End[155]
3
4 1791 Start[155.1] S
5 1792 Concrete surface
6 1793 Geometry By road LHS
7 1794 Concrete road surface
8 1795 Need a bridge
9 1796 End[155.1]
10
11
12
13
14
15
16
17
18
19
20
21
22
23
# Description Details
iv. Women 9
8 Name & Designation of the Key Participants:
From RDA/PIU/ESD (Social &
i.
Environment)
ii. From PS/DSD/GND
Community Representatives (may
include representations from Schools,
iii.
Religious Organizations)/
Representatives of Displaced Persons
9 Issues raised/ Suggestions made bythe Participants
# Description Details
Flooding Sections, irrigation canals,
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that
vii. Not required
may be used during construction
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school, Special sign boards required near schools,
viii.
Temple, Church, Kovil, Mosque, mosque area existing course way section.
Cemetery Cultural /Community
Centers etc.)
Province : Eastern
District : Trincomalee
1 1756 Start[156]
2 1757 Inventory Light post RHS
# Description Details
3 GND Kinniya
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016
iv. Women 3
8 Name & Designation of the Key Participants:
From RDA/PIU/ESD (Social &
i.
Environment)
ii. From PS/DSD/GND
Community Representatives (may
include representations from Schools,
iii.
Religious Organizations)/
Representatives of Displaced Persons
9 Issues raised/ Suggestions made bythe Participants
Road alignment existing as well as
i. Maintain the same alignment
design in general
Road width (carriageway and
ii. overall) existing , Land availability if 3 – 3 wide
improvement required
Land owned/used by vulnerable No land adjacent the ROW is inhabited by a
iii.
groups of people group of vulnerable people
Sensitive locations (forests, cultural/ A section of the existing road passes through a
iv.
archeological/ historical sites, etc.) people living
# Description Details
Flooding Sections, irrigation canals,
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that Not required as the ROW is sufficient for and
vii.
may be used during construction temporary diversion
Road safety-related issues
(junctions, curves, Embankments,
Tank bunds, hospitals, school,
viii. 2 or 3 junction – 3 curve
Temple, Church, Kovil, Mosque,
Cemetery Cultural /Community
Centers etc.)
Figure 1 Road condition was inspected Figure 1.1 Damaged road section
Province : Eastern
District : Trincomalee
1 061 Start[157]
2 062 Macadam
16
# Description Details
Sensitive locations (forests, cultural/ A section of the existing road passes through a
iv.
archeological/ historical sites, etc.) people living
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that
vii. Not required
may be used during construction
Province : Eastern
District : Trincomalee
1 046 Start[158]
2 047 Social(Religious) Mosque
3 048 Geometry By road LHS
4 049 Geometry By road RHS
16
17 104 Start[158.1]
18 105 Geometry By road LHS
19 106 Geometry By road LHS
52 141
# Description Details
3 GND Rahmaniya
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.2016 4.40 PM
Total No of Participants in the Transect
6 11
Walk
Numbers of persons in each of following
7
categories participated in the meeting
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Yes
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes (Can use Rahmaniya Road)
may be used during construction
Figure 1 Road width measures were taken Figure 1.1 Damaged road section
Province : Eastern
District : Trincomalee
1 502 Start[159.2]
2 503 Social(Religious) Kovil RHS
23 524 End[159]
24 525 Start[159.2]
25 526 Geometry Curve
26 527 Geometry Curve
28 529 End[159.2]
29
30
31
32
33
34
35
36
37
38
39
40
# Description Details
3 GND Kattaiyaaru
4 District Trincomalee
5 Date/ Time of Transect Walk 15.10.201612.45 PM
Total No of Participants in the Transect
6 7
Walk
Numbers of persons in each of following
7
categories participated in the meeting
U C Road Page 1
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. No
Contractor’s camp site
Suggestions on alternate routes that
vii. Yes
may be used during construction
U C Road Page 2
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
U C Road Page 3
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
U C Road Page 4
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
U C Road Page 5
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
Province : Eastern
District : Trincomalee
U C Road Page 6
IROAD – EASTERN PROVINCE – TRINCOMALEE DISTRICT
U C Road Page 7
IROAD – EASTERN PROVINCE – BATTICALOA DISTRICT
# Description Details
3 GND 227/A
4 District Trincomalee
5 Date/ Time of Transect Walk 16.10.20162.15 PM
Total No of Participants in the Transect
6
Walk
Numbers of persons in each of following
7
categories participated in the meeting
i. Indigenous Persons
ii. Disabled
Water-related issues ( drainage Flooding in the last section of road. Culvert and
v. paths, rivers and stream crossings, drainage required
Flooding Sections, irrigation canals,
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Empty lands near to the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 Road condition was inspected Figure 1.1 Damaged road section
Province : Eastern
District : Trincomalee
1 814 Start[161]
2 815 Geometry By road RHS
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands available near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant land available
Contractor’s camp site
Suggestions on alternate routes that
vii. Muslim colony Road
may be used during construction
Province : Eastern
District : Trincomalee
45 080 Suhada
46 081 Social Bus halt RHS
47 082 Geometry By road LHS
76 111 End[163]
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many empty lands near tothe road
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. None
Contractor’s camp site
Suggestions on alternate routes that
vii. None
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
16
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Many Vacant lands near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. None (main road)
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands near the road
Contractor’s camp site
Suggestions on alternate routes that
vii. 25th Housing road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Vacant lands available
Contractor’s camp site
Suggestions on alternate routes that
vii. Light road
may be used during construction
Province : Eastern
District : Trincomalee
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available Many bare lands
Contractor’s camp site
Suggestions on alternate routes that
vii. Available
may be used during construction
Figure 1 Community meeting was held Figure 1.1 Road condition inspected
Province : Eastern
District : Trincomalee
31 629 Start[169.2]
32 630 Inventory Culvert
33 631 Social(Educational) Pre school
38 636 End[169.2]
39
40
41
42
43
44
# Description Details
# Description Details
other water bodies, etc.)
Suggestion on location of
vi. Available
Contractor’s camp site
Suggestions on alternate routes that
vii. Vellankad road
may be used during construction
Figure 1 Community discussion was held Figure 1.1 Road condition was inspected
Province : Eastern
District : Trincomalee
1 001 End[170]
70 070 Forest
71 071 Inventory Culvert
72 072 Inventory Wall RHS
73 073 Social(Defense) Camp
74 074 Gate of com
75 075 Social(Religious) Religion Place