A. MiCOM P442
1. LINE DATA
2. GROUND FACTOR
This value
Grounding Factor Kg = (Z0 – Z1) / (3 * looks not
Z1) realistic. Pls
Magnitude of Grounding Factor 0.496 check up zero
Kg = (SQRT((X0-XL)*(X0-XL))+((R0- sequence
RL)*(R0-RL)))/(3*(SQRT(RL*RL)+ reactance/km
(XL*XL)))
Zone 1 setting
3. ZONE SETTINGS need to review
if any series
DIST Z1 (polygon) (80% of compensated
Protected Line Impedance*(CTR/PTR)) lines is
available at
0.8 X 2.33 X 0.4 0.75 Raipur end
25.4
Typically, phase fault distance zones would be set to avoid the minimum
load impedance by a margin of 30%, (bearing in mind that the PSB zone
surrounds the Zone 3 characteristic) and earth fault distance zones would
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 4 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
= 4.06
5.1 UNBLOCKING
CURRENTTHRESHOLDS:
The three unblocking current thresholds namely, IN>, I2> and Imax
should be set above the maximum expected residual current unbalance,
the maximum negative sequence unbalance and the maximum
expected power swing current.
IN> 40%
I2> 30 %
Unblocking timer:
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 6 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
7. SWITCH ON TO FAULT
1ST stage over current (I>1) is used to operate, as back up over current, which will
change as non-directional over current during VT Fuse failure with a definite time
delay set under TIME VTS.
I>1 Function DT
I>1 Directional Directional FWD
I>1 VTS Block Non Directional
I>1 Current Set 1.500 A
I>1 Time delay 2s
I>1 Time VTS 2Sec
I>2 Function Disabled
I>3 Status Enabled
I>3 Current Set 3A
I>3 Time delay 3.000 s ( This time delay is not having role in
SOTF/TOR logic. . Since not possible to block
time delay, keep a higher setting as 3 Sec.)
I>4 Status Disabled
1ST stage over current (IN>1) is used to operate, as back up earthfault, which will
change as non directional earth fault during VT Fuse failure with a definite time
delay set under TIME VTS.
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 7 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
IN>1 Function DT
IN>1 Directional Directional FWD
IN>1 VTS Block Non Directional
IN>1 Current Set 0.3A (30% of rated current. Standard
value)
IN>1 Time delay 2s
IN>1 Time VTS 2s
IN>2 Status Disabled
11.AUTO RECLOSURE
12.CHECK SYNCH
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 8 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
Detect 3P Enabled
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 9 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
B. MiCOM P437
1. LINE DATA
Line
CT & PT Details
CT Primary 800 Amp
CT Secondary 1 Amp
PT Primary 220 Kilo Volt
PT Secondary 110 Volt
CT / PT Ratio 0.4
3. GROUND FACTOR
This value
Grounding Factor Kg = (Z0 – Z1) / (3 * looks not
Z1) realistic. Pls
Magnitude of Grounding Factor 0.496 check up zero
Kg = (SQRT((X0-XL)*(X0-XL))+((R0- sequence
RL)*(R0-RL)))/(3*(SQRT(RL*RL)+ reactance/km
(XL*XL)))
Zone 1 setting
need to review
Settings are entering in secondary values. Hence before start entering if any series
the values
, CT secondary value should be set. Other wise settings will change compensated
on changing
CT secondary value. lines is
available at
Raipur
Total 6 Impedance and 8 Timer Modules are available for for grading. User end either
can select
Polygonal or Circular for Tripping Characteristic
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 11 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
Zones which are not used (like Zone 4 to 7) get blocked by the timer
setting, t4…t7 = blocked
Since NTPC - SIPAT line needs only three Zones in the forward
Direction and one Zone in Reverse Direction, Zone and timer
settings are recommended as below
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 12 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
3. ZONE SETTINGS
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 13 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
25.4
Typically, phase fault distance zones would be set to avoid the minimum
load impedance by a margin of 20%, (bearing in mind that the PSB zone
surrounds the Zone 3 characteristic) and earth fault distance zones would
use a 10% margin.
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 14 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
The relay can be used for in all power systems, whatever the neutral point
treatment.
That may be Low Impedance Grounding / Isolated or Resonant grounded
with starting PG / Isolated or Resonant grounded without starting PG / Short
time Grounding
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 15 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
The base current enables the measurement systems for under voltage and
under impedance fault detection to enable. This setting acts like pole dead
and prevent starting of under voltage & under impedance starter in pole
dead condition
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 16 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 17 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 18 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
Typically, the ∆R and ∆X band settings are both set between 10% and
30% of R3ph.
Considering 20% of the R3Ph setting for catering to the fastest power
swings,
= 4.06
24.38
6.1
Operate delay = 0.1 sec (Even though power swing detected, block
will be after this time delay. Setting is between Z1 and Z2. This will
allow only Z1 element to trip and all other zones blocked in power
swing)
Release delay = 0.2 sec (Release delay is the drop off timer for PSB.
This will help to hold PSB block once the impedance locus went out of
PSB band and re enter in the PSB band)
Max. Blocking time = 2 Sec
Operate Value Trip = Blocked
Operate delay trip = 0 sec
R = 24.38
X = 7.98
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 19 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
= 84.62 deg
I> 1.2A
ti> 2 Sec
IN> 0.3A
tIN> 2 Sec
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 20 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
I > 1.5 A
TI> 2 Sec
IN> 0.3 A
TIN>2 Sec
All other stages of O/C keep in maximum
I negative
MCMON FF Enabled
I Negative FF 0.1(permissible unbalance )
V neg 0.2 ( Operate value for fuse failure)
Vpos> 0.15V Nom( Operative value for fuse failure)
HSR Operating mode = 1 pole trip only (selected single pole AR only)
HSR Operating mode = TRIP dependent (start dead time only on trip)
Dead time setting = 1 sec
Reclaim time = 25 Sec
13. SOTF
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 21 of 22
Settings/Bhilai/220kV Line Protn
Rev-A 05/01/06
AREVA T&D
AUTOMATION SUPPORT
19/1 GST Road, Pallavaram, Chennai -600043
Page 22 of 22