EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAEP-1026,
Fireside Layup in SAEP-1026 Section 5 requires Safety
A5
Precautions & CONFINED SPACE ENTRY (Form 924-4), permit.
Section 13
B. Checklist items (Program for Maintenance Inspection shall follow SAEP-1026). See Attachment 1.
REMARKS:
ATTACHMENTS: ATTACHMENT 1 - SAEP-1026 BOILER LAY-UP PROCEDURE & ASSOCIATED PRESERVATION & INSPECTION REQMTS
REFERENCE DOCUMENTS:
1. SAEP-1026, Boilers Lay-Up Procedures (31 December 2016)
2. SAEP-1025, Chemical Cleaning of Steam Generation Systems (16-October-2016)
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative