# TPEB-QHSE-F-014
ISSUE# 01
ARCHTECTURAL PAINTING
ISSUE DATE 05-06-2017
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA PASS FAIL N/A RE-INSP DATE
No.
C Final Inspection
A
C1 The finished surface isSurface Preparation
free from sag and runs.
C2 All defects
Surface shallbe
should befree
corrected or restored
of defects. to desired
All cracks, uneven results
surface,
A1 including
joints damagesmisaligned
overlapping, from inspection like
edges, adhesion
screw testing,
tightening or wet
other
film thickness
defects shouldtests, etc.
be repaired prior to painting.
C3 If DFT (dry filmpainted
thickness)
Surface to be shallisbe
recommended by manufacturer,
free of oil, grease, dust, dirt,
A2 the same should be within the acceptable limit as indicated in
molds or any foreign matter.
the manufacturer's recommendation.
C4 Atmospheric
Where there is relative humidity
discoloring, shallor
fading, bewhere
less than 85% during
the color is different
A3
surface preparation for painting.
as required, the same shall be repaired or restored to achieve
Weather conditionofshould
the requirements projectbespecifications
fair and temperature range
or approved should
color
A4
be as perormanufacturer
scheme swathes. recommendation.
For cement board and gypsum surfaces, resin exudation and/or
A5 large knots shall be removed and replaced with approved filler
or knot sealer and the surface shall be primed.
Gypsum & cement board accessories installed at corners and
A6 joints shall be checked for deficiencies and rectified as per
required surface finish.
B Paint Application
ISSUE# 01
ARCHTECTURAL PAINTING
ISSUE DATE 05-06-2017
REMARKS: