Sei sulla pagina 1di 2

TAMIMI Pre-Engineered Buildings DOC.

# TPEB-QHSE-F-014

ISSUE# 01
ARCHTECTURAL PAINTING
ISSUE DATE 05-06-2017

IC NUMBER DATE APPROVED QR NUMBER


TAMIMI PEB INSPECTION CHECKLIST

PAINTING WORKS INSPECTION CHECKLIST TPEB-IC-


PROJECT TITLE WBS / BI / WO NUMBER CONTRACTOR / SUBCONTRACTOR

AL KIFAH HOLDINGS - MARJAN

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

SEE ATTACHED DWGS. SEE ATTACHED N/A N/A

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

WITNNESS N/A N/A

ITEM
ACCEPTANCE CRITERIA PASS FAIL N/A RE-INSP DATE
No.
C Final Inspection
A
C1 The finished surface isSurface Preparation
free from sag and runs.
C2 All defects
Surface shallbe
should befree
corrected or restored
of defects. to desired
All cracks, uneven results
surface,
A1 including
joints damagesmisaligned
overlapping, from inspection like
edges, adhesion
screw testing,
tightening or wet
other
film thickness
defects shouldtests, etc.
be repaired prior to painting.
C3 If DFT (dry filmpainted
thickness)
Surface to be shallisbe
recommended by manufacturer,
free of oil, grease, dust, dirt,
A2 the same should be within the acceptable limit as indicated in
molds or any foreign matter.
the manufacturer's recommendation.
C4 Atmospheric
Where there is relative humidity
discoloring, shallor
fading, bewhere
less than 85% during
the color is different
A3
surface preparation for painting.
as required, the same shall be repaired or restored to achieve
Weather conditionofshould
the requirements projectbespecifications
fair and temperature range
or approved should
color
A4
be as perormanufacturer
scheme swathes. recommendation.
For cement board and gypsum surfaces, resin exudation and/or
A5 large knots shall be removed and replaced with approved filler
or knot sealer and the surface shall be primed.
Gypsum & cement board accessories installed at corners and
A6 joints shall be checked for deficiencies and rectified as per
required surface finish.
B Paint Application

Mixing and application of the paint shall be in accordance with


B1 project specifications, approved method statement or approved
manufacturer's recommendation.
B2 Cleaning solvent shall be of low toxicity.
Substrate and ambient temperature is within acceptable limit as
B4 indicated in approved method statement or as per approved
manufacturer's recommendation.
Primer shall be applied sufficiently thinned to penetrate the
B5
surface.
Where area is to receive two or more dissimilar paint colors, the
B6 terminations, i. e., ends of walls, doors and windows, trims, etc.
shall be fixed using tape (masking tape or approved material).

Where a different material is applied adjacent to paint area like


sealant, grout, etc., both the painted area and the sealant/grout
B7
area shall be protected using tape (masking tape or any
approved material) to avoid contamination on both surfaces.
TAMIMI Pre-Engineered Buildings DOC. # TPEB-QHSE-F-014

ISSUE# 01
ARCHTECTURAL PAINTING
ISSUE DATE 05-06-2017

REMARKS:

PRODUCTION ENGINEER / QC INSPECTOR QUALITY ENGINEER / QC THIRD PARTY


Supervisor MANAGER REPRESENTATIVE
NAME: NAME: NAME: NAME;

SIGNATURE SIGNATURE SIGNATURE SIGNATURE:

DATE: DATE: DATE: DATE:

Potrebbero piacerti anche