SCHEDULE "C"
ATTACHMENT I
CONTRACT PRICE BREAKDOWN
a. The lump sum Contract Price as defined in Paragraph 1.1 of this Schedule "C" shall be SAR
___________. The lump sum Contract Price shall be excluded from Fiscal Measures sets forth in
Paragraph 12 of Schedule “C” and is broken down as follows for the purpose of progress
measurement:
Material Construction
Item Description of Elements (SR) (SR)
Mobilization - Maximum 5% of
1.0
LS Contract Price
Site Preperation and Earth
2.0
Works
SAPMT Camp Accomodation
3.0
Buildings
Excecutive Diwaniyah and
4.0
Gathering Tent
9.0 Musallah
Demobilization - Minimum of
21.0
5% of the LS Price
Total Lump Sum Contract
22.0
Price - -
b. Fiscal Measures: THESE ARE BIDDING ITEMS. Pursuant to Paragraph 12 of Schedule "C",
CONTRACTOR shall quote below (if applicable) the sum(s) which it has estimated as the the
potential financial impact of each of the following Fiscal Measures for undertaking the Work against
above Lump Sum for the entire WORK and coming into effect in the Kingdom of Saudi Arabia on the
effective date of the Contract (including where any of the following are already in force and are
amended, modified, repealed, replaced or activated). Each sum shall represent the actual, auditable
and verifiable increment to the Lump Sum price. CONTRACTOR should insert (N/A) against the
Fiscal Measure that is not applicable throughout Contract terms.
3. Price Adjustment: Utilities limited to water and electricity. UoM (LS) ________ SAR.
CONTRACTOR shall be compensated with this fiscal Measure as set forth in in Schedule “C”.
WN
his Schedule "C" shall be SAR
om Fiscal Measures sets forth in
the purpose of progress
Total
(SR)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
3.4.1 ¾” LM
3.4.2 1” LM
3.4.3 1½” LM
3.4.4 2” LM
3.4.5 3” LM
3.4.6 4” LM
3.4.7 6” LM
3.5 RGS Conduit, Belowground:
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
3.5.1 1” LM
3.5.2 2” LM
3.5.3 3” LM
3.5.4 4” LM
3.5.5 6" LM
3.5.6 8" LM
3.6 Cable Tray:
Cable tray, covered or un-covered including
all fixtures, bends, fittings, expansion joints,
splice plates, end plates, drop-out plates,
covers, NEMA VE-1/NEMA-12B Class
aluminum ladder straight grounding, lugs,
accessories and support brackets, for
external and internal installation. Cable
Tray/Ladder shall:
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
The WORK Unit Rates shall include, but not limited to, all material, labor, installation,
transportation, construction, testing, Pre-Commissioning, Commissioning and Mechncial
Completion. All specifciatinos shall be in accordance with Schedule "B" of the Contract as
applicable. Unit prices shall include updates to all documentation and drawings as a result of
the changes.
The Unit Rates descriptions in this Section follow the abbreviations for Unit of Measurement as
set forth below:
Each (EA)
Linear Meter (LM)
Square Meter (SM)
Cubic Meter (CM)
Kilogram (KG)
Tonnage (TON)
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
l, labor, installation,
ssioning and Mechncial
le "B" of the Contract as
and drawings as a result of
2.6 DOZERS
2.6.1 CAT-D6
2.6.2 CAT-D7
2.6.3 CAT-D8
2.6.4 CAT-D9
2.7 CRANES
2.7.1 12-Ton standard Boom
2.7.2 15-Ton standard Boom
2.7.3 18-Ton standard Boom
2.7.4 22-Ton standard Boom
2.7.5 30-Ton standard Boom
2.8 WELDING MACHINES
2.8.1 Motor Gen - 300 Amp D.C.
2.8.2 Motor Gen - 400 Amp D.C.
2.8.3 Oxy-Acetylene Set w/Torch
2.9 COMPRESSORS
2.9.1 150 CFM-Portable
2.9.2 175 CFM-Portable
2.9.3 300 CFM-Portable
2.9.4 375 CFM-Portable
2.10 GENERATORS
2.10.1 Generator Set - 10 kw
2.10.2 Generator Set - 25 kw
2.10.3 Generator Set - 50 kw
2.10.4 Generator Set - 100 kw
2.10.5 Generator Set - 200 kw
2.10.6 Generator Set - 500 kw
SCHEDULE "C"
ATTACHMENT I
Pursuant to Paragraph 10 of Schedule "C" and after the CONTRACTOR directly furnished,
installed, and maintained Contractor Camp facilities, the lump sum Price of SAR ___________ is
for purchasing CONTRACTOR Camp facilities and/or Project Support Buildings.
TIES
OR directly furnished,
rice of SAR ___________ is
t Buildings.
EDULE "C"
SCHEDULE "C"
ATTACHMENT I
EXHIBIT II - OPTION TO EXERCISE
a. The Lump Sum Price for the Option to construct additional residential SAPMT camp as defined in
Paragraph 1.1 of this Schedule "C" and set forth in Paragraph 1 of Schedule "H" shall be SAR
___________. This Lump Sum Price shall be excluded from Fiscal Measures sets forth in Paragraph
12 of Schedule “C” and is broken down as follows for the purpose of progress measurement:
Material Construction
Item Description of Elements (SR) (SR)
Mobilization - Maximum 2% of
1.0
LS Contract Price
Site Preparation and Earth
2.0
Works
4.0 Utilities
Demobilization - Minimum of
9.0
5% of the LS Price
CISE
H1
T CAMP
Total
(SR)
SCHEDULE "C"