CodeDescription Total
1 Notes to this Builders Quantities 0
2 Preliminaries 0
3 Overheads and Margin 0
4 Demolition 0
5 Groundworks 0
6 Piling 0
7 Concrete 0
8 Formwork 0
9 Reinforcement 0
10 Post Tensioning 0
11 Precast Concrete 0
12 Waterproofing and Tanking 0
13 Masonry 0
14 Stonework 0
15 Structural Steel 0
16 Metalwork 0
17 Woodwork 0
18 Glazing 0
19 Partitions and Wall Linings 0
20 Roofing 0
21 Suspended Ceilings 0
22 Facade 0
23 Doors and Door Hardware 0
24 Floor Finishes 0
25 Floor and Wall Tiling 0
26 Painting 0
26a Conservation Works 0
27 Whitegoods and Appliances 0
28 Special Equipment 0
29 Hydraulic Services 0
30 Electrical Services 0
31 Mechanical Services 0
32 Fire Protection Services 0
33 Vertical Transportation Services 0
34 External Works and Landscaping 0
35 Novated Design Fees 0
36 Contractors Design Contingency 0
37 Provisional Sums 0
TOTAL 0
Notes to this Builders Quantities
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
1/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
1/1.BThis Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
1/1.CThis document forms no part of the Contract and shall not form the basis of any claim or variation to the C
1/1.DTenderers are to fully review all documents and make their own assessment of the full scope of the works
DESCRIPTION OF WORKS
1/1.GThe works comprise the construction of a 53 level building comprising of 593 residential apartments, car p
1/1.HThe following Gross Floor Area schedule is provided as a guide only, and is measured in accordance with th
APARTMENT SCHEDULE
Total No
OTHER INFORMATION
1/4.BRetail Tenancies No
DOCUMENTS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
residential apartments, car parking, pool, gymnasium and ground floor tenancies all as detailed in the specification and as
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
GENERALLY
2/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
2/1.BThis Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
2/1.CThis document forms no part of the Contract and shall not form the basis of any claim or variation to the C
2/1.DTenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
2/1.EThis Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
2/1.F raking and / or circular work;
d) Waste of materials;
2/1.GAll work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
LEGEND
2/2.AThe following abbreviations have been used throughout these Builders Quantities
2/2.Bt = Tonne
2/2.Cm3 = Cubic Metre
2/2.Dm2 = Square Metre
2/2.Em = Metre
2/2.Fmm = Millimetre
2/2.GNo = Number
2/2.Hkg = Kilogram
2/2.J kN = Kilonewton
2/2.KMPa = Megapascal
2/2.LAS = Australian Standard
2/2.MBS = British Standard
2/2.Ydia = Diameter
2/2.Zapprox = Approximately
2/2.Amax = Maximum
2/2.Amin = Minimum
2/3.ARefer to the Specification and Contract Documents for full details of Conditions of Tender and Conditions o
PRELIMINARIES
Generally
Planning Permit
2/3.FAllow for all costs, fees, permits and charges, attending Item
2/3.GAllow for visiting the site and familiarisation with the ex Item
Geotechnical Report
2/3.J The Tenderer's attention is called to Appendix D of the Note
2/3.MAllow for all fees and costs associated with the Building Item
Modifications
2/4.DAllow for NDY fee for complying with the FER (refer to N Item
Acoustic Specification
2/4.J Allow for conforming with all requirements of the Acousti Item
Authority Information
2/5.BThe Tenderer's attention is called to Appendix X of the Note
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
s of Tender and Conditions of Contract.
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
3/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
3/1.BThis Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
3/1.CThis document forms no part of the Contract and shall not form the basis of any claim or variation to the C
3/1.DTenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
3/1.EThis Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
3/1.F raking and / or circular work;
d) Waste of materials;
3/1.GAll work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
Generally
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
raking and / or circular work;
d) Waste of materials;
All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
Measurement and prices deemed to include for removing all rubbish and debris, making good to work dist
ALLOW ITEMS
MEASUREMENT NOTES
Refer to the Specification and the Tender Documents for the full details of demolition works and include fo
Demolition of walls will include stiffeners, lintels and wall finishes unless otherwise noted
Footings
Floor slabs
External walls
Ditto to Level 2 52 m
Ditto to Level 3 52 m
Ditto to Level 4 55 m
Ditto to Level 5 58 m
Ditto to Level 2 3m
Ditto to Level 3 3m
Ditto to Level 1 9 No
Ditto to Level 2 8 No
Ditto to Level 3 8 No
Ditto to Level 4 8 No
Ditto to Level 5 4 No
External doors
Ditto at Level 2 2 No
Ditto but 1440W x 2020H overall size 2 No
Internal walls
Ditto to Level 5 59 m
Ditto to Level 1 3 No
Ditto to Level 2 4 No
Ditto to Level 3 4 No
Ditto to Level 4 3 No
Internal doors
Ditto to Level 1 23 No
Ditto to Level 2 48 No
Ditto to Level 3 34 No
Ditto to Level 4 38 No
Ditto to Level 5 11 No
Ditto to Level 1 1 No
Ditto to Level 2 1 No
Ditto to Level 4 1 No
Ditto to Level 2 1 No
Ditto to Level 3 15 No
Ditto to Level 4 1 No
Stairs, floors and floor finishes
Roof
Engineering services
Sundries
ADDITIONAL ITEMS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
is, making good to work disturbed, temporary shoring (other than designed shoring) and similar items
molition works and include for all requirements therein in the prices for the items in this Section
unless otherwise noted
wise noted
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
5/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
5/1.BThis Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
5/1.CThis document forms no part of the Contract and shall not form the basis of any claim or variation to the C
5/1.DTenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
5/1.EThis Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
5/1.F raking and / or circular work;
d) Waste of materials;
5/1.GAll work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
5/2.AUnless otherwise stated, prices for excavation are to include for excavation in all types of materials encoun
5/2.BPrices are also to include for all double handling and temporary spoil heaps, and for any excavation for wo
5/2.CVolumes or depths of excavation are those in ground and of filling are those after consolidation, no allowan
5/2.DPrices are to include for grubbing up roots, concrete, foundations, disused services or drains
5/2.EPrices are also to include for taking all precautions necessary to protect and maintain any existing services
5/2.FUnless stated otherwise prices for filling and hardcore are deemed to include for levelling, grading and trim
5/2.GVolumes of excavation and filling required for the Builder's own purposes have not been measured and are
5/2.HPrices for membranes are deemed to include for turn-ups or turn-downs less than or equal to 500 mm (unl
ALLOW ITEMS
5/2.MAllow for inspecting the site and for complying with all re Item
5/2.NAllow for setting out and keeping site records as require Item
GROUNDWORKS
Site Works
Bulk excavation
Detailed excavation
5/2.BPit for raft footing RF1, RF2 & Pump pit exceedin 254 m3
Surface Preparation
Filling in beds
Plastic membranes
Termite treatment
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
all types of materials encountered including rock and / or filling and for all levelling, grading, trimming, compacting, scabbl
ter consolidation, no allowance has been made for increase in bulk or for compaction
vices or drains
aintain any existing services and existing work and make good any damage to same
han or equal to 500 mm (unless stated otherwise in respective items) and for dressing around and sealing to all penetration
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ng, compacting, scabbling and similar to faces of excavations other than to reduce level excavation and floor slab and road
and floor slab and road pavement excavations, keeping sides plumb, backfilling with approved engineered fill, backfilling ov
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
eered fill, backfilling overbreak in excavations, consolidating backfill and disposing surplus spoil.
Piling
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
6/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
6/1.BThis Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
6/1.CThis document forms no part of the Contract and shall not form the basis of any claim or variation to the C
6/1.DTenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
6/1.EThis Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
6/1.F raking and / or circular work;
d) Waste of materials;
6/1.GAll work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
6/2.APrices for setting up pile rig are to include for any necessary excavation required for movement of piling ri
6/2.BPrices are to include for excavating in materials as found, keeping excavations free from debris and water,
6/2.DPrices are to include for giving all notices and complying with all regulations
6/2.EPrices are to include for setting out to centres as indicated on the drawings and ensuring that all survey m
6/2.GPrices are to include for logging and recording sizes and depths of all excavations
6/2.J Prices are to include for cutting off any excess length of piles, any splices necessary in the designed length
ALLOW ITEMS
6/2.KAllow for designing the bored piles based on the require Item
6/2.LAllow for establishing the piling equipment on site and moItem
6/2.QAllow for inspecting the site and for complying with all re Item
6/2.RAllow for verifying location and depth of all existing conc Item
MEASUREMENT NOTES
FOUNDATION PILING
Shoring works
Set up the piling rig at the required working levels including any necessary extra excavation required, bori
6/3.ASet of Two (2) No. 750 dia bored piers - Pile load 1 No
6/3.BDitto - PC4 2 No
6/3.DSet of Four (4) No. 750 dia bored piers - Pile load 1 No
SHOTCRETE WALL
Sundry items
ADDITIONAL ITEMS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
free from debris and water, maintaining the sides of excavations and cleaning prior to placement of concrete and for dispo
d ensuring that all survey marks other than those necessary for removal be left intact
essary in the designed length of the pile and for anything necessary to facilitate the execution of piling work
tra excavation required, boring for the pier holes, temporary and/or permanent liners, under-reaming bored holes, socketin
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
7/1.BThis Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
7/1.CThis document forms no part of the Contract and shall not form the basis of any claim or variation to the C
7/1.DTenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
7/1.EThis Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
7/1.F raking and / or circular work;
d) Waste of materials;
7/1.GAll work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
7/2.APrices for concrete are to include for plant for mixing, depositing, handling, placing in position, vibrating, s
7/2.BPrices for blinding concrete shall include for all necessary formwork and finishes
7/2.CSeparate items have been included to allow for the construction and isolation joints detailed on the structu
7/2.DWhere different concrete mixes are specified in adjacent elements, prices shall include for overspill of conc
7/2.EPrices for surface finishes are to include for temporary grounds, and for screeding off to a true surface read
7/2.FPrices for screeds are to include for all scaffolding and hoisting, preparation of bases to receive finishes, ad
7/2.GPrices are to include for all movement or expansion joints and joint accessories including proprietary joint
ALLOW ITEMS
MEASUREMENT NOTES
N10 Mass Concrete Blinding layer 50mm Min to be found on highly or less weathered siltstone with an allo
N10 Mass Concrete Blinding layer 50mm Min to be found on highly or less weathered siltstone with an allo
7/3.XRaft footing 98 m3
Capping beams 16 m3
Staircases
Concrete sundries
Monolithic finishes
Cast in plates
7/6.MAllow for all cast-in plates, shelf angles and the l 1 Item
Plinths
ADDITIONAL ITEMS
7/6.PAllow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
acing in position, vibrating, screeding, additional concrete to fill voids in faces of excavation and making good defective wor
joints detailed on the structural drawings. Prices are to include for all other joints including scabbled joints whether indicate
l include for overspill of concrete and for additional formwork or construction joints as deemed necessary by the Contracto
bases to receive finishes, adhesives and similar including to achieve specific tolerances, bedding, grouting and pointing m
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ing good defective work after removal of formwork. Prices are to include for forming all mortices and or building in all cond
routing and pointing materials, cutting and sealing and making good around openings
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
d or building in all conduits, pipes, bolts, sleeves, cramps, nailing blocks, ties, anchors and other items supplied by the vario
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
ms supplied by the various trades including cutting formwork as necessary and or making good on completion
Formwork
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
8/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
8/1.BThis Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
8/1.CThis document forms no part of the Contract and shall not form the basis of any claim or variation to the C
8/1.DTenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
8/1.EThis Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
8/1.F raking and / or circular work;
d) Waste of materials;
8/1.GAll work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
8/2.APrices are to include for all necessary boarding of class necessary and specified to produce the required fin
8/2.BPrices are also to include for cutting around and perforations in walls, slabs, etc. for projecting reinforcing b
8/2.CPrices are also to include for formations including flashing chases, grooves, rebates, chamfered edges and
ALLOW ITEMS
MEASUREMENT NOTES
8/2.RFaces of folds 18 m2
8/3.CForm 300 x 300 x 200 deep sump in lift pit base completeNo
Lost formwork
Permanent formwork
Conventional formwork
8/3.AFaces of folds 7 m2
Permanent formwork
Sundry Formwork
ADDITIONAL ITEMS
8/5.GAllow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
d to produce the required finish, all raking and circular cutting, supports, erecting, framing, setting to cambers, cutting, bo
bates, chamfered edges and splayed internal angles as these items have not been measured
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
o cambers, cutting, bolts, straps, ties, hangers, pipes and similar angles, temporary inspection openings, removal, cleaning
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
ings, removal, cleaning, wetting and treatment with separating agent before placing concrete, oiling emulsions, release ag
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
emulsions, release agents, easing, striking, filling tie bolts holes, strutting left after removal of formwork and temporary pr
work and temporary propping as necessary
Reinforcement
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
9/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
9/1.BThis Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
9/1.CThis document forms no part of the Contract and shall not form the basis of any claim or variation to the C
9/1.DTenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
9/1.EThis Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
9/1.F raking and / or circular work;
d) Waste of materials;
9/1.GAll work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
9/2.APrices are to include for protecting, cleaning, cutting, bending, marking, fabricating, placing and for all nec
9/2.BPrices for fabric reinforcement are further to include for all bending at edges to form turn down, for all bee
ALLOW ITEMS
MEASUREMENT NOTES
9/2.EWhere ratios for reinforcement have been used, these are stated. Tenderers are to satisfy themselves that
Bar Reinforcement
Mesh Reinforcement
ADDITIONAL ITEMS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
ating, placing and for all necessary spacers, hangers, temporary fixings, including tie wire and chair supports. Allowance ha
o form turn down, for all been measured net and prices are to include for laps and additional cutting and waste necessary a
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
supports. Allowance has been made in the measurement of rod and bar reinforcement for hooks and splices where detaile
d splices where detailed, but no allowance has been made or will be made for rolling margin or additional hooks and splices
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
GENERALLY
10/1.Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
10/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
10/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
10/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
10/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
10/1.raking and / or circular work;
d) Waste of materials;
10/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
10/2.Prices for post tensioned reinforcing steel measured shall include extra for cores and ducts (including form
10/2.Prices for post tensioned reinforcing steel measured shall also include for supply of expendable items such
ALLOW ITEMS
MEASUREMENT NOTES
ADDITIONAL ITEMS
10/2.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
es and ducts (including forming and grouting or sealing of cores, ducts or grooves), filling recesses and shear keys, stressin
ply of expendable items such as cones, wedges, anchor plates, spacers and similar items
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
nd shear keys, stressing steel (including supply and delivery, degreasing, straightening, cutting to length, assembling, hois
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
ngth, assembling, hoisting and fixing cables, dead anchorages, live anchorages & similar items and tensioning of stressing
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
tensioning of stressing steel cables) and for any additional spiral cage bursting reinforcement at live and dead end anchora
and dead end anchorage pockets
Precast Concrete
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
11/1.Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
11/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
11/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
11/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
11/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
11/1.raking and / or circular work;
d) Waste of materials;
11/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
11/2.Rates shall include for all temporary screeds, grounds and rules.
11/2.Prices shall include for conforming to the requirements of all statutory requirements and regulation of all c
11/2.Prices shall included for plant for mixing and depositing concrete formwork and moulds, including the infor
ALLOW ITEMS
MEASUREMENT NOTES
11/2.Precast concrete panel quantities are measured in m2 (No of panels stated) and panels are not classified s
11/2.Unless otherwise stated, openings within panels or voids at perimeter of panels have NOT been deducted
Panel thickness
11/2.Panel thickness's stated in the following descriptions are the minimum structural thickness as noted on the
11/2.Refer to drawings for full details of panels including grooves, recesses and rebates of panels as these are n
11/2.Tenderers are to make their own determination as to the highest and / or heaviest lift required for the Work
11/3.All ferrules, inserts, bolts, washers, shims and angles for precast connections to be hot dip galvanised to A
Reinforcement
External precast concrete column panels of 80 MPa including 10 No. N32 vertical bars with 3 No. N12 ties a
External precast concrete column panels of 80 MPa including 12 No. N28 vertical bars with 3 No. N12 ties a
External precast concrete column panels of 65 MPa including 16 No. N24 vertical bars with 4 No. N12 ties a
External precast concrete column panels of 65 MPa including 10 No. N28 vertical bars with 3 No. N12 ties a
External precast concrete column panels of 50 MPa including 16 No. N20 vertical bars with 4 No. N12 ties a
External precast concrete column panels of 50 MPa including 8 No. N28 vertical bars with 1 No. N12 ties at
External precast concrete column panels of 40 MPa including 16 No. N16 vertical bars with 4 No. N12 ties a
External precast concrete column panels of 40 MPa including 8 No. N24 vertical bars with 1 No. N12 ties at
External precast panels of 50 MPa including N12-250 E.F verticals, N12-200 E.F horizontal, N12-200 U bars
External precast panels of 65 MPa including one layer of SL81 mesh reinforcement each face, connections
External precast panels of 65 MPa including N20-400 E.F verticals, RL1018 E.F main bars horizontal, conne
External precast panels of 65 MPa including N12-250 E.F verticals, N12-200 E.F horizontal, N12-200 U bars
Refer to Drawing S04-01, S04-51, S04-52, S04-55 for typical reinforcement details to internal precast conc
Internal precast concrete column panels of 80 MPa including 12 No. N28 vertical bars with 3 No. N12 ties a
Internal precast concrete column panels of 80 MPa including 10 No. N32 vertical bars with 3 No. N12 ties a
Internal precast concrete column panels of 65 MPa including 10 No. N28 vertical bars with 3 No. N12 ties a
Internal precast concrete column panels of 65 MPa including 10 No. N28 vertical bars with 3 No. N12 ties a
Internal precast concrete column panels of 50 MPa including 10 No. N24 vertical bars with 2 No. N12 ties a
Internal precast panels of 40 MPa including one layer of SL82 mesh reinforcement each face, connections
Allow for Internal precast panels of 50 MPa MPa including reinforcement, connections and smooth off-form
Internal precast panels of 65 MPa including one layer of SL102 mesh reinforcement each face, connections
LOOSE METALWORK
11/13Drill and epoxy grout 400 long N16 bars into precast paneNote
WET JOINT
FIELD WELDING
11/14Allow for any field welding required for the erectio 1 Item
ADDITIONAL ITEMS
11/14Allow for any other items deemed necessary to carr 1 Item
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
ments and regulation of all controlling Authorities and to relevant Australia Standards and Codes of Practice
d moulds, including the information of rebates, grooves, cored holes etc. grouting sleeves and pockets and the like for anch
ates of panels as these are not described in detail in the items following
cal bars with 3 No. N12 ties at 300 centres, connections and smooth off-form finish to both sides
cal bars with 3 No. N12 ties at 200 centres, connections and smooth off-form finish to both sides
cal bars with 4 No. N12 ties at 150 centres, connections and smooth off-form finish to both sides
cal bars with 3 No. N12 ties at 300 centres, connections and smooth off-form finish to both sides
cal bars with 4 No. N12 ties at 300 centres, connections and smooth off-form finish to both sides
al bars with 1 No. N12 ties at 250 centres, connections and smooth off-form finish to both sides
cal bars with 2 No. N12 ties at 300 centres, connections and smooth off-form finish to both sides
cal bars with 4 No. N12 ties at 300 centres, connections and smooth off-form finish to both sides
al bars with 1 No. N12 ties at 250 centres, connections and smooth off-form finish to both sides
F horizontal, N12-200 U bars each end, connections and smooth off-form finish to both sides
ment each face, connections and smooth off-form finish to both sides
main bars horizontal, connections and smooth off-form finish to both sides
F horizontal, N12-200 U bars each end, connections and smooth off-form finish to both sides
al bars with 3 No. N12 ties at 150 centres, connections and smooth off-form finish to both sides
al bars with 3 No. N12 ties at 300 centres, connections and smooth off-form finish to both sides
al bars with 3 No. N12 ties at 150 centres, connections and smooth off-form finish to both sides
al bars with 3 No. N12 ties at 300 centres, connections and smooth off-form finish to both sides
al bars with 3 No. N12 ties at 200 centres, connections and smooth off-form finish to both sides
al bars with 2 No. N12 ties at 300 centres, connections and smooth off-form finish to both sides
ment each face, connections and smooth off-form finish to both sides
ections and smooth off-form finish to both sides (See drawing No S27-01)
ment each face, connections and smooth off-form finish to both sides
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ts and the like for anchorages and flashing and the grouting and filling of such pockets, all reinforcement including any add
ed to suit the architectural detailing
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
ment including any additional bar or pull out bar reinforcement at perimeters and trimming to openings and penetrations a
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
ngs and penetrations and at fixing or for handling purposes, surface finishes as specified, all metal work items cast into pan
ork items cast into panels, sundry packers, shims and washers, shop welding, all necessary temporary erection, working pl
ry erection, working platforms, marking, delivery, unloading, hoisting, erecting, fixing, protection, patching and repairing d
atching and repairing damaged panels, storage racks, lifting devices, props, temporary bracing etc. not required to form pa
not required to form part of the completed works
Waterproofing and Tanking
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
12/1.Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
12/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
12/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
12/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
12/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
12/1.raking and / or circular work;
d) Waste of materials;
12/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
12/2.Rates shall include for all temporary screeds, grounds and rules.
ALLOW ITEMS
MEASUREMENT NOTES
Common Areas
Enviro HP1200 or equal approved waterproofing membrane including substrate preparation, turn-ups all as
HYCHEM SF20 Clear including substrate preparation, turn-ups all as per manufacturer's requirements, all a
Enviroseal WP or equal approved waterproofing membrane including substrate preparation, turn-ups all as
BASF Masterseal 556 or equal approved waterproofing membrane including substrate preparation, turn-up
WC floors 110 m2
Guestrooms
BASF Masterseal 556 or equal approved waterproofing membrane including substrate preparation, turn-up
WC floors 1,110 m2
WC walls (assumed waterproofing for shower wall 3,533 m2
Waterproofing to roof
Allow Waterproofing membrane system laid on concrete slab including substrate preparation, turn-ups all a
ADDITIONAL ITEMS
12/3.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
paration, turn-ups all as per manufacturer's requirements, all as specified in specification and drawings
e preparation, turn-ups all as per manufacturer's requirements, all as specified in specification and drawings
e preparation, turn-ups all as per manufacturer's requirements, all as specified in specification and drawings
ubstrate preparation, turn-ups all as per manufacturer's requirements, all as specified in specification and drawings
ubstrate preparation, turn-ups all as per manufacturer's requirements, all as specified in specification and drawings
ate preparation, turn-ups all as per manufacturer's requirements, all as specified in specification and drawings
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
n and drawings
n and drawings
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
13/1.Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
13/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
13/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
13/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
13/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
13/1.raking and / or circular work;
d) Waste of materials;
13/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
13/2.Prices of masonry are to include for scaffolding, planking and hoisting and are deemed to include for leavin
13/2.Prices for masonry are further to include for wedging and pinning up soffits, mortar and necessary addition
13/2.Prices for faced blockwork shall include for all plumbing to angles, small areas, narrow widths and protecti
13/2.Prices for hollow block work shall include for solid blocks where core holes would otherwise be visible or w
13/2.Prices are to include for forming any additional control joints within lengths of all walls as these are not ind
13/2.Prices are to include for rough and fair cutting including raking, splay and circular cutting, forming all angle
13/2.Tenderers are referred to the Drawings to locate the following items of blockwork. Drawings do not in all ca
ALLOW ITEMS
Smooth faced concrete blockwork as specified including mortar, vertical control joints, wall stiffeners as re
Form the following openings to concrete blockwork including lintels, jambs, sills, copings and all associated
Smooth faced concrete blockwork fire 2HR as specified including mortar, vertical control joints, wall stiffen
Form the following openings to concrete blockwork including lintels, jambs, sills, copings and all associated
ADDITIONAL ITEMS
13/3.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
deemed to include for leaving loose bricks or blocks and cleaning out cavities, leaving weep holes, forming cavities, formin
uld otherwise be visible or where required for fire rating or other purposes
ork. Drawings do not in all cases indicate wall thickness and types of blocks (i.e. hollow or solid) and the types stated have
ol joints, wall stiffeners as required and reinforcement to Engineers approval and laid in a stretcher bond:
cal control joints, wall stiffeners as required and reinforcement to Engineers approval and laid in a stretcher bond:
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
orming cavities, forming rebated reveals and pointing and cleaning down to reveals where necessary, fractional size blocks
y, fractional size blocks, plain and plain return blocks, all necessary machine cutting to form bond, cutting or forming chase
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
utting or forming chases for edges of floor slabs, cutting or leaving holes or openings as recesses for building in ducts, pipe
building in ducts, pipes sleeves, lugs bolts, or brackets, cables, conduits and other similar items required for trades, leavin
uired for trades, leaving surfaces rough or raking out joints for plastering and flashings, knocking off angles in preparation
angles in preparation for plastering, bedding frames or plates in mortar, building in joists, bearers or similar, temporary su
r similar, temporary supports to openings, templates and for all necessary making good
Stonework
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
14/1.Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
14/1.The Tenderer is also referred to the Flagstaff Place Apartments Tender Information Document which contai
14/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
14/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
14/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
14/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
14/1.
raking and / or circular work;
14/2.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
14/2.Prices of stonework are to include for scaffolding, planking and hoisting, cleaning out cavities, leaving wee
14/2.Wedging and pinning up soffits, mortar and necessary additional ties at openings, control joints and the lik
14/2.Plumbing to angles, small areas, narrow widths and protection and cleaning down as specified on completi
14/2.Prices are to include for forming any additional control joints within lengths of all walls as these are not ind
ALLOW ITEMS
MEASUREMENT NOTES
N/A
DOOR THRESHOLE
Bar Unit
14/5.900 wide ditto (Apartment A, A1, C, C1, D, D1, DT, S12, G,No
Penthouse Ensuites
14/6.900 wide x 470 deep x 200 high x 20 thick Tara Arabes poNo
14/6.900 wide x 440 deep x 200 high x 20 thick Tara Arabes poNo
Stone Benchtops
14/6.900 wide x 750 deep x 20mm thick Pure White 1141 Caesa
No
14/6.2370 wide x 650 deep x 20mm thick Pure White 1141 Caes
No
ADDITIONAL ITEMS
14/7.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
tion Document which contains the full details of this project and is to allow in their prices for the full intent and meaning th
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
ing out cavities, leaving weep holes, forming cavities, forming rebated reveals and pointing and cleaning down to reveals, f
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ning down to reveals, fractional size stones, plain and plain return stones, all necessary machine cutting to form bond, tem
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
ting to form bond, temporary supports, templates and for all necessary making good
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
Structural Steel
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
15/1.Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
15/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
15/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
15/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
15/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
15/1.raking and / or circular work;
d) Waste of materials;
15/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
15/2.Prices are to include for all fabrication work, including setting to cambers, marking, delivery, storage, unlo
15/2.Prices for purlins, girts, trimmers, bridging, etc. shall include for all plates, angles, connection cleats and b
15/2.Prices are to allow for shop priming all steelwork unless stated to be galvanised, in which case it shall be h
15/2.No allowance has been or will be made in any weight for rolling margin or for welding material
ALLOW ITEMS
MEASUREMENT NOTES
15/2.Bolts in steel to steel and/or concrete connections have not been enumerated but are included as allow ite
15/2.All bolts, nuts, washers, cast-in ferrules and holding down bolts are to be hot dip galvanised to AS1214 and
Structural steel with surface treatments and finishes in accordance with Specification and drawings
Metal decking
Structural steel with surface treatments and finishes in accordance with Specification and drawings
15/3.75x6 SHS hanger (ar) 0.29 t
ADDITIONAL ITEMS
15/10Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
king, delivery, storage, unloading, hoisting, erecting, fixing, drilling for bolts including those for fixing timber and drawings
les, connection cleats and brackets etc. and for cutting, drilling, notching, forming openings, standard laps (unless stated o
welding material
but are included as allow items
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
g timber and drawings or not, cutting, notching ends of members, shop welding including full strength butt welding, plant,
rd laps (unless stated otherwise), splices, bolts, nuts, washers etc. and fixing
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
th butt welding, plant, tools, riveted work, counter sinking, approved lubricants, and tapping for bolts or machine screws, fo
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
s or machine screws, for cutting to dead lengths and machining ends and bearings
Metalwork
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
16/1.Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
16/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
16/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
16/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
16/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
16/1.raking and / or circular work;
d) Waste of materials;
16/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
16/2.Prices generally shall include for all fabricating, cutting, notching, drilling, etc. welding and grinding off sm
16/2.Prices are to include for all bolts, nuts and any type of washer, explosive power fixings, masonry and chem
16/2.Prices shall also include for the preparation and touching up on site of any damage to shop applied priming
ALLOW ITEMS
MEASUREMENT NOTES
SUBSTATION FITOUT
CAT LADDERS
Extenal Handrails
STAIR NOSING
Lobby Stairs
3x6mm stainless steel continous strips fixed into 40 m
BOH Stairs
Fire Stairs
STEEL PORTAL
LIFT CAR
SKIRTING
ACCESS HATCHES
Bedheads
Room Signage
Lift Indicator
Astra Walker- Icon & level Tower rail 300mm length 222 No
METAL GATE
ROLLER SHUTTER
SIGNAGE
External Signage
EX-ID-1 1 No
EX-ID-2 2 No
Internal Signage
I-ID-1 1 No
I-ID-2 20 No
I-ID-4 3 No
I-ID-5 1 No
I-ID-6 1 No
I-ID-7 1 No
I-DIR-1 4 No
I-RM-2 3 No
I-RM-3 10 No
I-WF-1 4 No
I-WF-2 20 No
I-WF-3 6 No
I-REG-1 1 No
MISCELLANOUS METALWORK
ADDITIONAL ITEMS
16/13Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
welding and grinding off smooth and buffing up, shop priming, marking and labelling and provision of protective coatings,
r fixings, masonry and chemical anchors including drilling, counter sinking and tapping for bolts or screws
mage to shop applied priming or finishes and touching up damaged galvanised surfaces and welds
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
of protective coatings, delivery, unloading, handling, hoisting, filling and fixing in position and for separation of dissimilar m
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
paration of dissimilar materials, removal of protective coatings, and cleaning down on completion
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
Woodwork
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
17/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
17/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
17/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
17/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
17/1.raking and / or circular work;
d) Waste of materials;
17/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
17/2.Prices are to include for all labours in framing, notching and fitting around projections, pipes, light fittings,
17/2.Prices shall also include for all chrome, black and brass hardware and accessories, short lengths, shadow g
17/2.All caulking , backing rods etc. as required by the drawings and as specified at junctions with window fram
17/2.All framing associated with the fibre cement cladding if shown on the structural drawings would be include
17/2.Support channels or runners, fastening system for fixing panels to channels/runners, and all necessary pac
17/2.Fixing clips, backing strips, screws, bolts and similar fasteners in connections
17/2.Caulking, sealing and backing at joints between panels, and between panels and adjacent structure
17/2.Flashing or cover trims at all junctions to render the cladding water tight regardless of whether such items
ALLOW ITEMS
17/2.Allow for preparation of shop drawings Item
MEASUREMENT NOTES
TIMBER SKIRTINGS
Reception Lobby
Executive Lounge
Basement Toilets
Assume that joinery works to all types of King Room are Note
King Rooms
645 wide x 600 deep x 2400 high Mini Bar Module 228 No
790 wide x 400 deep x 2400 high Mirror & Shelf M 228 No
1900 wide x 400 deep x 2400 high TV & Shelf Modu 228 No
1320 wide x 400 deep x 2400 high TV & Shelf & Ar 228 No
450 wide x350 deep x 650 high Beside Table, Draw 456 No
Twin rooms
Suite Rooms
LOOSE FURNITURE
GYM room
Meeting rooms
Lecturn (LTC001) 5 No
17/24Armchair (CHR012) 2 No
17/24Armchair (CHR013) 4 No
17/24Armchair (CHR014) 4 No
17/24Ottoman (OTM002) 1 No
17/24Ottoman (OTM003) 1 No
17/24Sofa (SOF002) 2 No
Sofa (SOF003) 2 No
17/24Allow for 700mm dia. dining round table - measured in Landscaping works
17/25Reception Lobby
17/25Armchair (CHR003) 4 No
Sofa (SOF001) 2 No
17/25Executive Lounge
17/25Dining Chair (CHR015) 26 No
17/25Meeting Room
17/25Armchair (CHR001) 2 No
King Rooms
Twin Rooms
Armchair (CHR001) 8 No
Armchair (CHR001) 6 No
Ottoman (OTM001) 5 No
Sofa (SOF002) 9 No
BLINDS
Allow for supply and installation blinds, curtains to windows (net measure) with rail & track including all iro
Roman Blind BND001 with fabric FAB008 for Typical guestrooms, Heritage Suites and Ambulant & DDA Roo
Roller Blind BND002 with fabric FAB007 for Typical guestrooms, Heritage Suites and Ambulant & DDA Room
Fix Roman Blind BND005 with fabric FAB022 for Bar Lounge & Lobby Bar
ADDITIONAL ITEMS
17/25Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
ections, pipes, light fittings, hatches, grilles and similar complete with all cleats, packers, wedges and similar and all nails,
ries, short lengths, shadow gaps, cut and fitted ends, mitred and internal and external angles, fair ends, fair return ends an
junctions with window frames, abutments, etc. have not been measured separately but shall be included for in the rates f
al drawings would be included in the Structural Steel Section. The Contractor is to make allowance for all and/or additional
nd adjacent structure
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
nd similar and all nails, screws and masonry anchors (unless stated otherwise) and for all labours such as rebating, grooving
nds, fair return ends and the like. Prices shall also include for any small timber quad moulds or trim timbers as necessary as
or all and/or additional framing required by or indicated on the architectural details but not shown on the structural drawing
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
h as rebating, grooving, chamfering, splaying, bevelling, tapering, bullnosing, moulding and similar items including cutting
the structural drawings, including all sub-frames, channels, trims and the like
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
tems including cutting, notching, boring etc, in connection with all services installation
Glazing
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
raking and / or circular work;
d) Waste of materials;
All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
Prices for glazing shall include for all glazing, frames, hardware, sealants etc as required
ALLOW ITEMS
MEASUREMENT NOTES
GLAZED WALL
Common areas
Guestrooms
GLZ001, GLZ 002 - Guestroom shower screen with 25mm frame in selected finish, including pivot door wit
MIRROR
Common areas
Feature curved mirrors with metal frame (exl lighting), all as specified in specification and drawings:
MIR001 - 6mm thick Viridian MirrorEcho clear glass to internal wall, all as specified in specification and dra
to GYM 18 m2
MIR001 - 6mm thick Viridian MirrorEcho clear glass to Wet areas, dimension varies (TBC), all as specified in
to Lift car 11 m2
Guestrooms
MIR001 - 6 thick Viridian MirrorEcho with 10mm metal frame in selected powdercoat finish to all exposed s
SHM001 - Thermogroup - Ablaze Mirrors, Wall Mounted Magnifying/Make up Mirror - Extendable Arm , 200m
Joinery mirrors
MIR001 - 6 thick Viridian MirrorEcho with 10x50mm metal angle frame in selected finish to all exposed sur
Winged mirror side panel comprising 6 thick Viridian MirrorEcho (MIR001) with metal angle frame in select
GLAZED DOORS
Common areas 0
D20 Series - single pivot glass door with custom steel frame, including all hardware and accessories, all as
D21 Series - double pivot glass door with custom steel frame, including all hardware and accessories, all a
D21.1 - 2100 high(TBC) x 2x820 wide 2 No
D22 Series - single sliding glass door with custom steel frame, including all hardware and accessories, all a
D23 Series - double swing glass door with custom steel frame, including all hardware and accessories, all a
Guestrooms
D20 Series - single pivot glass door with custom steel frame, including all hardware and accessories, all as
ADDITIONAL ITEMS
Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
nish, including pivot door with Viridian DuraClean clear glass (GLZ001) above Viridian ScalaTexture glass (GLZ002), 600mm
ercoat finish to all exposed surfaces and edges, all as specified in specification and drawings:
rror - Extendable Arm , 200mm Diameter in tuscan Bronze finish (Code: R16SM)
cted finish to all exposed surfaces and edges, fixed to MDF substrate, all as specified in specification and drawings:
metal angle frame in selected finish, fixed to RHS metal joinery, all as specified in specification and drawings:
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
lass (GLZ002), 600mm towel rail intergrated with frame,all as specified in specification and drawings:
and drawings:
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
19/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
19/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
19/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
19/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
19/1.raking and / or circular work;
d) Waste of materials;
19/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
19/2.Prices for stud walls are to include for the walls being erected complete in position with all components ne
19/2.Prices are to include for all angles, corners, free ends and fixings ends as these have not been measured s
19/2.Prices are to include additional studs and noggins required for the forming of openings and fixings of surfa
19/2.Prices for forming door openings shall allow for forming the appropriate clear opening to accommodate the
19/2.Prices are to allow for wall bracing support as required as per structural documentation
ALLOW ITEMS
MEASUREMENT NOTES
19/2.Stud framing has been measured over door and window oNote
SPEEDWALLING
INTERNAL PARTITIONS
Operable wall
WALL LININGS
Wall Linings
TOILET PARTITION
ADDITIONAL ITEMS
19/6.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
e have not been measured separately. Items have been measured for forming door openings however the area of the door
openings and fixings of surface mounted items and incidental members and trimmers as necessary
opening to accommodate the door and door frame required including all additional framing required
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
er the area of the door openings have not been deducted. Linings to walls are measured separately
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
20/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
20/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
20/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
20/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
20/1.raking and / or circular work;
d) Waste of materials;
20/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
20/2.Prices are to include for hoisting, laps, all cutting and waste, separation strips, filler strips, mastic and silic
20/2.Prices shall allow for encapsulation of the insulation with polythene or similar where required and for cuttin
20/2.Prices for flashings and cappings are to include for all laps, angles, junctions with other flashings and capp
ALLOW ITEMS
MEASUREMENT NOTES
Allow for metal roof panel at Level 11, including gut 175 m2
ADDITIONAL ITEMS
20/5.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
filler strips, mastic and silicon sealants, nails, screws, clips, explosive driven pins, rivets, straps and the like, all drilling and
where required and for cutting to size and re-encapsulating on site as necessary including the provision of protective clothi
ith other flashings and cappings, abutments with structure, expansion joints, closed cell polyethylene filler strips etc, and f
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
the like, all drilling and for cutting and fitting around projections
e filler strips etc, and for turn in of flashings, wedging and pointing and the like
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
21/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
21/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
21/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
21/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
21/1.raking and / or circular work;
d) Waste of materials;
21/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
21/2.Prices are to include for ceilings complete including all necessary additional suspension hangers where ligh
21/2.Prices are to also include for trimming ceilings and suspension systems around openings for light fittings, v
21/2.Prices are also to include for bridging suspension system around in ceiling services and obstructions
21/2.Prices for bulkhead linings are to include for all additional framing members
21/2.Prices are also to include for additional suspension to support ceiling hung fixtures and equipment
ALLOW ITEMS
MEASUREMENT NOTES
ADDITIONAL ITEMS
21/4.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials
uspension hangers where light fittings occur and neatly cutting and fitting around pipe brackets, conduits, smoke and therm
d openings for light fittings, ventilation registers, access panels and the like. No deduction has been made for these openin
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
duits, smoke and thermal detectors, emergency and exit lights, supports for surface mounted fittings and fixtures
s and fixtures
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
Facade
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
22/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
22/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
22/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
22/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
22/1.raking and / or circular work;
d) Waste of materials;
22/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
22/2.Prices for windows, screens and the like are to include for all glass and glazing including any double glazed
22/2.Prices are to include for the supply and installation complete including all hardware anchors, flashings, cov
22/2.Prices for doors are to include for hinges, operators, tracks, frames, glass and all furniture detailed on the
ALLOW ITEMS
22/2.All windows and doors must comply with the current editio
Note
Unitised Curtain Wall System, Structural glazed, Silver/Grey Low E coated neutral glass, Powder coated alu
Unitised Curtain Wall System, Structural glazed, Silver/Grey Low E coated neutral glass, Powder coated alu
Unitised Curtain Wall System, Structural glazed, Silver/Grey Low E coated neutral glass, Powder coated alu
Unitised Curtain wall System, Max 2100 wide panels, Rounded Vertical GRC Blades, Structural Glazed, Dar
Unitised Curtain Wall System, Structural glazing, Silver/Grey low e coated neutral glass, Powder-coated Alu
Flat Panel GRC with Dummy Joints as documented, Structural Precast under measured separately elsewhe
Precast panel to match GRC - Light sand blast coloured precast concrete, colour and texture to match sam
Precast panel to match GRC - Light sand blast coloured precast concrete, colour and texture to match sam
Spandrel panel façade, Panelised split mullion window system, glazing to match FS-01, including flush glaz
Double glazed, painted steel frame window including hardware and all necessary fixing accessories (FS-08
GLASS BALUSTRADES
Type BS-01 Balustrade: Cantilevered clear laminated Grade A safety glass comprising recessed stainless st
EXTERNAL WINDOWS
New windows
Existing Windows
EXTERNAL CLADDING
ADDITIONAL ITEMS
22/30Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
including any double glazed units or special units as noted on the window schedules or drawings with acoustic and therma
ware anchors, flashings, cover plates, trims, angle support brackets, packers, trims, caulking, miscellaneous equipment, fa
all furniture detailed on the door schedule, drawings and the performance specification
tral glass, Powder coated aluminium frame, curved GRC surround and nom 300mm fill panel in staggered pattern arrangem
tral glass, Powder coated aluminium frame, curved GRC surround and nom 900mm fill panel in staggered pattern arrangem
tral glass, Powder coated aluminium frame, curved GRC surround and infill panel in Checkerboad pattern arrangement, max
ades, Structural Glazed, Dark Grey low e coated neutral glass panels, High Gloss Painted Metal curved sides to match glass
tral glass, Powder-coated Aluminium thermally broken frame, Flush GRC Infill panel arranged vertically, Max 2100 wide pan
ur and texture to match sample held by the Architect including 15x15 Dummy joints and 15x15mm expressed joints on eve
ur and texture to match sample held by the Architect with curved GRC surround and flush GRC infil panel as specified on dr
ch FS-01, including flush glazed hinged access doors, operable lift and fold glazed panel door to Northern facade - extent sh
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
th acoustic and thermal properties, seals, weather seals, fire seals, bedding, structural silicone, backing rods, etc
llaneous equipment, fastenings, etc as required. Opening sashes are to be complete with frames, glass, heavy duty friction
ered pattern arrangement, max 2100 wide panels
ass, heavy duty friction stays and locking hardware. Opening sashes shall include insect screens where required. All windo
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
ere required. All window sashes shall be fitted with approved sash restrictors on both sides
Doors and Door Hardware
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
23/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
23/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
23/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
23/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
23/1.raking and / or circular work;
d) Waste of materials;
23/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
23/2.Prices are to include for all labours in framing, notching and fitting around projections, pipes, light fittings,
23/2.Prices shall also include for all short lengths, cut and fitted ends, mitred and internal and external angles, f
23/2.Prices shall also include for any small timber quad moulds or trim timbers as necessary as these have not
ALLOW ITEMS
MEASUREMENT NOTES
Glazed doors and associated side panels shall be not less than 6mm laminated safety glass unless otherw
EXTERNAL DOORS
D11 Series - double swing door, non fire rated with pressed metal frame, finishing applied (tbc), all as spec
INTERNAL DOORS
D1 Series - single swing door, 45mm thick solid core timber leaf door, fire rated and smoke door with press
D2 Series - single swing door, 45mm thick solid core timber leaf door, fire rated and smoke door with press
D3 Series - single swing door, 38mm thick solid core timber leaf door with pressed metal frame, finishing a
D4 Series - single swing door, 38mm thick solid core timber leaf door with pressed metal frame, paint finis
D7 Series - "1 & 1/2" leaf swing door, 45mm thick solid core timber leaf door, fire rated and smoke door w
D8 Series - "1 & 1/2" leaf swing door, 38mm thick solid core timber leaf door with pressed metal frame, pa
D8.1 - 2300 high x 820/520 wide 3 No
D10 Series - double swing door, 45mm thick solid core timber leaf door, fire rated and smoke door with pre
D12 Series - double swing door, 38mm thick solid core timber leaf door with pressed metal frame, paint fin
D13 Series - single pivot door, 38mm thick solid core timber leaf door with pressed metal frame, finishing
D14 Series - double pivot door, 38mm thick solid core timber leaf door with pressed metal frame, finishing
D30 Series - new single swing door into heritage zone, all as specifed in drawings and specification:
D31 Series - new double swing fire rated door into heritage zone, all as specifed in drawings and specifica
Guestrooms
D1 Series - single swing door, 45mm thick solid core timber leaf door, fire rated and smoke door with press
New door into heritage zone swing door single leaf group
D30 Series - new single swing door into heritage zone, all as specifed in drawings and specification:
DOOR HARDWARES
Common Areas
To timber doors
Suspension
Lock/Latch No
Keying No
Furniture No
Closer No
Sequence Device No
Bolts No
Door Seals No
To Glazed doors
Guestrooms
To Timber doors
To Glazed doors
or Dorma floor pivot bearing door strap to suit
980 No
timber (code DOBTS7421);
Lock/Latch L10 - Magnetic catch to suit bespoke d 980 No
Allow for complying for any additional requirements for Doors whose Hardwares to be confirmed later
D14.4 1 No
D14.5 2 No
D15.1 2 No
D15.2 3 No
D22.1 1 No
D25.1 1 No
D25.2 3 No
D25.5 2 No
D26.1 1 No
D27.1 1 No
D30.1 1 No
D30.3 1 No
D30.5 2 No
D30.6 1 No
D31.1 2 No
ADDITIONAL ITEMS
Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
ections, pipes, light fittings, hatches, grilles and similar complete with all cleats, packers, wedges and similar and all nails,
nternal and external angles, fair ends, fair return ends and the like
d and smoke door with pressed metal frame, finishing applied (TBC), all as specifed in drawings and specification:
d and smoke door with pressed metal frame, paint finish, all as specifed in drawings and specification:
ssed metal frame, finishing applied (TBC), all as specifed in drawings and specification:
ssed metal frame, paint finish, all as specifed in drawings and specification:
fire rated and smoke door with pressed metal frame, paint finish, all as specifed in drawings and specification:
with pressed metal frame, paint finish, all as specifed in drawings and specification:
ted and smoke door with pressed metal frame, paint finish, all as specifed in drawings and specification:
ressed metal frame, paint finish, all as specifed in drawings and specification:
ssed metal frame, finishing applied (TBC), all as specifed in drawings and specification:
essed metal frame, finishing applied (TBC), all as specifed in drawings and specification:
frame, finishing applied (TBC), all as specifed in drawings and specification:
d and smoke door with pressed metal frame, finishing applied (TBC), all as specifed in drawings and specification:
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
nd similar and all nails, screws and masonry anchors (unless stated otherwise) and for all labours such as rebating, grooving
specification:
specification:
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
h as rebating, grooving, chamfering, splaying, bevelling, tapering, bullnosing, moulding and similar items including cutting
he Contractors responsibility to advise all Sub-Contractors of the nature of this document.
tems including cutting, notching, boring etc, in connection with all services installation
Floor Finishes
CodeDescription antity Unit Rate Total
XXXXXXXXXXXXXXXXXX
THE FOLLOWING ARE STANDARD CLAUSES - THE APPLICABLE TAKE-OFF'ER ARE PLEASE CHECK
XXXXXXXXXXXXXXXXXX
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
24/1.This Builder's Quantities document has been prepared to assist Tenderer in the preparation of their Tender
24/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
24/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
24/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
24/1.raking and / or circular work;
d) Waste of materials;
24/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
24/2.Prices are to include for temporary grounds, screeds and similar including to achieve specified tolerances,
24/2.Prices are also to include for all scaffolding and hoisting, preparation of bases to receive finishes, sealing a
ALLOW ITEMS
MEASUREMENT NOTES
CARPET
Common Areas
Hotel Rooms
TIMBER FLOORING
VINYL FLOORING
SEALANT
ROOF BALAST
INSULATION
SKIRTINGS
TACTILE INDICATORS
ADDITIONAL ITEMS
24/3.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
e preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES are
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
chieve specified tolerances, bedding, grouting and pointing materials, cutting and/or making good around pipes, sanitary fi
to receive finishes, sealing and making good around pipes, sanitary fixtures, floor wastes, mirrors, light fittings, grilles and
PLY STILL FOR THIS JOB
, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completene
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
round pipes, sanitary fixtures and similar, labour to internal angles, curing of finished work, cleaning down and polishing, c
ght fittings, grilles and similar, external angles, any metal casing or stopping beads.
ss and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors responsi
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
25/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
25/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
25/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
25/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
25/1.raking and / or circular work;
d) Waste of materials;
25/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
25/2.Prices are to include for temporary grounds, screeds and similar including to achieve specified tolerances,
25/2.Prices are also to include for all scaffolding and hoisting, preparation of bases to receive finishes, sealing a
25/2.Prices are to include for all movement joints and joint accessories
ALLOW ITEMS
MEASUREMENT NOTES
EXTERNAL TILING
N/A
INTERNAL TILING
Floor Tiles - Common Areas
Tiled Skirtings
WALL TILING
25/5.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
chieve specified tolerances, bedding, grouting and pointing materials, cutting and/or making good around pipes, sanitary fi
to receive finishes, sealing and making good around pipes, sanitary fixtures, floor wastes, mirrors, light fittings, grilles and
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
round pipes, sanitary fixtures and similar, labour to internal angles, curing of finished work, cleaning down and polishing, c
ght fittings, grilles and similar, external angles, any metal casing or stopping beads
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
26/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
26/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
26/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
26/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
26/1.raking and / or circular work;
d) Waste of materials;
26/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
26/2.Prices are to include for providing, erecting and removing scaffolding, preparation of surfaces as described
26/2.Prices are to also include for additional painting required to grooved surfaces on concrete wall panels.
MEASUREMENT NOTES
ALLOW ITEMS
EXTERNAL PAINTING
INTERNAL PAINTING
Interior White calm Low-Sheen paint in accordance with manufacturer's Dulux, code SW1H5 (Pal 001)
Interior Ghosting Low-Sheen paint in accordance with manufacturer's dulux code P15A1(Pal 002)
Interior Ghosting Low-Sheen bathroom wall paint to have mouldshied protection in accordance with manuf
Interior Charcoal Low-Sheen paint in accordance with manufacturer's dulux code P13A1 (Pal 003)
Reception lobby 28 m2
Meeting Room 93 m2
Meeting Room 48 m2
Restaurant colunm 65 m2
Interior Low-Sheen paint in accordance with manufacturer's dulux code PG1C9(Pal 008)
GYM 25 m2
ACC Shower 33 m2
Female&Male toilet 195 m2
Executive Lounge 44 m2
Interior Low-Sheen, Natural white paint in accordance with manufacturer's dulux, code SW1F4(Pal 013)
BOH 559 m2
Interior Dark Door paint in accordance with manufacturer's dulux code PG1C9 (Pur 001)
Interior Charcoal light in accordance with manufacturer's dulux code P13A6 (Pur 006)
Supplier Bishop decor Waterstone Polished plaster paint in accordance with manufacturer's dulux nessie S
Bar 19 m2
Supplier Bishop decor Waterstone Polished plaster paint in accordance with manufacturer's (SPF002)
Bar 15 m2
Supplier Bishop decor Waterstone Polished plaster paint in accordance with manufacturer's dulux nessie S
Bar 27 m2
Dulux powder coating Low-Sheen, colour match bedhead fabric FAB001 (PCT005)
26/4.Reception Lobby 36 m2
Dulux powder coating Low-Sheen, Skirting(PCT006)
26/4.Restaurant wall 54 m2
Wall mural painting finishes to Executive Lounge at mezzanine level, drawing A14.65
Executive Lounge 30 m2
Prepare and apply paint in accordance with manufacturer's dulux (PAF001, PAF005 & PAF006)
Interior semi-gloss paint in accordance with manufacturer's dulux code P13A6 (PAS 001)
Interior semi-gloss paint in accordance with manufacturer's dulux code P15A1 (PAS 002)
WALL PAPERING
FABRIC WALL
ADDITIONAL ITEMS
26/8.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
tion of surfaces as described in the Specification, rubbing down between coats and similar work, the protection and/or mas
de P15A1(Pal 002)
anufacturer's (SPF002)
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
e for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own mea
protection and/or masking of floors, fittings and similar work, removing and replacing door and window furniture and remo
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
26/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
26/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
26/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
26/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
26/1.raking and / or circular work;
d) Waste of materials;
26/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
26/2.Prices are to include for providing, erecting and removing scaffolding, preparation of surfaces as described
26/2.Prices are to include for removal, reinstating and replacing by new materials as specified in drawings.
ALLOW ITEMS
ADDITIONAL ITEMS
26/8.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
tion of surfaces as described in the Specification, rubbing down between coats and similar work, the protection and/or mas
s specified in drawings.
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
e for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own mea
protection and/or masking of floors, fittings and similar work, removing and replacing door and window furniture and remo
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
27/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
27/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
27/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
27/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
27/1.raking and / or circular work;
d) Waste of materials;
27/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
ALLOW ITEMS
MEASUREMENT NOTES
Supply and install the following (Guestrooms, Suites, Ambulant & DDA, Staff BOH)
Iron
Iron board
Kettle
Ice machine upto 240 kgs ice cubes per day capac 1 No
Allow for all other Builders work in connection with Whit Item
ADDITIONAL ITEMS
Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
28/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
28/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
28/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
28/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
28/1.raking and / or circular work;
d) Waste of materials;
28/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
LINEIN CHUTE
Allow for Builders Work in Connection with Linein Chute including but not limited to the following:
28/2.Allow for taking delivery and fixing in position sun 1 Item
GYM EQUIPMENT
Allow for Builders Work in Connection with Linein Chute including but not limited to the following:
ADDITIONAL ITEMS
28/6.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
ed to the following:
ed to the following:
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
29/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
29/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
29/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
29/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
29/1.raking and / or circular work;
d) Waste of materials;
29/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
29/2.For all tapware measured below any wall penetrations by spindle and bonnet or faucet outlets are to be wa
29/2.Traps on sanitary fittings and pipework have not been measured separately but are deemed to be included
ALLOW ITEMS
MEASUREMENT NOTES
29/2.Tenderers are particularly referred to the Acoustic specifications and are to include for all extra requiremen
HYDRAULIC SERVICES
SANITARY FITTINGS
Bathroom Basin
Tapware
Toilet Suites
Cleaners Sink
Tapware
Toilet Suites
Urinal
No
Caroma - 0.8L Electronic Cube Urinal Series II, 6
Bathroom Basin
Tapware
Toilet Suites
anthracite
grey, size: 355mm W x 615mm D, White 1 No
vitreous china finish. Pan Code: 618335W; Seat
Waste
No
Astra Walker - Bottle Trap, Dimensions: 180mm 1
Bathroom Basin
Floor Waste
Tapware
Shower set
Toilet Suites
Waste
No
Astra Walker - Bottle Trap, Dimensions: 180mm 222
AMBULANT GUESTROOM SANITARY FITTINGS
Bathroom Basin
Floor Waste
Tapware
Shower set
Toilet Suites
anthracite
grey, size: 355mm W x 615mm D, White 9 No
vitreous china finish. Pan Code: 618335W; Seat
Allow for Waste
No
Astra Walker - Bottle Trap, Dimensions: 180mm 9
Bathroom Basin
Floor Waste
Tapware
Toilet Suites
anthracite
grey, size: 355mm W x 615mm D, White 6 No
vitreous china finish. Pan Code: 618335W; Seat
Allow for Waste
No
Astra Walker - Bottle Trap, Dimensions: 180mm 6
Bathroom Basin
Floor Waste
Tapware
Shower set
Toilet Suites
Waste
No
Astra Walker - Bottle Trap, Dimensions: 180mm 16
Bath
Allow for Builders Work in Connection with Hydraulic Services including but not limited to the following:
ADDITIONAL ITEMS
29/9.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
30/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
30/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
30/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
30/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
30/1.raking and / or circular work;
d) Waste of materials;
30/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
ALLOW ITEMS
ELECTRICAL SERVICES
Allow for the following Electrical Services, in accordance with Section 3 of the Electrical Services Specificat
30/2.Projects Principal Requirements Item
30/2.Communications Item
Allow for Builders Work in Connection with Electrical Services as per Section 3.3 of the Electrical Services S
30/3.Allow for forming openings in slabs for floor boxes and co Item
ADDITIONAL ITEMS
30/3.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
31/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
31/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
31/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
31/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
31/1.raking and / or circular work;
d) Waste of materials;
31/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
ALLOW ITEMS
MEASUREMENT NOTES
31/2.Tenderers are particularly referred to the Acoustic specifications and are to include for all extra requiremen
MECHANICAL SERVICES
Allow for the following Mechanical Services, in accordance with Section 3 of the Mechanical Services Speci
31/2.Electrical Item
31/2.Controls Item
Allow for Builders Work in Connection with Mechanical Services as per Section 3.3.1 of the Mechanical Ser
ADDITIONAL ITEMS
31/3.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
3.3.1 of the Mechanical Services Specification, including but not limited to the following:
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
32/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
32/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
32/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
32/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
32/1.raking and / or circular work;
d) Waste of materials;
32/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
ALLOW ITEMS
MEASUREMENT NOTES
32/2.Tenderers are particularly referred to the Acoustic specifications and are to include for all extra requiremen
FIRE PROTECTION SERVICES
Allow for the following Fire Protection Services, in accordance with Section 3 of the Fire Services Specificat
32/2.Maintenance Item
32/2.Extinguishers Item
32/3.Concrete fill for plinths and inertia bases where required. Item
32/3.Allow for all other builders work in connection with Fire P Item
ADDITIONAL ITEMS
32/3.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
33/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
33/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
33/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
33/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
33/1.raking and / or circular work;
d) Waste of materials;
33/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
ALLOW ITEMS
MEASUREMENT NOTES
Allow for the following Lifts in accordance with Vertical Transportation Services Specification
Allow for Builders Work in Connection with Vertical Transportation Services Specification, including but not
ADDITIONAL ITEMS
33/3.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
s Specification
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
34/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
34/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
34/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
34/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
34/1.raking and / or circular work;
d) Waste of materials;
34/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PRICES
34/2.Prices for kerbs, roadways and pavements are to include for any surface excavation and/or filling over the
34/2.Prices are to include for any formwork required and for any permanent timber edgings to asphalt pavemen
34/2.Prices for planting shall include for all excavation, quality soil backfill, preparation, fertilising, delivery, han
ALLOW ITEMS
MEASUREMENT NOTES
TRAFFIC MANAGEMENT
LANDSCAPE TO COURTYARD
Masonry
Channel Drains
Waterproofing
Waterproofing membrane system laid on concrete slab including substrate preparation, turn-ups all as per
Stoneworks
Painting
Planters
Climber Frames/Mesh
Furniture
Softscape; Supply and plant the following plants including excavation, approved slow-release fertiliser, sta
DRAINAGE
BOLLARD
Bollard including necessary fixing accessories 1 No
LID COVER
BICYCLE HOOPS
ADDITIONAL ITEMS
34/11Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
vation and/or filling over the site to correct levels, sub-grade compaction and all beds, membranes and finishes as detailed
tion, fertilising, delivery, handling, storage if required, stakes to plants as required, drainage pipes, re-wetting agent, water
paration, turn-ups all as per manufacturer's requirements, all as specified in specification and drawings
ed slow-release fertiliser, stakes and ties if required, forming water basins, topsoil backfilling
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
nd finishes as detailed
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
35/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
35/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
35/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
35/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
35/1.raking and / or circular work;
d) Waste of materials;
35/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
Generally
ADDITIONAL ITEMS
35/2.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
7/1.ARefer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
36/1.This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
36/1.This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
36/1.Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
36/1.This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
36/1.raking and / or circular work;
d) Waste of materials;
36/1.All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
Generally
ADDITIONAL ITEMS
36/2.Allow for any other items deemed necessary to carry out Ittem
Total 0
F'ER ARE PLEASE CHECK ALL SPECIFICATIONS AND DRAWINGS, AS TO WHETHER THEY APPLY STILL FOR THIS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons
GENERALLY
Refer to the Specifications and the Tender Documents for full details of materials and workmanship and inc
This Builder's Quantities document has been prepared to assist Tenderers in the preparation of their Tende
This document forms no part of the Contract and shall not form the basis of any claim or variation to the C
Tenderers are to fully review all documents and make their own assessment of the full scope of the works
METHOD OF MEASUREMENT
This Builders Quantities document has generally been measured in accordance with the 'WT Partnership M
and the like, and junctions between straight and
raking and / or circular work;
d) Waste of materials;
All work has been measured net as fixed in position and all sizes stated in item descriptions are approxima
PROVISIONAL SUMS
The following provisional sums are included for work which may be carried out during the course of the pro
Provisional sums to be expended in part or whole as directed by the principle or wholly deducted (includin
Signage
ADDITIONAL ITEMS
als and workmanship and include for all requirements therein in the prices for the items in this Section.
he preparation of their Tenders. Whilst every care has been taken in the preparation of this document, NO GUARANTEES ar
ny claim or variation to the Contract whatsoever including any errors, omissions or anomalies in either description, quantity
the full scope of the works and allow accordingly in the Tender Sum submitted.
e with the 'WT Partnership Method of Measurement of Builders Quantities' a copy of which is available for viewing at the offi
m descriptions are approximate only and are not to be used for ordering of materials.
during the course of the project by the Tenderer which have not been specified at the time of tender
or wholly deducted (including attendance and profit allowance) from the contract sum if not required
PLY STILL FOR THIS JOB
nt, NO GUARANTEES are given or implied by the PROPRIETOR or WT PARTNERSHIP as to the correctness and / or completen
le for viewing at the office of WT Partnership. Tenderers are to either accept the method adopted or carry out their own me
ess and / or completeness of the stated quantities and / or description of the measured works. It is the Contractors respons