Contractor JV-JGSK
Owner/Client KNPC
Consultant Wood
Penetration
Penetration
Cumulative Between Penetration
No. of Initial to Final Penetration Readings per Blow Hammer DCP Index
Blow Readings (mm) (mm) (mm) Factor (mm/blow)
0 76 0 0 0 1 0
5 179 103 103 21 1 21
5 243 167 64 13 1 13
5 284 208 41 8 1 8
5 323 247 39 8 1 8
5 358 282 35 7 1 7
3 376 300 18 6 1 6
Estimated CBR %
50
40
30
20
10
0
0 50 100 150 200 250 300 3
Estimated CBR %
Note: 1. This report shall not be reproduced, except in full, without the prior written approval of the management of TSD.
2. The test results relate only to the location tested.
Tested By Checked By
Estimated
CBR % Remarks
0
10
16
30
30
35
40
Estimated CBR %
roval of the management of TSD.
Checked By
on
8 Ahmadi 61001 Kuwait.
btc-kuwait.com
Dynamic Cone Penetration Test
ASTM D6951/6951M
Service Order No. Date: Report No.
Pavement Condition : Back Filled Owner/Client: Kuwait National Petroleum Corporation KNPC
Depth in mm
150
6 5 358 282 35 7 1 7 35
7 3 376 300 18 6 1 6 40
8 200
9
10
250
11
12
300
13
14
15 350
Note: 1. This report shall not be reproduced, except in full, without the prior written approval of the management of TSD.
Tested By Checked By
Technical Service Division
Tel. +965-1867777, Ext. 4255 Fax. +965-22284444, P.O. Box 9088 Ahmadi 61001 Kuwait.
Web site: www.nbtcgroup.com, Email: tech.services@nbtc-kuwait.com
Dynamic Cone Penetration Test
ASTM D6951/6951M
Service Order No. Date: Report No.
Test Data
Penetration
Cumulative Penetration
No. of Initial to Final Penetration Between Penetration per DCP Index Estimated CBR
S.No Blow Readings (mm) Readings (mm) Blow (mm) Hammer Factor (mm/blow) % Remarks
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Note: 1. This report shall not be reproduced, except in full, without the prior written approval of the management of TSD.