OU-GH-01
EX-GH-01
50 Lps.
EX-GH-02
35 Lps.
GUARD HOUSE
GROUND & ROOF PLAN
A/C SERVICES LAYOUT
SALALH URBAN
HVAC
140050 140050-NEO-DPC-GH-401-001 R0
T P OINT
S
TI NG OU G GRID
SET BUILDIN
11 FOR
10 R ALLEL Y LINE
9 A, PA OUNDAR
8 I D
GR OT B
7 L
TO P OFFSET
)
5
6
(10M 9
4 ON
3 STATI
2 S U B
1
5000
0 E L LINE
Y ALL
N DAR PAR ID 11;
1000
BO U R
PLO
T TO G GREES 8 &9
E
90 D OTLINE
0
A TO P
L
PLO
0
1920
T BO
8800
UND
6000
ARY
3000 AMP EXIT
8
R
UP
0
G
RAM
A LOBBY UP
P EN
TRY
B
3000
C DN
0
D
TOM
L
V
MAIN CC B
D
E
ER
4780
RY
F
G
R0 12-04-17 ISSUED FOR TENDER JAY RAM
YARD
SERVICE
PLOT B
OUNDA
RY
2 5
TEL : 23232564. FAX : 24835727
T B OU NDARY
7
PLO
6
PROPOSED DPC HEAQUARTER'S BUILDING
10
SITE PLAN
HVAC SERVICES LAYOUT
U NDARY
PLOT BO
RAM JAY RAM AKM
PLOT BO
12-4-2017 1:350
HVAC
UNDARY
140050 140050-NEO-DPC-SP-400-001 R0
OU-00-00
RAMP UP
GENERATOR ROOM
9000X5000
RAMP UP
CHILLER YARD
(OPEN TO SKY)
17000x12000
ELECTRICAL ROOM
9000X6800
RAMP UP
RAMP UP
TOILET
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-SY-401-001 R0
OU-00-00
OU-SY-10
OU-SY-09
OU-SY-08
O P E N
R O O F D E C K
OU-SY-07
OU-SY-06
O P E N
R O O F D E C K
OU-SY-05
O P E N
OU-SY-04
OU-SY-02
OU-SY-03
ROOF PLAN
HVAC SERVICES LAYOUT
12-04-2017 NTS
HVAC
140050 140050-NEO-DPC-SY-401-002 R0
PUMP-1 PUMP-2
(DUTY) (STAND-BY)
37.90 L/s 37.90 L/s
P
P P
SECONDARY PUMPS
DECOUPLERS BYPASS
POT STRAINER
WITH BYPASS
PRESURISATION
UNIT
P P
AIR SEPERATOR
P
AIR-COOLED SCREW CHILLERS
CHILLER-2
250 TR NRV Chiller-1 Chiller-2
P PRIMARY PUMPS Ref.No.
(Duty) (Standby)
(STANDBY) QUICK FILL
CONNECTION 40 MM Chiller Cooling Capacity in TR 250 250
CHEMICAL 12.0 12.0
DOSING TANK
6.0 6.0
AUTO DOSING SYSTEM
40 40
Refrigerant R-134A
CHILLER
SCHEMATIC LAYOUT
Chilled water
1 Duty + 1 Stand by with
secondary
2 *
37.90 LPS @ 30.0m
16Kw Auto duty sharing auto duty
Pumps (415V/3/50Hz)
Head changeover with VFD
( CHW SP-1 to
RAM JAY RAM AKM
CHW SP-02)
1) PUMP HEAD IS INDICATIVE ONLY, CONTRACTOR TO PROVIDE PRESSURE LOSS CALCULATIONS FOR OFFICE B+G+3 SALALH
BOTH PRIMARY & SECONDARY PUMP FOR APPROVAL PRIOR TO ORDER.
12-04-2017 NTS
2) PRESSURIZATION UNIT, VESSEL CAPACITY CALCULATIONS TO BE SUBMITTED BY THE CONTRACTOR.
3) CHEMICAL DOSING SYSTEM CALCULATIONS TO BE SUBMITTED BY THE CONTRACTOR . HVAC
140050 140050-NEO-DPC-SY-401-003 R0
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
A
B
B-06
B-07 01 02 03 04 05 06
B STORE
B SERVICES
FFL -3.900
FFL -3.900 SSL -4.000
T
SSL -4.000
B-08
AHU
B
FFL -3.900 B
SSL -4.000 FFL -3.900 B-04
SSL -4.000 B-03 B-02 8PERSONS
IT ROOM SERVICE LIFT LIFT CAPACITY RL-02
1000KG CAPACITY
FFL -3.900
T T T SSL -4.000
B-05
6M D R I V E W A Y
STAIR-01
FFL -3.900
B-01 SSL -4.000
LOBBY
FHC
C
ENTRY
B
RAMP-01 DOWN
UP UP 07
SLOPE 1:6
D
HEAVY DUTY
SLOPE 1:12 SLOPE 1:12
EXIT
STEEL GRATING DRAIN UP UP RAMP-02 UP
24 25 26 27 28 29 30 SLOPE 1:6
DRIVEWAY DRIVEWAY
09
FHC
F
FFL -3.900
SSL -4.000 B-09
23 22 21 20 19 18 17 16 15 14 13 12 11 10 STAIR-02
FFL -4.000
FFL -3.900 SSL -5.200 DHOFAR POWER COMPANY
SSL -4.000
RL-02
G NATIONAL ENGINEERING OFFICE
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-401-001 R0
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
ROAD
50000
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000
STONE KERB LINE
1 2 3 4 5 6 1 2 3 4 5 6 DN
UP UP RAMP SLOPE 1:12
A
T
G-19
VAV-GF- 01 G-20
MALE TOILET G-17
1425 Lps. T FEMALE TOILET MALE PRAYER ROOM
G-07
STONE KERB LINE
SERVICE CORRIDOR
G-10
IT ROOM G-05 G-04
G-09
T SERVICE LIFT LIFT
G-22
CORRIDOR 6
1000KG CAPACITY
5000
5
UP 4
3
2
1
CUT-OUT @ H/L
RWP 8PERSONS 8PERSONS
UP
FHC CSAHU-GF- 01
CAPACITY CAPACITY 4.3TR
C G-16
ENTRY
T
CANTEEN
FFL +0.000
ROAD
DN DN
SSL -0.100
VOID
5000
SLOPE 1:12
VAV-GF- 02
30000
3164Lps.
D
EXIT
PLANTERBOX
DN DN
VOID R0 12-04-17 ISSUED FOR TENDER JAY RAM
G-02A
5000
RECEPTION
CUSTOMER SERVICE ENTRY
RWP RWP
E
G-02
LOBBY
1 2 3 4 5 6
OPEN ABOVE
5000
FHC
F
6
5
G-01 4
AIRLOCK LOBBY UP 3
PLANTERBOX
2
5000
G-15 1
STAIR-02 UP
NATIONAL ENGINEERING OFFICE
FFL -0.010
MAIN ENTRY
RAM JAY RAM AKM
ROAD
OFFICE B+G+3 SALALH
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-401-002 R0
LEGEND:
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
LEDGE
A RWP RWP 1-06A 1-05 FCU-FF- 02 RWP
VOID SERVICES PANTRY 2.5TR
1-18
1-02
ABLUTION
STAIR-01 T 1-17
FEMALE PRAYER ROOM
5000
T
1-06
SERVICE LOBBY
AHU CUT-OUT T 1-20
MALE TOILET
1-19
UP FEMALE TOILET
SERVICE CORRIDOR
1-08A
STAIR-03
1-09 1-04 1-03
1-22 1-21
TRAINING ROOM T 1-07 SERVICE LIFT LIFT
1-08
HANDICAPPED TOILET CORRIDOR
IT ROOM UP
5000
UP 1-15 1-16
PRINTER ROOM AIR FLOW SERVER ROOM
1130 Lps.
C
T T T
1-09A
CORRIDOR 1-01
LOBBY
5000
CUT-OUT
30000
1-11 1-14
CORRIDOR OFFICE-1
5000
RWP RWP
E
VOID
1-10 THIS SIDE ENCLOSED BY
OFFICE-2 PARTITION WALL
TBA
5000
FHC
F
GLASS PARTITION DN
1-12 UP 1-13
MEETING ROOM STAIR-02
5000
RWP RWP
G
800
2501050
CONSULTANT
OFFICE B+G+3 SALALH
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-401-003 R1
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
1350
A
2-06A RWP
RWP AHU CUT-OUT 2-05
SERVICES T
PANTRY
VOID 2-02 2-19
STAIR-01 MALE TOILET
5000
2-06
SERVICE LOBBY
T
2-20
FEMALE TOILET
UP
B 2-09
TRAINING ROOM 2-04 2-03
2-07
T
IT ROOM SERVICE LIFT LIFT
DN UP
2-17
5000
2-18
UP CORRIDOR
2-08A HANDICAPPED TOILET
STAIR-03 2-08
SERVICE CORRIDOR
GLASS PARTITION FHC
RWP 2-01
C LOBBY
2-09A
CORRIDOR
5000
30000
D
2-16
OFFICE-3
5000
RWP RWP
E
2-10 2-11
OFFICE-1 OFFICE-2
5000
2-15
CORRIDOR
FHC
F
GLASS PARTITION
2-12 2-14
5000
2-13
RWP STORE
RWP NATIONAL ENGINEERING OFFICE
RWP
G
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-401-004 R0
OU-00-00
1
A-203
A-200
1 2 3 4 5 6 7 8 9 10 11
1 Elevation 1
950 1000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 1000 950
1350 600
3-23
HANDICAPPED TOILET
1950
A
RWP AHU CUT-OUT 3-02 RWP
VOID 3-06A T
STAIR-01
SERVICES
3-06 3-05
5000
B 3-08A
STAIR-03
3-04 3-03
LIFT
CORRIDOR
SERVICE CORRIDOR
SERVICE LIFT
3-07
3-22
GLASS PARTITION UP
IT ROOM UP
5000
3-08
T
3-21
FHC FFL +13.000
PRINTER ROOM
3-01
RWP SSL +12.900
LOBBY
C
3-10 3-09A
TOILET CORRIDOR
5000
Elevation 4
1 3-11 1
3-13
A-202 TOILET A-202
PANTRY
3-20 2 A-201
30000
OFFICE-2
D FL-01
Elevation 2
A-200 2
RWP RWP
E
3-12 3-14 3-15
BOARD ROOM DINING ROOM OFFICE-1
5000
3-19
CORRIDOR
F FHC
GLASS PARTITION
3-18
STAIR-02
5000
3-16 UP
NATIONAL ENGINEERING OFFICE
MEETING ROOM
3-17
RWP STORE
RWP
RWP
G
12-04-2017 1:100
1 1 Elevation 3 HVAC
A-203 ISSUED FOR TENDER
A-201
140050 140050-NEO-DPC-HQ-401-005 R0
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
A
RWO TOW +18.200 m OU-FF-02 OU-GF-02 RWO
OU-BF-02 OU-BF-03 RWO TOW +18.200 m
RWO
R-02 FFL +17.000 TEF-TR- 01
1050Lps.
OU-FF-04
B R-01
STAIR
LIFT OVERHEAD OU-FF-4/2 OU-FF-4/1
OU-FF-01
OU-BF-01
SSL +18.200 TOW +18.200 m
ODU-TR-01A
(STANDBY)
7.0 TR (24.6kW)
TOW +18.200 m
OU-GF-01 OU-GF-03 OU-FF-01 OU-FF-03
RWO
C
RIDGE
OU-SF-01 OU-SF-02 OU-SF-03 OU-TF-02
TOS +17.100 m
TOS +17.100 m
R0 12-04-17 ISSUED FOR TENDER JAY RAM
RIDGE
E
RWO RWO
TOW +18.200 m
TEF-TR- 02
105Lps.
DHOFAR POWER COMPANY
TOW +18.200 m
RWO RWO RWO RWO NATIONAL ENGINEERING OFFICE
G
ROOF PLAN
HVAC SERVICE LAYOUT
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-401-006 R0
BASEMENT FLOOR CELING SUSPENDED FAN COIL UNIT SCHEDULE SPLIT UNIT SCHEDULE
BASEMENT FLOOR :-
COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY
TOTAL
LOAD (TR)
COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY
TOTAL
LOAD (TR)
COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY
TOTAL
LOAD (TR)
COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY
TOTAL
LOAD (TR)
THIRD FLOOR :- SPLIT UNIT SCHEDULE * PUMP HEAD IS INDICATIVE AND SHALL BE VERIFIED BASED ON SHOP
DRAWING BY CONTRACTOR
COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY TOILET EXTRACT AIR FAN SCHEDULE
TOTAL
LOAD (TR)
AIR FLOW EXTERNAL STATIC
REF.NO SERVED AREA TYPE QTY REMARKS
(L/S) PRESSURE (Pa)
SL.NO REF.NO SUPPLY AIR RETURN FRESH AIR AC LOAD CHW FLOW EXTERNAL STATIC ON COIL OFF COIL
AC LOAD (KW) REMARKS
(L/S) AIR (L/S) (L/S) (TR) RATE(L/S) HEAD (pa)
BUILDING FOR DISTRIBUTION
CONTROL CENTRE AT SALALAH
EQUIPMENT SCHEDULE
HVAC SERVICE LAYOUT
12-04-2017 NTS
HVAC
140050 140050-NEO-DPC-HQ-401-007 R0
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
A
B
B-06
B-07 01 02 03 04 05 06
B STORE
B SERVICES
FFL -3.900
FFL -3.900 SSL -4.000
SSL -4.000
B-08
AHU
B
FFL -3.900 B
SSL -4.000 FFL -3.900 B-04
SSL -4.000 B-03 B-02 8PERSONS
IT ROOM SERVICE LIFT LIFT CAPACITY RL-02
1000KG CAPACITY
FFL -3.900
SSL -4.000
B-05
6M D R I V E W A Y
STAIR-01
FFL -3.900
B-01 SSL -4.000
LOBBY
FHC
C
ENTRY
B
RAMP-01 DOWN
UP UP 07
SLOPE 1:6
D
HEAVY DUTY
SLOPE 1:12 SLOPE 1:12
EXIT
STEEL GRATING DRAIN UP UP RAMP-02 UP
24 25 26 27 28 29 30 SLOPE 1:6
DRIVEWAY DRIVEWAY
09
FHC
F
FFL -3.900
SSL -4.000 B-09
23 22 21 20 19 18 17 16 15 14 13 12 11 10 STAIR-02
FFL -4.000
FFL -3.900 SSL -5.200 DHOFAR POWER COMPANY
SSL -4.000
RL-02
G NATIONAL ENGINEERING OFFICE
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-402-001 R0
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
ROAD
50000
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000
STONE KERB LINE
1 2 3 4 5 6 1 2 3 4 5 6 DN
UP UP RAMP SLOPE 1:12
A
3.0TR
G-19
G-20
MALE TOILET G-17
FEMALE TOILET MALE PRAYER ROOM
G-07
STONE KERB LINE
SERVICE CORRIDOR
G-10
IT ROOM G-05 G-04
G-09
SERVICE LIFT LIFT
G-22
CORRIDOR 6
1000KG CAPACITY
5000
5
UP 4
3
2
1
CUT-OUT @ H/L
RWP 8PERSONS 8PERSONS
UP
FHC
CAPACITY CAPACITY
C G-16
ENTRY
T
CANTEEN
FFL +0.000
ROAD
DN DN
SSL -0.100 CSAHU-GF- 01
VOID
5000
4.3TR
SLOPE 1:12
30000
EXIT
PLANTERBOX
DN DN
VOID R0 12-04-17 ISSUED FOR TENDER JAY RAM
G-02A
5000
RECEPTION
CUSTOMER SERVICE ENTRY
RWP RWP
E
G-02
LOBBY
1 2 3 4 5 6
OPEN ABOVE
5000
FHC
F
6
5
G-01 4
AIRLOCK LOBBY UP 3
PLANTERBOX
2
5000
G-15 1
STAIR-02 UP
NATIONAL ENGINEERING OFFICE
FFL -0.010
MAIN ENTRY
RAM JAY RAM AKM
ROAD
OFFICE B+G+3 SALALH
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-402-002 R0
LEGEND:
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
LEDGE
A RWP RWP 1-06A 1-05 RWP
VOID SERVICES PANTRY 1-18
1-02
ABLUTION
STAIR-01 1-17
FCU-FF- 02
FEMALE PRAYER ROOM
5000
1-06 2.5TR
SERVICE LOBBY
AHU CUT-OUT 1-20
MALE TOILET
1-19
UP FEMALE TOILET
SERVICE CORRIDOR
1-08A
STAIR-03
1-09 1-04 1-03
1-22 1-21
TRAINING ROOM 1-07 SERVICE LIFT LIFT
1-08
HANDICAPPED TOILET CORRIDOR
IT ROOM UP
5000
UP 1-15 1-16
PRINTER ROOM SERVER ROOM
C
1-09A
CORRIDOR 1-01
LOBBY
5000
CUT-OUT
30000
1-11 1-14
CORRIDOR OFFICE-1
5000
RWP RWP
E
VOID
1-10 THIS SIDE ENCLOSED BY
OFFICE-2 PARTITION WALL
TBA
5000
FHC
F
GLASS PARTITION DN
1-12 UP 1-13
MEETING ROOM STAIR-02
5000
CONSULTANT
OFFICE B+G+3 SALALH
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-402-003 R0
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
1350
A
2-06A RWP
RWP AHU CUT-OUT 2-05
SERVICES PANTRY
VOID 2-02 2-19
STAIR-01 MALE TOILET
5000
2-06
SERVICE LOBBY
2-20
FEMALE TOILET
UP
B 2-09
TRAINING ROOM 2-04 2-03
2-07
IT ROOM SERVICE LIFT LIFT
DN UP
2-17
5000
2-18
UP CORRIDOR
2-08A HANDICAPPED TOILET
STAIR-03 2-08
SERVICE CORRIDOR
GLASS PARTITION FHC
RWP 2-01
C LOBBY
2-09A
CORRIDOR
5000
30000
D
2-16
OFFICE-3
5000
RWP RWP
E
2-10 2-11
OFFICE-1 OFFICE-2
5000
2-15
CORRIDOR
FHC
F
GLASS PARTITION
2-12 2-14
5000
2-13
RWP STORE
RWP
RWP NATIONAL ENGINEERING OFFICE
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-402-004 R0
OU-00-00
1
A-203
A-200
1 2 3 4 5 6 7 8 9 10 11
1 Elevation 1
950 1000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 1000 950
1350 600
3-23
HANDICAPPED TOILET
1950
A
RWP AHU CUT-OUT 3-02 RWP
VOID 3-06A
STAIR-01
SERVICES
3-06 3-05
5000
B 3-08A
STAIR-03
3-04 3-03
LIFT
CORRIDOR
SERVICE CORRIDOR
SERVICE LIFT
3-07
3-22
GLASS PARTITION UP
IT ROOM UP
5000
3-08
3-21
FHC FFL +13.000
PRINTER ROOM
3-01
RWP SSL +12.900
LOBBY
C
3-10 3-09A
TOILET CORRIDOR
5000
Elevation 4
1 3-11 1
3-13
A-202 TOILET A-202
PANTRY
3-20 2 A-201
30000
OFFICE-2
D FL-01
Elevation 2
A-200 2
RWP RWP
E
3-12 3-14 3-15
BOARD ROOM DINING ROOM OFFICE-1
5000
3-19
CORRIDOR
F FHC
GLASS PARTITION
3-18
STAIR-02
5000
3-16 UP
NATIONAL ENGINEERING OFFICE
MEETING ROOM
3-17
RWP STORE
RWP
RWP
G
12-04-2017 1:100
1 1 Elevation 3 HVAC
A-203 ISSUED FOR TENDER
A-201
140050 140050-NEO-DPC-HQ-402-005 R0
OU-00-00
1 2 3 4 5 6 7 8 9 10 11
A
RWO TOW +18.200 m
RWO RWO TOW +18.200 m
RWO
R-02 FFL +17.000
SERVICES SSL +16.900
AHU CUT-OUT
B R-01
STAIR
LIFT OVERHEAD
SSL +18.200 TOW +18.200 m
TOW +18.200 m
RWO
C
RIDGE
ROOF
D RIDGE RIDGE
FFL +17.100
SSL +16.900
TOS +17.100 m
TOS +17.100 m
R0 12-04-17 ISSUED FOR TENDER JAY RAM
RIDGE
E
RWO RWO
TOW +18.200 m
ROOF PLAN
CHW SERVICE LAYOUT
12-04-2017 1:100
HVAC
140050 140050-NEO-DPC-HQ-402-006 R0
30 MM THK CAULKING SEALANT FINISH INSIDE 50x45MM HARD WOOD
TIMBER BATTEN 600MMC/C
(ALL AROUND THE PERIMETER OF THE ROOM) 150 MM CONCRETE VIBRATION ISOLATION
600
BY MAIN 50 MM AIR GAP
CONTRACTOR
100 THK ROCK WOOL
SCREED 50MM BY MAIN WATER PROOFING
RCC SLAB BY MAIN
CONTRACTOR CONTRACTOR
600
600
1200
600
250 15MM THK
REGULAR BOARD
150
350
50
150
600
50
SECTION DETAILS OF FLOATING FLOOR
SCALE 1:10
600
AHU ON FLOATING FLOOR
SCALE 1:25
0
60
100 THK ROCK WOOL
0
60
0
60 15MM THK REGULAR BOARD
CAULKING SEALANT
ROCK WOOL
600
600
DETAIL "A"
SCALE : NTS
623
200
600
623
U-TRAP
TUNDISH DRAIN
AHU
FLOATING FLOOR
200
DUCT
SLAB
CLIENT
PROJECT
HVAC STANDARD
INSTALLATION DETAILS (SHEET 1 OF 4)
12-04-2017 NTS
HVAC
140050 140050-NEO-HVAC-001 R0
CLIENT
CONSULTANT
NATIONAL ENGINEERING OFFICE
PROJECT
HVAC STANDARD
INSTALLATION DETAILS (SHEET 2 OF 4)
12-04-2017 NTS
HVAC
140050 140050-NEO-HVAC-002 R0
DETAIL NO. 07/ SD-02
DETAIL NO. 01/ SD-001B
DETAIL NO. 04/ SD-001B
t W t
CONSULTANT
NATIONAL ENGINEERING OFFICE
HxW
DUCT
hxw
PROJECT
0 TO 12"
U.S.G
19" TO 30" 22 1" POCKET JOINT AT 4 FT. CENTRES WITH CROSS BREAKING t
121" POCKET JOINT AT 4 FT. CENTRES CROSS BREAKING & 1 21" x 121" x 81" ANGLE GIRTH AT 8 FT. CENTRES BOLTED TO THE
31" TO 42" 22 POCKET JOINTS
121" POCKET JOINT AT 4 FT. CENTRES CROSS BREAKING & 1 21" x 121" x 16
3
" ANGLE GIRTH AT 4 FT. CENTRES BOLTED TO
43" TO 54" 20
THE POCKET JOINTS
121" POCKET JOINT AT 4 FT. CENTRES CROSS BREAKING & 1 21" x 121" x 16
3
" ANGLE GIRTH AT 4 FT. CENTRES BOLTED TO
55" TO 72" 20
THE POCKET JOINTS
HxW
2 - 121" x 121" x 16
3
" ANGLE AT 4 FT. CENTRES BOLTED TO THE DUCT WITH 38"BOLT AT 1 21" CENTRES FASTENED TOGETHER
DUCT
hxw
73" ABOVE 18
WITH 38" BOLTS AT 2" CENTRES WITH RUBBER GASKET BETWEEN THE TWO ANGLE CROSS BEARING
RAM JAY RAM AKM
12-04-2017 NTS
HVAC
140050 140050-NEO-HVAC-003 R0
CHILLED WATER PIPE SUPPLY & RETURN RISER CLAMP PIPE HANGER STANDARDS PIPE SUPPORT DETAIL
PIPE
SINGLE PIPE SUPPORT FROM FLOOR FLOOR SUPPORT FOR INSULATED PIPE CEILING SUPPORT FOR INSULATED PIPES VERTICAL PIPE SUPPORT DETAILS
IN A/C PLANT ROOM
MULTIPLE PIPES SUPPORT FROM FLOOR FLOOR SUPPORT FOR VERTICAL PIPE FCU CHW PIPING CONNECTIONS AHU CHW PIPING CONNECTIONS
CLIENT
CONSULTANT
NATIONAL ENGINEERING OFFICE
PROJECT
HVAC STANDARD
FLOOR PENETRATION FLOOR PENETRATION WALL PENETRATION EXTERNAL WALLS ABOVE OR
DRY LOCATION MECH. ROOMS / WET AREAS BELOW GRADE INSTALLATION DETAILS (SHEET 4 OF 4)
GUIDE ARRANGEMENT ANCHOR ARRANGEMENT
PIPE SLEEVE DETAILS VERTICAL PIPE SUPPORT DETAILS IN SHAFT PIPE SLEEVE DETAILS GUIDE & ANCHOR DETAIL 02-04-2017 NTS
HVAC
140050 140050-NEO-HVAC-004 R0