Sei sulla pagina 1di 22

OU-00-00

1
OU-GH-01
EX-GH-01
50 Lps.

EX-GH-02
35 Lps.

R0 12-04-17 ISSUED FOR TENDER JAY RAM

DHOFAR POWER COMPANY

NATIONAL ENGINEERING OFFICE

PROPOSED DPC HEADQUARTER'S


BUILDING AT SALALAH

GUARD HOUSE
GROUND & ROOF PLAN
A/C SERVICES LAYOUT

RAM JAY RAM AKM

SALALH URBAN

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-GH-401-001 R0
T P OINT
S
TI NG OU G GRID
SET BUILDIN
11 FOR
10 R ALLEL Y LINE
9 A, PA OUNDAR
8 I D
GR OT B
7 L
TO P OFFSET
)
5
6
(10M 9
4 ON
3 STATI
2 S U B
1
5000
0 E L LINE
Y ALL
N DAR PAR ID 11;

1000
BO U R
PLO
T TO G GREES 8 &9
E
90 D OTLINE

0
A TO P
L

PLO
0
1920

T BO
8800

UND
6000

ARY
3000 AMP EXIT
8

R
UP

0
G

RAM
A LOBBY UP

P EN
TRY
B

3000
C DN

0
D

CUS ICE ENT


SER
ENT
RY
DG.

TOM
L

V
MAIN CC B
D
E

ER

4780
RY
F
G
R0 12-04-17 ISSUED FOR TENDER JAY RAM

YARD
SERVICE

PLOT B
OUNDA
RY

3 DHOFAR POWER COMPANY


DARY
P.O BOX 2609, POSTAL CODE 211
B OU N
PLOT
SALALAH, SULTANATE OF OMAN

2 5
TEL : 23232564. FAX : 24835727

4 NATIONAL ENGINEERING OFFICE

T B OU NDARY
7
PLO
6
PROPOSED DPC HEAQUARTER'S BUILDING

10
SITE PLAN
HVAC SERVICES LAYOUT

U NDARY
PLOT BO
RAM JAY RAM AKM
PLOT BO

OFFICE B+GF+3 SALALAH -

12-4-2017 1:350

HVAC
UNDARY

ISSUED FOR TENDER

140050 140050-NEO-DPC-SP-400-001 R0
OU-00-00

RAMP UP

GENERATOR ROOM
9000X5000

RAMP UP

CHILLER YARD
(OPEN TO SKY)
17000x12000

ELECTRICAL ROOM
9000X6800
RAMP UP

CHILLER PUMP ROOM


8800X7000
R0 12-04-17 ISSUED FOR TENDER JAY RAM
TRANSFORMER YARD
(OPEN TO SKY)
9000X8000

FIRE & DOMESTIC WATER TANK


7.000X5.000X3.000mm

RAMP UP

FIRE & DOMESTIC PUMP ROOM


8800X6000
BMS & MAINT
STORE ROOM ENANCE ROOM
3000X4000 4100X4000

TOILET

DHOFAR POWER COMPANY


EX-SY-01
35 Lps.

NATIONAL ENGINEERING OFFICE

RAMP UP RAMP UP RAMP UP RAMP UP

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

SERVICE YARD PLAN


CHILLER SERVICES LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-SY-401-001 R0
OU-00-00

OU-SY-10

OU-SY-09
OU-SY-08

O P E N
R O O F D E C K

OU-SY-07

OU-SY-06

R0 12-04-17 ISSUED FOR TENDER JAY RAM

O P E N

R O O F D E C K

OU-SY-05
O P E N

OU-SY-04
OU-SY-02

DHOFAR POWER COMPANY


OU-SY-01

NATIONAL ENGINEERING OFFICE

OU-SY-03

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

ROOF PLAN
HVAC SERVICES LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 NTS

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-SY-401-002 R0
PUMP-1 PUMP-2
(DUTY) (STAND-BY)
37.90 L/s 37.90 L/s
P

P P

SECONDARY PUMPS

WATER FLOW METER

DECOUPLERS BYPASS

POT STRAINER
WITH BYPASS

CHILLER-1 PUMP-2 PUMP-1


(STD.BY) (DUTY) EXPANSION
250 TR P 34.82 L/s 34.82 L/s VESSEL
(DUTY)

PRESURISATION
UNIT
P P

AIR SEPERATOR

P
AIR-COOLED SCREW CHILLERS
CHILLER-2
250 TR NRV Chiller-1 Chiller-2
P PRIMARY PUMPS Ref.No.
(Duty) (Standby)
(STANDBY) QUICK FILL
CONNECTION 40 MM Chiller Cooling Capacity in TR 250 250
CHEMICAL 12.0 12.0
DOSING TANK

6.0 6.0
AUTO DOSING SYSTEM
40 40

Water flow in LPS 37.90 37.90


R0 12-04-17 ISSUED FOR TENDER JAY RAM
Elect. Power Input (KW)
420 420
(415V/3/50Hz)
CHILLER YARD PUMP ROOM
No. of Compressors 2 2

No. of Independent Refrigerant Circuits 2 2

Min. Capacity (%) 15 15

Refrigerant R-134A

Fan Type Propeller type, teoa, Six pole, Class F, IP 55

Fan Speed (Maximum) 950 RPM

Maximum Noise Level at 5m Distance 90dBA

Remarks All chillers connected to common Header


DHOFAR POWER COMPANY
1 duty & 1 stand by
Remarks
( With autochange over / weekly)

NATIONAL ENGINEERING OFFICE

CHILLED WATER PUMPS SCHEDULE

Duty Required for


Ref. No. Qty Elect. Power Input Remarks
Each Pump

BUILDING FOR DISTRIBUTION


Chilled water CONTROL CENTRE AT SALALAH
primary Pumps *
37.90 LPS @ 15.0m 11Kw
1 Duty + 1 Stand by with
( CHW PP-1 to 2 Auto duty sharing auto
Head (415V/3/50Hz)
CHW PP-02) duty changeover

CHILLER
SCHEMATIC LAYOUT
Chilled water
1 Duty + 1 Stand by with
secondary
2 *
37.90 LPS @ 30.0m
16Kw Auto duty sharing auto duty
Pumps (415V/3/50Hz)
Head changeover with VFD
( CHW SP-1 to
RAM JAY RAM AKM
CHW SP-02)

1) PUMP HEAD IS INDICATIVE ONLY, CONTRACTOR TO PROVIDE PRESSURE LOSS CALCULATIONS FOR OFFICE B+G+3 SALALH
BOTH PRIMARY & SECONDARY PUMP FOR APPROVAL PRIOR TO ORDER.
12-04-2017 NTS
2) PRESSURIZATION UNIT, VESSEL CAPACITY CALCULATIONS TO BE SUBMITTED BY THE CONTRACTOR.
3) CHEMICAL DOSING SYSTEM CALCULATIONS TO BE SUBMITTED BY THE CONTRACTOR . HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-SY-401-003 R0
OU-00-00

1 2 3 4 5 6 7 8 9 10 11

SLAB CUT-OUT @ H/L

A
B

B-06
B-07 01 02 03 04 05 06
B STORE
B SERVICES
FFL -3.900
FFL -3.900 SSL -4.000
T

SSL -4.000
B-08
AHU
B
FFL -3.900 B
SSL -4.000 FFL -3.900 B-04
SSL -4.000 B-03 B-02 8PERSONS
IT ROOM SERVICE LIFT LIFT CAPACITY RL-02
1000KG CAPACITY
FFL -3.900
T T T SSL -4.000
B-05
6M D R I V E W A Y
STAIR-01
FFL -3.900
B-01 SSL -4.000
LOBBY
FHC
C
ENTRY

B
RAMP-01 DOWN
UP UP 07
SLOPE 1:6

+0.800mm SSL -4.000 +0.800mm


SLOPE 1:12 SLOPE 1:12 WALL HEIGHT WALL HEIGHT
FROM FFL.
FROM FFL.

D
HEAVY DUTY
SLOPE 1:12 SLOPE 1:12

EXIT
STEEL GRATING DRAIN UP UP RAMP-02 UP
24 25 26 27 28 29 30 SLOPE 1:6

R0 12-04-17 ISSUED FOR TENDER JAY RAM

+0.800mm WALL HEIGHT


FROM FFL.
08
E

DRIVEWAY DRIVEWAY
09

FHC
F

FFL -3.900
SSL -4.000 B-09
23 22 21 20 19 18 17 16 15 14 13 12 11 10 STAIR-02
FFL -4.000
FFL -3.900 SSL -5.200 DHOFAR POWER COMPANY
SSL -4.000

RL-02
G NATIONAL ENGINEERING OFFICE

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

BASEMENT FLOOR PLAN


HVAC SERVICE LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-401-001 R0
OU-00-00

1 2 3 4 5 6 7 8 9 10 11

ROAD
50000

5000 5000 5000 5000 5000 5000 5000 5000 5000 5000
STONE KERB LINE

1 2 3 4 5 6 1 2 3 4 5 6 DN
UP UP RAMP SLOPE 1:12
A

STONE KERB LINE


RWP
RWP G-08 FCU-GF- 02
SERVICES G-06
AHU CUT-OUT FCU-GF- 01 PANTRY G-18 3.0TR

2.0TR ABLUTION AREA T


5000

T
G-19
VAV-GF- 01 G-20
MALE TOILET G-17
1425 Lps. T FEMALE TOILET MALE PRAYER ROOM
G-07
STONE KERB LINE

G-09A SERVICE LOBBY


AHU
STAIR-03 SHAFT G-03
G-11 STAIR-01
WORK STATION @ H/L G-21
HANDICAPPED TOILET
B

SERVICE CORRIDOR
G-10
IT ROOM G-05 G-04

G-09
T SERVICE LIFT LIFT
G-22
CORRIDOR 6
1000KG CAPACITY
5000

5
UP 4
3
2
1
CUT-OUT @ H/L
RWP 8PERSONS 8PERSONS
UP
FHC CSAHU-GF- 01
CAPACITY CAPACITY 4.3TR

C G-16
ENTRY

T
CANTEEN
FFL +0.000
ROAD

DN DN
SSL -0.100
VOID
5000

SLOPE 1:12

VAV-GF- 02
30000

3164Lps.
D

EXIT
PLANTERBOX

DN DN
VOID R0 12-04-17 ISSUED FOR TENDER JAY RAM

G-02A
5000

RECEPTION
CUSTOMER SERVICE ENTRY

RWP RWP

E
G-02
LOBBY
1 2 3 4 5 6

OPEN ABOVE
5000

G-12 G-13 G-14


UP AIRLOCK LOBBY CUSTOMER SERVICE-1 OFFICE
G-15A
CORRIDOR

FHC
F
6
5
G-01 4
AIRLOCK LOBBY UP 3
PLANTERBOX

2
5000

G-15 1
STAIR-02 UP
NATIONAL ENGINEERING OFFICE

FFL -0.010

RWP RWP RWP


RWP
G 6
5
DN 4 DN
RAMP SLOPE 1:12 3
2
RAMP SLOPE 1:12
1 STONE KERB LINE
STONE KERB LINE

GROUND FLOOR PLAN


HVAC SERVICE LAYOUT

MAIN ENTRY
RAM JAY RAM AKM

ROAD
OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-401-002 R0
LEGEND:

OU-00-00

1 2 3 4 5 6 7 8 9 10 11

1950 50000 1950


600 1250 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 1950
1950
1950

LEDGE
A RWP RWP 1-06A 1-05 FCU-FF- 02 RWP
VOID SERVICES PANTRY 2.5TR
1-18
1-02
ABLUTION
STAIR-01 T 1-17
FEMALE PRAYER ROOM
5000

T
1-06
SERVICE LOBBY
AHU CUT-OUT T 1-20
MALE TOILET
1-19
UP FEMALE TOILET

SERVICE CORRIDOR
1-08A
STAIR-03
1-09 1-04 1-03
1-22 1-21
TRAINING ROOM T 1-07 SERVICE LIFT LIFT

1-08
HANDICAPPED TOILET CORRIDOR
IT ROOM UP
5000

UP 1-15 1-16
PRINTER ROOM AIR FLOW SERVER ROOM
1130 Lps.

GLASS PARTITION FHC PCU-FF-01A


(STANDBY)
PCU-FF-01
(WORKING)
RWP 7.0 TR (24.6kW) 7.0 TR (24.6kW)

C
T T T

1-09A
CORRIDOR 1-01
LOBBY
5000

CUT-OUT
30000

1-11 1-14
CORRIDOR OFFICE-1
5000

R0 12-04-17 ISSUED FOR TENDER JAY RAM

RWP RWP

E
VOID
1-10 THIS SIDE ENCLOSED BY
OFFICE-2 PARTITION WALL
TBA
5000

FHC
F
GLASS PARTITION DN

1-12 UP 1-13
MEETING ROOM STAIR-02
5000

RWP NATIONAL ENGINEERING OFFICE

RWP RWP
G
800
2501050

FIRST FLOOR PLAN


HVAC SERVICE LAYOUT

GLASS AND STEEL CANOPY


TO SUPPLIERS DETAILS
TO BE APPROVED BY ENGINEER'S RAM JAY RAM AKM

CONSULTANT
OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-401-003 R1
OU-00-00

1 2 3 4 5 6 7 8 9 10 11

1950 50000 1950


600 6100 450 4800 5000 5000 5000 5000 5000 5000 4800 450 6100 600
1350 4750 450 14700 900 8400 900 14700 450 4750 1350
1950

1350

A
2-06A RWP
RWP AHU CUT-OUT 2-05
SERVICES T
PANTRY
VOID 2-02 2-19
STAIR-01 MALE TOILET
5000

2-06
SERVICE LOBBY
T

2-20
FEMALE TOILET
UP

B 2-09
TRAINING ROOM 2-04 2-03
2-07
T
IT ROOM SERVICE LIFT LIFT
DN UP
2-17
5000

2-18
UP CORRIDOR
2-08A HANDICAPPED TOILET
STAIR-03 2-08
SERVICE CORRIDOR
GLASS PARTITION FHC
RWP 2-01
C LOBBY
2-09A
CORRIDOR
5000
30000

D
2-16
OFFICE-3
5000

R0 12-04-17 ISSUED FOR TENDER JAY RAM

RWP RWP
E
2-10 2-11
OFFICE-1 OFFICE-2
5000

2-15
CORRIDOR
FHC
F
GLASS PARTITION

2-12 2-14
5000

MEETING ROOM STAIR-02

2-13
RWP STORE
RWP NATIONAL ENGINEERING OFFICE
RWP
G

SECOND FLOOR PLAN


GLASS AND STEEL CANOPY HVAC SERVICE LAYOUT
TO SUPPLIERS DETAILS
TO BE APPROVED BY ENGINEER'S
CONSULTANT
RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-401-004 R0
OU-00-00

1
A-203
A-200
1 2 3 4 5 6 7 8 9 10 11
1 Elevation 1

1950 50000 1950

950 1000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 1000 950
1350 600

3-23
HANDICAPPED TOILET
1950

A
RWP AHU CUT-OUT 3-02 RWP
VOID 3-06A T
STAIR-01
SERVICES

3-06 3-05
5000

3-09 SERVICE LOBBY PANTRY


CEO OFFICE T
UP 3-24
MALE TOILET 3-25
FEMALE TOILET

B 3-08A
STAIR-03
3-04 3-03
LIFT

CORRIDOR
SERVICE CORRIDOR
SERVICE LIFT
3-07

3-22
GLASS PARTITION UP
IT ROOM UP
5000

3-08
T

3-21
FHC FFL +13.000
PRINTER ROOM
3-01
RWP SSL +12.900
LOBBY
C
3-10 3-09A
TOILET CORRIDOR
5000

Elevation 4
1 3-11 1
3-13
A-202 TOILET A-202
PANTRY

3-20 2 A-201
30000

OFFICE-2
D FL-01
Elevation 2

R0 12-04-17 ISSUED FOR TENDER JAY RAM


5000

A-200 2

RWP RWP
E
3-12 3-14 3-15
BOARD ROOM DINING ROOM OFFICE-1
5000

3-19
CORRIDOR

F FHC
GLASS PARTITION

3-18
STAIR-02
5000

3-16 UP
NATIONAL ENGINEERING OFFICE
MEETING ROOM
3-17
RWP STORE
RWP
RWP
G

THIRD FLOOR PLAN


HVAC SERVICE LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

1 1 Elevation 3 HVAC
A-203 ISSUED FOR TENDER
A-201

140050 140050-NEO-DPC-HQ-401-005 R0
OU-00-00

1 2 3 4 5 6 7 8 9 10 11

A
RWO TOW +18.200 m OU-FF-02 OU-GF-02 RWO
OU-BF-02 OU-BF-03 RWO TOW +18.200 m
RWO
R-02 FFL +17.000 TEF-TR- 01
1050Lps.

SERVICES SSL +16.900


AHU CUT-OUT

OU-FF-04
B R-01
STAIR
LIFT OVERHEAD OU-FF-4/2 OU-FF-4/1

OU-FF-01
OU-BF-01
SSL +18.200 TOW +18.200 m
ODU-TR-01A
(STANDBY)
7.0 TR (24.6kW)

TOW +18.200 m
OU-GF-01 OU-GF-03 OU-FF-01 OU-FF-03

RWO
C

RIDGE
OU-SF-01 OU-SF-02 OU-SF-03 OU-TF-02

OU-TF-01 OU-TF-03 OU-SR-01 OU-TF-05 ROOF


D RIDGE RIDGE
FFL +17.100
SSL +16.900

TOS +17.100 m
TOS +17.100 m
R0 12-04-17 ISSUED FOR TENDER JAY RAM

RIDGE
E
RWO RWO

TOW +18.200 m

TEF-TR- 02
105Lps.
DHOFAR POWER COMPANY
TOW +18.200 m
RWO RWO RWO RWO NATIONAL ENGINEERING OFFICE
G

SSL +18.400 TOS +17.100 m


TOS +17.100 m

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

ROOF PLAN
HVAC SERVICE LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-401-006 R0
BASEMENT FLOOR CELING SUSPENDED FAN COIL UNIT SCHEDULE SPLIT UNIT SCHEDULE
BASEMENT FLOOR :-
COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY
TOTAL
LOAD (TR)

GROUND FLOOR CELING SUSPENDED FAN COIL UNIT SCHEDULE

GROUND FLOOR :- SPLIT UNIT SCHEDULE

COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY
TOTAL
LOAD (TR)

FIRST FLOOR CELING SUSPENDED FAN COIL UNIT SCHEDULE

FIRST FLOOR :- SPLIT UNIT SCHEDULE

COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY
TOTAL
LOAD (TR)

SECOND FLOOR CELING SUSPENDED FAN COIL UNIT SCHEDULE

SECOND FLOOR :- SPLIT UNIT SCHEDULE

COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY
TOTAL
LOAD (TR)

THIRD FLOOR CELING SUSPENDED FAN COIL UNIT SCHEDULE

THIRD FLOOR :- SPLIT UNIT SCHEDULE * PUMP HEAD IS INDICATIVE AND SHALL BE VERIFIED BASED ON SHOP
DRAWING BY CONTRACTOR
COOLING
CAPACITY
S.NO UNIT.REF TYPE QTY TOILET EXTRACT AIR FAN SCHEDULE
TOTAL
LOAD (TR)
AIR FLOW EXTERNAL STATIC
REF.NO SERVED AREA TYPE QTY REMARKS
(L/S) PRESSURE (Pa)

R0 12-04-17 ISSUED FOR TENDER JAY RAM

GROUND FLOOR CELING SUSPENDED AHU UNIT SCHEDULE

FIRST FLOOR PRECESSION COOLING UNIT SCHEDULE

DHOFAR POWER COMPANY

NATIONAL ENGINEERING OFFICE

BF & ROOF AHU SCHEDULE VAV SCHEDULE

SL.NO REF.NO SUPPLY AIR RETURN FRESH AIR AC LOAD CHW FLOW EXTERNAL STATIC ON COIL OFF COIL
AC LOAD (KW) REMARKS
(L/S) AIR (L/S) (L/S) (TR) RATE(L/S) HEAD (pa)
BUILDING FOR DISTRIBUTION
CONTROL CENTRE AT SALALAH

EQUIPMENT SCHEDULE
HVAC SERVICE LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 NTS

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-401-007 R0
OU-00-00

1 2 3 4 5 6 7 8 9 10 11

SLAB CUT-OUT @ H/L

A
B

B-06
B-07 01 02 03 04 05 06
B STORE
B SERVICES
FFL -3.900
FFL -3.900 SSL -4.000
SSL -4.000
B-08
AHU
B
FFL -3.900 B
SSL -4.000 FFL -3.900 B-04
SSL -4.000 B-03 B-02 8PERSONS
IT ROOM SERVICE LIFT LIFT CAPACITY RL-02
1000KG CAPACITY
FFL -3.900
SSL -4.000
B-05
6M D R I V E W A Y
STAIR-01
FFL -3.900
B-01 SSL -4.000
LOBBY
FHC
C
ENTRY

B
RAMP-01 DOWN
UP UP 07
SLOPE 1:6

+0.800mm SSL -4.000 +0.800mm


SLOPE 1:12 SLOPE 1:12 WALL HEIGHT WALL HEIGHT
FROM FFL.
FROM FFL.

D
HEAVY DUTY
SLOPE 1:12 SLOPE 1:12

EXIT
STEEL GRATING DRAIN UP UP RAMP-02 UP
24 25 26 27 28 29 30 SLOPE 1:6

R0 12-04-17 ISSUED FOR TENDER JAY RAM

+0.800mm WALL HEIGHT


FROM FFL.
08
E

DRIVEWAY DRIVEWAY
09

FHC
F

FFL -3.900
SSL -4.000 B-09
23 22 21 20 19 18 17 16 15 14 13 12 11 10 STAIR-02
FFL -4.000
FFL -3.900 SSL -5.200 DHOFAR POWER COMPANY
SSL -4.000

RL-02
G NATIONAL ENGINEERING OFFICE

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

BASEMENT FLOOR PLAN


CHW SERVICE LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-402-001 R0
OU-00-00

1 2 3 4 5 6 7 8 9 10 11

ROAD
50000

5000 5000 5000 5000 5000 5000 5000 5000 5000 5000
STONE KERB LINE

1 2 3 4 5 6 1 2 3 4 5 6 DN
UP UP RAMP SLOPE 1:12
A

STONE KERB LINE


RWP
RWP G-08
SERVICES G-06
AHU CUT-OUT FCU-GF- 01 PANTRY G-18
2.0TR ABLUTION AREA
FCU-GF- 02
5000

3.0TR
G-19

G-20
MALE TOILET G-17
FEMALE TOILET MALE PRAYER ROOM
G-07
STONE KERB LINE

G-09A SERVICE LOBBY


AHU
STAIR-03 SHAFT G-03
G-11 STAIR-01
WORK STATION @ H/L G-21
HANDICAPPED TOILET
B

SERVICE CORRIDOR
G-10
IT ROOM G-05 G-04

G-09
SERVICE LIFT LIFT
G-22
CORRIDOR 6
1000KG CAPACITY
5000

5
UP 4
3
2
1
CUT-OUT @ H/L
RWP 8PERSONS 8PERSONS
UP
FHC
CAPACITY CAPACITY
C G-16
ENTRY

T
CANTEEN
FFL +0.000
ROAD

DN DN
SSL -0.100 CSAHU-GF- 01
VOID
5000

4.3TR
SLOPE 1:12
30000

EXIT
PLANTERBOX

DN DN
VOID R0 12-04-17 ISSUED FOR TENDER JAY RAM

G-02A
5000

RECEPTION
CUSTOMER SERVICE ENTRY

RWP RWP

E
G-02
LOBBY
1 2 3 4 5 6

OPEN ABOVE
5000

G-12 G-13 G-14


UP AIRLOCK LOBBY CUSTOMER SERVICE-1 OFFICE
G-15A
CORRIDOR

FHC
F
6
5
G-01 4
AIRLOCK LOBBY UP 3
PLANTERBOX

2
5000

G-15 1
STAIR-02 UP
NATIONAL ENGINEERING OFFICE

FFL -0.010

RWP RWP RWP


RWP
G 6
5
DN 4 DN
RAMP SLOPE 1:12 3
2
RAMP SLOPE 1:12
1 STONE KERB LINE
STONE KERB LINE

GROUND FLOOR PLAN


CHW SERVICE LAYOUT

MAIN ENTRY
RAM JAY RAM AKM

ROAD
OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-402-002 R0
LEGEND:

OU-00-00

1 2 3 4 5 6 7 8 9 10 11

1950 50000 1950


600 1250 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 1950
1950
1950

LEDGE
A RWP RWP 1-06A 1-05 RWP
VOID SERVICES PANTRY 1-18
1-02
ABLUTION
STAIR-01 1-17
FCU-FF- 02
FEMALE PRAYER ROOM
5000

1-06 2.5TR

SERVICE LOBBY
AHU CUT-OUT 1-20
MALE TOILET

1-19
UP FEMALE TOILET

SERVICE CORRIDOR
1-08A
STAIR-03
1-09 1-04 1-03
1-22 1-21
TRAINING ROOM 1-07 SERVICE LIFT LIFT

1-08
HANDICAPPED TOILET CORRIDOR
IT ROOM UP
5000

UP 1-15 1-16
PRINTER ROOM SERVER ROOM

GLASS PARTITION FHC PCU-FF-01


(WORKING)
RWP 7.0 TR (24.6kW)

C
1-09A
CORRIDOR 1-01
LOBBY
5000

CUT-OUT
30000

1-11 1-14
CORRIDOR OFFICE-1
5000

R0 12-04-17 ISSUED FOR TENDER JAY RAM

RWP RWP

E
VOID
1-10 THIS SIDE ENCLOSED BY
OFFICE-2 PARTITION WALL
TBA
5000

FHC
F
GLASS PARTITION DN

1-12 UP 1-13
MEETING ROOM STAIR-02
5000

RWP NATIONAL ENGINEERING OFFICE


RWP RWP
G
800
2501050

FIRST FLOOR PLAN


CHW SERVICE LAYOUT
GLASS AND STEEL CANOPY
TO SUPPLIERS DETAILS
TO BE APPROVED BY ENGINEER'S RAM JAY RAM AKM

CONSULTANT
OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-402-003 R0
OU-00-00

1 2 3 4 5 6 7 8 9 10 11

1950 50000 1950


600 6100 450 4800 5000 5000 5000 5000 5000 5000 4800 450 6100 600
1350 4750 450 14700 900 8400 900 14700 450 4750 1350
1950

1350

A
2-06A RWP
RWP AHU CUT-OUT 2-05
SERVICES PANTRY
VOID 2-02 2-19
STAIR-01 MALE TOILET
5000

2-06
SERVICE LOBBY
2-20
FEMALE TOILET
UP

B 2-09
TRAINING ROOM 2-04 2-03
2-07
IT ROOM SERVICE LIFT LIFT
DN UP
2-17
5000

2-18
UP CORRIDOR
2-08A HANDICAPPED TOILET
STAIR-03 2-08
SERVICE CORRIDOR
GLASS PARTITION FHC
RWP 2-01
C LOBBY
2-09A
CORRIDOR
5000
30000

D
2-16
OFFICE-3
5000

R0 12-04-17 ISSUED FOR TENDER JAY RAM

RWP RWP
E
2-10 2-11
OFFICE-1 OFFICE-2
5000

2-15
CORRIDOR
FHC
F
GLASS PARTITION

2-12 2-14
5000

MEETING ROOM STAIR-02

2-13
RWP STORE
RWP
RWP NATIONAL ENGINEERING OFFICE

SECOND FLOOR PLAN


GLASS AND STEEL CANOPY CHW SERVICE LAYOUT
TO SUPPLIERS DETAILS
TO BE APPROVED BY ENGINEER'S
CONSULTANT
RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-402-004 R0
OU-00-00

1
A-203
A-200
1 2 3 4 5 6 7 8 9 10 11
1 Elevation 1

1950 50000 1950

950 1000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 1000 950
1350 600

3-23
HANDICAPPED TOILET
1950

A
RWP AHU CUT-OUT 3-02 RWP
VOID 3-06A
STAIR-01
SERVICES

3-06 3-05
5000

3-09 SERVICE LOBBY PANTRY


CEO OFFICE
UP 3-24
MALE TOILET 3-25
FEMALE TOILET

B 3-08A
STAIR-03
3-04 3-03
LIFT

CORRIDOR
SERVICE CORRIDOR
SERVICE LIFT
3-07

3-22
GLASS PARTITION UP
IT ROOM UP
5000

3-08
3-21
FHC FFL +13.000
PRINTER ROOM
3-01
RWP SSL +12.900
LOBBY
C
3-10 3-09A
TOILET CORRIDOR
5000

Elevation 4
1 3-11 1
3-13
A-202 TOILET A-202
PANTRY

3-20 2 A-201
30000

OFFICE-2
D FL-01
Elevation 2

R0 12-04-17 ISSUED FOR TENDER JAY RAM


5000

A-200 2

RWP RWP
E
3-12 3-14 3-15
BOARD ROOM DINING ROOM OFFICE-1
5000

3-19
CORRIDOR

F FHC
GLASS PARTITION

3-18
STAIR-02
5000

3-16 UP
NATIONAL ENGINEERING OFFICE
MEETING ROOM
3-17
RWP STORE
RWP
RWP
G

THIRD FLOOR PLAN


CHW SERVICE LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

1 1 Elevation 3 HVAC
A-203 ISSUED FOR TENDER
A-201

140050 140050-NEO-DPC-HQ-402-005 R0
OU-00-00

1 2 3 4 5 6 7 8 9 10 11

A
RWO TOW +18.200 m
RWO RWO TOW +18.200 m
RWO
R-02 FFL +17.000
SERVICES SSL +16.900
AHU CUT-OUT

B R-01
STAIR
LIFT OVERHEAD
SSL +18.200 TOW +18.200 m

TOW +18.200 m

RWO
C

RIDGE
ROOF
D RIDGE RIDGE
FFL +17.100
SSL +16.900

TOS +17.100 m
TOS +17.100 m
R0 12-04-17 ISSUED FOR TENDER JAY RAM

RIDGE
E
RWO RWO

TOW +18.200 m

DHOFAR POWER COMPANY


TOW +18.200 m
RWO RWO RWO RWO NATIONAL ENGINEERING OFFICE
G

SSL +18.400 TOS +17.100 m


TOS +17.100 m

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

ROOF PLAN
CHW SERVICE LAYOUT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH

12-04-2017 1:100

HVAC

ISSUED FOR TENDER

140050 140050-NEO-DPC-HQ-402-006 R0
30 MM THK CAULKING SEALANT FINISH INSIDE 50x45MM HARD WOOD
TIMBER BATTEN 600MMC/C
(ALL AROUND THE PERIMETER OF THE ROOM) 150 MM CONCRETE VIBRATION ISOLATION

1000g POLYTHENE SHEET


45 /150 GALVANIZED 150mm CONCRETE
STEEL METAL DECK UP STAND
25 MM THK PERIMETER ISOLATION BOARD
GALVANIZED STEEL
HAT CHANNEL
UPSTAND SCREED 50MM

600
BY MAIN 50 MM AIR GAP
CONTRACTOR
100 THK ROCK WOOL
SCREED 50MM BY MAIN WATER PROOFING
RCC SLAB BY MAIN
CONTRACTOR CONTRACTOR

600
600

1200

600
250 15MM THK
REGULAR BOARD

150

350
50

150

600
50
SECTION DETAILS OF FLOATING FLOOR
SCALE 1:10

600
AHU ON FLOATING FLOOR
SCALE 1:25

TYPICAL CONTROL PANEL FIXING DETAIL


SCALE : NTS

50x45MM HARD WOOD


TIMBER BATTEN 600MMC/C

0
60
100 THK ROCK WOOL

0
60

0
60 15MM THK REGULAR BOARD

10mm GAP FILL


WITH SEALANT

CAULKING SEALANT

ROCK WOOL

600
600
DETAIL "A"

SCALE : NTS

623
200

600

623
U-TRAP

TUNDISH DRAIN

AHU

FLOATING FLOOR

200

DUCT
SLAB

CLIENT

TYPICAL TUNDISH DRAIN CONNECTION DETAIL DHOFAR POWER COMPANY


SCALE: NTS

TYPICAL DUCT SUPPORT DETAIL


CONSULTANT
SCALE : NTS NATIONAL ENGINEERING OFFICE

PROJECT

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

HVAC STANDARD
INSTALLATION DETAILS (SHEET 1 OF 4)

RAM JAY RAM AKM

OFFICE B+G+3 SALALH 236

12-04-2017 NTS

HVAC

ISSUED FOR TENDER

140050 140050-NEO-HVAC-001 R0
CLIENT

DHOFAR POWER COMPANY

CONSULTANT
NATIONAL ENGINEERING OFFICE

PROJECT

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

HVAC STANDARD
INSTALLATION DETAILS (SHEET 2 OF 4)

RAM JAY RAM AKM

OFFICE B+G+3 SALALH 236

12-04-2017 NTS

HVAC

ISSUED FOR TENDER

140050 140050-NEO-HVAC-002 R0
DETAIL NO. 07/ SD-02
DETAIL NO. 01/ SD-001B
DETAIL NO. 04/ SD-001B

TYPICAL SHUTTER FIRE DAMPER THROUGH WALL WITH


GRILLE CONNECTION

DETAIL NO. 05/ SD-001B


DETAIL NO. 06/ SD-001B

DETAIL NO. 07/ SD-001B DETAIL NO. 06/ SD-001B


DETAIL NO. 08/ SD-001B

RECOMMENDED HANGER SIZES FOR


RECTANGULAR G.I. DUCT
LONGEST MAXIMUM
DROP ROD
DIMENSION OF ANGLE SPACING
DIA (mm)
DUCT (mm)

UPTO 12" 20 x 3 mm FLAT 8 3000

13" THRU 24" 1 x 1 x 81" 8 3000

25" THRU 40" 112 x 121 x 61" 10 2500

41" THRU 64" 3 x 3 x 51" 10 2500

OVER 64" 3 x 3 x 41" 15 2500

t W t

RECOMMENDED HANGER SIZES FOR


t
RECTANGULAR G.I. DUCT
LONGEST MAXIMUM
DROP ROD
DIMENSION OF ANGLE SPACING
DIA (mm)
DUCT (mm)
H
t W t
UPTO 12" 20 x 3 mm FLAT 8 3000

t 13" THRU 24" 1 x 1 x 81" 8 3000


t

121 x 121 x 61"


25" THRU 40" 10 2500
CLIENT
41" THRU 64" 3 x 3 x 51" 10 2500
H
1
OVER 64" 3x3x 4" 15 2500

DHOFAR POWER COMPANY

CONSULTANT
NATIONAL ENGINEERING OFFICE
HxW
DUCT
hxw

PROJECT

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

LOW VELOCITY DUCT CONSTRUCTION SCHEDULE


HVAC STANDARD
SIDE (H)

0 TO 12"
U.S.G

24 1" POCKET JOINT AT 8 FT. CENTRES


TRANSVERSE JOINTS & BRACING
INSTALLATION DETAILS (SHEET 3 OF 4)
13" TO 18" 24 1" POCKET JOINT AT 4 FT. CENTRES WITH CROSS BREAKING

19" TO 30" 22 1" POCKET JOINT AT 4 FT. CENTRES WITH CROSS BREAKING t
121" POCKET JOINT AT 4 FT. CENTRES CROSS BREAKING & 1 21" x 121" x 81" ANGLE GIRTH AT 8 FT. CENTRES BOLTED TO THE
31" TO 42" 22 POCKET JOINTS

121" POCKET JOINT AT 4 FT. CENTRES CROSS BREAKING & 1 21" x 121" x 16
3
" ANGLE GIRTH AT 4 FT. CENTRES BOLTED TO
43" TO 54" 20
THE POCKET JOINTS

121" POCKET JOINT AT 4 FT. CENTRES CROSS BREAKING & 1 21" x 121" x 16
3
" ANGLE GIRTH AT 4 FT. CENTRES BOLTED TO
55" TO 72" 20
THE POCKET JOINTS
HxW

2 - 121" x 121" x 16
3
" ANGLE AT 4 FT. CENTRES BOLTED TO THE DUCT WITH 38"BOLT AT 1 21" CENTRES FASTENED TOGETHER
DUCT
hxw

73" ABOVE 18
WITH 38" BOLTS AT 2" CENTRES WITH RUBBER GASKET BETWEEN THE TWO ANGLE CROSS BEARING
RAM JAY RAM AKM

OFFICE B+G+3 SALALH 236

12-04-2017 NTS

HVAC

ISSUED FOR TENDER

140050 140050-NEO-HVAC-003 R0
CHILLED WATER PIPE SUPPLY & RETURN RISER CLAMP PIPE HANGER STANDARDS PIPE SUPPORT DETAIL

PIPE

SINGLE PIPE SUPPORT FROM FLOOR FLOOR SUPPORT FOR INSULATED PIPE CEILING SUPPORT FOR INSULATED PIPES VERTICAL PIPE SUPPORT DETAILS
IN A/C PLANT ROOM

MULTIPLE PIPES SUPPORT FROM FLOOR FLOOR SUPPORT FOR VERTICAL PIPE FCU CHW PIPING CONNECTIONS AHU CHW PIPING CONNECTIONS
CLIENT

DHOFAR POWER COMPANY

CONSULTANT
NATIONAL ENGINEERING OFFICE

PROJECT

BUILDING FOR DISTRIBUTION


CONTROL CENTRE AT SALALAH

HVAC STANDARD
FLOOR PENETRATION FLOOR PENETRATION WALL PENETRATION EXTERNAL WALLS ABOVE OR
DRY LOCATION MECH. ROOMS / WET AREAS BELOW GRADE INSTALLATION DETAILS (SHEET 4 OF 4)
GUIDE ARRANGEMENT ANCHOR ARRANGEMENT

RAM JAY RAM AKM

OFFICE B+G+3 SALALH 236

PIPE SLEEVE DETAILS VERTICAL PIPE SUPPORT DETAILS IN SHAFT PIPE SLEEVE DETAILS GUIDE & ANCHOR DETAIL 02-04-2017 NTS

HVAC

ISSUED FOR TENDER

140050 140050-NEO-HVAC-004 R0