Sei sulla pagina 1di 8

MLR/IPP/EMD/50

VEDANTA LIMITED 4X600 MW IPP, JHARSUGUDA


POWERMECH PROJECTS LIMITED
AOH CHECK LIST FOR LT MOTORS
Unit No- DATE:
RATING: EQUP. NAME:
S.NO. POINTS TO BE CHECKED DESIRED OBSERVATION

MOTOR END:

1 Cleanliness. To be in clean condition.


2 Condition of lug Bright/decoloured
3 Terminal block To be in good condition
4 Earthing condition: To be in connected condition
5 End cover & Cooling fan. Check for any damage
6 Termination tightness. To be in tight condition.
7 Motor Lubrication To be packed if necessary.
8 Bed bolt tightness To be in tight condition.
9 Motor Insulation value(Ph- E) Compare the standard value
10 Winding resistance Compare the standard value
11 Codition of Bearing Replace of bearing if necessary
12 Local push button/interlock. To be in clean & tight condition.
13 TB sealing To be sealed
14 Gland sealing To be sealed
AFTER COMPLETION OF AOH:

1 Trial run. If required

2
Direction of Rotaton view from DE
Side
3 Load current. R= Y= B

PMPL Technician PMPL Engineer Vedanta Operation-


Sign - Sign- Sign- Sign-
Name Name Name- Name-
D 4X600 MW IPP, JHARSUGUDA
CH PROJECTS LIMITED
MOTORS

PERMIT NO-
REMARKS
Y= B

Vedanta Operation-
Sign- Sign-
Name- Name-
MLR/IPP/EMD/50
VEDANTA LIMITED 4X600 MW IPP, JHARSUGUDA
POWERMECH PROJECTS LIMITED
AOH CHECKLIST OF HT MOTOR
UNIT NO- DATE-

RATING- EQUIPMENT NAME- PERMIT NO-

SL NO JOB DESCRIPTION STATUS


1 HT Motor IR, Winding resistance, Inductance to be taken.
2 Motor End Neutral CT Tightness Checking .
Motor Space Heaters to be checked, Terminal box Cable
3 Termination Tightness, Sealing, Cable Lug Condition

4 Support Insulator to be checked, Motor Earthing to be checked.

5 Motor Cooling Fan Stud inspection and modification if necessary.


6 Impeller Inspection, Oil Leakage to be arrested if any.
7 Cooler Cleaning by Service air
8 Grease draining & refilling if required.
9 Local push button operation checking & modification if required.
10 Checking of Greasing and Draining Point
11 Bearing Inspection DE/NDE
12 Cable Insulation Resistance Checking
AFTER COMPLETION OF AOH:
1 Trial run. If required
2 Load current. R= Y= B=
3 Motor Vibration

4 Direction of Rotaton view from DE Side

PMPL Technician PMPL Engineer Vedanta Ope


Sign- Sign- Sign Sign-
Name Name Name Name-
JHARSUGUDA
LIMITED
MOTOR

PERMIT NO-

REMARKS
Check DOR
Y= B=

Ope
Sign-
Name-