Sei sulla pagina 1di 249

COMMISSIONING TEST REPORT OFMOBILE SUBSTATION

CLIENT-ETHIOPIAN ELECTRIC POWER (EEP)


CONTENT SHEET

Page No.1
CLIENT: ETHIOPIAN ELECTRICAL POWER(EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION- Sheet No. 1 of 1

CONTENT SHEET
CONTENT NO. DESCRIPTION Pages

1 POWER TRANSFORMER 2-7

2 PASS 8-10

3 CURRENT TRANSFORMER 11-14

4 METAL CLAD SWITCHGEAR 15-72

5 DIFF PROTECTION TEST 73

6 OVERCURRENT & EARTH-FAULT RELAY 74-95

7 SURGE ARRESTER 96-102

8 15kV XLPE POWER CABLES 103-106

9 EARTHING TRANSFORMER 107-108

10 CVT 109

11 AC POWER 110

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


1. POWER TRANSFORMER
TEST REPORT FOR POWER TRANSFORMER
DATE:
Page No.2
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 6

1. Equipment Details:
Make:
Type :
Rating HV :
Rating LV :
HV Volts :
LV Volts:
Current Rating HV:
Current Rating LV:
Vector Group :
% Z HV/LV :
SI. No.
Type of transfomer:
Year of Manufacture :
2. General Checks:

SN DESCRIPTION REMARKS
1. Check all components are installed. OK
2. Check nameplates information (visible location) as per contract OK
specifications.
3. Check tightness of all bolts. OK
4. Check that all grounding is securely connected (two grounding OK
connections to main tank are required).
5. Check that the piping to Buchholz relay has proper slope. OK
6. Check that the tank pressure is positive, if applicable. OK
7. Check that the valves between the main tank and radiators are right OK
8. Check the HV, LV (if applicable) bushings for damage and OK
completeness.
9. Check for correct color and quantity of desiccant (moisture absorbing OK
media) in breathers. Check for correct breather oil levels.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR POWER TRANSFORMER
DATE:
Page No.3
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 6

SN DESCRIPTION REMARKS
10. Check heaters and humidity meters in local panel are at correct OK
settings.
11. Check that phase marking with Switchgear and cables. OK
12. Check all pipes, hoses. OK
13. Check the vertical and horizontal clearances of live parts to adjacent OK
grounded points conform to standard.
14. Check integrity of diaphragm/air bag in the conservator. OK
15. Perform all of the manufacturer's specific checks. OK
16. Check labeling of all auxiliary devices as per approved drawing. OK
17. Check proper operation of auxiliary devices as follows: OK
a) Tap changer (upper-lower-out of step and interlock).
b) Oil level gauges.
c) Top oil temperature gauges.
d) Buchholz relay by gas injection.
e) Winding temperature gauges.
f) OLTC oil/gas surge (pressure) relay.
g) Ensure correct operation of the Pressure Relief Device
microswitch.
h) Push buttons and indicators.
i) Oil sampling port (main tank and OLTC).
j) Upper and lower main tank valves.
k) Tap changer diverter switch compartment, oil filtering pumps
and filter in good condition (if available).
18. Check that the oil sampling valves for the main tank and OLTC are OK
accessible from ground level.
19. Check oil level in main tank, conservator, tap changer tank and OK
bushings, etc. Test the oil level gauges and their alarms
20. Bleed trapped air at the bushing turrets and radiators. OK
21. Check all external wiring for correctness and tightness. OK

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR POWER TRANSFORMER
DATE
Page No.4
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 6
3. Insulation Resistance Measurement:

Main Winding Voltage used IR Value PI


for megger R 15 R 60 R 600
HV to Earth R >10 GΩ >10 GΩ >10 GΩ >1
S >10 GΩ >10 GΩ >10 GΩ >1
T >10 GΩ >10 GΩ >10 GΩ >1
LV to Earth R >10 GΩ >10 GΩ >10 GΩ >1
S >10 GΩ >10 GΩ >10 GΩ >1
T >10 GΩ >10 GΩ >10 GΩ >1
MV to Earth R >10 GΩ >10 GΩ >10 GΩ >1
S >10 GΩ >10 GΩ >10 GΩ >1
T >10 GΩ >10 GΩ >10 GΩ >1
MV to LV R 790 MΩ 790 MΩ 790 MΩ >1
S 790 MΩ 790 MΩ 790 MΩ >1
T 790 MΩ 790 MΩ 790 MΩ >1
4. Ratio Test: (All values in Volts)
HV-Tap Applied HV Volts Measured MV Volts Measured LV Volts
Position 1U1V 1V1W 1W1U 2U2V 2V2W 2W2U R-S S-T R-T
1
2
3
4
5
6
7
8
9
10
11B
12
13
14
15
16
17
18
19
20
21

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature& Date Signature& Date Signature& Date Signature& Date


TEST REPORT FOR POWER TRANSFORMER
DATE:
Page No.5
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 4 of 6


5. Winding Resistance Test; ( Injecter current +25A )

Tap Primary Winding Resistance Secondary Winding Tertiary Winding


No. (Ω)HV Resistance MV(Ω) Resistance LV(Ω)ARK
RS ST RT rs st rt rs st rt

1 4.5Ω 4.5 Ω 4.5 Ω 0.35Ω 0.35Ω 0.35Ω 0.3Ω 0.3Ω 0.3Ω


2 4.5Ω 4.5 Ω 4.5 Ω
3 4.5Ω 4.5 Ω 4.5 Ω
4 4.4Ω 4.4 Ω 4.4 Ω
5 4.3Ω 4.3Ω 4.3Ω
6 4.3Ω 4.3Ω 4.3Ω
7 4.1Ω 4.1Ω 4.1Ω
8 4.1Ω 4.1Ω 4.1Ω
9 4.1Ω 4.1Ω 4.1Ω
10 4.2Ω 4.2Ω 4.2Ω
11B 4.2Ω 4.2Ω 4.2Ω
12 4.2Ω 4.2Ω 4.2Ω
13 4.3Ω 4.3Ω 4.3Ω
14 4.3Ω 4.3Ω 4.3Ω
15 4.4Ω 4.4 Ω 4.4 Ω
16 4.4Ω 4.4 Ω 4.4 Ω
17 4.4Ω 4.4 Ω 4.4 Ω
18 4.4Ω 4.4 Ω 4.4 Ω
19 4.5Ω 4.5 Ω 4.5 Ω
20 4.8 Ω 4.8Ω 4.8Ω
21 4.8 Ω 4.9Ω 4.8Ω

6. Insulation Resistance Measurement: (core)

Main Winding IR Value

Core-E
Clamp-E
Core-Pw

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR POWER TRANSFORMER
DATE:
Page No.5
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 4 of 6

7. OIL SAMPLE MAIN TRANSFORMER

i. MAIN TANK OIL SAMPLE

NO OLTC OIL SAMPLE

1 62.9 KV

2 60.8 KV

3 61.6 KV

4 65.8 KV

5 61.5 KV

6 48.3 KV

TOTAL AVERAGE 60.1 KV

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR POWER TRANSFORMER
DATE:
Page No.5
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 4 of 6

8. Functional Checks:

SL.
DESCRIPTION REMARKS
NO.
1. Check for current and voltage ratings of all motors for tap changer. Check that
OK
MCBs for protection are set at proper over load settings
2. MCBs in cooler control cubicle to be checked by current injection for alarm OK
and trip
3 On load Tap Changer tests: OK
a. Check current and voltage ratings of tap changer motor.
b. Raise/Lower Control (local-remote) and indication and perform
adjustment as required.
c. End of tap travel control.
d. End of winding travel control (both ends).
e. Check that the windings are not open circuited during tap
changing. This should be done during the winding
resistance test.
4. Liquid level (alarm and trip). OK
5. Top Oil Temperature Device: (stop, start alarm and trip). OK
6. Buchholz Relay {alarm and trip). OK
7. Oil / Gas Surge (pressure) relay (alarm and trip). OK
8. Pressure Relief Device (alarm and trip) OK

9.Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


2. PASS
TEST REPORT FOR PASS
DATE:
Page No.8
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 3

1. Equipment Details:
Make:
Type :
Rated Volts :
Rated Current :
Making Capacity:
Breaking Capacity:
Operating Duty:
SI. No.
Year of Manufacture :
2. General Inspection:

SN DESCRIPTION REMARKS
1. Inspect for physical damage or defects. ok
2. Check nameplate information for correctness. ok
3. Check tightness of all bolted connections (torque wrench method). ok
4. Check all wiring is correct according to approved drawings and that ok
terminal connections are secure.
5. Check that ail grounding cables are securely connected. ok
6. Check for correct breaker position indication (breaker open/closed). ok
7. For SF6 breakers: ok
a. Check for correct SF6 pressure in each pole.
b. Check for gas leakage.
c. Calibrate SF6 pressure gauge.
d. Check operation of gas density switch (alarm and lockout
functions).
e. Check air and moisture content of SF6 gas in breaker

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR PASS
DATE:
Page No.9
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 3

SN DESCRIPTION REMARKS
8. For motor/spring operation mechanisms:
a. Check manual spring charge operation.
b. Verify correct spring status indication (spring ok
charged/discharged).
c. Perform all specific checks on the mechanism according to
the manufacturer’s instructions.

3. Insulation Resistance Test : (Values in GΩ )

Ref Voltage used R ph S ph T ph


for megger
Pole to Earth (CB Closed) 10kV >10 GΩ >10 GΩ >10 GΩ
Across Contact (CB Open) 10kV >10 GΩ >10 GΩ >10 GΩ

5. Coil Resistance Measurement:

Instrument Details multimeter


Calibration valid upto

6. Operational checks

SN DESCRIPTION REMARKS
1. a. Manual ok
2. Close ok
3. Open ok
4. b. Electrical ok
5. Close ok
6. Open ok
7. Protection Tripping ok
8. Anti-Pumping Function ok

Tested by: Witnessed by: Witnessed by:


Tested by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR PASS
DATE:
Page No.10
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 3

7.Functional Checks:

SN DESCRIPTION REMARKS

1. Emergency Trip ok
2. ON-OFF Indication ok
3. Spring charge Limit Switch ok
4. CB Aux. contacts ok
5. Auto Trip Indication ok
6. Trip circuit healthy ok
7. Sf6 gas pressure indication ok
8. Interchangeability of CB ok
9. Aux Switch operation (13No+13Nc.) ok
10. Operation Counter ok

8. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


3. CURRENT TRANSFORMER
TEST REPORT FOR CURRENT TRANSFORMER
DATE:
Page No.11
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 4

1. Name Plate Details:


Make:
Rated kV :
SI. No.: Rph: Sph: Tph:
Year of Manufacture :
2. General Checks:

SL. NO. DESCRIPTION REMARKS


1. Inspect for physical damage or defects. ok
2. Check nameplate Information for correctness. ok
3. Check that outdoor secondary wiring terminations are installed in ok
moisture proof enclosures.
4. Check tightness of all bolted connections . ok
5. Check that all grounding cables are securely connected. ok
6. Check secondary wiring is correctly color coded and size of wires is as ok
specified.
7. Check proper lugs have been used on terminations. ok
8. Check CT locations physically and secondary terminal labeling has been ok
done correctly.

3. Insulation resistance Test:


CIRCUIT MEGGER R-Ph Y-Ph B-Ph
USED
Pri-E NA
1S1 -2S1
1S1 -3S1
2S1 -3S1
1S1 -4S1
1S1-E
2S1-E
3S1-E
4S1-E

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR CURRENT TRANSFORMER
DATE:
Page No.13
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 4

4. Winding Resistance Measurement:

CT CIRCUIT R-Ph(Ω) S-Ph(Ω) T-Ph(Ω)


1S1 - 1S2 1.0 1.0 1.0
Core1
1S1 - 1S3 0.5 0.5 0.5
2S1 - 2S2 1.0 1.0 1.0
Core2
2S1 - 2S3 1.1 1.1 1.1
3S1 - 3S2 1.6 1.6 1.6
Core3
3S1 - 3S3 0.9 0.8 1.0
4S1 - 4S2 1.6 1.6 1.6
Core4
4S1 - 4S3 0.9 0.9 0.9

5. Polarity Confirmation Test:

CT CIRCUIT R-Ph S-Ph T-Ph


1S1 - 1S2 OK OK OK
Core1 1S1 - 1S3 OK OK OK
1S2 - 1S3 OK OK OK
2S1 - 2S2 OK OK OK
Core2 2S1 - 2S3 OK OK OK
2S2 - 2S3 OK OK OK
3S1 - 3S2 OK OK OK
Core3 3S1 - 3S3 OK OK OK
3S2 - 3S3 OK OK OK
4S1 - 3S2 OK OK OK
Core4 4S1 - 3S3 OK OK OK
4S2 - 3S3 OK OK OK

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR CURRENT TRANSFORMER
DATE:
Page No.14
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 4 of 4

6. Ratio Test:
R-Phase Y-Phase B-Phase
CT CORE Applied Measured Applied Measured Applied Measured
Current(A) Current(A) Current(A) Current(A) Current(A) Current(A)
CT1 1S1-1S3 10 10 10 10 10 10
30 30 30 30 30 30
60 60 60 60 60 60
90 90 90 90 90 90
CT2 2S1-2S3 10 10 10 10 10 10
30 30 30 30 30 30
60 60 60 60 60 60
90 90 90 90 90 90
CT3 3S1-3S3 10 10 10 10 10 10
30 30 30 30 30 30
60 60 60 60 60 60
90 90 90 90 90 90
CT4 4S1-4S3 10 10 10 10 10 10
30 30 30 30 30 30
60 60 60 60 60 60
90 90 90 90 90 90

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
4. METAL CLAD SWITCHGEAR
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.15
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 58

1. Equipment Details:
Make:
Type :15kV GIS
SI. No
Year of Manufacture :
Operating Voltage :
Feeder Details :in comeing
Control Voltage :

2. General Inspection:

SN DESCRIPTION REMARKS
1. Inspect for physical damage or defects. ok
2. Check nameplate information for correctness. ok
3. Inspect enclosures for proper alignment, grounding . ok
4. Inspect all covers, panels section and doors for paint work and ok
proper fit.
5. Check for smooth and proper movement of racking mechanisms for ok
alignment, shutters, rollers, rails and guides.
6. Check for proper alignment of the breaker primary and secondary ok
contacts.
7. Check operation of all mechanical interlocks. ok
8. Check tightness of all bolted connections . ok
9. Check main and riser buses for correct phasing. ok
10. Verify that all front panel mounted devices (meters, push buttons, ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.
11. Perform mechanical checks and visual inspection on all circuit ok
breakers.
12. Perform mechanical checks and visual inspection on all current ok
transformers.
13. Perform mechanical checks and visual inspection on all voltage ok
transformers.

Tested by: Witnessed by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.16
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect ok


and grounding switches.

15. Check for correct breaker position indication. ok

16. Check for correct spring status indication (spring ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, and leakage ok
where possible.

18. For SF6 breakers, check the operation of the gas density switch ok
(alarm and lockout functions).

19. Perform all specific checks on the breaker and spring operating ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. ok

22. Check that all phase marking have been installed per specifications. ok

23. Check that all special tools, devices, etc., as per specification have ok
been provided.

3. Circuit Breaker Test Report:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.17
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 58

i) Insulation Resistance Test:


Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs


R CB Close R-E
CB Close R-S
CB Open R-R'
S CB Close S-E
CB Close S-T
CB Open S-S'
T CB Close T-E
CB Close T-R
CB Open T-T'

iii) Mechanical Checks:


Description Remarks
CB rack in / out operation NA
CB rack in / out indications
Manual spring charging operation ok
Spring charged indication ok
Manual ON / OFF operation ok
CB ON/OFF operation ok
Power contact alignment with panel contacts ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.18
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 4 of 58

iv) Electrical Checks:


Description Remarks
Spring charging operation time (Sec) ok
Test / Service position switch ok
ON / OFF operation in location / remote ok
Spring charged indication ok
CB ON/OFF indication ok
Lamp indications ok

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:


: Instrument

Description Megger used R-ph S-ph T-ph


Primary to Earth
Primary to Core-1
Primary to Core-2
Primary to Core-3
Core-1 to Earth Since the CT is sealed with the CB notable to test
Core-2 to Earth
Core-3 to Earth
Core-1 to Core-2
Core-2 to Core-3
Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.20
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 6 of 58

ii) CT Secondary Winding Resistance Measurement:


Instrument Details multimeter Make

Description Terminal Nos. R-ph S-ph T-ph


Core-1 1S1-1S2 4.1 4.1 4.1
1S1-1S3 8.4 8.1 8.2
Core-2 2S1-2S2 4.1 4.1 4.1
2S1-2S3 8.2 8.2 8.7
Core-3 3S1-3S2 3.1 3.1 3.1
3S1-3S3 6.5 6.5 6.5
Core-4 4S1-4S2 3.1 3.1 3.1
4S1-4S3 6.5 6.3 6.5

iii) CT Polarity Check:


Description Terminal Nos. R-ph S-ph T-ph
Core-1 1S1-1S2 OK OK OK
1S1-2S3 OK OK OK
Core-2 2S1-2S2 OK OK OK
2S1-2S3 OK OK OK
Core-3 3S1-3S2 OK OK OK
3S1-3S3 OK OK OK

iv) CT Ratio Test:


Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1
1S1-1S2

10 0.004 0.004 0.004


Core-1 30 0.012 0.012 0.012
2500/1
1S1-1S3 60 0.024 0.024 0.024
90 0.036 0.036 0.036

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.21
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 7 of 58

v) CT Ratio Test:
Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-2
2S1-2S2

Core-2
2S1-2S3

vi) CT Ratio Test:


Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-3
3S1-3S2

Core-3
3S1-3S3

vii) CT Check List:


SI.
Check Point Remarks
No.
1. All CT quantity, rating, type & make are as per approved ok
drawings.
2. No physical damage to any of the CT. ok
3. Inter-panel wiring from CTs to disconnect or terminal blocks in ok
panel as per approved drawings.
4. CT secondary star point terminals are properly earthed at ok
disconnector terminal blocks.
5. CT wiring ferrules are as per drawing. ok
6. All CT connections are properly tightened. ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.22
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 8 of 58

5. BUS PT Test Report

PT Serial No.
R-Ph. S-Ph. T-Ph.

i) PT Insulation Resistance Test:

Description Megger R-ph. S-ph T-ph


used
Primary to Earth 5000V
Primary to Core-1 5000V
Primary to Core-2 5000V
Core-1 to Earth 500V
Core-2 to Earth 500V
Core-1 to Core-2 500V

ii) PT Winding Resistance Test:

R S T
1a-1n
2a-2n
Da-dn

iii) PT Polarity Check:

Description Terminal Nos. R-ph. S-ph. T-ph.


Core-1 1a-1n OK OK OK

Core-2 2da-2n OK OK OK

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.23
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 9 of 58

iV) PT Ratio Test:


BB VT LINE VT
Primary Voltage a-n a-n da-n
Injected
R 380 2.53 2.53 4.38
S 380 2.53 2.53 4.38
T 380 2.53 2.53 4.38

v) PT Check List:

SI.
Check Point Remarks
No.
1. All PT quantity, rating, type & make are as per approved ok
drawings.
2. No physical damage to any of the PT. ok
3. Inter-panel wiring from PTs to disconnector terminal blocks in ok
panel as per approved drawings.
4. PT primary neutral terminals are properly earthed. ok
5. PT wiring ferrules are as per drawing. ok
6. All PT connections are properly tightened. ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.24
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 10 of 58

6. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB ok ok ok ok

B Closing of CB ok ok ok ok

C Breaker position indication ok ok ok ok

D Heater in Switchgear ok ok ok ok

E Incomer and disconnector interlock ok ok ok ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1. Equipment Details:
Make:
Type :15kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :outgoing feeder 1
Control Voltage :

2. General Inspection:

SN DESCRIPTION REMARKS
1. Inspect for physical damage or defects. ok
2. Check nameplate information for correctness. ok
3. Inspect enclosures for proper alignment, grounding and vermin ok
proofing.
4. Inspect all covers, panels section and doors for paint work and ok
proper fit.
5. Check for smooth and proper movement of racking mechanisms for ok
alignment, shutters, rollers, rails and guides.
6. Check for proper alignment of the breaker primary and secondary ok
contacts.
7. Check operation of all mechanical interlocks. ok
8. Check tightness of all bolted connections . ok
9. Check main and riser buses for correct phasing. ok
10. Verify that all front panel mounted devices (meters, push buttons, ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.
11. Perform mechanical checks and visual inspection on all circuit ok
breakers.
12. Perform mechanical checks and visual inspection on all current ok
transformers.
13. Perform mechanical checks and visual inspection on all voltage ok
transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect ok


and grounding switches.

15. Check for correct breaker position indication. ok

16. Check for correct spring status indication (spring ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. ok

22. Check that all phase marking have been installed per specifications. ok

23. Check that all special tools, devices, etc., as per specification have ok
been provided.

3.Circuit Breaker Test Report

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:


Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs


R CB Close R-E
CB Close R-S
CB Open R-R'
S CB Close S-E
CB Close S-T
CB Open S-S'
T CB Close T-E
CB Close T-R
CB Open T-T'

iii) Mechanical Checks:

Description Remarks
CB rack in / out operation NA
CB rack in / out indications
Manual spring charging operation ok
Spring charged indication ok
Manual ON / OFF operation ok
CB ON/OFF operation ok
Emergency Trip operation ok
Power contact alignment with panel contacts ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:


Description Remarks
Spring charging operation time (Sec) ok
Test / Service position switch ok
ON / OFF operation in location / remote ok
Spring charged indication ok
CB ON/OFF indication ok
Lamp indications ok

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:


: Instrument

Description Megger used R-ph S-ph T-ph


Primary to Earth
Primary to Core-1
Primary to Core-2
Primary to Core-3
Core-1 to Earth Since the CT is sealed with the CB notable to test
Core-2 to Earth
Core-3 to Earth
Core-1 to Core-2
Core-2 to Core-3
Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph


Core-1 1S1-1S2 1.8 1.8 1.8
1S1-1S3 3.2 3.2 3.2
Core-2 2S1-2S2 1.4 1.4 1.4
2S1-2S3 2.4 2.4 2.4
Core-3 3S1-3S2 1.4 1.4 1.4
3S1-3S3 2.4 2.4 2.4

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph


Core-1 1S1-1S2 Ok Ok Ok
1S1-2S3 Ok Ok Ok
Core-2 2S1-2S2 Ok Ok Ok
2S1-2S3 Ok Ok Ok
Core-3 3S1-3S2 Ok Ok Ok
3S1-3S3 ok ok ok
iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1
1S1-1S2

10 0.011 0.011 0.011


Core-1 30 0.03 0.03 0.03
800/1
1S1-1S3 60 0.07 0.07 0.07
90 0.12 0.12 0.12

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:
Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1
1S1-1S2

Core-1
1S1-1S3

vi) CT Check List:


SI.
Check Point Remarks
No.
1. All CT quantity, rating, type & make are as per approved ok
drawings.
2. No physical damage to any of the CT. ok
3. Inter-panel wiring from CTs to disconnect or terminal blocks in ok
panel as per approved drawings.
4. CT secondary star point terminals are properly earthed at ok
disconnector terminal blocks.
5. CT wiring ferrules are as per drawing. ok
6. All CT connections are properly tightened. ok

5. Circuitry/ Operational Checks:


SI. Circuit Reference Circuit Checks Operational Checks
No. Local Remote Local Remote
A Tripping of CB ok ok ok ok
B Closing of CB ok ok ok ok
C Breaker position indication ok ok ok ok
D Heater in Switchgear ok ok ok ok
E Incomer and disconnector interlock ok ok ok ok

6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:
Make:
Type :15kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :outgoing feeder 2
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS
1. Inspect for physical damage or defects. ok
2. Check nameplate information for correctness. ok
3. Inspect enclosures for proper alignment, grounding and vermin ok
proofing.
4. Inspect all covers, panels section and doors for paintwork and ok
proper fit.
5. Check for smooth and proper movement of racking mechanisms for ok
alignment, shutters, rollers, rails and guides.
6. Check for proper alignment of the breaker primary and secondary ok
contacts.
7. Check operation of all mechanical interlocks. ok
8. Check tightness of all bolted connections . ok
9. Check main and riser buses for correct phasing. ok
10. Verify that all front panel mounted devices (meters, push buttons, ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.
11. Perform mechanical checks and visual inspection on all circuit ok
breakers.
12. Perform mechanical checks and visual inspection on all current ok
transformers.
13. Perform mechanical checks and visual inspection on all voltage ok
transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS
14 Perform mechanical check and visual inspection on all disconnect ok
and grounding switches.
15. Check for correct breaker position indication. ok
16. Check for correct spring status indication (spring ok
charged/discharged).
17. For SF6 breakers, check the correct gas pressure, quality and ok
leakage where possible.
18. For SF6 breakers, check the operation of the switch (alarm and ok
lockout functions).
19. Perform all specific checks on the breaker and spring operating ok
mechanism according to the manufacture's instructions.
20, Check that all control wiring is correct according to the approved N
drawing and terminal connections are secure.
21. Check all wiring is correct according to approved drawings. ok
22. Check that all phase marking have been installed per specifications. ok
23. Check that all special tools, devices, etc., as per specification have ok
been provided.

3.Circuit Breaker Test Report:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:


Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs


R CB Close R-E
CB Close R-S
CB Open R-R'
S CB Close S-E
CB Close S-T
CB Open S-S'
T CB Close T-E
CB Close T-R
CB Open T-T'

iii) Mechanical Checks:

Description Remarks
CB rack in / out operation NA
CB rack in / out indications
Manual spring charging operation ok
Spring charged indication ok
Manual ON / OFF operation ok
CB ON/OFF operation ok
Emergency Trip operation ok
Power contact alignment with panel contacts ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks
Spring charging operation time (Sec) ok
Test / Service position switch ok
ON / OFF operation in location / remote ok
Spring charged indication ok
CB ON/OFF indication ok
Lamp indications ok

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:


: Instrument

Description Megger used R-ph S-ph T-ph


Primary to Earth
Primary to Core-1
Primary to Core-2
Primary to Core-3
Core-1 to Earth
Core-2 to Earth Since the ct is seald with the CB notable to test
Core-3 to Earth
Core-1 to Core-2
Core-2 to Core-3
Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph


Core-1 1S1-1S2 1.8 1.8 1.8
1S1-1S3 3.2 3.2 3.2
Core-2 2S1-2S2 1.4 1.4 1.4
2S1-2S3 2.4 2.4 2.4
Core-3 3S1-3S2 1.4 1.4 1.4
3S1-3S3 2.4 2.4 2.4

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph


Core-1 1S1-1S2 ok ok ok
1S1-2S3 ok ok ok
Core-2 2S1-2S2 ok ok ok
2S1-2S3 ok ok ok
Core-3 3S1-3S2 ok ok ok
3S1-3S3 ok ok ok
iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1
1S1-1S2

10 0.011 0.011 0.011


Core-1 30 0.03 0.03 0.03
800/1
1S1-1S3 60 0.07 0.07 0.07
90 0.12 0.12 0.12

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1
1S1-1S2

Core-1
1S1-1S3

vi) CT Check List:


SI.
Check Point Remarks
No.
1. All CT quantity, rating, type & make are as per approved ok
drawings.
2. No physical damage to any of the CT. ok
3. Inter-panel wiring from CTs to disconnect or terminal blocks in ok
panel as per approved drawings.
4. CT secondary star point terminals are properly earthed at ok
disconnector terminal blocks.
5. CT wiring ferrules are as per drawing. ok
6. All CT connections are properly tightened. ok

5. Circuitry/ Operational Checks:


SI. Circuit Reference Circuit Checks Operational Checks
No. Local Remote Local Remote
A Tripping of CB ok ok ok ok
B Closing of CB ok ok ok ok
C Breaker position indication ok ok ok ok
D Heater in Switchgear ok ok ok ok
E Incomer and disconnector interlock ok ok ok ok

6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:
Make:
Type :15kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :out going feeder 3
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS
1. Inspect for physical damage or defects. ok
2. Check nameplate information for correctness. ok
3. Inspect enclosures for proper alignment, grounding and vermin ok
proofing.
4. Inspect all covers, panels section and doors for paint work and ok
proper fit.
5. Check for smooth and proper movement of racking mechanisms for ok
alignment, shutters, rollers, rails and guides.
6. Check for proper alignment of the breaker primary and secondary ok
contacts.
7. Check operation of all mechanical interlocks. ok
8. Check tightness of all bolted connections . ok
9. Check main and riser buses for correct phasing. ok
10. Verify that all front panel mounted devices (meters, push buttons, ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.
11. Perform mechanical checks and visual inspection on all circuit ok
breakers.
12. Perform mechanical checks and visual inspection on all current ok
transformers.
13. Perform mechanical checks and visual inspection on all voltage ok
transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS
14 Perform mechanical check and visual inspection on all disconnect ok
and grounding switches.
15. Check for correct breaker position indication. ok
16. Check for correct spring status indication (spring ok
charged/discharged).
17. For SF6 breakers, check the correct gas pressure, quality and ok
leakage where possible.
18. For SF6 breakers, check the operation of the switch (alarm and ok
lockout functions).
19. Perform all specific checks on the breaker and spring operating ok
mechanism according to the manufacture's instructions.
20, Check that all control wiring is correct according to the approved ok
drawing and terminal connections are secure.
21. Check all wiring is correct according to approved drawings. ok
22. Check that all phase marking have been installed per specifications. ok
23. Check that all special tools, devices, etc., as per specification have ok
been provided.

3.Circuit Breaker Test Report:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:


Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs


R CB Close R-E
CB Close R-S
CB Open R-R'
S CB Close S-E
CB Close S-T
CB Open S-S'
T CB Close T-E
CB Close T-R
CB Open T-T'

iii) Mechanical Checks:

Description Remarks
CB rack in / out operation NA
CB rack in / out indications
Manual spring charging operation ok
Spring charged indication ok
Manual ON / OFF operation ok
CB ON/OFF operation ok
Emergency Trip operation ok
Power contact alignment with panel contacts ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks
Spring charging operation time (Sec) ok
Test / Service position switch ok
ON / OFF operation in location / remote ok
Spring charged indication ok
CB ON/OFF indication ok
Lamp indications ok

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:


: Instrument

Description Megger used R-ph S-ph T-ph


Primary to Earth
Primary to Core-1
Primary to Core-2
Primary to Core-3
Core-1 to Earth Since the ct is seald with the CB notable to test
Core-2 to Earth
Core-3 to Earth
Core-1 to Core-2
Core-2 to Core-3
Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph


Core-1 1S1-1S2 1.8 1.8 1.8
1S1-1S3 3.2 3.2 3.2
Core-2 2S1-2S2 1.4 1.4 1.4
2S1-2S3 2.4 2.4 2.4
Core-3 3S1-3S2 1.4 1.4 1.4
3S1-3S3 2.4 2.4 2.4

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph


Core-1 1S1-1S2 ok ok ok
1S1-2S3 ok ok ok
Core-2 2S1-2S2 ok ok ok
2S1-2S3 ok ok ok
Core-3 3S1-3S2 ok ok ok
3S1-3S3 ok ok ok
iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1
1S1-1S2

10 0.011 0.011 0.011


Core-1 30 0.03 0.03 0.03
800/1
1S1-1S3 60 0.07 0.07 0.07
90 0.12 0.12 0.12

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at ok


disconnector terminal blocks.
5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB ok ok ok ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock ok ok ok ok

6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :15kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :out going feeder 4
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.

12. Perform mechanical checks and visual inspection on all current Ok


transformers.

13. Perform mechanical checks and visual inspection on all voltage ok


transformers.
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. ok

23. Check that all special tools, devices, etc., as per specification have ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation ok
Spring charged indication ok
Manual ON / OFF operation ok
CB ON/OFF operation ok
Emergency Trip operation ok
Power contact alignment with panel contacts ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) ok


Test / Service position switch ok
ON / OFF operation in location / remote ok
Spring charged indication ok
CB ON/OFF indication ok
Lamp indications

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the ct is seald with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:


Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 1.8 1.8 1.8

1S1-1S3 3.3 3.3 3.3

Core-2 2S1-2S2 1.4 1.4 1.4

2S1-2S3 2.4 2.4 2.4

Core-3 3S1-3S2 1.4 1.4 1.4

3S1-3S3 2.4 2.4 2.4

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 ok ok ok
Core-3 3S1-3S2 Ok Ok Ok

3S1-3S3 Ok Ok Ok

iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.011 0.011 0.011

Core-1 30 0.03 0.03 0.03


800/1
1S1-1S3 60 0.07 0.07 0.07

90 0.12 0.12 0.12

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Description Ratio Primary Current Measured Secondary Current


Injected (Amps) ( Amps)

R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB ok ok ok ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear ok ok ok ok

E Incomer and disconnector interlock ok ok ok ok


6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :15kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :out going feeder 5
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. ok

10. Verify that all front panel mounted devices (meters, push buttons, ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit ok


breakers.
12. Perform mechanical checks and visual inspection on all current ok
transformers.

13. Perform mechanical checks and visual inspection on all voltage ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect ok


and grounding switches.

15. Check for correct breaker position indication. ok

16. Check for correct spring status indication (spring ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. ok

22. Check that all phase marking have been installed per specifications. ok

23. Check that all special tools, devices, etc., as per specification have ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation ok

Spring charged indication ok

Manual ON / OFF operation ok

CB ON/OFF operation ok

Emergency Trip operation ok

Power contact alignment with panel contacts ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) ok

Test / Service position switch ok

ON / OFF operation in location / remote ok

Spring charged indication ok

CB ON/OFF indication ok

Lamp indications ok
4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 1.8 1.8 1.8

1S1-1S3 3.2 3.2 3.2

Core-2 2S1-2S2 1.4 1.4 1.4

2S1-2S3 2.4 2.4 2.4

Core-3 3S1-3S2 1.4 1.4 1.4

3S1-3S3 2.4 2.4 2.4

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 Ok Ok Ok

Core-3 3S1-3S2 Ok Ok Ok
3S1-3S3 ok ok ok

iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.011 0.011 0.011

Core-1 30 0.03 0.03 0.03


800/1
1S1-1S3 60 0.07 0.07 0.07

90 0.12 0.12 0.12

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Primary Current Measured Secondary Current


Description Ratio
Injected (Amps) ( Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok

6. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :15kV GIS
SI. No.
Year of Manufacture :

Operating Voltage :
Feeder Details :out going feeder 6
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.
5. Check for smooth and proper movement of racking mechanisms for Ok
alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.

12. Perform mechanical checks and visual inspection on all current Ok


transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation Ok
Spring charged indication Ok
Manual ON / OFF operation Ok
CB ON/OFF operation Ok
Emergency Trip operation Ok
Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok


Test / Service position switch Ok
ON / OFF operation in location / remote Ok
Spring charged indication Ok
CB ON/OFF indication Ok
Lamp indications

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:


Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 1.8 1.8 1.8

1S1-1S3 3.3 3.3 3.3

Core-2 2S1-2S2 1.3 1.3 1.3

2S1-2S3 2.4 2.4 2.4

Core-3 3S1-3S2 1.4 1.4 1.4

3S1-3S3 2.4 2.4 2.4

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 Ok Ok Ok
Core-3 3S1-3S2 Ok Ok Ok

3S1-3S3 Ok Ok Ok

iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.011 0.011 0.011

Core-1 30 0.03 0.03 0.03


800/1
1S1-1S3 60 0.07 0.07 0.07

90 0.12 0.12 0.12

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Description Ratio Primary Current Measured Secondary Current


Injected (Amps) ( Amps)

R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok


6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :15kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :

Feeder Details :out going feeder 7


Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for Ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.

12. Perform mechanical checks and visual inspection on all current Ok


transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation Ok
Spring charged indication Ok
Manual ON / OFF operation Ok
CB ON/OFF operation Ok
Emergency Trip operation Ok
Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok


Test / Service position switch Ok
ON / OFF operation in location / remote Ok
Spring charged indication Ok
CB ON/OFF indication Ok
Lamp indications

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:


Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 0.8 0.8 0.8

1S1-1S3 1.3 1.3 1.3

Core-2 2S1-2S2 0.8 0.8 0.8

2S1-2S3 1.3 1.3 1.3

Core-3 3S1-3S2 0.8 0.8 0.8

3S1-3S3 1.3 1.3 1.3

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 Ok Ok Ok
Core-3 3S1-3S2 Ok Ok Ok

3S1-3S3 Ok Ok Ok

iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.025 0.025 0.025

Core-1 30 0.075 0.075 0.075


400/1
1S1-1S3 60 0.15 0.15 0.15

90 0.225 0.225 0.225

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Description Ratio Primary Current Measured Secondary Current


Injected (Amps) ( Amps)

R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok


6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.15
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 58

1.Equipment Details:

Make:
Type :33kV GIS
SI. No
Year of Manufacture :
Operating Voltage :

Feeder Details :in comeing


Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding . Ok

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.
5. Check for smooth and proper movement of racking mechanisms for Ok
alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.

12. Perform mechanical checks and visual inspection on all current Ok


transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Witnessed by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.16
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, and leakage Ok
where possible.

18. For SF6 breakers, check the operation of the gas density switch Ok
(alarm and lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

4. Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.17
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications

Manual spring charging operation Ok


Spring charged indication Ok
Manual ON / OFF operation Ok
CB ON/OFF operation Ok
Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.18
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 4 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok


Test / Service position switch Ok
ON / OFF operation in location / remote Ok
Spring charged indication Ok
CB ON/OFF indication Ok
Lamp indications Ok

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.20
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 6 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 4.7 4.7 4.7

1S1-1S3 9.1 8.9 8.7

Core-2 2S1-2S2 4.7 4.7 4.7

2S1-2S3 8.7 8.7 8.8

Core-3 3S1-3S2 3.5 3.6 3.4

3S1-3S3 6.7 6.8 6.7

Core-4 4S1-4S2 3.5 3.4 3.4

4S1-4S3 6.7 6.7 6.7

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 Ok Ok Ok
Core-3 3S1-3S2 Ok Ok Ok

3S1-3S3 Ok Ok Ok

iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.005 0.005 0.005

Core-1 30 0.015 0.015 0.015


2000/1
1S1-1S3 60 0.03 0.03 0.03

90 0.045 0.045 0.045

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.21
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 7 of 58

v) CT Ratio Test:
Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-2

2S1-2S2

Core-2

2S1-2S3

vi) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-3

3S1-3S2

Core-3

3S1-3S3

vii) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.
4. CT secondary star point terminals are properly earthed at Ok
disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.22
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 8 of 58

5. BUS PT Test Report

PT Serial No.

R-Ph. S-Ph. T-Ph.

i) PT Insulation Resistance Test:

Description Megger R-ph. S-ph T-ph


used

Primary to Earth 5000V

Primary to Core-1 5000V

Primary to Core-2 5000V

Core-1 to Earth 500V

Core-2 to Earth 500V

Core-1 to Core-2 500V


ii) PT Winding Resistance Test:

R S T

1a-1n

2a-2n

Da-dn

iii) PT Polarity Check:

Description Terminal Nos. R-ph. S-ph. T-ph.

Core-1 1a-1n Ok Ok Ok

Core-2 2da-2n Ok Ok Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.23
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 9 of 58

iV) PT Ratio Test:

BB VT LINE VT

Primary Voltage a-n a-n da-n


Injected

R 380 0.66 0.66 1.15

S 380 0.66 0.66 1.15

T 380 0.66 0.66 1.15

v) PT Check List:

SI.
Check Point Remarks
No.

1. All PT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the PT. Ok

3. Inter-panel wiring from PTs to disconnector terminal blocks in Ok


panel as per approved drawings.

4. PT primary neutral terminals are properly earthed. Ok

5. PT wiring ferrules are as per drawing. Ok

6. All PT connections are properly tightened. Ok


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.24
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 10 of 58

6. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok


7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :33kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :

Feeder Details :out going feeder 1


Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for Ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok


10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.

12. Perform mechanical checks and visual inspection on all current Ok


transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation Ok
Spring charged indication Ok
Manual ON / OFF operation Ok
CB ON/OFF operation Ok
Emergency Trip operation Ok
Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok


Test / Service position switch Ok
ON / OFF operation in location / remote Ok
Spring charged indication Ok
CB ON/OFF indication Ok
Lamp indications Ok

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:


Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 1.8 1.9 1.9

1S1-1S3 3.2 3.3 3.3

Core-2 2S1-2S2 1.4 1.4 1.4

2S1-2S3 2.4 2.4 2.4

Core-3 3S1-3S2 1.4 1.4 1.4

3S1-3S3 2.5 2.5 2.5

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok
1S1-2S3 Ok Ok Ok
Core-2 2S1-2S2 Ok Ok Ok
2S1-2S3 Ok Ok Ok
Core-3 3S1-3S2 Ok Ok Ok
3S1-3S3 Ok Ok Ok
iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.01 0.01 0.01

Core-1 30 0.037 0.037 0.037


800/1
1S1-1S3 60 0.075 0.075 0.075

90 0.11 0.11 0.11

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:
Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok


6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :33kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :out going feeder 2
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for Ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.
12. Perform mechanical checks and visual inspection on all current Ok
transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation Ok
Spring charged indication Ok
Manual ON / OFF operation Ok
CB ON/OFF operation Ok
Emergency Trip operation Ok
Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok


Test / Service position switch Ok
ON / OFF operation in location / remote Ok
Spring charged indication Ok
CB ON/OFF indication Ok
Lamp indications

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:


Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 1.8 1.8 1.8

1S1-1S3 3.2 3.2 3.2

Core-2 2S1-2S2 1.4 1.4 1.3

2S1-2S3 2.4 2.4 2.4

Core-3 3S1-3S2 1.4 1.4 1.4

3S1-3S3 2.4 2.5 2.5

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 Ok Ok Ok
Core-3 3S1-3S2 Ok Ok Ok

3S1-3S3 Ok Ok Ok

iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.01 0.01 0.01

Core-1 30 0.037 0.037 0.037


800/1
1S1-1S3 60 0.075 0.075 0.075

90 0.11 0.11 0.11

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Description Ratio Primary Current Measured Secondary Current


Injected (Amps) ( Amps)

R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok


6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :33kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :out going feeder 3
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for Ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.
12. Perform mechanical checks and visual inspection on all current Ok
transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation Ok

Spring charged indication Ok

Manual ON / OFF operation Ok

CB ON/OFF operation Ok

Emergency Trip operation Ok

Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok

Test / Service position switch Ok

ON / OFF operation in location / remote Ok

Spring charged indication Ok

CB ON/OFF indication Ok

Lamp indications Ok
4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 1.8 1.7 1.8

1S1-1S3 3.2 3.3 3.3

Core-2 2S1-2S2 1.4 1.4 1.4

2S1-2S3 2.5 2.5 2.4

Core-3 3S1-3S2 1.4 1.4 1.4

3S1-3S3 2.4 2.4 2.4

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 Ok Ok Ok

Core-3 3S1-3S2 Ok Ok Ok

3S1-3S3 Ok Ok Ok

iv) CT Ratio Test:


Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.01 0.01 0.01

Core-1 30 0.037 0.037 0.037


800/1
1S1-1S3 60 0.075 0.075 0.075

90 0.11 0.11 0.11

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2
Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok

6. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :33kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :out going feeder 4
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for Ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.

12. Perform mechanical checks and visual inspection on all current Ok


transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation Ok

Spring charged indication Ok

Manual ON / OFF operation Ok

CB ON/OFF operation Ok

Emergency Trip operation Ok

Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok

Test / Service position switch Ok

ON / OFF operation in location / remote Ok

Spring charged indication Ok

CB ON/OFF indication Ok

Lamp indications Ok
4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 1.8 1.8 1.8

1S1-1S3 3.3 3.3 3.3

Core-2 2S1-2S2 1.4 1.4 1.4

2S1-2S3 2.4 2.5 2.5

Core-3 3S1-3S2 1.4 1.4 1.4

3S1-3S3 2.4 2.5 2.5

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 Ok Ok Ok

Core-3 3S1-3S2 Ok Ok Ok

3S1-3S3 Ok Ok Ok

iv) CT Ratio Test:


Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2
Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok

6. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :33kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :out going feeder 5
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.

4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for Ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.
12. Perform mechanical checks and visual inspection on all current Ok
transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation Ok
Spring charged indication Ok
Manual ON / OFF operation Ok
CB ON/OFF operation Ok
Emergency Trip operation Ok
Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok


Test / Service position switch Ok
ON / OFF operation in location / remote Ok
Spring charged indication Ok
CB ON/OFF indication Ok
Lamp indications

4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:


Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 1.8 1.8 1.8

1S1-1S3 3.3 3.3 3.3

Core-2 2S1-2S2 1.4 1.4 1.4

2S1-2S3 2.5 2.5 2.5

Core-3 3S1-3S2 1.4 1.4 1.4

3S1-3S3 2.5 2.5 2.4

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok
1S1-2S3 Ok Ok Ok
Core-2 2S1-2S2 Ok Ok Ok
2S1-2S3 Ok Ok Ok
Core-3 3S1-3S2 Ok Ok Ok
3S1-3S3 Ok Ok Ok
iv) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

10 0.01 0.01 0.01

Core-1 30 0.037 0.037 0.037


800/1
1S1-1S3 60 0.075 0.075 0.075

90 0.11 0.11 0.11

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:
Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok


6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.25
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 11 of 58

1.Equipment Details:

Make:
Type :33kV GIS
SI. No.
Year of Manufacture :
Operating Voltage :
Feeder Details :out going feeder 6
Control Voltage :

2.General Inspection:

SN DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check nameplate information for correctness. Ok

3. Inspect enclosures for proper alignment, grounding and vermin Ok


proofing.
4. Inspect all covers, panels section and doors for paint work and Ok
proper fit.

5. Check for smooth and proper movement of racking mechanisms for Ok


alignment, shutters, rollers, rails and guides.

6. Check for proper alignment of the breaker primary and secondary Ok


contacts.

7. Check operation of all mechanical interlocks. Ok

8. Check tightness of all bolted connections . Ok

9. Check main and riser buses for correct phasing. Ok

10. Verify that all front panel mounted devices (meters, push buttons, Ok
switches, indicator lamps, mimic buses, etc.) are installed as per
drawings.

11. Perform mechanical checks and visual inspection on all circuit Ok


breakers.

12. Perform mechanical checks and visual inspection on all current Ok


transformers.

13. Perform mechanical checks and visual inspection on all voltage Ok


transformers.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.26
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 12 of 58

SN DESCRIPTION REMARKS

14 Perform mechanical check and visual inspection on all disconnect Ok


and grounding switches.

15. Check for correct breaker position indication. Ok

16. Check for correct spring status indication (spring Ok


charged/discharged).

17. For SF6 breakers, check the correct gas pressure, quality and Ok
leakage where possible.

18. For SF6 breakers, check the operation of the switch (alarm and Ok
lockout functions).

19. Perform all specific checks on the breaker and spring operating Ok
mechanism according to the manufacture's instructions.

20, Check that all control wiring is correct according to the approved Ok
drawing and terminal connections are secure.

21. Check all wiring is correct according to approved drawings. Ok

22. Check that all phase marking have been installed per specifications. Ok

23. Check that all special tools, devices, etc., as per specification have Ok
been provided.

3.Circuit Breaker Test Report:


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.27
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 13 of 58

i) Insulation Resistance Test:

Instrument Details Megger MEGGER USED

Phase Measured Between Insulation Resistance in MOs

R CB Close R-E

CB Close R-S

CB Open R-R'

S CB Close S-E

CB Close S-T

CB Open S-S'

T CB Close T-E

CB Close T-R

CB Open T-T'

iii) Mechanical Checks:

Description Remarks

CB rack in / out operation NA


CB rack in / out indications
Manual spring charging operation Ok

Spring charged indication Ok

Manual ON / OFF operation Ok

CB ON/OFF operation Ok

Emergency Trip operation Ok

Power contact alignment with panel contacts Ok

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.28
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 14 of 58

iv) Electrical Checks:

Description Remarks

Spring charging operation time (Sec) Ok

Test / Service position switch Ok

ON / OFF operation in location / remote Ok

Spring charged indication Ok

CB ON/OFF indication Ok

Lamp indications Ok
4. Metering / Protection CT Test Report:

i) CT Insulation Resistance Test:

Instrument Details Megger MEGGER USED Instrument Details Megger Make:

: Instrument

Description Megger used R-ph S-ph T-ph

Primary to Earth

Primary to Core-1

Primary to Core-2

Primary to Core-3

Core-1 to Earth
Since the CT is sealed with the CB notable to test
Core-2 to Earth

Core-3 to Earth

Core-1 to Core-2

Core-2 to Core-3

Core-3 to Core-1

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR METAL CLAD SWITCHGEAR
DATE:
Page No.30
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 16 of 58

ii) CT Secondary Winding Resistance Measurement:

Instrument Details multimeter Make Rish14s

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 0.8 0.8 0.8

1S1-1S3 1.3 1.3 1.3

Core-2 2S1-2S2 0.9 0.9 0.9

2S1-2S3 1.3 1.3 1.3

Core-3 3S1-3S2 0.9 0.9 0.9

3S1-3S3 1.5 1.5 1.5

iii) CT Polarity Check:

Description Terminal Nos. R-ph S-ph T-ph

Core-1 1S1-1S2 Ok Ok Ok

1S1-2S3 Ok Ok Ok

Core-2 2S1-2S2 Ok Ok Ok

2S1-2S3 Ok Ok Ok

Core-3 3S1-3S2 Ok Ok Ok

3S1-3S3 Ok Ok Ok

iv) CT Ratio Test:


Measured Secondary Current
Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2

Core-1

1S1-1S3

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR METAL CLAD SWITCHGEAR


DATE:
Page No.32
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 18 of 58

v) CT Ratio Test:

Measured Secondary Current


Primary Current
Description Ratio ( Amps)
Injected (Amps)
R-Ph S-Ph T-Ph

Core-1

1S1-1S2
Core-1

1S1-1S3

vi) CT Check List:

SI.
Check Point Remarks
No.

1. All CT quantity, rating, type & make are as per approved Ok


drawings.

2. No physical damage to any of the CT. Ok

3. Inter-panel wiring from CTs to disconnect or terminal blocks in Ok


panel as per approved drawings.

4. CT secondary star point terminals are properly earthed at Ok


disconnector terminal blocks.

5. CT wiring ferrules are as per drawing. Ok

6. All CT connections are properly tightened. Ok

5. Circuitry/ Operational Checks:

SI. Circuit Reference Circuit Checks Operational Checks

No. Local Remote Local Remote

A Tripping of CB Ok Ok Ok Ok

B Closing of CB Ok Ok Ok Ok

C Breaker position indication Ok Ok Ok Ok

D Heater in Switchgear Ok Ok Ok Ok

E Incomer and disconnector interlock Ok Ok Ok Ok

6. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

5. DIFF PROTECTION TEST


TEST REPORT FOR DIFF PROTECTION TEST
DATE:
Page No.74
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 22


1. Equipment Details:

Make :
Model :
SI. No. :

2. General Inspection:

3. a. HV Side Diff Trip (1PH):

CT= 800/1

Phase Setting Current Injected Current Operated Current Operated time(s)


(pu) (A) Id(pu)

R ph 0.2 0.079 0.504 0078 ms

Sph 0.2 0.079 0.504 0078ms

T ph 0.2 0.079 0.0503 0078ms

4. b. MV Side Diff Trip (1PH):

CT=2000/1

Phase Setting Current Injected Current Operated Current Operated time(s)


(pu) (A) Id(pu)
R ph 0.2 0.099 0.199 0022 ms

Sph 0.2 0.099 0.201 0022 ms

T ph 0.2 0.099 0.200 0022 ms

5. C. LV Side Diff Trip (1PH):

CT= 2500/1

Phase Setting Current Injected Current Operated Current Operated time(s)


(pu) (A) Id(pu)

R ph 0.2 0.145 0.189 0029 ms

Sph 0.2 0.145 0.189 0029ms

T ph 0.2 0.145 0.189 0029 ms


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR DIFF PROTECTION TEST


DATE:
Page No.74
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 22

5. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. NO. DESCRIPTION REMARKS

1 Wiring checks Ok

2 Correct operation of appropriate indicator / aux. relay Ok


3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok

5 Relay cover properly fixing Ok

6 Correct operating reset switch Ok


7 Relay Draw out conditions CT shorting link should be Ok
short

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


6.OVERCURRENT &
EARTH-FAULT
PROTECTION TEST
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:230kVincomer feeder

3. General Inspection:

6. a. phase IO/C HIG-1(50):


CT Ratio 800/1
I>0.179 A
Time Delay: 1.5 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.17 0.17 136 1504 ms
Sph 0.17 0.17 136 1504 ms
T ph 0.17 0.17 136 1504 ms

b. Phase TOC High-1 ( 51):


curve:DMT
I> 2A
Time Delay: 3 sec

Phase Setting Current TMS


(A) Opt current(A) Opt time(s)

R ph 2 3 sec 1600 3006 ms


Sph 2 3 sec 1600 3006 ms
T ph 2 3 sec 1600 3006 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 1A


Time Delay: 2.5 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 1A 1A 799 2505 ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)


SL. DESCRIPTION REMARKS
NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:15kVincomer feeder

3. General Inspection:

CT Ratio 2500/1

4. a. DMT O/C Test (I>): 0.75 A


Time Delay: 1.5 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.75 0.75 1970 mA 1542 m
Sph 0.75 0.5 1970 mA 1542 ms
T ph 0.5 0.75 1970 mA 1542 ms

b. DMT O/C Test (I>> ): 0.48

Time Delay: 1.5 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.48 0.48 1197 mA 1540 ms
Sph 0.49 0.48 1197 mA 1540 ms
T ph 0.49 0.48 1197 mA 1540 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT: MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT E/F Test ( Io> ) :


Time Delay:

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph
Sph
T ph

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)


SL. DESCRIPTION REMARKS
NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

Earthling Transformer
ET Neutral CT Ratio 400/1
Setting current = 0.15
to= 1 sec
3Io EXT= 60A

7. Remarks:

Tested by: Witnessed by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:15kVoutgoing feeder 1

3. General Inspection:
CT Ratio 800/1A

4. a. DMT O/C Test (I>): 1A


Time Delay: 1.2 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 1A 1A 1A 1206 ms
Sph 1A 1A 0.9 1206 ms
T ph 1A 1A 1A 1206 ms

b. DMT O/C Test (I>> ): 1A

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 1A 1A 1A 56 ms
Sph 1A 1A 0.9 56 ms
T ph 1A 1A 1A 56 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05 A


Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.05A 0.05A 0049mA 0052 ms
S ph 0.05A 0 0 0052 ms
T ph 0.05A 0.05A 0049mA 0052 ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)


SL. DESCRIPTION REMARKS
NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.
2. Location and Feeder Name:15kVoutgoing feeder 2
3. General Inspection:
CT Ratio 800/1A

4. a. DMT O/C Test (I>): 1A


Time Delay: 1.2 sec

Phas Setting Injected Operated Operated time(s)


e Current (A) Current (A) Current (A)
R ph 1A 1A 1A 1206 ms
Sph 1A 1A 0.9 1206 ms
T ph 1A 1A 1A 1206 ms

b. DMT O/C Test (I>> ): 1A

Time Delay: 0.05 sec

Phas Setting Injected Operated Operated time(s)


e Current (A) Current (A) Current (A)
R ph 1A 1A 1A 56 ms
Sph 1A 1A 0.9 56 ms
T ph 1A 1A 1A 56 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05 A


Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.05A 0.05A 0049mA 0052 ms
S ph 0.05A 0 0 0052 ms
T ph 0.05A 0.05A 0049mA 0052 ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)


SL. DESCRIPTION REMARKS
NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:15kVoutgoing feeder 3


3. General Inspection:
CT Ratio 800/1A
4. DMT O/C Test (I>): 1A
Time Delay: 1.2 sec

Phase Setting Current Injected Operated Current Operated time(s)


(A) Current (A) (A)

R ph 1A 1A 1A 1206 ms
Sph 1A 1A 0.9 1206 ms
T ph 1A 1A 1A 1206 ms

b. DMT O/C Test (I>> ): 1A


Time Delay: 0.05 sec

Phase Setting Current Injected Operated Current Operated time(s)


(A) Current (A) (A)

R ph 1A 1A 1A 56 ms
Sph 1A 1A 0.9 56 ms
T ph 1A 1A 1A 56 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05 A


Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.05A 0.05A 0049mA 0052 ms
S ph 0.05A 0 0 0052 ms
T ph 0.05A 0.05A 0049mA 0052 ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.
2. Location and Feeder Name:15kVoutgoing feeder 4
3. General Inspection:
CT Ratio 800/1A
4. DMT O/C Test (I>): 1A
Time Delay: 1.2 sec
Phase Setting Current Injected Operated Current Operated time(s)
(A) Current (A) (A)
R ph 1A 1A 1A 1206 ms
Sph 1A 1A 0.9 1206 ms
T ph 1A 1A 1A 1206 ms

b. DMT O/C Test (I>> ): 1A


Time Delay: 0.05 sec

Phase Setting Current Injected Operated Current Operated time(s)


(A) Current (A) (A)
R ph 1A 1A 1A 56 ms
Sph 1A 1A 0.9 56 ms
T ph 1A 1A 1A 56 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22
5. a. DMT REF Test ( Io> ) : 0.05 A
Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.05A 0.05A 0049mA 0052 ms
S ph 0.05A 0 0 0052 ms
T ph 0.05A 0.05A 0049mA 0052 ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:15kVoutgoing feeder 5


3. General Inspection:
CT Ratio 800/1A
4. DMT O/C Test (I>): 1A
Time Delay: 1.2 sec
Phase Setting Current Injected Operated Current Operated time(s)
(A) Current (A) (A)
R ph 1A 1A 1A 1206 ms
Sph 1A 1A 0.9 1206 ms
T ph 1A 1A 1A 1206 ms

b. DMT O/C Test (I>> ): 1A


Time Delay: 0.05 sec

Phase Setting Current Injected Operated Current Operated time(s)


(A) Current (A) (A)
R ph 1A 1A 1A 56 ms
Sph 1A 1A 0.9 56 ms
T ph 1A 1A 1A 56 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22
5. a. DMT REF Test ( Io> ) : 0.05 A
Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.05A 0.05A 0049mA 0052 ms
S ph 0.05A 0 0 0052 ms
T ph 0.05A 0.05A 0049mA 0052 ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:15kVoutgoing feeder 6


3. General Inspection:
CT Ratio 800/1A
4. DMT O/C Test (I>): 1A
Time Delay: 1.2 sec
Phase Setting Current Injected Operated Current Operated time(s)
(A) Current (A) (A)
R ph 1A 1A 1A 1206 ms
Sph 1A 1A 0.9 1206 ms
T ph 1A 1A 1A 1206 ms

b. DMT O/C Test (I>> ): 1A


Time Delay: 0.05 sec

Phase Setting Current Injected Operated Current Operated time(s)


(A) Current (A) (A)
R ph 1A 1A 1A 56 ms
Sph 1A 1A 0.9 56 ms
T ph 1A 1A 1A 56 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05 A


Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.05A 0.05A 0049mA 0052 ms
S ph 0.05A 0 0 0052 ms
T ph 0.05A 0.05A 0049mA 0052 ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:15kVoutgoing feeder 7 Auxiliary transformer

3. General Inspection:
CT Ratio 400/1A
4. DMT O/C Test (I>): 1A
Time Delay: 1.2 sec
Phase Setting Current Injected Operated Current Operated time(s)
(A) Current (A) (A)
R ph 1A 1A 1A 1206 ms
Sph 1A 1A 0.9 1206 ms
T ph 1A 1A 1A 1206 ms

b. DMT O/C Test (I>> ): 1A


Time Delay: 0.05 sec

Phase Setting Current Injected Operated Current Operated time(s)


(A) Current (A) (A)
R ph 1A 1A 1A 56 ms
Sph 1A 1A 0.9 56 ms
T ph 1A 1A 1A 56 ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05 A


Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.05A 0.05A 0049mA 0052 ms
S ph 0.05A 0 0 0052 ms
T ph 0.05A 0.05A 0049mA 0052 ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:
Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:33kVincomer feeder

3. General Inspection:

CT Ratio 2000/1

4. a. DMT O/C Test (I>): 0.45 A


Time Delay: 1.5 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph 0.45 0.45 896 A 1504ms
Sph 0.45 0.45 896 A 1504ms
T ph 0.45 0.45 896 A 1504ms

b. DMT O/C Test (I>> ): 0.6

Time Delay: 1.5 sec


Phase Setting Current Injected Current Operated Current Operated time(s)
(A) (A) (A)
R ph 0.6 0.6 1196 1504ms
Sph 0.6 0.6 1196 1504ms
T ph 0.6 0.6 1196 1504ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:


Signature Signature Signature Signature
& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)
PROJECT: MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT E/F Test ( Io> ) :


Time Delay:

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)
R ph
Sph
T ph

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.
1 Wiring checks Ok
2 Correct operation of appropriate indicator / aux. relay Ok
3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok
5 Relay cover properly fixing Ok
6 Correct operating reset switch Ok
7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:

Tested by: Witnessed by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature


& Date & Date & Date & Date
TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:

Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:33kVoutgoing feeder 1

CT Ratio 800/1

3. General Inspection:

4. a. DMT O/C Test (I>): 1

Time Delay: 1.2 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 0.98 1227ms

Sph 1 1 0.98 1227ms

T ph 1 1 0.98 1227ms

b. DMT O/C Test (I>> ): 1

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 0.98 54ms

Sph 1 1 0.98 54ms

T ph 1 1 0.98 54ms
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05

Time Delay: 0.01

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 0.05 0 0 117ms

S ph 0.05 0 0 117ms

T ph 0.05 0.05 0.05 117ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.

1 Wiring checks Ok

2 Correct operation of appropriate indicator / aux. relay Ok


3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok

5 Relay cover properly fixing Ok

6 Correct operating reset switch Ok


7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:

Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:33kVoutgoing feeder 2

CT RATIO 800/1

3. General Inspection:

4. a. DMT O/C Test (I>): 1

Time Delay: 1.2 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 1 1216ms

Sph 1 1 0.9 1216ms

T ph 1 1 1 1216ms

b. DMT O/C Test (I>> ): 1

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 0.9 60ms

Sph 1 1 0.9 60ms

T ph 1 1 1 60ms
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 0.05 0 0 51ms

S ph 0.05 0.05 0.05 51ms

T ph 0.05 0 0 51ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.

1 Wiring checks Ok

2 Correct operation of appropriate indicator / aux. relay ok


3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok

5 Relay cover properly fixing Ok

6 Correct operating reset switch Ok


7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:

Make :
Model :
SI. No.
CT Sec.

2. Location and Feeder Name:33kVoutgoing feeder 3

CT RATIO 800/1

3. General Inspection:

4. a. DMT O/C Test (I>): 1

Time Delay: 1.2 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 1 1173ms

Sph 1 1 0.9 1173ms

T ph 1 1 0.9 1173ms

b. DMT O/C Test (I>> ): 1A

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 0.99 54ms

Sph 1 1 0.99 54ms

T ph 1 1 0.99 54ms
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05

Time Delay: 0.05

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 0.05 0.05 0.05 54ms

S ph 0.05 0 0 54ms

T ph 0.05 0 0 54ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.

1 Wiring checks Ok

2 Correct operation of appropriate indicator / aux. relay Ok


3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok

5 Relay cover properly fixing Ok

6 Correct operating reset switch Ok


7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY


DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:

Make :
Model :

SI. No.
CT Sec.

2. Location and Feeder Name:33kVoutgoing feeder 4

CT RATIO 800/1

3. General Inspection:
4. a. DMT O/C Test (I>): 1

Time Delay: 1.2sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 1 1205ms

Sph 1 1 1 1205ms

T ph 1 1 1 1205ms

b. DMT O/C Test (I>> ): 1A

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 0.99 56ms

Sph 1 1 0.9 56ms

T ph 1 1 0.99 56ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05

Time Delay: 0.05

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 0.05 0.05 0.053 54ms

S ph 0.05 0.05 0.053 54ms

T ph 0.05 0.05 0.053 54ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.

1 Wiring checks Ok

2 Correct operation of appropriate indicator / aux. relay Ok


3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok

5 Relay cover properly fixing Ok

6 Correct operating reset switch Ok


7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY


DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:

Make :
Model :

SI. No.
CT Sec.

2. Location and Feeder Name:33kVoutgoing feeder 5

3. General Inspection:
4. a. DMT O/C Test (I>): 1

Time Delay: 1.2 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 1 1210ms

Sph 1 1 0.99 1210ms

T ph 1 1 0.99 1210ms

b. DMT O/C Test (I>> ): 1A

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 1 58ms

Sph 1 1 0.99 58ms

T ph 1 1 0.99 58ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05

Time Delay: 0.05

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 0.05 0 0 57ms

S ph 0.05 0.05 0.049 57ms

T ph 0.05 0 0 57ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.

1 Wiring checks Ok

2 Correct operation of appropriate indicator / aux. relay Ok


3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok

5 Relay cover properly fixing Ok

6 Correct operating reset switch Ok


7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY


DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:

Make :
Model :

SI. No.
CT Sec.

2. Location and Feeder Name:33kVoutgoing feeder 6

3. General Inspection:
4. a. DMT O/C Test (I>): 1

Time Delay: 1.2 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 1 1204ms

Sph 1 1 0.99 1204ms

T ph 1 1 0.99 1204ms

b. DMT O/C Test (I>> ): 1A

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 1 54ms

Sph 1 1 0.99 54ms

T ph 1 1 0.99 54ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05

Time Delay: 0.05

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 0.05 0 0 66ms

S ph 0.05 0 0 66ms

T ph 0.05 0.05 0.05 66ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.

1 Wiring checks Ok

2 Correct operation of appropriate indicator / aux. relay Ok


3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok

5 Relay cover properly fixing Ok

6 Correct operating reset switch Ok


7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY


DATE:
Page No.75
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 22

1. Equipment Details:

Make :
Model :

SI. No.
CT Sec.

2. Location and Feeder Name:33kVoutgoing feeder 7 Auxiliary Transformer

CT RATIO 400/1

3. General Inspection:
4. a. DMT O/C Test (I>): 1A

Time Delay: 1.2 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 0.09 1338ms

Sph 1 1 0.09 1338ms

T ph 1 1 0.09 1338ms

b. DMT O/C Test (I>> ): 1

Time Delay: 0.05 sec

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 1 1 0.09 55ms

Sph 1 1 0.09 55ms

T ph 1 1 0.09 55ms

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR OVERCURRENT & EARTH-FAULT RELAY
DATE:
Page No.76
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 22

5. a. DMT REF Test ( Io> ) : 0.05

Time Delay: 0.05 A

Phase Setting Current Injected Current Operated Current Operated time(s)


(A) (A) (A)

R ph 0.05 0.050 0.05 0051ms

S ph 0.05 0 0 0051ms

T ph 0.05 0 0 0051ms

6. Functional checks : (Whether Operational Checks OK / Not OK / Not Available)

SL. DESCRIPTION REMARKS


NO.

1 Wiring checks Ok

2 Correct operation of appropriate indicator / aux. relay Ok


3 Correct initiation of alarm contacts Ok
4 Correct circuit breaker tripping contacts Ok

5 Relay cover properly fixing Ok

6 Correct operating reset switch Ok


7 Relay Draw out conditions CT shorting link should be short Ok

7. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


7. SURGE ARRESTOR
TEST REPORT FOR SURGE ARRESTOR
DATE:
Page No.96
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 7

1. Equipment Details:

Make :
Type :
SI. No. : R-ph : S-ph : T-ph :
Voltage Rating :
Year of Manufacture :

2. Location and Feeder Name: 230kV side Surge arresster

3. General Checks:

SL. NO. DESCRIPTION REMARKS

1. Equipment’s is free from Dirt / Dust foreign Materials Ok

2. Check name plate information for correctness Ok


3. Equipment is free from all visible defects on physical inspection Ok
4. Support structures & Surge counter has been provided with Ok
Earth

5. All insulators & surge counter are free from any physical defects Ok
6. Check one end of surge counter Is connected to the bottom of Ok
LA stack and one end of surge counter has been Earth

7. For multi-unit stack check that the physical arrangement of the Ok


units are erected according to the manufacturer's specification.

8. Check tightness of all bolted connections. Ok

4. Insulation resistance Measurement:

TIME:1MIN

SN Description R-ph S-ph T-ph


1. 1st Stack & Earth 9.99 GΩ 9.99 GΩ 9.99 GΩ

5. Surge Counter Reading:

SN Reading RS-Phase S-Phase T-Phase

1 Counter Reading ok ok ok

6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


8. POWER CABLE
TEST REPORT FOR POWER CABLE
DATE:
Page No.103
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 4

1. Equipment Details:

Rated Voltage :15kv


Cable Size :

2. Location and Feeder Name: 15KV Panel/ Incomer Feeder

3. General Inspection:

SL. NO. DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check for proper cable support, clamping, trays, blocking. Ok


3. Verify all cable connections as per approved drawing. Ok
4. Verify that all cables and cores are labeled correctly. Ok
5. Check tightness of terminals and confirm the cables Ok
are secured.

6. Check that all cable trays are secure and correctly grounded. Ok
7. Check cable entry path trench as ducts are to be properly Ok
sealed.

8. Visual Insulation, size and rating confirmation. Ok


9. Check cable size against rating required. Ok

4. Insulation Resistance Test for Before High Voltage Test: (For 1 Min)
Connection R-E S-E T-E

Resistance >10GΩ >10GΩ >10GΩ

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR POWER CABLE
DATE:
Page No.104
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 4

5. General Checks:

1 Check Cable Proper clearance , Ok


Check Cable Earthed or Unearthed, When Earthed
2 Ok
Cable Should be Earthed

3 Cable End Lugs Properly Crimped Ok

4 After Hi Pot Test Terminals Tightness to be checked Ok


6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR POWER CABLE


DATE:
Page No.105
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 4

1. Equipment Details:

Rated Voltage :15kv


Cable Size

2. Location and Feeder Name: 15KV Panel/ Outgoing Feeder


3. General Inspection:

SL. NO. DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check for proper cable support, clamping, trays, blocking. Ok


3. Verify all cable connections as per approved drawing. Ok
4. Verify that all cables and cores are labeled correctly. Ok
5. Check tightness of terminals and confirm the cables Ok
are secured.

6. Check that all cable trays are secure and correctly grounded. Ok
7. Check cable entry path trench as ducts are to be properly Ok
sealed.

8. Visual Insulation, size and rating confirmation. Ok


9. Check cable size against rating required. Ok

4. Insulation Resistance Test for Before High Voltage Test: (For 1 Min)

Connection R-E S-E T-E

Resistance >10GΩ >10GΩ >10GΩ

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR POWER CABLE
DATE:
Page No.106
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 4 of 4

5. Insulation Resistance Test for After High Voltage Test: (For 1 Min)

Connection R-E S-E T-E

Resistance >10GΩ >10GΩ >10GΩ

6. General Checks:

1 Check Cable Proper clearance , Ok


Check Cable Earthed or Unearthed, When Earthed
2 Ok
Cable Should be Earthed

3 Cable End Lugs Properly Crimped Ok

4 After Hi Pot Test Terminals Tightness to be checked Ok


7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR POWER CABLE
DATE:
Page No.103
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 4

4. Equipment Details:

Rated Voltage :33kv


Cable Size :

5. Location and Feeder Name: 33KV Panel/ Incomer Feeder

6. General Inspection:

SL. NO. DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check for proper cable support, clamping, trays, blocking. Ok


3. Verify all cable connections as per approved drawing. Ok
4. Verify that all cables and cores are labeled correctly. Ok
5. Check tightness of terminals and confirm the cables Ok
are secured.

6. Check that all cable trays are secure and correctly grounded. Ok
7. Check cable entry path trench as ducts are to be properly Ok
sealed.

8. Visual Insulation, size and rating confirmation. Ok


9. Check cable size against rating required. Ok

4. Insulation Resistance Test for Before High Voltage Test: (For 1 Min)
Connection R-E S-E T-E

Resistance >10GΩ >10GΩ >10GΩ

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR POWER CABLE
DATE:
Page No.104
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 2 of 4

5. General Checks:

1 Check Cable Proper clearance , Ok


Check Cable Earthed or Unearthed, When Earthed
2 Ok
Cable Should be Earthed

3 Cable End Lugs Properly Crimped Ok

4 After Hi Pot Test Terminals Tightness to be checked Ok


6. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR POWER CABLE


DATE:
Page No.105
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 3 of 4

4. Equipment Details:

Rated Voltage :33kv


Cable Size

5. Location and Feeder Name: 33KV Panel/ Outgoing Feeder


6. General Inspection:

SL. NO. DESCRIPTION REMARKS

1. Inspect for physical damage or defects. Ok

2. Check for proper cable support, clamping, trays, blocking. Ok


3. Verify all cable connections as per approved drawing. Ok
4. Verify that all cables and cores are labeled correctly. Ok
5. Check tightness of terminals and confirm the cables Ok
are secured.

6. Check that all cable trays are secure and correctly grounded. Ok
7. Check cable entry path trench as ducts are to be properly Ok
sealed.

8. Visual Insulation, size and rating confirmation. Ok


9. Check cable size against rating required. Ok

4. Insulation Resistance Test for Before High Voltage Test: (For 1 Min)

Connection R-E S-E T-E

Resistance >10GΩ >10GΩ >10GΩ

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR POWER CABLE
DATE:
Page No.106
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 4 of 4

5. Insulation Resistance Test for After High Voltage Test: (For 1 Min)

Connection R-E S-E T-E

Resistance >10GΩ >10GΩ >10GΩ

6. General Checks:

1 Check Cable Proper clearance , Ok


Check Cable Earthed or Unearthed, When Earthed
2 Ok
Cable Should be Earthed

3 Cable End Lugs Properly Crimped Ok

4 After Hi Pot Test Terminals Tightness to be checked Ok


7. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


9.EARTHING TRANSFORMER
TEST REPORT FOR EARTHING TRANSFORMER
DATE:
Page No.117
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 1

1. Equipment Details:

Make:
KVA:
SR. no:
Rated Voltage

Vector group:

2. Location and Feeder Name: 15KV Earthing Transformer

3. Insulation Resistance Test:

Connection Voltage used Measured IR value(GΩ)


for megger

HV-E 5KV R S T N

R15 R60 R15 R60 R15 R60 R15 R60

>10G >10GΩ >10G >10G >10G >10G >10G >10G


Ω Ω Ω Ω Ω Ω Ω
4. Winding Resistance:

B/W Measured B/W Measured


Resistances Resistances

RS 11.4 R-N 6.7

ST 11.4 S-N 6.7

TR 11.4 T-N 6.7

rs 0.4

st 0.4

tr 0.4

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR EARTHING TRANSFORMER

DATE:
Page No.117
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 1

Commented [E1]:
6.Ratio test

supply LVside

R S T r s t

380 380 380 10.2 10.2 10.2

rn sn tn

6.1 6.1 6.

7.Remarks: The 15kv Earthing Transformer is fit for commissioning.

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


TEST REPORT FOR EARTHING TRANSFORMER
DATE:
Page No.117
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 1

3. Equipment Details:

Make:
KVA:
SR. no:
Rated Voltage
Vector group:

4. Location and Feeder Name: 33KV Feeder side

3. Insulation Resistance Test:

Connection Voltage used Measured IR value(GΩ)


for megger

HV-E 5KV R S T N

R15 R60 R15 R60 R15 R60 R15 R60

>10G >10GΩ >10G >10G >10G >10G >10G >10G


Ω Ω Ω Ω Ω Ω Ω

4. Winding Resistance:

B/W Measured B/W Measured


Resistances Resistances

RS 44 R-N 22.3
ST 44 S-N 22.3

TR 44 T-N 22.3

rs 0.3

st 0.3

tr 0.3

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR EARTHING TRANSFORMER

DATE:
Page No.117
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 1

5. OIL SAMPLE MAIN TRANSFORMER

1. BOT OIL SAMPLE

NO BOT OIL SAMPLE

1 kV

2 kV

3 kV
4 kV

5 kV

TOTAL AVERAGE kV

7.Ratio test

supply LVside

RS ST RT rs st tr

380 380 380 4.7 4.7 4.7

rn sn tn

2.71 2.71 2.71

7.Remarks: The 33kv Earthing Transformer is fit for commissioning.

Tested by: Tested by: Witnessed by: Witnessed by:


Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date


10.CVT

TEST REPORT FOR CVT


DATE:
Page No.117
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 1


1. Equipment Details:

Make :
Type :
SI. No. : R-ph : S-ph : T-ph :
Voltage Rating :230KV
Year of Manufacture :2016

2. Insulation Resistance Test:

Ref Voltage used R ph S ph T ph


for megger

Primary-COER 10KV 215 G 215 G 215 G

Primary – Earth 10Kv >10 T >10 T >12 T

3.Winding Resistance:

R(Ω) S(Ω) T(Ω)

1a-1n 0.3 0.3 0.3

2a-2n 0.4 0.4 0.3

da-dn 0.4 0.4 0.4

4. Remarks: The CVT is fit for commissioning.


Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

11.AC POWER
TEST REPORT FOR AC POWER
DATE:
Page No.117
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 1

1.Equipment Details:

Make :

Voltage Rating :
Year of Manufacture :

2. AC POWER cheeck

Inco voltag bettry voltage bettry voltage bettry voltage


mein e
g

1 110V 1 2.281 19 2.21 37 2.26

2 110V 2 2.24 20 2.21 38 2.34

3 110V 3 2.24 21 2.21 39 2.24

4 110V 4 2.24 22 2.22 40 2.24

5 2.31 23 2.23 41 2.22

6 2.23 24 2.24 42 2.31

7 2.41 25 2.19 43 2.26

8 2.26 26 2.27 44 2.24

9 2.20 27 2.19 45 2.24

10 2.21 28 2.19 46 2.24

11 2.23 29 2.19 47 2.21

12 2.21 30 2.24 48 2.22

13 2.31 31 2.22 49 2.24

14 2.31 32 2.21 50 2.2

15 2.2 33 2.24 51 2.29

16 2.24 34 2.21 52
17 2.23 35 2.2

18 2.27 36 2.23

3. Remarks:

Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

TEST REPORT FOR AC POWER


DATE:
Page No.117
CLIENT: ETHIOPIAN ELECTRICAL POWER (EEP)

PROJECT:WOLIDYA 230/33/15kV - MOBILE SUBSTATION Sheet No. 1 of 1

1.Equipment Details:
Make :
Voltage Rating :
Year of Manufacture :

2. AC POWER cheeck

Inco Voltag bettry voltage bettry voltage bettry voltage


mein e
g

1 110V 1 2.281 19 2.22 37 2.34

2 110V 2 2.244 20 2.26 38 2.26

3 110V 3 2.246 21 2.23 39 2.26

4 110V 4 2.321 22 2.24 40 2.3

5 2.242 23 2.24 41 2.211

6 2.256 24 2.19 42 2.22

7 2.236 25 2.27 43 2.24

8 2.286 26 2.22 44 2.26

9 2.246 27 2.19 45 2.24

10 2.235 28 2.24 46 2.24

11 2.223 29 2.19 47 2.24

12 2.245 30 2.23 48 2.24

13 2.236 31 2.23 49 2.27

14 2.282 32 2.25 50 2.24

15 2.224 33 2.24 51 2.24

16 2.242 34 2.24 52 2.29

17 2.27 35 2.23

18 2.23 36 2.2

3. Remarks:
Tested by: Tested by: Witnessed by: Witnessed by:

Name: Name: Name: Name:

Signature Signature Signature Signature

& Date & Date & Date & Date

Potrebbero piacerti anche