Datos:

Vp = 50 km/h i = 0.70%
e max = 7.00% Bombeo = 2.50%
p= -9.00% Carril = 3.5 m (ancho)
Prog PC= 3+097.52 %Recta = 70% (60 - 80)%
Cota PC= 2990.22 Sentido = Izquierda
Lc= 157.08 m
Longitud de transición:
carril * emax 3.5*7.00% Lt = 35 m
Lt = = =
i 0.70%
Longitud de aplanamiento:
carril * bombeo 3.5*2.50% N= 12.5 m
N= = =
i 0.70%
Replanteo Entrada:
Descripción Progresivas Izquierda Eje Derecha Esquema
A 3+060.52 2993.463 2993.550 2993.463 -2.5% ↙ ↘ -2.5%
B 3+073.02 2992.338 2992.425 2992.425 -2.5% ↙ → 0.0%
C 3+085.52 2991.213 2991.300 2991.388 -2.5% ↙ ↗ 2.5%
D - PC 3+097.52 2990.049 2990.220 2990.392 -4.9% ↙ ↗ 4.9%
E 3+108.02 2989.030 2989.275 2989.520 -7.0% ↙ ↗ 7.0%

Replanteo Salida:
Descripción Progresivas Izquierda Eje Derecha Esquema
E 3+244.10 2976.783 2977.028 2977.273 -7.0% ↙ ↗ 7.0%
D - PT 3+254.60 2975.911 2976.083 2976.254 -4.9% ↙ ↗ 4.9%
C 3+266.60 2974.915 2975.003 2975.090 -2.5% ↙ ↗ 2.5%
B 3+279.10 2973.790 2973.878 2973.878 -2.5% ↙ → 0.0%
A 3+291.60 2972.665 2972.753 2972.665 -2.5% ↙ ↘ -2.5%