TONNAGE

PUSHBACK SEQUENCE
Top Soil OB Limonit LG LGSO HGSO
1 20000 8000 17000 1000 34687.5 159375
2 20000 7000 24000 5000 40312.5 136875
1 3 20000 9000 24000 8000 29062.5 123750
4 18000 6000 20000 4000 24375 90937.5
5 13000 7000 26000 4000 35625 83437.5
TOTAL TONNAGE PB 1 91,000 37,000 111,000 22,000 164,063 594,375
1 10000 2000 15000 5000 30000 99375
2
2 18000 8000 25000 3000 28125 80625
TOTAL TONNAGE PB 2 28,000 10,000 40,000 8,000 58,125 180,000
1 8000 4000 18000 5000 28125 102187.5
2 6000 3000 12000 1000 9375 28125
3
3 15000 6000 30000 8000 41250 132187.5
4 14000 5000 19000 6000 43125 139687.5
TOTAL TONNAGE PB 3 43,000 18,000 79,000 20,000 121,875 402,188
1 16000 5000 23000 4000 53437.5 157500
2 18000 6000 32000 17000 56250 160312.5
4
3 16000 9000 37000 11000 40312.5 162656.3
4 24000 5000 38000 10000 37500 212812.5
TOTAL TONNAGE PB 4 74,000 25,000 130,000 42,000 187,500 693,281
TOTAL 236,000 90,000 360,000 92,000 531,563 1,869,844

stripping ratio ore 2,401,406 2.3


others 1,046,000 1.0
SWELL FACTOR

Volume (m³)
Insitu Loose
0.015625 0.019292
0.015625 0.021250
0.015625 0.018422
0.015625 0.019625
0.015625 0.019375
0.015625 0.018125
0.015625 0.018500
0.015625 0.019000
0.015625 0.019313
0.015625 0.019860
0.015625 0.019276

volume insitu
SF = x 100%
volume loose

0.0156250
= x 100%
0.0192762
= 81.05851 %
DATA PENGAMATAN CYCLE TIME ALAT MUAT

Swing
No Gali Swing Isi Tumpah
WS Kosong
9000 1 13.45 3.45 13.04 6.11
26000 2 19.14 4.54 12.52 3.55
28000 3 11.42 3.22 12.19 4.51
9000 4 12.44 3.31 12.24 3.52
9000 5 15.54 3.45 14.43 4.32
81,000 6 16.45 4.49 14.13 4.33
1000 7 15.34 3.31 12.49 3.44
12000 8 20.12 4.42 13.14 3.55
13,000 9 15.57 4.09 13.29 4.15
18000 10 15.43 5.14 13.37 4.09
7000 11 15.22 4.31 14.26 3.21
23000 12 17.36 3.45 11.37 4.28
14000 13 15.53 4.02 12.57 3.83
62,000 14 16.35 4.51 13.53 4.14
12000 15 14.44 4.27 12.55 5.24
39000 16 18.17 4.34 12.56 5.51
19000 17 17.25 4.43 12.32 4.57
42000 18 19.27 5.52 14.54 3.48
112,000 19 15.47 5.31 13.18 5.15
268,000 20 19.25 3.24 12.55 4.13
21 13.44 3.24 13.15 4.22
22 17.32 4.27 12.28 3.53
23 14.29 4.44 12.55 6.02
24 18.39 4.57 13.23 4.04
25 16.41 5.15 12.41 3.53
26 17.49 4.45 13.29 5.57
27 15.57 3.57 13.02 4.24
28 16.24 4.25 13.13 4.32
29 17.45 4.41 12.48 3.22
30 15.55 3.25 14.27 3.36
DATA PENGAMATAN CYCLE TIME ALAT ANGKUT

Waktu Waktu Waktu Waktu Waktu Waktu


No
Muat Angkut Mnvr I Dumping Kembali Mnvr II
1 45.23 685.25 41.12 26.34 664.41 45.38
2 54.15 651.49 43.23 25.31 654.37 44.27
3 45.15 650.32 44.22 25.24 678.47 50.34
4 62.31 670.43 40.43 27.16 654.52 52.56
5 40.12 680.23 40.23 26.53 645.23 49.25
6 58.32 665.53 43.32 25.23 652.23 47.54
7 43.21 661.12 44.15 27.43 648.39 43.59
8 57.25 664.23 50.45 24.23 647.45 53.34
9 54.21 672.56 49.32 26.45 636.48 52.46
10 73.45 641.32 52.57 24.43 657.13 47.43
11 59.55 670.56 47.54 25.06 648.24 55.12
12 61.35 654.45 43.19 25.54 676.52 51.32
13 57.14 653.43 52.12 24.54 681.22 44.35
14 42.44 663.51 50.42 24.18 638.45 46.52
15 65.23 684.37 44.39 23.24 645.34 49.54
16 61.25 668.58 52.17 26.43 662.33 52.47
17 56.57 643.35 53.21 24.15 679.13 53.43
18 58.45 665.28 42.31 25.29 652.41 48.32
19 71.34 655.47 42.31 27.23 678.43 44.27
20 64.47 681.26 44.23 25.43 653.43 47.26
21 59.57 654.53 52.13 26.44 657.38 48.51
22 54.32 653.37 43.19 25.13 652.28 54.24
23 55.45 675.25 51.23 25.48 652.48 55.34
24 57.45 654.41 53.41 23.33 680.22 46.53
25 53.12 668.36 44.53 25.39 663.36 48.41
26 62.31 651.45 43.32 27.32 633.19 43.25
27 58.17 657.31 51.23 24.34 643.36 54.48
28 62.35 664.37 52.13 24.47 682.54 53.36
29 75.32 672.33 48.31 24.33 643.51 46.47
30 62.35 664.43 44.19 24.38 673.45 49.5

DATA PENGAMATAN FILL FACTOR

Faktor
Volume Volume
No Pengisia
Material Bucket
n
1 2.20 2.1 105
2 2.03 2.1 97
3 2.15 2.1 102
4 2.24 2.1 107
5 2.22 2.1 106
6 2.24 2.1 107
7 2.12 2.1 101
8 2.05 2.1 98
9 2.24 2.1 107
10 2.15 2.1 102
11 2.14 2.1 102
12 2.05 2.1 98
13 2.11 2.1 100
14 2.13 2.1 101
15 2.03 2.1 97
16 2.01 2.1 96
17 2.14 2.1 102
18 2.09 2.1 100
19 2.14 2.1 102
20 2.15 2.1 102
21 2.22 2.1 106
22 2.23 2.1 106
23 2.17 2.1 103
24 2.04 2.1 97
25 2.21 2.1 105
26 2.01 2.1 96
27 2.09 2.1 100
28 2.06 2.1 98
29 2.16 2.1 103
30 2.11 2.1 100
PERHITUNGAN DISTRIBUSI FREKUENSI

Jumlah Data (n) = 30


Jumlah Kelas Interval (K) = 1 + 3.33 Log 30
= 5.92
= 6

1. Waktu Menggali
- Data Tertinggi (X Max) = 20.12
- Data Terendah (X Min) = 11.42
- Interval Kelas (Ci) = 1.45

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
11.42 - 12.87 2 12.15 24.29
12.88 - 14.33 3 13.61 40.82 16.14
14.34 - 15.79 10 15.07 150.65 detik
15.80 - 17.25 5 16.53 82.63
17.26 - 18.71 6 17.99 107.91 0.27
18.72 - 20.17 4 19.45 77.78 menit
Jumlah 30 484.07

2. Waktu Swing Isi


- Data Tertinggi (X Max) = 5.52
- Data Terendah (X Min) = 3.22
- Interval Kelas (Ci) = 0.38

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
3.22 - 3.60 10 3.41 34.12
3.61 - 4.00 0 3.81 0.00 4.19
4.01 - 4.39 7 4.20 29.39 detik
4.40 - 4.78 9 4.59 41.33
4.79 - 5.18 2 4.99 9.97 0.07
5.19 - 5.57 2 5.38 10.76 menit
Jumlah 30 125.56
PERHITUNGAN DISTRIBUSI FREKUENSI

Jumlah Data (n) = 30


Jumlah Kelas Interval (K) = 1 + 3.33 Log 30
= 5.92
= 6

1. Waktu Muat
- Data Tertinggi (X Max) = 75.32
- Data Terendah (X Min) = 40.12
- Interval Kelas (Ci) = 5.87

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
40.12 - 45.99 5 43.05 215.27
46.00 - 51.86 0 48.93 0.00 57.55
51.87 - 57.74 9 54.81 493.26 detik
57.75 - 63.62 11 60.68 667.52
63.63 - 69.49 2 66.56 133.12 0.96
69.50 - 75.37 3 72.44 217.31 menit
Jumlah 30 1726.47

2. Waktu Angkut
- Data Tertinggi (X Max) = 685.25
- Data Terendah (X Min) = 641.32
- Interval Kelas (Ci) = 7.32

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
641.32 - 648.64 2 644.98 1289.96
648.65 - 655.97 9 652.31 5870.81 663.31
655.98 - 663.31 2 659.64 1319.29 detik
663.32 - 670.64 10 666.98 6669.76
670.65 - 677.97 3 674.31 2022.92 11.06
677.98 - 685.30 4 681.64 2726.56 menit
Jumlah 30 19899.30

3. Waktu Manuver I
- Data Tertinggi (X Max) = 53.41
- Data Terendah (X Min) = 40.23
- Interval Kelas (Ci) = 2.20

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
40.23 - 42.43 5 41.33 206.64
42.44 - 44.63 11 43.54 478.89 46.62
44.64 - 46.84 0 45.74 0.00 detik
46.85 - 49.05 2 47.95 95.90
49.06 - 51.25 5 50.16 250.78 0.78
51.26 - 53.46 7 52.36 366.53 menit
Jumlah 30 1398.73

PERHITUNGAN DISTRIBUSI FREKUENSI

Jumlah Data (n) = 30


Jumlah Kelas Interval (K) = 1 + 3.33 Log 30
= 5.92
= 6

Fill Factor
- Data Tertinggi (X Max) = 106.67
- Data Terendah (X Min) = 95.71
- Interval Kelas (Ci) = 1.83

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
95.71 - 97.54 5 96.63 483.13
97.55 - 99.38 3 98.46 295.39
99.39 - 101.21 5 100.30 501.49 102
101.22 - 103.05 8 102.13 817.07 %
103.06 - 104.88 2 103.97 207.94
104.89 - 106.72 7 105.80 740.63
Jumlah 30 3045.64

Rata-Rata Fill Factor= 101 %


PERHITUNGAN DISTRIBUSI FREKUENSI

Jumlah Data (n) = 30


Jumlah Kelas Interval (K) = 1 + 3.33 Log 30
= 5.92
= 6

3. Waktu Menumpah
- Data Tertinggi (X Max) = 14.54
- Data Terendah (X Min) = 11.37
- Interval Kelas (Ci) = 0.53

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
11.37 - 11.90 1 11.63 11.63
11.91 - 12.44 5 12.17 60.86 13.07
12.45 - 12.98 8 12.71 101.69 detik
12.99 - 13.51 10 13.25 132.49
13.52 - 14.05 1 13.79 13.79 0.22
14.06 - 14.59 5 14.33 71.63 menit
Jumlah 30 392.09

4. Waktu Swing Kosong


- Data Tertinggi (X Max) = 6.11
- Data Terendah (X Min) = 3.21
- Interval Kelas (Ci) = 0.48

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
3.21 - 3.69 10 3.45 34.52
3.70 - 4.19 6 3.95 23.67 4.22
4.20 - 4.68 8 4.44 35.51 detik
4.69 - 5.17 1 4.93 4.93
5.18 - 5.67 3 5.43 16.28 0.07
5.68 - 6.16 2 5.92 11.84 menit
Jumlah 30 126.74
PERHITUNGAN DISTRIBUSI FREKUENSI

Jumlah Data (n) = 30


Jumlah Kelas Interval (K) = 1 + 3.33 Log 30
= 5.92
= 6

4. Waktu Dumping
- Data Tertinggi (X Max) = 27.43
- Data Terendah (X Min) = 23.24
- Interval Kelas (Ci) = 0.70

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
23.24 - 23.94 2 23.59 47.18
23.95 - 24.65 9 24.30 218.68 25.31
24.66 - 25.36 6 25.01 150.04 detik
25.37 - 26.06 4 25.71 102.86
26.07 - 26.77 5 26.42 132.11 0.42
26.78 - 27.48 4 27.13 108.52 menit
Jumlah 30 759.38

5. Waktu Kembali
- Data Tertinggi (X Max) = 682.54
- Data Terendah (X Min) = 633.19
- Interval Kelas (Ci) = 8.22

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
633.19 - 641.42 3 637.30 1911.91
641.43 - 649.65 7 645.54 4518.76 657.34
649.66 - 657.89 9 653.77 5883.95 detik
657.90 - 666.12 3 662.01 1986.02
666.13 - 674.36 1 670.24 670.24 10.96
674.37 - 682.59 7 678.48 4749.34 menit
Jumlah 30 19720.23

6. Waktu Manuver II
- Data Tertinggi (X Max) = 55.34
- Data Terendah (X Min) = 43.25
- Interval Kelas (Ci) = 2.02

Frekwen X
Interval Kelas Nilai Tengah (Xi) Fi x Xi
si (Fi) rata-rata
43.25 - 45.27 5 44.26 221.29
45.28 - 47.29 5 46.28 231.41 49.25
47.30 - 49.32 6 48.31 289.85 detik
49.33 - 51.34 4 50.33 201.33
51.35 - 53.37 5 52.36 261.79 0.82
53.38 - 55.39 5 54.38 271.91 menit
Jumlah 30 1477.58
TOTAL CYCLE TIME PERHITUNGAN FREKUENSI

1. Waktu Menggali

Data
Waktu
Cycle Time
Detik Menit 2
1. Waktu M 16.14 0.27 5
2. Waktu S 4.19 0.07 15
3. Waktu 13.07 0.22 20
4. Waktu 4.22 0.07 26
Jumlah 37.62 0.63 30

3. Waktu Menumpah

Data

1
6
14
24
25
30
TOTAL CYCLE TIME PERHITUNGAN FREKUENSI

1. Waktu Muat

Data
Waktu
Cycle Time
Detik Menit 5
1. Waktu M 57.55 0.96 5
2. Waktu A 663.31 11.06 14
3. Waktu M 46.62 0.78 25
4. Waktu 25.31 0.42 27
5. Waktu K 657.34 10.96 30
6. Waktu M 49.25 0.82
Jumlah 1499.39 24.99 3. Waktu Manuver I

Data

5
16
16
18
23
30

5. Waktu Kembali

Data

3
10
19
22
23
30

PERHITUNGAN FREKUENSI

Fill Factor

Data

5
8
13
21
23
30
PERHITUNGAN FREKUENSI Pengamatan Jam Kerja Tersedia

1. Waktu Menggali 2. Waktu Swing Isi - Satu hari =


- Satu min =
Result Data Result - Satu bula =
- Satu tah =
2 10 10
3 10 0 1. Shift 1
10 17 7 Senin - Kamis, Sabtu dan Minggu
5 26 9 8:00 -
6 28 2 12:00 -
4 30 2 13:00 -
Jumlah waktu kerja
3. Waktu Menumpah 4. Waktu Swing Kos
Jum'at
Result Data Result 8:00 -
11:30 -
1 10 10 13:30 -
5 16 6 Jumlah waktu kerja
8 24 8
10 25 1
1 28 3 2. Shift 2
5 30 2 Senin - Minggu
20:00 -
0:00 -
1:00 -
Jumlah waktu kerja

Jumlah jam =
=
PERHITUNGAN FREKUENSI

1. Waktu Muat 2. Waktu Angkut

Result Data Result

5 2 2
0 11 9
9 13 2
11 23 10
2 26 3
3 30 4

3. Waktu Manuver I 4. Waktu Dumping

Result Data Result

5 2 2
11 11 9
0 17 6
2 21 4
5 26 5
7 30 4

5. Waktu Kembali 6. Waktu Manuver II

Result Data Result

3 5 5
7 10 5
9 16 6
3 20 4
1 25 5
7 30 5

PERHITUNGAN FREKUENSI

Fill Factor

Result

5
3
5
8
2
7
atan Jam Kerja Tersedia Pengamatan Waktu-Waktu Hambatan

2 shift Kegiatan
7 hari kerja Waktu Delay
28 hari kerja - jalan licin setelah hujan
336 hari kerja - mengisi bahan bakar
- keperluan operator
Waktu Standby
amis, Sabtu dan Minggu - terlambat kerja
12:00 Waktu Kerja - cepat berakhirnya kerja
13:00 Waktu Istirahat - sesudah dan sebelum istirahat
17:00 Waktu Kerja - waktu menunggu alat
8:00 Waktu Repair
- waktu pemanasan alat

11:30 Waktu Kerja Waktu Delay


13:30 Waktu Istirahat Waktu Standby
18:00 Waktu Kerja Waktu Repair
8:00 Total Waktu Hambatan (menit)

Waktu Efektif (menit) *


Efisiensi kerja (%) **

0:00 Waktu Kerja - Waktu Efektif = Jumlah jam efektif - total waktu hambatan

1:00 Waktu Istirahat - Efisiensi kerja = (Waktu efektif : Jumlah jam efektif ) x 100 %

5:00 Waktu Kerja


8:00 Tingkat Efisiensi Alat Mekanis
Mechanical Availability (%)
16 jam Physical Availability (%)
960 menit Use of Availability (%)
Effective Utilization (%)

- MA = (Waktu Efektif : (Waktu Efektif + Waktu Repair )) x 100 %

- PA = ((Waktu Efektif + Waktu Standby) : Jumlah Jam Efekif ) x 100 %

- UA = (Waktu Efektif : (Waktu Efektif + Waktu Standby )) x 100 %


u-Waktu Hambatan Summary

Alat Muat Alat Angkut > Target produksi per tahun (ton)
> Data alat muat
60 60 - Cycle time (menit)
35 35 - Kapasitas bucket (m³)
20 25 - Jumlah unit
- Efisiensi kerja (%)
35 35 - Fill factor (%)
30 30 - Swell Factor (%)
lum istirahat 10 10 > Data alat angkut
25 20 - Cycle time (menit)
- Kapasitas bak*
15 15 - Jumlah unit
- Efisiensi kerja (%)
115 120 - Jumlah pengisian
100 95 > Jumlah jam efektif
15 15 > Jumlah hari kerja
230 230 > Hari hujan rata-rata per bulan
> Density Saprolit (ton/m³)
730 730
76 76 * Kapasitas bak = Kap.bucket x Swell Factor x Fill Factor x banyaknya peng

efektif - total waktu hambatan Kemampuan produksi


ktif : Jumlah jam efektif ) x 100 % > Alat Muat*
- Produksi per hari
lat Mekanis - Produksi per bulan
97 97 - Produksi per tahun
86 85 > Alat Angkut**
87 88 - Produksi per hari
76 76 - Produksi per bulan
- Produksi per tahun
tu Efektif + Waktu Repair )) x 100 %

u Standby) : Jumlah Jam Efekif ) x 100 % * Produksi Alat Muat = [(Kapasitas Bucket x FF x SW x D x 60 menit/jam) /
u Efektif + Waktu Standby )) x 100 % * Produksi Alat Angkut = [(Kapasitas Bakx D x 60 menit/jam) / CT] x jumlah
1,000,000

0.63
2.1
1
76
101
81

24.99
6.87
10
76
4
16
28
17
1.5

t x Swell Factor x Fill Factor x banyaknya pengisian

2,999.09
32,990.03
395,880.37

3,009.53
33,104.82
397,257.78

asitas Bucket x FF x SW x D x 60 menit/jam) / CT] x jumlah jam efektif

pasitas Bakx D x 60 menit/jam) / CT] x jumlah jam efektif