Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
13 Enclosure-B, Qualification of Key Personnel, Pg. 61. It is requested to the Client to make a Please refer Addendum.
3.Senior Contract Specialist relaxation of 15 years in professional
experience of Contract Management.
1) Essential Qualification:
b) Professional Experience of 20 years in Contract
Management.
14 Enclosure-B, Qualification Of Key Personnel, Pg. 63. It is requested to the Client to consider Post As per clause 5. 2), post
5.Senior Quantity Surveyor Graduate in Civil Engineering. graduate degree in
2) Preferential Qualifications: Engineering is already a
a) Post Graduate Degree in Construction preferential qualification.
Management/Engineering/certificate course in management/
certificate course in construction management/certificate course
in contract management/ certificate course in quantity
surveying.
15 Enclosure-B, Qualification Of Key Personnel, Pg. 63. It is requested to the Client to consider Not tenable.
6.Highway Design Specialist experience in national assignments instead
of abroad.
2) Preferential Qualifications.
a) Experience as a Highway Design Specialist abroad.
16 Enclosure-B, Qualification Of Key Personnel, Pg. 63. It is requested to the Client to consider Not tenable.
7.Bridge Design Specialist experience in national assignments instead
of abroad.
2) Preferential Qualifications.
a) Experience as a Bridge Design Specialist abroad.
17 Enclosure-B, Qualification Of Key Personnel, Pg. 64. It is requested to the Client to consider Not tenable.
9. Senior Bridge & Structural Engineer experience in national assignments instead
of abroad.
2) Preferential Qualifications
b) Experience as a Bridge Engineer abroad.
18 Enclosure-B, Qualification Of Key Personnel, Pg. 67. It is requested to the Client to consider Not tenable.
10. Material Engineer experience in national assignments instead
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
of abroad.
2) Preferential Qualifications
b) Abroad experience as Material Engineer in Highway
Construction projects.
19 Enclosure-B, Qualification Of Key Personnel, Pg. 68. It is requested to the Client to make a Not tenable.
15. Electrical Engineer relaxation of 15 years in professional
experience of construction supervision of
1) Essential Qualifications: electrical works in similar position and
b) Professional Experience of 15 years in construction
supervision of electrical works in similar position. Fully c) Experience of 5 years in similar capacity
familiar with installation, testing and commissioning of in Construction / Construction Supervision
electrical equipment and systems of Highways. of Highway projects.
2) Preferential Qualifications:
a) Post Graduation Electrical/ Electronics and Communication
Engineering
22 Enclosure-B, Qualification Of Key Personnel, Pg. 69 It is requested to the client to consider Please refer Addendum.
19. Safety Engineer experience in national exposure in the field
of Road Safety Management Plan instead.
2) Preferential Qualifications
d) International Exposure in the field of Road Safety
Management Plan
23 "Payments for remuneration made in accordance with With reference to the above Clause, we Not tenable.
Clause GC 6:2(a), understand that, payment to the consultancy
Pg. 97 firm of the financial proposal namely, (i)
transportation, (ii) Duty travel to site (iii)
(i) Consultants shall be paid billing rates for services rendered Office Rent, (iv) office supplies
by the personnel of all categories namely (i) key Personnel; (ii) communication etc. (v) reports & document
sub-Professional personnel and (iii) Support staff on man-moth printing and (vi) survey equipment etc.
wise. For calculating billing rates of remaining items (during quoted amount will be percentage-wise.
construction period), of the financial proposal, namely (i) However, with reference to the latest NHAI
transportation, (ii) Duty travel to site (iii) Office Rent, (iv) standards which says, “6.2(a) "Payments for
office supplies communication etc. (v) reports & document remuneration and reimbursable items made
printing and (vi) survey equipment etc. quoted amount in accordance with Clause GC 6.2 (a) in
(pertaining to construction period only) of selected consultant local currency shall be adjusted as follows :
will be converted to percentage of civil work cost quoted by i) Consultants shall be paid billing rates for
civil contractors and payment will be made in proportionate to services rendered by the personnel of all
the cumulative financial progress of the civil work of all the 3 categories namely (i) key Personnel; (ii)
packages put together, provided further that payment against sub-Professional personnel and (iii) Support
reimbursable expenditures shall be minimum of actually and staff on man-month basis . Billing rates of
reasonably incurred by the Consultant or the proportionate remaining items of the financial proposal,
amount calculated as mentioned in this clause. namely (i) transportation, (ii) Duty travel to
site (iii) Office Rent, (iv) office supplies
communication etc. (v) reports & document
printing and (vi) survey equipment etc. shall
be worked out month wise as per actual
expenditure.”
Hence, we kindly request to the Client to
change the payment criteria from percentage
basis to monthly basis as per NHAI
standards.
Please confirm.
24 DATA SHEET, Section 5.1, It is requested to the Client for more clarity The factor is to be applied
iii. Qualification and competence of following on same. on the marks obtained by
professional/sub-professional staff for the assignment shall each key personal CVs so
be evaluated. The weightage for various key staff are as that evaluation for CVs are
under: done for a total marks of 75.
Weightage1 - 75
1The above total marks will be converted by applying a factor
of 15/56 to arrive at weightage for each CV.
25 Bid Due Date, Clause No. 22 of ITC, Page 9 In order to submit a competitive and Not tenable.
comprehensive proposal and requires
Bid Due Date involvement of highly experienced experts
with very specific criteria, it is requested to
extend the submission deadline by 30
working days beyond 10/12/2019.
26 Evaluation Criteria and Sub Criteria for Please refer Addendum.
Relevant Experience of the firm for the
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
Assignment does not specify break - up of
score to be obtained by a firm under
different sub - heads, e.g, when a firm will
get full marks in different sub - heads,
27 Simi la rly, Evaluation Criteria and Sub Please refer Addendum.
Criteria for Qualification and Competence
of the key staff for the assignment does not
specify break - up of score to be obtained by
a key staff,
28 It is not clear from the RFP weather Sub- As per GCC clause 3.7, prior
consultants are to be appointed at bid approval shall be required
submission stage or to be appointed after for the appointment of sub-
award of Consultancy Services, consultant.
29 From RFP it is also not clear that how much Please refer GCC clause 3.7.
and what part of services may be entrusted
to sub - consultants,
30 Clause 22, Page 9 Both the timelines are contradictory to each Please refer Addendum.
Submission of Hard 11.12.2019 till other. We request the Client to kindly clarify
copy of Technical 14:00 hrs the same.
Proposal +
Document Fee +
Bid Security
Clause 4.1 d), Page 17
Hard copy of the documents as specified in point nos. 4.1 (b)
above (excluding Financial Proposal) only is required to be
submitted at the address given below latest by 1300 hours on
bid opening date.
31 Clause 4.1 d), Page 17 Both the clauses are contradictory to each Hard copy of financial
other. We request the Client to kindly clarify proposal is not to be
Appendix B-1, Page 28
whether we need to submit a hard copy of submitted.
Hard copy of the documents as specified in point nos. 4.1 (b) financial proposal or not? Please refer Addendum.
above (excluding Financial Proposal) only is required to be
submitted at the address given below latest by 1300 hours on
bid opening date.
First Para:
We are hereby submitting our Proposal, which includes this
Technical Proposal and a Financial Proposal sealed under a
separate envelope for the above mentioned work.
32 Clause 5.1, Data Sheet, Page 22 Since these are Greenfield Projects of Not tenable.
Sub criteria for Relevant Experience of the firm for the Authority Engineer‟s wherein currently
assignment: Greenfield Projects are executed to attain
Criteria " Marks sustainability. Hence, it would be
appropriate to provide additional marks
Year of Establishment of the Firm (In case of JV 2 from this marking criteria to the firms with
year of establishment of Lead Member shall be having Greenfield Projects experience of
considered) similar size/length within last 7 years.
Average Annual Turnover (last 3 years) from 2 It is requested to please confirm the same.
consultancy business
Experience in Construction 16
Supervision/Independent Engineer/Authority
Engineer in Highway Projects of 4/6**-laning or
more of length at least equal to 25% of Project
Length, in last 7 years*
Experience in DPR preparation/ Feasibility Study 5
cum Preliminary Design Report for Number of
Highway Projects (of length 25% of Project
Length of 4/6**laning or more) in last 7 years*
Total 25
33 Clause 13, Page 57 We request the Client to kindly allow 30 Not tenable.
PERFORMANCE SECURITY days of time to submit Performance Security
The successful consulting firm shall have to submit a Bank from the date of issue of LOA since
Guarantee (BG) for an amount of 2.50% of the Contract Value procuring a bank guarantee from banks
within 15 days of issue of LOA. The BG shall be valid for a taken reasonable amount of time.
period of 2 months beyond the expiry of the Contract period. We also request the Client to kindly allow
The BG shall be in the format specified in Appendix H of draft bank guarantees from any Scheduled Bank
contract form and furnished from a Nationalized Bank, IDBI or in India instead of Nationalized Bank.
/ ICICI Bank / EXIM Bank. In case of JV, the BG shall be Please confirm.
furnished on behalf of the JV and not individually by the
members.
34 Enclosure-A, Page 59 There is a discrepancy in the sub-total The sub-total of man-month
Total Man-month in Maintenance / Defect Liability period of 60 wherein 404 is mentioned as total. However, in Maintenance / Defect
months is 404. upon calculation, the sub-total comes out to Liability period of 60
484. months shall be read as 484.
The same (sub-total as 484) is also Please refer Addendum.
mentioned in the BoQ.
Please modify/correct the same.
35 S. No. 6, Enclosure B, Page 63 Most of the experts from the transportation Not tenable.
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
Highway Design Specialist sector with 20 years experience are not
1) Essential Qualifications. executing any design related projects but
a) Post Graduate in Transportation/Highway/Pavement only managing the projects as Project
Engineering from recognized university. Managers. Hence, to propose exclusive
b) Professional Experience of 15 years. 12 years of Bridge Design Specialist, we request the
experience in handling design of Highways. client to kindly consider the following
c) At least 5 years‟ experience as Sr. Pavement modifications:
Engineer / Highway Design Engineer or similar Highway Design Specialist
capacity in Highway project in designing highways 1) Essential Qualifications.
using computer design software. a) Graduate in Civil Engineering from
d) HDS should have handled as Sr. Pavement Engineer a recognized University.
/ Highway Design Engineer or similar capacity of at b) Professional Experience of 15 years.
least one Projects of project Preparation of major 12 years of experience in handling
highway Project of four–laning/ six –laning/ design of Highways.
Expressway. c) At least 5 years‟ experience as Sr.
e) Not more than 65 years of age. Pavement Engineer / Highway
Design Engineer or similar capacity
2) Preferential Qualifications
in Highway project in designing
highways using computer design
Experience as a Highway Design Specialist abroad.
software.
d) HDS should have handled as Sr.
Pavement Engineer / Highway
Design Engineer or similar capacity
of at least one Projects of project
Preparation of major highway Project
of four–laning/ six –laning/
Expressway.
e) Not more than 65 years of age.
2) Preferential Qualifications
a) Post Graduate in
Transportation/Highway/Pavement
Engineering from recognized
university.
Please confirm.
36 S. No. 7, Enclosure B, Page 63 Most of the experts from the transportation Not tenable.
Bridge Design Specialist sector with 20 years experience are not
1) Essential Qualifications. executing any design related projects but
a) Post Graduate in Structural Engineering from a only managing the projects as Project
recognized University. Managers. Hence, to propose exclusive
b) Professional Experience of 20 years. Bridge Design Specialist, we request the
c) 15 years experience in handling design of bridge / client to kindly consider the following
Flyover / ROB and other structures. modifications:
d) At Least 5 years experience in independently Bridge Design Specialist
designing of Major Highway Bridges / ROBs / 1) Essential Qualifications.
Flyovers using computer design software. a) Graduate in Civil Engineering from a
e) Not more than 65 years of age. recognized University.
2) Preferential Qualifications: b) Professional Experience of 15 years.
a) Experience as a Bridge Design Specialist abroad. c) 12 years experience in handling design
of bridge / Flyover / ROB and other
structures.
d) At Least 5 years experience in
independently designing of Major
Highway Bridges / ROBs / Flyovers
using computer design software.
e) Not more than 65 years of age.
2) Preferential Qualifications
b) Post Graduate in Structural Engineering
from a recognized University.
Please confirm.
37 SECTION 1:INFORMATION TO CONSULTANTS; We request you to please re-visit this Not tenable
Clause 14; A)Eligibility criteria for sole applicant firm ; clause and consider below criteria:
1(a)& 1 (b)(Page No.6) In DPR projects -Feasibility Study Report
The firm should have minimum experience of preparation of submission also consider for evaluation.
detailed Project Report/Feasibility Study cum Preliminary
Design Report of 4/6** Ianing project of aggregate length equal
to 1.5 times or more than the Project Length mentioned in Table
1. Firm should also have prepared DPR/Feasibility Study cum
Preliminary Design Report for at least one project of similar
category of four/six Ianing work of25% of Project Length
mentioned in Table1.
38 SECTION 1:INFORMATION TO CONSULTANTS; We request you to consider substantially Not Tenable
Clause 14; A)Eligibility criteria for sole applicant firm; 1(a) completed projects (i.e more that
& 1 (b)(Page No. 6) 80%completed).
Preferential Qualifications:-
a) Post Graduate Degree in Construction Management/Highway
Engineering/Transportation/Pavement Engineering / Soil
Mechanics / Foundation Engineering
76. Page-61 The expertise of Team Leader for a Not tenable
Deputy Team Leader DPR/Project preparation role is significantly
Essential Qualifications different that the expertise for a Supervision
e) Dy. TL should have handled as Deputy Team Leader or assignment.
similar capacity of at least one Projects of project Preparation of
major highway Project of two laning with paved shoulder / four We request you to keep this clause in the
– laning/ six –laning/ Expressway preferential qualification, as it is difficult to
find the candidates with Dy. team Leader
experience both in Construction Supervision
and in Project Preparation
77. Page-62 We note that in case all other senior staff Please refer Addendum.
Senior Contract Specialist like Team Leader cum Senior Highway
Essential Qualifications:- Engineer, Deputy Team Leader, Resident
b) Professional Experience of 20 years in Contract Management Engineer the Professional Experience of 15
Preferential Qualifications:- years is requested in their respective fields,
a) Degree in Law/PG in management/certificate course in whereas in case of Senior Contract
management/ certificate course in construction management/ Specialist this is 20 years. Hence we request
certificate course in contract management you to modify the clause as below:-
Senior Contract Specialist
Essential Qualifications:-
b) Professional Experience of 15 years in
Contract Management
Preferential Qualifications:-
a) Degree in Law/PG in
management/certificate course in
management/ certificate course in
construction management/ certificate course
in contract management / PG in Civil
Engineering
83. Page-69 1) Please specify the Age Limit for this Please refer Addendum.
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
TMS Expert position
Essential Qualifications:
a) Graduate in Electrical/Electronics and Communication 2) The roles and responsibilities of TMS
Engineering from a recognized university includes hardware, software and
implementation, commissioning which is
Preferential Qualifications: generally part of Information Technology.
a) Post Graduation Electrical/ Electronics and Communication
Engineering Hence we request you to modify the clause
as below:
TMS Expert
Essential Qualifications:
a) Graduate in Electrical/Electronics and
Communication Engineering / Information
Technology / Computer Engineering from a
recognized university
Preferential Qualifications:
a) Post Graduation Electrical/ Electronics
and Communication Engineering /
Information Technology / Computer
Engineering
84. Page-89-90, Clause-4.5, c • Due to number of similar urban Not tenable
Removal and/or Replacement of Personnel transportation projects that are underway
For the replacement due to death/extreme medical ground, the throughout, there is a huge scarcity of
remuneration to be paid to any of the Key Personnel provided as experienced resources. In addition, due to
a replacement shall be 90% of the remuneration which would the resource availability shortage it is
have been payable to the original Key Personnel replaced. extremely difficult to retain the staff on the
However, for the reason other than death/extreme medical project during the contract period.
ground, (i) for total replacement up to 33% of key personnel, • The current stipulation of penalty is too
remuneration of replaced Key Personnel shall be 80% of the high and will cripple the functioning of the
remuneration which would have been payable to the original consultant.
Key Personnel • We request that the replacements of Key
replaced (ii) for total replacement between 33% to 50%, Professionals should be allowed without any
remuneration of replaced Key Personnel shall be 75% of the penalty in exceptional circumstances like
remuneration which would have been payable to the original personnel not being available for reasons of
Key Personnel replaced and (iii) for total replacement between any incapacity or due to health or voluntary
50% to 66%, remuneration of replaced Key Personnel shall be resignation from firm or termination from
70% of the remuneration which would have been payable to the the firm. Such replacements would be made
original Key Personnel replaced (iv) for total replacements with personnel qualified and experienced as
beyond 66% of the key personnel the client shall initiate action per the stipulations of the RFP.
of higher penalty/termination/debarment up to 2 years as • For replacement due to any other reasons,
considered appropriate. the remuneration provided is very high.
No reduction in remuneration shall be done in case of
replacement of sub-professional staff. We request you to modify it as below:-
Removal and/or Replacement of
Personnel
For the replacement of Key Professionals
due to death/extreme medical ground/ for
reasons of any incapacity or due to health or
voluntary resignation from firm or
termination from the firm, there will be no
penalty for replacement provided that such
replacements would be made with personnel
qualified and experienced as per the
stipulations of the RFP
However, for the reason other than
death/extreme medical ground,
(i) for total replacement up to 33% of key
personnel, remuneration of replaced Key
Personnel shall be 95% of the remuneration
which would have been payable to the
original Key Personnel replaced
(ii) for total replacement between 33% to
50%, remuneration of replaced Key
Personnel shall be 90% of the remuneration
which would have been payable to the
original Key Personnel replaced and
(iii) for total replacement between 50% to
66%, remuneration of replaced Key
Personnel shall be 85% of the remuneration
which would have been payable to the
original Key Personnel replaced
(iv) for total replacements beyond 66% of
the key personnel the remuneration of
replaced Key Personnel shall be 75% of the
remuneration which would have been
payable to the original Key Personnel
replaced
No reduction in remuneration shall be done
in case of replacement of sub-professional
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
staff.
85. Page-93, clause-6.4, sub clause-c You will appreciate that the consultant will Not tenable
The Client shall cause the payment of the Consultants mobilize substantial resources on the Project
periodically as given in schedule of payment above within sixty and therefore will remain in requirement for
(60) days after the receipt by the Client of bills with supporting periodic fund to manage the working capital
documents. Only such portion of a monthly statement that is not requirement on the Project.
satisfactorily supported may be withheld from payment We therefore request you that in line with
the practice being adopted by other
government agencies like NHAI, please
reconsider the time period for payment of
invoices as follows:
• 75% of the invoice may be paid within
seven (7) days and the remaining 25% shall
be paid within 30 days from the date of
receipt of invoice by client
90. DATA SHEETCl5.1. (i) Pg (22) Kindly provide the detailed evaluation Please refer Addendum.
Sub criteria for Relevant Experience of the firm for the criteria for calculation of marks for Relevant
assignment. Experience of the firm for the assignment.
91. DATA SHEET Cl 5.1. (iii)Pg (23) Kindly provide the detailed evaluation Please refer Addendum.
Sub criteria for qualification of key criteria for calculation of marks for Relevant
Personnel Experience of the Professional staff for the
assignment.
92. SECTION 3.FORMATS FOR SUBMISSION OF FIRMS Kindly provide the marks allotted for in Completed Projects or
CREDENTIALS Appendix ACl. ix. Pg. 26 hand DPRs and the detailed evaluation substantially completed
Assignments in hand including those for which the Letter of criteria for same. Projects shall only be
Acceptance from the clients received as on 7 days prior to due considered in evaluation.
date for submission of proposals: The details shall be given in
the following format,
93. General: Cl 10 (pg 4) Kindly modify this clause as: Not tenable
Consultants may apply either as a sole firm or forming Joint
Venture with other consultants. In case of Joint Venture, the Consultants may apply either as a sole firm
maximum number of Joint Venture partners is limited to 2 (i.e. or forming Joint Venture/ Associate with
one lead + 1JV partner). Formulation of more than one JV with other consultants. In case of Joint Venture,
different partners for the same work is not allowed and all such the maximum number of Joint Venture
proposal involving the firms shall be treated· as non-responsive partners is limited to 2 (i.e. one lead + 1 JV
and liable to be rejected. If the consultant submits bids as sole partner/Associate). Formulation of more
applicant and also in JV with another consultant, both bids shall than one JV with different partners for the
be summarily rejected. No consultant shall submit more than same work is not allowed and all such
one bid either individually or /and as part of any JV. proposal involving the firms shall be treated
as non-responsive and liable to be rejected.
If the consultant submits bids as sole
applicant and also in JV with another
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
consultant, both bids shall be summarily
rejected. No consultant shall submit more
than one bid either individually or /and as
part of any JV.
94. Cl 6.2 (a)(i)(pg 97) Kindly modify this clause as: Not tenable
Consultants shall be paid billing rates for services rendered by
the personnel of all categories namely (i) key Personnel; (ii)sub- Consultants shall be paid billing rates for
Professional personnel and (iii)Support staff on man-moth wise. services rendered by the personnel of all
For calculating billing rates of remaining items (during categories namely (i) key Personnel; (ii)
construction period), of the financial proposal, namely sub-Professional personnel and (iii)Support
(i)transportation, (ii) Duty travel to site (iii)Office Rent, (iv) staff on man-moth wise and for
office supplies communication etc (v) reports &document reimbursable items (i)transportation, (ii)
printing and (vi) survey equipment etc. quoted Duty travel to site (iii) Office Rent, (iv)
amount(pertaining to construction period only)of selected office supplies communication etc (v)reports
consultant will be converted to percentage of civil work cost & document printing and(vi) survey
quoted by civil contractors and payment will be made in equipment etc. as per quoted amount.
proportionate to the cumulative financial progress of the civil Beginning 13th months from the last date of
work of all the 3 packages put together, provided further that submission of bid, billing rates shall be
payment against reimbursable expenditures shall be minimum increased to cover all items of contract @
of actually and reasonably incurred by the Consultant or the 5%every 12 months. However, for
proportionate amount calculated as mentioned in this clause. evaluation and award of the Bid proposals,
However, during the maintenance period, to cater for the the quoted initial rate(as applicable for first
possibility that the packages will not be completed in 12 months from last date of submission of
synchronous manner i.e. there might be a scenario that 2 out of bid)shall be multiplied by the total time
3 packages enter into DLP while 1 package is under input for each position on this contract, i.e.
construction, the demobilization for items namely (i) without considering the increase in the
transportation, (ii) Duty travel to site (iii) Site Office, (iv) office billing rates. All payments shall be made in
supplies & communication etc (v) reports& document printing Indian Rupees and shall be subjected to
shall be made as per the requirements and under consultation applicable Indian laws withholding taxes if
with the Authority. The payment during maintenance period any.
shall be made as per the deployed items on monthly basis.
Beginning 13th months from the last date of submission of bid,
billing rates shall be increased to cover all items of contract
@5% every 12 months. However, for evaluation and award of
the Bid proposals, the quoted initial rate (as applicable for first
12 months from last date of submission of bid) shall be
multiplied by the total time input for each position on this
contract, i.e. without considering the increase in the billing
rates. All payments shall be made in Indian Rupees and shall be
subjected to applicable Indian laws withholding taxes if any.
95. RFP Page 11, Section 2 letter of Invitation to Consultants. Generally the technical evaluation shall take Not tenable
Clause 1.12. into account of the original CV's replaced
"Consultants who agree to such extension shall confirm that CV(s) is considered as per provisions of
they maintain the Availability of the Professional staff replacement without any cost deductions.
nominated in the Proposal. or in their confirmation of extension
01 validity of the Proposal. Consultants could submit new staff Kindly consider.
in replacement, who would be considered in the final evaluation
for contract award.
96. RFP Page 15Section 2 LOI to Consultants, clause We request for non-linking of reimbursable Not tenable
3.6FinancialProposal expenditure with financial progress of the
For calculating billing rates of remaining items (during contractor. Same is applicable in MoRTH as
construction period) of the financial proposal, namely (i) well as NHAI projects. In view of the same
transportation, (ii) Duty travel to site (iii) Office Rent, (iv) we would like to request you to kindly"
office supplies communication etc (v) reports & document remove the clause of construction linked
printing and (vi) ·survey equipment etc. quoted amount payment on some items and request you
(pertaining to construction period only) of selected consultant amend the same.
will be converted to percentage of civil work cost quoted by
civil contractors and payment will be made in proportionate to
the Cumulative financial progress of the civil work of all the 3
packages put together.
97. RFP page 89-90. General Conditions of Contract. Clause 4.5 The assignment period is to last for7 years Not tenable
( c) and it is not feasible to retain same key
"…….the remuneration to be paid to any of the Key Personnel personnel and the frequent changes are not
provided as are placement shall be 90% of the remuneration ruled out. We request for adopting a realistic
which would have been payable to the original Key Personnel approach for the replacement and no
replaced. However, for the reason other than death/extreme deductions are proposed alter a certain
medical ground, (i)for total replacement up to 33% of key period.
personnel, remuneration of replaced Key Personnel shall be
80% of the remuneration which would have been payable to the
original Key Personnel replaced (ii) for total replacement
between 33% to 50%, remuneration of replaced Key Personnel
shall be 75% of the remuneration which would have been
payable to the original Key Personnel replaced and (iii) for total
replacement between 50% to 66%,remuneration of replaced
Key Personnel shall be 70% of the remuneration which would
have been payable to the original Key Personnel replaced (iv)
for total replacements beyond 66% of the key personnel the
client shall initiate action of higher
penalty/termination/debarment up to 2years as considered
appropriate. No reduction in remuneration shall be done in case
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
of replacement of sub Professional staff.
98. Appendix 1:Form of Bank Guarantee for Advance Kindly consider it as: Nationalized Indian Not tenable
Payments (Reference Clause 6.4(a} of Contract}, Page111 Bank or reputed foreign commercial Bank or
Note 2: The bank guarantee shall be from a Nationalized Indian any Scheduled Commercial Bank approved
Bank or reputed foreign commercial Bank acceptable to client by RBI having.
for Foreign Consultant with counter guarantee from
Nationalized Bank. Bank guarantee furnished by Foreign
consultant shall be confirmed by any Nationalized Bank in
India.
99. General Replacement of RE during maintenance Not tenable
Replacement of RE during maintenance period period without deduction of rate may please
be allowed. As no competent
RE/Professional wish to continue in long
maintenance period.
100. If contract gets extended beyond 96 If at all the contract gets extended beyond 96 Not tenable
months months, the rate of escalation may be
considered as10% as the consultants have
generated the Financial Proposal based on of
96 months period considering 5% escalation
only.
101. CV of one Key Personnel Team Please clarify and confirm whether the CV Please refer Addendum.
of one Key Personnel Team can be proposed
for all the 2Contract Packages.
102. Extension of Bid Due Date It is requested to extend bid due date by 15 Not tenable
10.12.2019 days i.e. 25.12.2019
103 RFP document The Consultants would also like to confirm A bidder will be allocated
General whether same team can be proposed for both one package only with one
the consultancy packages of Bundelkhand exclusive team
Expressway Project and Gorakhpur
Expressway project.
This may please be confirmed.
104 Section 6, TOR, Enclosure B Qualification of Key Personnel, As few projects have been implemented in Not tenable
Page No. 60-61, 66-67 and 69 the country, therefore, the Consultants
Team Leader cum Senior Highway Engineer request to Client to also consider 2-lane
Deputy Team Leader projects with the multiplication factor of 0.5
Highway Engineer as the same is considered by NHAI /
Environment Expert MoRTH.
Safety Engineer This may please be consider and confirmed.
…………. 2 laning with paved shoulders / four-laning / six –
laning / Expressway.
105 Section 6, TOR, Enclosure B Qualification of Key Personnel, The Consultants understand that 2-laning Not tenable
Page No. 60-61, 66-67 and 69 projects will also be considered with the
Resident Engineer multiplication factor of 0.5 as the same is
d) Should have handled at least 2 Highway projects of about 20- considered by NHAI / MoRTH.
25 km each.
This may please be confirmed.
106 Section 6, TOR, Enclosure B Qualification of Key Personnel, The Consultants understand that 2-laning Not tenable
Page No. 62 projects will also be considered in addition
to 4/6 lane as similar construction work
Resident Engineer with Consultants / Contractor.
c) At least 8 years experience as Resident Engineer/Assistant
Resident Engineer /Highway Engineer /Project Director This may please be confirmed
/Project Manager/ Superintending Engineer or equivalent/
Executive Engineer or equivalent on similar construction
work/Independent Engineering project.
107 Qualification of Key Personnel, Page No. 60 to 69 As no specific length is mentioned where Not tenable
Team Leader cum Senior Highway Engineer number of projects is required for the said
Deputy Team Leader positions, however 20-25 km length is
Senior Quantity Surveyor required for the position of Resident
Highway Design Specialist Engineer, therefore, the Consultants
Sr. Pavement Engineer understand that the same is also applicable
Highway Engineer for all the key personnel where number of
Material Engineer highway projects is required.
Environment Expert The Consultants understand that 2-lane
Electrical Engineer projects will also be considered with the
TMS Expert multiplication factor of 0.5 as the same is
Safety Engineer considered by NHAI / MoRTH.
This may please be confirmed.
108 Section 6, TOR, Enclosure B Qualification of Key Personnel, As similar capacity is not define for the said Not tenable
Page positions, therefore the consultants
Senior Contract Specialist understand that Executive Engineer and
Senior Quantity Surveyor above will be considered from the Govt.
Highway Design Specialist Organizations in similar capacity.
Sr. Pavement Engineer
Material Engineer
Sr. Bridge & Structural Engineer
Bridge & Structural Engineer
Electrical Engineer
Safety Engineer
Geotechnical Expert
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
Building Design & Construction Engineer
109 Section 6, TOR, Enclosure B Qualification of Key Personnel, As per the ToR, the same professional Not tenable
Page No. 61 experience is required for the position of
Deputy Team Leader Team Leader & Deputy Team Leader.
e) Dy. TL should have handled as Deputy Team Leader or The Consultants understand that expert with
similar capacity of at least one Projects of project Preparation of similar professional experience may not like
major highway Project of two laning with paved shoulder / four to work as Deputy Team Leader if his CV is
– laning / six–laning / Expressway. suitable for the position of Team Leader.
Therefore, the Consultant would like to
request to omit the requirement of design
experience for the position of Deputy Team
Leader.
This may please be consider and confirmed.
110 Section 6, TOR, Enclosure B Qualification of Key Personnel, The Consultant understand that experience As per RFP
Page No. 61 with contractor as Project Manager will be
Deputy Team Leader considered.
d) Dy. TL should have handled as Deputy Team Leader/ This may please be confirmed.
Resident Engineer /Project Manager Superintending Engineer or
equivalent / or similar capacity of at least two projects in
Construction Supervision of Highways.
111 Section 6, ToR, Enclosure B Qualification of Key Personnel, The Consultants request the Client to Please refer Addendum.
Page No. 61 consider 20 years of professional experience
instead of 20 years in Contract Management
Senior Contract Specialist with relevant experience of 6 years as
Professional Experience of 20 years in Contract Management Contract Specialist.
This may please be considered and
confirmed.
112 Section 6, ToR, Enclosure B Qualification of Key Personnel, Various experts are available with Degree in Not tenable
Page No. 63 Civil Engineering and rich and extensive
Highway Design Specialist experience of highway design projects but
Post Graduate in Transportation / Highway/ Pavement might not possess Post Graduate.
Engineering from recognized university. Hence, the Client is requested to amend the
requirement as Degree in Civil Engineering.
Post Graduate in Transportation / Highway /
Pavement Engineering and other civil
engineering related field will be preferred.
The Consultants would also like to request
the Client to consider Post Graduation in
other Civil Engineering related field with
the existing requirement
The same may be accepted and Confirmed.
113 Section 6, ToR, Enclosure B Qualification of Key Personnel, The Consultants request the Client to Not tenable
Page No. 66 consider Post Graduation in other Civil
Highway Engineer Engineering related field with the existing
Post Graduate Degree in Highway Engineering. requirement.
This may please be confirmed.
114 Section 6, ToR, Enclosure B Qualification of Key Personnel, Various experts are available with Degree in Not tenable
Page No. 64 Civil Engineering and rich and extensive
Bridge Design Specialist experience of structural design of
Essential Qualification infrastructure projects but might not possess
a) Post Graduate in Structural Engineering from a recognized Post Graduate in Structural Engineering.
University. Hence, the Client is requested to amend the
requirement as Degree in Civil Engineering.
Masters in Structural Engineering will be
preferred.
The same may be accepted and confirmed.
115 Section 6, ToR, Enclosure B Qualification of Key Personnel, As Highway Design Engineer do not work Not tenable
Page No. 64 as Pavement Engineer, therefore the
Sr. Pavement Engineer Consultants request the Client to consider
c) At least 5 years' experience as Highway Design Highway Engineer along with the existing
Engineer / Pavement Engineer or similar capacity in Highway requirement and amend the requirement as:
project. “(c)At Least 5 years experience as Highway
Engineer/ Highway Design / Pavement
Engineer or similar capacity in Highway
Project”.
This may please be confirmed.
116 Section 6, ToR, Enclosure B Qualification of Key Personnel, The Consultants understand that Not tenable
Page No. 67 Environmental Planning/ Environmental
Environment Expert Engineering/ Environmental
Post Graduate in Environmental Science or equivalent Management will be considered as
equivalent in the qualification requirement
for the position of Environment Expert.
This may please be confirmed.
117 Section 6, ToR, Enclosure B Qualification of Key Personnel, The Consultants would like to mention that Not tenable
Page No. 67 the experts having more than 15 years
experience are providing their intermittent
Environment Expert input on various projects and may not be
b) Total Professional Experience of 15 years in available for the full time duration,
handling environmental aspects of highway projects. therefore, the Consultants request to amend
as –
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
“b) Total Professional Experience of
10 years in handling environmental aspects
of highway projects.”
This may please be considered and
confirmed.
118 Section 6, ToR, Enclosure B Qualification of Key Personnel, As various experts are available having vast Not tenable
Page No. 68 experience in similar highway projects in
various positions including as Geotechnical
Geotechnical Expert Expert but might not have experience of 15
b) Professional Experience of 15 years as Geotech Expert years as Geotech Expert. Thus the
Consultants request the Client to consider 15
years of professional experience instead of
15 years as Geotech Expert.
The Consultants would like to request that
following positions may also be considered
as similar capacity:
Material Engineer
Pavement Engineer
Pavement/Material Engineer
Material-cum-Geotechnical Expert
Executive Engineer and above
This may please be considered and
confirmed.
119 Section 6, ToR, Enclosure B Qualification of Key Personnel, The Consultants request to amend as – Not tenable
Page No. 68 “c) Experience of at least 5 years in
Highway Design/ Construction or related
Geotechnical Expert fields as Geotech Expert or similar
c) Experience of at least 5 years in Highway capacity.”
Construction or related fields as Geotech Expert This may please be considered and
confirmed.
120 Section 6, ToR, Enclosure B Qualification of Key Personnel, Number of experts are available having Post Not tenable
Page No. 68 Graduate Degree in Geology and vast
Geotechnical Expert similar experience. Therefore, the
a) Graduate in Civil Engineering from a recognized Consultants would like to request the Client
University to also considered Post Graduate Degree in
Geology and amend the qualification
requirement as:
a) Graduate in Civil Engineering/
Post Graduate Degree in Geology from a
recognized University.
“This may please be considered and
confirmed.”
121 Section 6, ToR, Enclosure B Qualification of Key Personnel, The Consultants request to amend as: Not tenable
Page No. 68 “c)Experience of 5 years in similar capacity
Electrical Engineer in Construction / Construction supervision
c)Experience of 8 years in similar capacity in Construction / of Highway projects.”
Construction supervision of Highway projects. This may please be considered and
confirmed.
122 Section 2 3.2 (ii), Page No. 13 The Consultants understand that the expert
The Applicants should prefer to field as many of their working with the bidding Consultants for
permanent staff as possible. During evaluation of CV of a more than 1 year will get full 5 marks.
retainer, such CV will be getting only 60% weightage of the The Consultants to request the Client to
marks allocated for the sub-criteria “Employment with Firm”. elaborate “Retainer”
The expert who has worked with the The expert working with the
firm in past. firm as consultants and
The expert working with the firm as being paid a specific amount
freelance consultants and being paid a every month for providing
specific amount every month for inputs as and when required.
providing inputs as and when required.
The expert who has given consent to
the bidding Consultants.
Further, the Consultants would like to
confirm
What sought of documentary proof the Please refer Clause 3.4 iv (a)
Consultants needs to provide to claim of Section-2.
and expert as Retainer. Managing Director/Head of
the firm/Authorized
Representative of the firm to
certify.
May please also confirm the minimum Please refer Clause 3.3ii.
duration with the bidding Consultants is Section-2
required to get 60% weightage for the
Retainer
123 Data Sheet, Clause 5, Page No. 23 The Consultants would like to suggest that Please refer clause 3.4 (iv)
Employment with Firm - 5 marks for claiming 5 marks against permanent (a) and (b) of Section 3 and
employment of the expert with the firm, the Appendix B-5; format of
some documentary proof, such as CV provided with the RFP.
employment certificate duly certified by the Applicants must declare
Chartered Accountant and recent TDS years with the firm/entity
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
certificate, supporting the permanent the which is to be certified by
employment of the expert with the firm the Managing Director/Head
should be enclosed along the CV in the or the authorized
Technical Proposal. representative of the firm.
Experience Certificate from
the employers are to be
attached alongwith the CV,
with the option of
submitting such Experience
Certificate at the time of
Contract negotiation
124 Sr. No. VIII of Appendix C-3, Financial Format in hard copy of There are discrepancies in the No. of copies The Bidder has to quote his
RFP given in Sr. No.10 of uploaded BOQ (Excel rates in BoQ format
AndSr. No.10 of BOQ uploaded Excel file file) and Sr. No. VIII of RFP Appendix C3 considering number of
As per hard copy of RFP: of Section 5. reports to be submitted
Reports and Document Printing The copies given in the RFP seems correct. monthly/quarterly each in 3
1) Monthly Reports (Common for all packages) – 288 copies Therefore, kindly correct the no. of copies of sets.
2) Monthly Reports (Package wise) – 864 copies each report in the BOQ also and upload the
3) Quarterly Reports – 108 copies Revised BOQ format in the web site
As per soft copy of BOQ:
10.01) Monthly Reports – 96 copies
10.02) Monthly Reports – 288 copies
10.03) Quarterly Reports – 12 copies
125 Clause No. 4.5 (c) of GCC In this regard, it is submitted that all the Not tenable
Replacement of Key Personnel consultants try their level best to keep the
As per Clause 4.5 (c) of GCC, for the replacement due to proposed key personnel but due to
death/extreme medical ground, the remuneration to be paid to unavoidable circumstances beyond their
any of the Key Personnel provided as a replacement shall be control, substitutions are needed. Above
90% of the remuneration which would have been payable to the mentioned conditions of the client are harsh
original Key Personnel replaced. However, for the reason other and should be modified as in all other
than death/extreme medical ground, (i) for total replacement up ongoing projects of NHAI, MoRT&H, PWD
to 33% of key personnel, remuneration of replaced Key and other State Govt etc. i.e. the Client shall
Personnel shall be 80% of the remuneration which would have reduce remuneration by 5% upto 33% of key
been payable to the original Key Personnel replaced (ii) for total personnel; reduction of 10% of the
replacement between 33% to 50%, remuneration of replaced remuneration between 33% to 50% and
Key Personnel shall be 75% of the remuneration which would reduction of 15% of the remuneration
have been payable to the original Key Personnel replaced and between 55% to 66% of key personnel.
(iii) for total replacement between 50% to 66%, remuneration of Total replacement beyond 66% of the total
replaced Key Personnel shall be 70% of the remuneration which key personnel, the client may initiate action
would have been payable to the original Key Personnel replaced for termination.
(iv) for total replacements beyond 66% of the key personnel the This may please be confirmed
client shall initiate action of higher
penalty/termination/debarment up to 2 years as considered
appropriate.
126 Clause No.3.6 of Letter of Invitation and Clause No. 6.2(a) of From this Clause, it may be seen that the Not tenable
SCC Client has co-related the Billing rates of
reimbursable items such as transportation,
As per clause No. 3.6 of LOI, Selected Consultants shall be paid duty travel to site, office rent, office
billing rates for services as per financial proposal submitted by supplies, communication, reports &
them on the basis of services rendered by the personnel of all document printing and survey equipment,
categories namely (i) Key Personnel; (ii) sub-Professional etc. with the financial progress of the civil
personnel and (iii) Support staff on man-month wise. For works.
calculating billing rates of remaining items (during construction This is unfair as if there are lapses on the
period) of the financial proposal, namely (i) transportation, (ii) part of Contractor during execution of civil
Duty travel to site (iii) Office Rent, (iv) office supplies works resulting in poor progress of the civil
communication etc. (v) reports & document printing and (vi) works, the Consultants shall be penalized
survey equipment etc. quoted amount (pertaining to without their fault as they will be paid less
construction period only) of selected consultant will be towards reimbursable items. The
converted to percentage of civil work cost quoted by civil Consultants have incurred expenses towards
contractors and payment will be made in proportionate to the reimbursable items, which should be paid as
cumulative financial progress of the civil work of all the 3 per actuals on monthly basis alongwith
packages put together. However, during the maintenance period, remuneration and should not be dependent
to cater for the possibility that the packages will not be on the financial progress of the civil works.
completed in synchronous manner i.e. there might be a scenario Further, it is submitted to kindly refer
that 2 out of 3 packages enter into DLP while 1 package is MoRT&H Circular No.RW-NH-
under construction, the demobilization for items namely (i) 34048/7/2013-S&R(B) dated 29.10.2018
transportation, (ii) Duty travel to site (iii) Site Office, (iv) office wherein payment Clause has been modified
supplies &communication etc (v) reports & document printing stating that all the payment pertaining to
shall be made as per the requirements and under consultation remuneration and reimbursable shall be
with the Authority. The payment during maintenance period made every month as per actual deployment
shall be made as per the deployed items on monthly basis. of personnel & logistics against earlier
instructions stating that the payments shall
be made based on percentage of Civil works
quoted by Civil Contractor and payment are
made in proportionate to the financial
progress of Civil Works.
Hence, it is requested that the Consultants
billing rates towards reimbursable items
should not be co-related with the financial
progress of the civil works.
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
127 Clause No.11 of TOR In this regard, given time period to provide Not tenable
Performance Security Performance Security Bank Guarantee to the
It is mentioned that the successful consulting firm shall have to Client is inadequate. Sometime the
submit a Bank Guarantee (BG) for an amount of 2.50% of the Consultant needs more time to complete
Contract Value within 15 days of issue of LOA. various Banking formalities to get Bank
Guarantee from the Bank.
The Client is requested to kindly provide
atleast 30 days from issue of LOA to submit
Performance Security Bank Guarantee to the
Client.
128 Additional Point It is requested that the date of submission of Not tenable
Extension of Date the proposal may please be extended and a
period of at least three weeks may please be
granted for the preparation of the proposal
from the date of issue of clarifications so
that our Experts can prepare a
comprehensive proposal addressing all the
issues of the RFP document / ToR.
129 SECTION 1: Information to Consultants, Point No. 10 on Page We request you to please allow a consultant Not tenable
No. 4 & 5 of RFP to participate in this project as Associate
Consultants may apply either as a sole firm or forming Joint Member (so as allow the Lead partner to
Venture with other consultants. In case of Joint Venture, the have a wider choice of capable CVs in the
maximum number of Joint Venture partners is limited to 2 (i.e. pre and post bid stage)
one lead + 1 JV partner). ………… ………. No consultant shall
submit more than one bid either individually or /and as part of
any JV.
130 SECTION 1: Information to Consultants, Point No. 10 on Page Please allow a wholly owned subsidiary of Not tenable
No. 4 & 5 of RFP an International firm to claim the technical
and financial (turnover, etc.) credentials of it
Consultants may apply either as a sole firm or forming Joint Holding company. This because
Venture with other consultants. In case of Joint Venture, the International firm set up wholly owned
maximum number of Joint Venture partners is limited to 2 (i.e. subsidiaries to bid and execute assignments
one lead + 1 JV partner). ………… ………. No consultant shall in India. You can also ask for an
submit more than one bid either individually or /and as part of undertaking by the Holding firm stating that
any JV. they will support all activities of their
subsidiary (including technical and
financial) in India
131 SECTION 1: Information to Consultants, Point No. 14, A). on We request you to please extend the Not tenable
Page No. 6 of RFP experience limit upto 10 years. This will
allow more Expressway projects to be
Eligibility criteria for sole applicant firm. showcased by the Consultants
Experience of the firm in last 7 years
132 DATA SHEET, Clause No. 5.1, iii, Pg. 23 of RFP Please allow the consultants to bid both the Please refer Addendum.
Qualification and competence of following professional/sub- packages with one team.
professional staff
133 SECTION 6: Clause 13; Performance Security, Pg 57& 58 of We request you to allow the consultant to Not tenable
RFP submit the Performance Security on Year to
Year basis with an undertaking (Affidavit)
Performance Security to extend the validity on yearly basis. Global
Banks generally provide one year BGs to
International firms in India
134 General We request to please extend the proposal Not tenable
Time Extension submission date by 4 weeks from the date of
issuance of clarifications. Documents have
to be translated, apostilled and notarised
which takes some time for International
firms
135 Note2Page25ofRFP We understand that the projects achieved The projects where more
The projects where morethan90%ofthework has been completed physical progress of 90%will be considered than 90% of the work has
shall be considered as substantially completed. The same shall and counted for evaluation. Kindly confirm been completed shall be
be certified by the Employer for the respective project. considered as substantially
completed. The same shall
be certified by the Employer
for the respective project
136 SECTION2. LETTER OF INVITATION TO We understand that permanent employee The expert working with the
CONSULTANTS, Clause3.3(ii) will have 100% of be weightage under sub- firm as consultants and
The Applicants should prefer to field as many of their criteria of Employment with Firm. being paid a specific amount
permanent staff as possible. During evaluation of CV of a Kindly clarify the definition of retainer to every month for providing
retainer, such CV will getting only 60% weightage of the get 60% weightage under this head. inputs as and when required.
marks allocated for the sub-criteria "Employment with Firm".
The permanent staff would be considered those already
employed with the firm prior to one year from the month during
which this Tender Notice is issued. Applicant shall submit the
details of the period of employment of the proposed personnel
with the firm.
137 The inputs for Senior Pavement Engineer, Senior Kindly clarify whether Headquarters should Please refer clause 4.19 of
Bridge/Structure Engineer shall be taken at least 40% in the be assumed as Consultant's Home Office or ToR (Section-6)
field every month and for the balance period, input will be Consultant's TL Office.
from the Headquarters, since for their services,
substantial support is needed from the Headquarters. Besides,
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
for the position of Sr. Contract specialist the input shall be
minimum for 20% period every month in the field and for
balance 80% period at Headquarters. Similarly for the Team
Leader and Dy. Team leader the input shall be minimum
10%period every month in the field and balance 90% at
Headquarters. The input in the field mentioned above for all the
above said key personnel is minimum and should be such
that each package is visited at least once in a month. For
days other than authorized leave and site visit by personnel of
the Authority Engineer, the entire team working at the
Headquarter (TL office) and Site Office
{RE Office) shall register their attendance on an biometric
recording instrument on a daily basis and shall submit the
summary of attendance on a monthly basis to the Authority
without fail along with the bills raised by the Authority
Engineer. Supporting documents of authorized leave and site
visits made by the personnel shall be submitted alone with the
monthly statement
138 Clause 11.3, Page 56 of RFP We understand that CV of sub- professional CVs of sub-professional
In addition to above, consultants are required to propose other staff and other field staff need not to be staff shall be evaluated for
key personnel, sub- professional staff and other field engineers submitted at this stage. However their CV their suitability by
as detailed in Enclosure-A and the minimum qualification will need to be get approved before Employer‟s Representative
requirements for the same is enclosed in Enclosure-B. mobilization. Kindly confirm. before deployment.
139 GCC, Clause 4.5, Page 89 Of RFP In case of replacement due to Please refer Addendum.
death/extreme medical ground, there should
4.5 Removal and/or Replacement of Personnel: For the not be any penalty on the replacement of
replacement due to death/extreme medical ground, the Key Staff. Kindly consider the same.
remuneration to be paid to any of the Key Personnel
provided as a replacement shall be 90% of the remuneration Penalty on replacement of 20% up to total
which would have been payable to the original Key Personnel replacement of 33% of key experts is very
replaced. However, for the reason other than death/extreme high. Consultant always do their best to
medical ground, retain the key experts and however to retain
(i) for total replacement up to 33% of key personnel, them is not in the hand of consultant.
remuneration of replaced It is requested to relax the %age on
Key Personnel shall be 80% of the remuneration replacement i.e. 10% up to 33%
which would have been payable to the original Key replacements and 15% on replacement
Personnel replaced. (ii) for total between 33% to 50% and 20% on
replacement between 33% to 50%, remuneration of replaced replacement between 50% to 66%
Key Personnel shall be 75% of the remuneration which would replacement.
have been payable to the original Key Personnel replaced and
(iii) for total replacement between 50% to 66%,
remuneration of replaced Key Personnel shall be 70% of the
remuneration which would have been payable to the original
Key Personnel replaced
(iv) for total replacements beyond 66% of the key personnel the
client shall initiate action of higher
penalty/termination/debarment up to 2 years as considered
appropriate. No reduction in remuneration shall be done in case
of replacement of sub-professional staff.
140 SCC, Clause 6.2 (a) I The project is divided into three different Not tenable
Payments for remuneration made in accordance with Clause GC packages and consultant need to maintain
6:2(a) in shall be adjusted as follows: the vehicles and four offices even when
Consultants shall be paid billing rates for services rendered there is no progress or slow progress of
by the personnel of all categories namely (i) key Personnel; (ii) work. All these services are provided on
sub- Professional personnel and (iii) Support staff on man-moth hiring basis and their monthly bill/rent
wise. For calculating billing rates of remaining items (during need to be paid by consultant on monthly
construction period), of the financial proposal, namely (i) basis .
transportation, In view of the same we request you to
(ii) Duty travel to site (iii) Office Rent, (iv) office supplies kindly make payments on monthly basis for
communication etc. (v) reports & document printing and (vi) all these services.
survey equipment etc. quoted amount (pertaining to
construction period only) of selected consultant will be
converted to percentage of civil work cost quoted by civil
contractors and payment will be made in proportionate to
the cumulative financial progress of the civil work of both the
2 packages put together, provided further that payment against
reimbursable expenditures shall be minimum of actually and
reasonably incurred by the Consultant or the proportionate
amount calculated as mentioned in the clause
141 Bid submission due date As there are 35 Key experts who are Not tenable
10th December 2019 required and identification of suitable
experts is a challenging and time taking
process, we request you to kindly extend the
bid due date at least by two weeks.
142 APPENDIX C-3: BREAKDOWN OF COSTS We understand that all these 6 replacements Please refer Clause 4.5 (c)
Page42 allowed after Construction Period for
A maximum of 6 replacements shall be allowed after the deployment shall be free of any penalty.
Construction Period for deployment in Maintenance Period. Kindly confirm.
143 Eligibility Criteria Page 6 We request you to consider Experience of The query is not clear.
The firm should have minimum experience of preparation of Design Projects under Experience in DPR
Sl. Clarifications as decided
Clause / Subject Query
No. by CEC
detailed Project Report/ Feasibility Study cum preparation. Feasibility Study cum
Preliminary Design Report of 4/6** laning project of Preliminary Design.
aggregate length equal to 1.5 times or more than the Project Kindly confirm.
Length mentioned in Table 1
144 Letter to Consultants Clause 1.12 Many times it happens that the gap between Not tenable
Page 11 the Negotiation stage and Letter of Award
The Data Sheet indicates how long Consultants' Proposals must stage gets prolonged and the proposed Key
remain valid after the submission date. During this period, Personnel might not be available for the
Consultants shall maintain the availability of Professional staff assignment.
nominated in the Proposal. The Authority will make its best In such a circumstance we request that there
effort to complete negotiations within this period. Should the may not be any penalty on such
need arise, however, the Authority may request Consultants to replacements.
extend the validity period of their proposals. Consultants who Kindly consider.
agree to such extension shall confirm that they maintain the
availability of the Professional staff nominated in the Proposal,
or in their confirmation of extension of validity of the Proposal,
Consultants could submit new staff in replacement, who would
be considered in the final evaluation for contract award.
145 61 -70 We request you to kindly provide the Please refer Addendum.
Enclosure -B: detailed Evaluation Criteria for assessment
of score of Firm and the Key personnel
Qualification of Key Personnel
146 48 There is variance with regard to no of copies The Bidder has to quote his
Appendix C-3: Breakdown of Costs of reports between Schedule-J of Financial rates in BoQ format
VIII. Reports and Document Printing Proposal Excel Sheet and Section VIII. considering number of
reports to be submitted
Monthly reports (Common for All Packages -Executive Reports and Documents Printing of monthly/quarterly each in 3
Summary) -Limited to 30 pages -288 copies Appendix C-3: Breakdown of Costs at Page sets.
No: 48 of RFP.
Monthly Reports (Package Wise) -864 copies We therefore request you to kindly rectify
this.
Quarterly Reports (Package Wise) -108 copies
Consultants may apply either as a sole firm or forming Joint Following clause is all NHAI, Ministry,
Venture with other consultants. In case of Joint Venture, the PWD etc government tender for allowance
maximum number of Joint Venture partners is limited to 2 (i.e. of associate.
one lead + 1 JV partner).
“the applicant whether a sole applicant or
lead member with joint
venture may also include an Associate for
providing key personnel. In such case, the
applicant should submit an MOU with
associate regarding role and responsibility of
Associate Company. However the maximum
no. of key personnel from Associate firm
during RFP proposal and implementation of
contract should be limited to two (2).”
149 Page 18 Clause 15 There are certain countries for which State Please refer Addendum.
State Bank of India BC Selling rate as on last date of Bank of India does not give selling rate.
submission of the bid
We request you to kindly Reserve Bank of
India (Selling rate) /International Monetary
Fund as on 28 days before the date of
submission of the bid
Sr. Reference
Existing Provisions in RFP Document Modified Provisions
No. Document
1. …………………………………………………… ……………………………………………………
…... …...
In case the financial figures and values of services In case the financial figures and values of services
provided are in foreign currency, the above provided are in foreign currency, the above
Section 1
enhancement factors will not be applied. Instead, enhancement factors will not be applied. Instead,
Clause 15
current market exchange rate (State Bank of India current market exchange rate (State Bank of India
BC Selling rate as on last date of submission of the BC Selling rate as on 15 days prior to bid due
bid) will be applied for the purpose of conversion date) will be applied for the purpose of conversion
of amount in foreign currency into Indian Rupees. of amount in foreign currency into Indian Rupees.
2. Section 2 Consultants shall furnish information
Deleted.
Clause 1.11 ……………………….. Financial Proposal
3. Hard copy of the documents as specified in point Hard copy of the documents as specified in point
nos. 4.1 (b) above (excluding Financial Proposal) nos. 4.1 (b) above (excluding Financial Proposal)
Section 2
only is required to be submitted at the address only is required to be submitted at the address
Clause 4.1 d)
given below latest by 1300 hours on bid opening given below latest by 1400 hours on bid opening
date……………… date……………………..
4. The Authority has issued the RFPs for selection
of two Authority’s Engineers. The sequence for
opening the financial bid for two Authority’s
Engineers shall be as follows:
1. Package I to Package III
2. Package IV to Package VI
1
Intermittent Inputs
2
Intermittent Inputs
Sr. Reference
Existing Provisions in RFP Document Modified Provisions
No. Document
AUTHORITY no no
ENGINEER (common for 4 (common for 3
packages) packages)
…. ……. ……. ……. …. ……. ……. …….
19 ……. ……. ……. 19 ……. ……. …….
Sub Total 1140 404 Sub Total 1140 484
B: Sub Professional B: Sub Professional
Staff Staff
(a) ……… …… …… (a) ……… …… ……
8. Section 6
Enclosure B,
Clause 3 Senior Professional Experience of 20 years in Contract Professional Experience of 15 years in Contract
Contract Specialist Management. Management.
1) Essential
Qualifications b)
9. Geotechnical Expert
Geotechnical Expert3
Duties: Geotechnical Expert (GE) will be reporting
Duties: Geotechnical Expert (GE) will be reporting to the Team Leader and give input as and when
to the Team Leader and give input as and when required. GE shall be responsible for analyzing and
required. GE shall be responsible for analyzing and verifying the specifications and results of
verifying the specifications and results of Geotechnical investigations and geotechnical
Geotechnical investigations and geotechnical details submitted by the contractor and producing
details submitted by the contractor and producing technical report of ground investigation and
technical report of ground investigation and interpretation using state of the art 2D, 3D ground
interpretation using state of the art 2D, 3D ground modeling software. GE shall be responsible for
modeling software. GE shall be responsible for giving her/his input regarding quality and
giving her/his input regarding quality and suitability of earth, stones, sand etc. used in the
suitability of earth, stones, sand etc. used in the project and stability and protection of embankment,
project and stability and protection of embankment, structures etc.
structures etc.
Section 6
Enclosure B, GE should have the following qualification /
Clause 16 GE should have the following qualification / experience.
experience.
1) Essential Qualifications:
1) Essential Qualifications:
a) Graduate in Civil Engineering from a
a) Graduate in Civil Engineering from a recognized University.
recognized University.
b) Professional Experience of 15 years as
b) Professional Experience of 15 years as Geotech Expert
Geotech Expert
c) Experience of at least 5 years in Highway
c) Experience of at least 5 years in Highway Construction or related fields as geotech Expert.
Construction or related fields as geotech Expert.
d) Not more than 65 years of age.
2) Preferential Qualifications:
2) Preferential Qualifications:
a) Post Graduation in Geotechnical/Soil
Mechanics / Foundation Engineering. a) Post Graduation in Geotechnical/Soil
Mechanics / Foundation Engineering.
10. Building Design & Construction Engineer Building Design & Construction Engineer
Duties: Building Design & Construction Engineer Duties: Building Design & Construction Engineer
(BDCE) shall report to Team Leader and respective (BDCE) shall report to Team Leader and respective
Resident Engineer. BDCE shall be responsible for Resident Engineer. BDCE shall be responsible for
verifying the specification, quantities, checking and verifying the specification, quantities, checking and
Section 6 analyzing the layout and structure design of all analyzing the layout and structure design of all
building structures using latest design software, building structures using latest design software,
Enclosure B,
submitted by the contractor and producing submitted by the contractor and producing
Clause 17
technical report using building & structural technical report using building & structural
modeling software. BDCE shall also be responsible modeling software. BDCE shall also be responsible
for monitoring the quality, quantity and progress of for monitoring the quality, quantity and progress of
construction activity of building works and construction activity of building works and
examination of Change of Scope orders and examination of Change of Scope orders and
quantities related to these thereof. quantities related to these thereof.
Sr. Reference
Existing Provisions in RFP Document Modified Provisions
No. Document
BDCE should have the following qualification / BDCE should have the following qualification /
experience. experience.
14. We, the undersigned, offer to provide the We, the undersigned, offer to provide the
Section 7 consulting services for the above in accordance consulting services for the above in accordance
First Para, with your Request for Proposal dated with your Request for Proposal dated
Appendix B-1, _____________and our Proposal. We are hereby _____________and our Proposal. We are hereby
Technical submitting our Proposal, which includes this submitting online our Technical Proposal and a
Proposal Technical Proposal and a Financial Proposal sealed Financial Proposal (in BOQ Format) under
Submission Form under a separate envelope for the above mentioned separate e-envelopes for the above mentioned
work. work.
15. Rental cost towards Survey Equipment (GPS/Total Rental cost towards Survey Equipment (GPS/Total
station /Auto Level) with semiskilled survey Party station /Auto Level) with semiskilled survey Party
BoQ format (2 persons) and one dedicated vehicle for Survey (3 persons) and one dedicated vehicle for Survey
item No, 11.01 Party (inclusive of vehicle rental driver‟s salary, Party (inclusive of vehicle rental driver‟s salary,
fuel operation and maintenance etc complete) with fuel operation and maintenance etc complete) with
rods, flags and other sundries – 2 Nos. rods, flags and other sundries – 3 Nos.
16. It is mandatory for all the Applicants to have class- It is mandatory for all the Applicants to have Class-
II Digital Signature Certificate (DSC) (in the name II / Class-III Digital Signature Certificate (DSC)
Section 2
of Authorized Signatory / Firm or Organisation / (in the name of Authorized Signatory/Firm or
Clause 4.2.1.1 Owner of the Firm or Organisation/ Owner of the Firm or Organisation)
from UP Electronics Corporation Limited or from
Organisation) from UP Electronics Corporation
any of the licensed certifying agency (“CA”)
Sr. Reference
Existing Provisions in RFP Document Modified Provisions
No. Document
Limited to participate in e-tendering of authorised by Controller of Certifying
Authority, GoI as per Government Order No.
UPEIDA as per Government Order No. 1067/78-2-
1067/78-2-2017-42 IT/2017 dated May 12, 2017 to
2017-42 IT/2017 dated May 12, 2017 to
participate in e-tendering of UPEIDA.
participate in the e-tendering process.
The Authority shall not be responsible if the
applicant fails to submit its proposal due to DSC
registration problem or due to any last moment
submission problem on E-Tender Portal.
The effect of the modifications of the above mentioned clauses shall be applicable mutatis mutandis in the entire RFP document.
APPENDIX -EC
(ii) Add 1 (one) mark extra for each completed project subject to Max of
4 marks.
(ii) Add 0.25 (zero point two five) marks extra for each additional project
subject to Max 1 mark.
TOTAL 25
1. Team Leader cum Senior Highway Engineer Scoring
1 Essential Qualification 25
marks(Max)
(ii) Experience of more than 15 years: 5.0% marks per year 20% (max)
(c) At least 5 years’ experience as Team Leader/Dy. Team Leader / Resident 5 years
Engineer/Project Manager or similar capacity in Highway project. (Min)
(ii) Experience of more than 5 years: 5.0% marks per year 20% (max)
(ii) Experience of more than 2 Projects: 5.0% marks per project 20% (max)
e) TL should have handled as Team Leader or similar capacity of at least one 1 project
Projects of project Preparation of major highway Project of 2 laning with (Min)
paved shoulders / four - laning/ six –laning / Expressway.
Marks for “TL should have handled as Team Leader or similar capacity of 10 marks
at least one Projects of project Preparation of major highway Project of 2 (Max)
laning with paved shoulders / four - laning/ six –laning / Expressway.”
(ii) Experience of more than 1 Project: 5.0% marks per project 20% (max)
(ii) Experience of more than 1 Project: 5.0% marks per project 20% (max)
(ii) 5.0 % increase of marks for every increase in no. of years of 20% (max)
employment with firm over 1 year
*Only those projects will be considered for evaluation at Sl 1(d) above where input of the personal
is at least one year and 1 (e ) above where the input of personnel is at least six months
2. Deputy Team Leader Scoring
1 Essential Qualification 25
marks(Max)
(ii) Experience of more than 15 years: 5.0% marks per year 20% (max)
(ii) Experience of more than 5 years: 5.0% marks per year 20% (max)
Marks for “Dy. TL should have handled as Deputy Team Leader/ 25 marks
Resident Engineer /Project Manager Superintending Engineer or (Max)
equivalent / or similar capacity of at least two projects in
Construction Supervision of Highways.”
(i) Experience of 2 Projects 80%
(ii) Experience of more than 2 Projects: 5.0% marks per project 20% (max)
Marks for “Dy. TL should have handled as Deputy Team Leader or 10 marks
similar capacity of at least one Projects of project Preparation of (Max)
major highway Project of two laning with paved shoulder / four –
laning/ six –laning/ Expressway.”
(ii) Experience of more than 1 Project: 5.0% marks per project 20%(max)
(ii) Experience of more than 1 Project: 5.0% marks per project 20%(max)
(ii) 5.0 % increase of marks for every increase in no. of years of 20% (max)
employment with firm over 1 year
*Only those projects will be considered for evaluation at Sl 1(d) above where input of the personal
is at least one year and 1 (e ) above where the input of personnel is at least six months
3. Sr. Contract Specialist Scoring
d) SQS should have handled as Quantity Surveyor in at least two projects in 2 Projects
Construction / Construction Supervision of Two/four / Six laning of (Min)
Highways/ Expressway.
Marks for “SQS should have handled as Quantity Surveyor in at least two 25 marks
projects in Construction / Construction Supervision of Two/four / Six laning (Max)
of Highways/ Expressway.”
(i) Marks for 2 projects 80%
(ii) 5% increase of marks for every increase in no. of Projects 5% and
20%(max)
Essential Qualification 25
1
marks(Max)
a) (i) Graduate in Civil Engineering from recognized university. 80%
2a) (ii) Post Graduate Degree in Highway / Transportation / Pavement 20% (max)
Engineering / Soil Mechanics.
Total Professional Experience of 12 years in handling Highway 12 years
Projects. (Min)
b) Marks for “ Total Professional Experience of 12 years in handling
15
Highway Projects.”
marks(Max)
(i) Experience of 12 years 80%
(ii) Experience of more than 12 years: 5.0% marks per year 20% (max)
At least 5 years’ experience as Highway design Engineer/ Pavement
Engineer or similar capacity in Highway Projects. 8 years (Min)
Marks for “At least 5 years’ experience as Highway design Engineer/ 40 marks
c) Pavement Engineer or similar capacity in Highway Projects” (Max)
(i) Experience of 5 years 80%
(ii) Experience of more than 5 years: 5.0% marks per year 20% (max)
1 General Qualification 25
marks(Max)
a) (i) Graduate in Civil Engineering from recognized university 80%
2a) Post Graduate Degree in Structural Engineering 20% (max)
2b Preferential Qualification
Experience as a Material Engineer abroad 1 Project
(min)
Marks for “Experience as a Material Engineer abroad” 5 marks
(Max)
(i) Marks for 1 project 80%
(ii) 5% increase of marks for every increase in no. of Projects. 20%(max)
2b Expertise in power transformers, power & control cables, current &voltage 1 Project
transformers (Min)
Marks for “Expertise in power transformers, power & control cables, current 10 marks
&voltage transformers.” (Max)
(i) Marks for 1 project 80%
(ii) 5% increase of marks for every increase in no. of Projects 20%(max)
2c) Experience in Power distribution systems, lighting systems, power studies 1 Project
and project trouble shooting. (Min)
Marks for "Experience in Power distribution systems, lighting systems, 10 marks
power studies and project trouble shooting". (Max)
(i) Marks for 1 project 80%
(ii) 5% increase of marks for every increase in no. of Projects 20%(max)
2d Background of installation and commissioning of generators, transformers, 1 Project
transmission lines, protection systems and UPS units (Min)
Marks for "Background of installation and commissioning of generators, 10 marks
transformers, transmission lines, protection systems and UPS units" (Max)
(i) Marks for 1 project 80%
(ii) 5% increase of marks for every increase in no. of Projects 20%(max)
1 Essential Qualification 25
marks(Max
)
a) (i) Graduate in Electrical/Electronics and Communication Engineering from a 80%
recognized university.
2a) (ii) Post Graduation Electrical/Electronics and Communication 20% (max)
Engineering /Instrumentation Engineer
At least 5 years as a TMS / ATMS / HTMS expert for road projects 5 years
(Min)
Marks for “At least 5 years as a TMS / ATMS / HTMS expert for road 25 marks
projects” (Max)
(i) Marks for 5 years 80%
(ii) Experience of more than 5 years: 5.0% marks per year 20% (max)
c TMSE should have handled at least 2 major toll / HTMS road projects. 2 Projects
(Min)
Marks for “TMSE should have handled at least 2 major toll / HTMS road 30 marks
projects.” (Max)
(i) Experience of 2 Projects 80%
(ii) Experience of more than 2 Projects: 5.0% marks per project 20% (max)
1 Essential Qualification 25
marks(Max
)
a) (i) Graduate in Civil Engineering from a recognized University. 80%
2a (ii) Post Graduate Degree in Traffic Transportation/Safety 20% (max)
Engineering/Transportation Planning.
d) Experience in Road Safety Audit of at least 2 nos 2 laning with paved 2 Projects
shoulder /4/6 lane highway / expressway project including 1 nos at design (Min)
stage
Marks for “Experience in Road Safety Audit of at least 2 nos 2 laning with 25 marks
paved shoulder /4/6 lane highway / expressway project including 1 nos at (Max)
design stage”
(i) Experience of 2 Projects 80%
(ii) Experience of more than 2 Projects: 5.0% marks per project 20% (max)
2b) Involvement in Preparation of Road Safety Policy of Nation / State / City 1 project
(Min)
Marks for “Involvement in Preparation of Road Safety Policy of Nation / State 5 marks
/ City ” (Max)
(i) Experience of 1Project 80%
(ii) Experience of more than 1 Project: 5.0% marks per project 20%(max)
2c Involvement in Preparation of Road Safety Management Plan for inter urban 1 project
Highways in PPP/EPC mode. (Min)
Marks for “Involvement in Preparation of Road Safety Management Plan for 5 marks
inter urban Highways in PPP/EPC mode.” (Max)
(i) Experience of 1Project 80%
(ii) Experience of more than 1 Project: 5.0% marks per project 20%(max)
Employment with the Firm 1 year (Min)
3(Dat Marks for “Employment with the Firm” 5 marks
a (Max)
Sheet)
(i) On retainership 60%
(i) 1 year 80%
(ii) 5.0 % increase of marks for every increase in no. of years of employment 20% (max)
with firm over 1 year
Total Score 100