Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: Risk Assessment for Location/Area:-
Contractor :- Finishing work

bility

bility
Sl Basic Job Potential Consequen Current control measure

Proba
Init Ad

Proba

ual
Resid
Risk rating Ri

risk
No. Steps Hazard ce ial diti sk
Ris on ra
P E A R k al ti
P E A R
Platform to be made as per standard and it con n
should be certified g
trol
Use of Double rope full body harness and it me
shoud be anchored above the head height at asu
different two anchoring points re

Slip of Use of rubber hand gloves for avoiding of skin


Get Injury hazards 2 0 0 0 2 4
materials/Tools
Drop Zone to be provided
Toe guard to be provided for preventing from
materials
Loose materials shall not be allowed to
Brick &
remain on the gangways
1 Plastering on
wall Take WAH permit before starting the activity

Enlist the name of workmenat daily


attachment sheet before starting the activity

Get Finishing activity at reject silo wall to be


Working at height 2 0 0 1 2 4
Injury/Fatality carried on sitting inside the jhola which is to
be hanged with reject silo wall while require
the changing the position of work
place,people shall go carefully from jhola to
silo shell with anchoring safety harness.

Prepaired By Approved By Reviwed by


Contractor Contractor
Date Date Date

1of1