Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
General Notes
7' 19'-3"
F-1
F-1
14'-9" 14'-9" 14'-9" 8'-9" 14'-9" 14'-9" 14'-9" 8'-9" 14'-9" 14'-9" 14'-9" 8'-9"
25'
C-3
C-3
C-3 C-3
General Notes:
2'-6"
C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
C-1 C-1
F-1 F-1
2'-6"
F-1 F-1 (1) Foundation of the structure is based on the assumed bearing capacity
1"
1"
7'-82
7'-82
12'-9"
12'-9"
2'-6"
C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 (2) Structural concrete for columns, shear walls & Lift shall have minimum
2'
F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 cylinder crushing strength at 28 days equal to 4000 psi while that for footings,
C-3 C-3 C-3
beams,slabs strength at 28 days equal to 3000 psi.
20'-9"
20'-9"
2'-6"
30'
30'
2'-6"
F-2 F-1 2'-6" (3) Structural steel shall have minimum yield strength equal to 60,000psi.
2'-6" 2'-6" It must be remembered that in slabs #3 bars shall be used of Grade 60.
18'-6"
18'-6"
2'-6"
2'-6" 2'-6" 2'-6"
2'-6" It should be very clear that all steel shall be grade 60 deformrd steel.
14'-3"
14'-3"
2'-6" 2'-6"
C-1 C-1
(4)Minimum clear cover to reinforcement shall be as under;
2'-6"
(a)Foundation = 2"
F-1
F-1
C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-3 C-3 C-3 (b)Beams and Columns = 1.5"
F-1
F-1
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
F-1 F-1 F-1 F-1 F-1 F-1 F-1
(c) Slabs = 0.75"
C-3
C-3
F-2 F-1
1"
1"
5'-102
5'-102
14'-9"
14'-9"
(5) Dowel length for columns
C-1 C-1 C-1 C-1 C-1 C-1
2'
(a) # 4 Bars = 26"
14'-9"
14'-9"
F-2 F-2 F-2 F-2 F-2 F-2 3'
2'-6"
2'-6" (b) # 5 Bars = 33"
C-1 C-1
(c) # 6 Bars = 39"
2'-6"
F-1 F-1
14'-9" 14'-9" 14'-9" 8'-9" 14'-9" 14'-9" 14'-9" 8'-9" 14'-9" 14'-9" 14'-9" 8'-9" C-3 C-3 (d) # 8 Bars = 52"
2'-6"
2'-6"
30'
30'
(6) Overlaps for Top Beam Bars
12'-9"
12'-9"
F-1 F-1
2'-6"
( a) # 4 Bars = 26"
GROUND FLOOR FOUNDATION LAYOUT PLAN
1"
1"
11'-02
11'-02
2'-6" ( b) # 5 Bars = 33"
C-1 C-1
SCALE:1'=81"
2'-6"
2'-6"
2'-6" ( c) # 6 Bars = 39"
C-2 C-2 F-1 F-1
2'-6"
( d) # 8 Bars = 52"
7' 17'-8"
(7) Overlaps for Bottom Beam Bars
F-1
F-1
14'-9"
14'-9"
2'-6"
and all Slab Bars:
C-3
C-3
2'-6"
GROUND FLOOR FOUNDATION ( a) # 3 Bars = 20"
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
30'
#4@10"C/C
#4@10"C/C
2'
#4@8"C/C
#4@8"C/C
LAYOUT PLAN
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
( b) # 4 Bars = 26"
#4@8"C/C
GROUND FLOOR FOUNDATION
#4@8"C/C
SCALE:1'=18"
2'-6"
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
LAYOUT PLAN ( c) # 5 Bars = 33"
#4@7"C/C #4@7"C/C #4@7"C/C #4@7"C/C
22'-9"
SCALE:1'=18" ( d) # 6 Bars = 39"
B-2
B-2
B-2 #4@7"C/C
B-2
B-2
B-2
B-2
#4@7"C/C
B-2
B-2
B-2
B-2
#4@7"C/C
B-2
B-2
#4@7"C/C
#4@7"C/C #4@7"C/C GROUND FLOOR FOUNDATION ( e) # 8 Bars = 52"
#4@10"C/C
LAYOUT PLAN
#4@7"C/C
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-2
SCALE:1'=18"
#4@10"C/C #4@10"C/C
#4@7"C/C
SCHEDULE OF R.C.C. SLABS
#4@7"C/C
#4@10"C/C
#4@7"C/C
#4@7"C/C
#4@7"C/C
#4@6"C/C #4@6"C/C #4@6"C/C
B-1
#4@6"C/C #4@6"C/C
B-1
#4@7"C/C
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
#4@7"C/C
#4@6"C/C
#4@7"C/C
#4@7"C/C
#4@6"C/C
#4@7"C/C
#4@8"C/C B-2
#4@6"C/C B-2
#4@10"C/C
#4@6"C/C
LONGER SPAN BARS @ 3/8''Ø 7'' c/c
#4@7"C/C
#4@10"C/C #4@10"C/C
SHORTER SPAN BARS @ 1/2"Ø 8'' c/c
B-1
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
ALL MAIN BARS BENT UP.
#4@10"C/C
#4@10"C/C
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
B-1
B-1
UP UP #4@7"C/C
#4@7"C/C
B-1
#4@10"C/C
#4@10"C/C
B-1
#4@10"C/C
#4@7"C/C
#4@10"C/C
#4@10"C/C
B-1 B-1 B-1
Notes
B-1
B-2
Notes:
#4@7"C/C
#4@10"C/C
GROUND FLOOR SLAB #4@10"C/C B-2 1. Coordinate Architectural Drawings with Structural Drawings.
B-1
#4@7"C/C 2. The written dimensions for top slab reinforcement are from
REINFORCEMENT PLAN #4@7"C/C
face of beam.
B-1
GABLE 3. Tie bars for top slab reinforcement are #3@12"C/C.
RAFTER DIAGONAL
END
SCALE:1'=81" #4@10"C/C BRACING.
ALTERNATIVE DIRECTION OF 4. Top of all slab panels is at the same level.
B-2
RAFTER DIAGONAL BRACING.
#4@7"C/C
#4@10"C/C
5. 3 # 4 bars (Min. length 4'-0") shall be placed diagonally in
B-1
#4@10"C/C bottom at four corners of each duct.
B-1
6. Provide 9" hook to all top slab reiforcement ending at beam.
B-2
#4@7"C/C
7. For Layout, location & size of services ducts , Arhitectural/
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 Electrical and Services/Plumbing Drawing shall be coordinated.
B-1
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@7"C/C
#4@10"C/C
8. Provide additional slab bars at the end of ducts, equal to bars
#4@10"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@8"C/C
B-2
B-2
B-2
B-2
B-2
B-2
#4@8"C/C
being discontinuous due to ducts.
B-2
B-2
B-2
B-2
B-2
B-2
B-2
#4@7"C/C
#4@8"C/C
#4@7"C/C
B-1
#4@10"C/C
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
#4@7"C/C #4@7"C/CB-1
SCALE:1'=18"
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
B-2
#4@10"C/C
B-2
DN DN #4@7"C/C
#4@7"C/C
#4@7"C/C
B-1
#4@10"C/C
#4@7"C/C
#4@7"C/C
#4@7"C/C
#4@6"C/C #4@6"C/C
#4@6"C/C #4@6"C/C
#4@6"C/C PROPOSED LA SERENE RESORT ON MAIN
#4@7"C/C
#4@10"C/C
#4@7"C/C
#4@6"C/C
NARAN / BABU SIR ROAD BATA KUNDI.
#4@7"C/C
#4@7"C/C
#4@6"C/C B-1
#4@7"C/C
#4@7"C/C
CROSSWALL
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@12"C/C
#4@8"C/C
GROUND FLOOR SLAB
#4@10"C/C
#4@10"C/C
#4@10"C/C
#4@7"C/C
REINFORCEMENT PLAN OWNER:
SCALE:1'=81"
#4@12"C/C
SYED TARIQ ALI
FIRST FLOOR SLAB #4@10"C/C
S/O
REINFORCEMENT PLAN #4@8"C/C
SYED ABU TALIB
#4@7"C/C
SCALE:1'=18"
#4@12"C/C
SIGN:
#4@12"C/C
#4@8"C/C
#4@6"c/c
9"
#4@8"c/c #3@7"c/c
3" 2'-0" 3" B/W
F.F.L
3"
SECOND FLOOR ROOF PLAN Porch Level
6"
2-#4
SCALE:1'=81" Water Level
#6@12"c/c #4@6"c/c #4@7"c/c
Outer FFL (I.F) (O.F)
Cover 1 21" 1
Cover 1 2"
6'-0"
#4@12"C/C #3@12"C/C
#3@9"c/c #3@9"c/c
5'-0"
#3@9"C/C (I.F) (O.F)
3 #4+2#4 3 # 6+2#4
#3@10"c/c
Corner Bar
12"
SECOND FLOOR ROOF PLAN
1'-6"
1'-9"
#3@4"c/c #3@8"c/c
#3@9"c/c 6"
3#6
SCALE:1'=81" B/W
6"
#4@6"C/C 9" 3#6
Section B-1
9"
5'-6"
3" 6"
Section B-2
#4@4"c/c Bw
#3@8"c/c #4@6"c/c
PCC (1:4:8)
Basement FFL #4@4"c/c Bw
3" 6" 6" 5'-0" 6" 6" 3"
Basement FFL 8#6 8#6 12 # 6
Basement FFL #3@9" c/c
95 % ASSHTO Compacted #4@7"c/c #4@7"c/c
2'-6"
1'-6"
7#4
12" 12" 12" 12" 8 # 4 #4@7" c/c 3" Ties 3" Ties Ties Granular Soil
2'-6"
SECTION AT A-A
2'-6"
1'-3"
1'-3"
1'-6"
1'-6"
PCC 1:4:8
1'-6"
3" 3"
12" 12" 3"
9" 1'-3"