Type of Capacity of
Sl. Name of Sub- Station Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer Peak Generation of IPP Normal Peak of Transformer Contingency Peak of Transformer % Loading
Generation transformer REMARKS
No. Station Code Max. in Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & Date & HV Side in LV Side in Date & HV Side in LV Side in Max. in Date & Date & HV Side in LV Side in Date & HV Side in LV Side in of Tfr.
plant in MVA Min. in MW MW Date & Time MW Min. in MW MW Date & Time MW Min. in MW MW MW Min. in MW MW MW Min. in MW MW MW Min. in MW MW MW
MW Time Time Amps Amps Time Amps Amps MW Time Time Amps Amps Time Amps Amps MW Time Time Time Amps Amps Time Amps Amps MW Time Time Time Amps Amps Time Amps Amps MW Time Time Time Amps Amps Time Amps Amps MW Time Time Amps Amps Time Amps Amps
1 2 3 4 6 14 15 16 14 15 16 14 15 16 17 18 20
Akkihebbalu
load will be redused after
1 25.11.19/02: commissioning of new
12.5 5 50 300 0 0 0 0 9.9 98.6 590 89.80
00 substaion at Beeruvally and
Madhuvinakodi
17/11/2019
100 53.5 144 483 0 0 0 0 66.2 192 612 69.86
&15:00
17/11/2019 &
100 53.3 142 475 0 0 0 0 66.8 194 615 70.21
15:00
3 Huygoanahally
30/11/2019
8 3.4 37 221 0 0 0 0 4.8 52 309 73.57
&12:00
28/11/2019
12.5 4.8 52 320 0.00
&14:00
15.11.2019 &
12.5 5.6 56 345 0 0 0 0 6.8 68 430 65.45
14:00
18.11.2019 &
12.5 6.4 66 400 0 0 0 0 6.6 74 434 66.06
10:00
Santhebachahally
23.11.2019 &
6 12.5 4.1 43 254 0 0 0 0 50 72 420 63.93
10:00
07.11.20
M/s Sourashakthi Solar 1.74 16.11.2019 1.86 0 0.6 0 0 0 0
19 & 16:
Energy & 13:00 0.08
00
30/11/2019 &
8 2.1 21 126 0 0 0 0 3.1 31 190 45.24
09:00
7 Sheelunere
20/11/2019 &
12.5 3.3 33 200 0 0 0 0 6 60 360 54.79
09:00
TCCM proposal submitted for
24.11.2019 & replacement of 6.3MVA by
6.3 2.9 26 159 0 0 0 0 3.9 38 230 69.49
23:00 12.5 MVA
8 Anegola
24.11.2019 &
8 3.2 29 173 0 0 0 0 4.4 45 259 61.67
23:00
TCCM proposal submitted for
28/11/2019 replacement of 6.3MVA by
6.3 5.3 52 331 0 0 0 0 5.3 52 331 100.00
@18:00 12.5 MVA
9 Dundanahally
TCCM proposal submitted for
26/11/2019@1 replacement of 12.5 MVA by
12.5 7.6 74 655 0 0 0 0 9.2 90 655 99.70
5:00 20 MVA
10 K.Honnalagere
Estimate submitted for DPR
for replacement of 8MVA by
8 40 228 0 0 0 0 6.9 70 416 99.05
12.5 MVA
3.8 15.11.19/11:00
Awiting for 12.5 MVA Tr
25-11-2019
for replacement of 8MVA by
8 6.5 & 65 392 14.4 0 0 0 7.3 73 438 104.29
12.5 MVA
03:00
Koppa
Approved in 78th TCCM
11 26-11-2019
for replacement of 12.5 MVA
12.5 5.4 & 54 324 0 0 0 0 #REF! 97 582 88.58
by 20 MVA.
18:00
21-11-2019 2-11-
Hydel 14.4 & 2019 #REF! 0 3.8 0 0 0 0
M/s SCM(NSL) Sugars 1.2
13:00 &
12:00 TCCM proposal submitted for
21.11.2019 &
12.5 1 12 72 13 0 0 0 #REF! #REF! #REF! #REF! addition 8MVA
9:00
K.M.Doddi
22.11.2019 &
12.5 5.4 60 360 0 0 0 0 8 0 87 13.24
13:00
12
4.11.201
20.11.2019
M/s Chamundeshwari Co-Gen 10.9 1.3 9 & 18: #REF! #REF! 1.8 0 0 0 0
& 10:00
Sugar 00
22.11.20
26.11.2019
M/s Vijayalakshmi Hydel 1.5 0.1 19 & 10: #REF! #REF! #REF! 0 1.2 0.3 0
&18:00
Hydro power 00
17.11.19/23: Approved in 78th TCCM
20 7.2 74 408 0 0 0 0 14 142 848 80.69 for Additional 20MVA
00
13 Maddur
12.11.19/19:
20 6.8 64 356 0 0 0 0 10.8 109 648 61.66
00
20.11.2019 &
8 3.7 34 202 0 0 0 0 5.9 56 330 78.57
15:00
07/11/19 @
17 12.5 2.8 28 195 0 0 0 0 7.6 76 463 70.47
14:00
M/s Malavally
Bio-Gas 0 0 0 0 0 0 0 0 0 0 0 No Generation
power plant
20.11.2019&
8 2.6 26 156 0 0 0 0 4.4 44 272 64.76
18:00
20 Besagarahalli
26.11.2019& TCCM proposal submitted for
8 3.2 32 196 0 0 0 0 5.9 59 354 84.29 replacement of 8 MVA by 20 MVA.
12:00
15/11/2019&
8 3.9 39 239 0 0 0 0 5.4 54 324 77.14
19:00 TCCM proposal submitted for
replacement 8MVA by 12.5 MVA
21 Chikkamandya
Approved in 78th TCCM
18/11/2019& for replacement of 8MVA by 20
8 25 2.5 154 0 0 0 0 66 68 408 97.14
9:00 MVA
27.11.2019
22 12.5 8.3 81 506 8.1 28/10 83 504 0 0 0 0 8.5 87 527 80.21
&15:00
20.11.2019&
24 12.5 4.6 48 276 0 0 0 0 9.5 97 572 87.06 Awaiting for Transformer for
15:00
replacement of Additional 8MVA
Kolakaranadoddi
20.11.2019&
2.9 32 178
11:00
20.11.19/18:
20 1 6.71 65 407 6.71 0 65 1 #REF! #REF! 523 49.76
00
25 Mandya
25.11.19/18:
20 8.2 84 520 0 0 0 0 12.62 133 777 73.93
00
14.11.2019
12.5 2.4 26 164 0 0 0 0 5.2 54 326 49.62
Haradanahalli 9:00
(Devalapura) 23.11.2019
31 8 3 29 146 0 0 0 0 3.6 38 156 37.14
12:00
32 Nagamangala
Approved in 78th TCCM
11-20-2019 for replacement of 12.5MVA by
12.5 4.6 46 280 0 0 0 0 9.1 91 546 83.11
@17:00 20 MVA
29/11/19 @14:
12.5 5.9 59 354 0 0 0 0 6 60 364 55.40 TCCM proposal submitted for r
00
34 Bannangadi replacement of 8 by 12.5MVA
15/11/19@11:
8 5.5 55 338 0 0 0 0 5.5 55 338 80.48
00
11/29/2019
8 3.6 36 220 0 0 0 0 5.4 54 334 79.52
@15 DPR approved.To be Tendered for
replacement of 8 by 12.5MVA
35 Chinakurali
11/16/2019 TCCM proposal submitted but dropped
8 41 4.1 250 0 0 0 0 41 64 388 92.38
@13 due to new station at Baby Betta for
replacement of 8 by 12.5MVA
Approved in 78th TCCM
11/20/2019
8 5 50 300 0 0 0 0 5.7 61 342 81.43 for replacement of 8 by 12.5
@10
MVA
36 Mahadeswarapura
Approved in 78th TCCM
11/27/2019
8 4 44 238 0 0 0 0 5.9 59 354 84.29 for replacement of 8 by 12.5
@10
MVA
38 M/s Atria
Brindavan, Tail 0 0 0 0 0 0 0
Race
M/s Atria
Brindavan, MHS 0 0 0 0 0 0 0
Generation station,
North Bank
TCCM proposal submitted for
6.3 244 0 0 0 0 5.5 55 331 100.00 replacement of 6.3 MVA by 12.5MVA
4.1 25/11/19 @11:00 41
39 Arakere
12.5 212 0 0 0 0 6.3 109 378 57.53
3.5 17/11/19 @16:00 35
TCCM proposal submitted for
22/11/2019 replacement of 6.3 MVA by
6.3 3.6 30 190 0 0 0 0 5.8 52 296 89.43
@19:00 12.5MVA
40 Belagola
16/11/2019
12.5 42 42 294 0 0 0 0 42 50 294 44.75
@11:00
20/11/19 @8:
41 Garudanaukkada 8 4.2 40 258 0 0 0 0 5.3 50 300 71.43
00
6/11/19 @19:
8 2.8 26 166 0 0 0 0 5.4 46 282 67.14
00
43 S.R. Patna
6/11/19 @19:
8 2.7 26 160 0 0 0 0 28 30 192 45.71
00
29.11.19/10:
55 KIADB Somanahalli 12.5 7 68 385
00
25/11/2019@1
56 Tumbekere 8 23 23 142
0:00
57 Vadkepura 8 1.8 20.11.2019 & 18:00 19 111
1 2 3 8 9 10
220 KV Lines
Yatchnalli(Angola limit) to
1 Mandya S/C 91 248 419 47.89
KrishnaRajapete (Huyo)
220kV
2 KR Pet to Thubinakere Mandya S/C 68.7 182 220 25.14 Huygonahal
ly Exp
66KV Lines 0
Tap to chinakurali
vaderalli -Yediyur(Thuruvekere
18 Mandya S/C 10 96 96 #DIV/0!
road)
Chikmandy
20 Chikk Mandya-Hampapura Mandya S/C 10.7 102 296 80.65
a
Somanahall
25 TK Halli - Halgur Mandya S/C 8 68 140 38.15
i-2
31 K.Honnalagere-Iglur Mandya S/C 14 142 160 43.60 t.k hally akkur mole
kikkeri - yachnahahalli
32 Mandya S/C 122 11.8 139 37.87 Idle charge CRP
(anegola)
35 Dundanahalli -Huliyur durga Mandya S/C 12.4 122 135 36.78 Idle charge
Huyoganhally-Krishnarajapet
39 Mandya S/C 16.6 160 294 80.11
line 1
Previous line
Huyoganhally to yachenahally Hygonahally - Huyg-cr
40 Mandya S/C 8.3 78 125 34.06
(Anegola limits). yachenahalli (Anegola patna
limit) made LILO and
commissioned on
04.03.2016.
tap to anegola Mandya S/C
TK hally -
K.M.Doddi-T.K.Halli M1 S/C 12.8 127 299 81.47
M1
48 Mandya
B.G.Pura
49 Megalapura SFC- B.G.Pura Mandya SC 11 100 100 27.25
I/c
Yatambadi
T.K.Hally-Akkurmole S/C 31 295 339 92.37
I/c
51 Mandya
Yatambadi
Tap to Yattambadi S/C
I/c
Huygonahalli-
52 Krishna pura - Yachenahalli Mandya S/C 5.4 54 84 22.89 Yachenahalli( Anegola
limit) made LILO and
commissioned on
04.03.2016 Load not
taken.