BOQ
CIVIL WORK
SL. NO. DSR NO DESCRIPTION OF ITEM Qty. UNIT Rate Amount (Rs.)
1
B SUB HEAD - II CONCRETE WORK
a) 5.3 All work from plinth level upto floor V level 4.00 Cum 3673.85 14695.40
2
D SUB HEAD -IV BRICKWORK
1 6.4.1 brick work in superstructure above plinth
level upto floor V level in cement mortar 1:4.
33.00 Cum 2529.05 83458.65
3
F SUB HEAD -VI ALUIMINIUM/WOOD
WORKS
1 9.1.1 Providing wood work in frames of doors,
windows, clerestory windows and other
frames, wrought framed and fixed in position:
4
5 Providing and fixing anodised aluminium
work for doors, windows, ventilators and
partitions with extruded built up standard Z
secions and other sections of approved
make conforming to IS: 733 and IS : 1285,
fixed with rawl plugs and screws or with
fixing clips, or with expansion hold fastners
including necessary filling up of gaps at
junctions, at top, bottom and sides with
required PVC/neoprene felt etc. Aluminium
sections shall be smooth, rust free, straight,
mitred and jointed mechanically wherever
required including cleat angle, Aluminium
snap beading for glazing / panelling, C.P.
brass / stainless steel screws, all complete
as per architectural drawings and the
directions of Engineer-in-charge. (Glazing
and panelling to be paid for separately.)
5
b). 9.97.4 150x10mm 450 each 42.75 19237.50
6
G SUB HEAD -VII FLOORING
7
2 15mm cement plaster of mix:
a) 13.2.1 1:4 ( 1 cement : 4 fine sand) 1800.00 sqm 90.35 162630.00
8
1) Applying and grouting a slurry coat of neat
cement using 2.75 kg/sqm of cement
admixed with proprietary water proofing
compound conforming to IS.2645 over the
RCC slab including cleaning the surface
before treatment.
9
TOTAL SCHEDULE ITEMS (IN Rs.) (A) 18305370.15