Sei sulla pagina 1di 1

P1 P2 P3 P4 P5 P6 P7 P8

LG NORTH AMERICAN
335' - 0"
1.
2.
FOR GENERAL NOTES, SEE SHEET PGS0.1.
FOR PRECAST TEE DETAILS, SEE SHEET PGS3.1.
HEADQUARTERS
3. FOR PRECAST COLUMN DETAILS, SEE SHEET PGS3.2. Prepared For
47' - 6" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 47' - 6" 4. REFER TO SHEETS PGS1.0, PGS2.1, AND PGS2.2 FOR FOUNDATION DETAILS.
5. REFER TO THIS SHEET FOR FLOOR DRAIN LOCATIONS. COORDINATE WITH L.G. Electronics U.S.A., Inc.
5 MECHANICAL DRAWINGS. 920 Sylvan Avenue
6
PGS3.2 TYP. 6. WARP SLABS AS REQUIRED TO PROVIDE A SMOOTH TRANSITION FOR ELEVATION
3 PGS3.2
DIFFERENCE.
Englewood Cliffs, NJ 07632
PGS3.2 7. SHEET PGS1.2 REPRESENTS THE TYPICAL TIER PLAN. ALL SECTION CUTS, PLAN
OPEN TO BELOW
DETAILS, AND NOTES SHOWN ON IT ARE TYPICAL OF EVERY TIER U.N.O.
PD 8. FOR FLOOR ELEVATIONS BETWEEN POINTS, USE STRAIGHT LINE INTERPOLATION.

+(0'-0")
9. SLOPE BEARING PLATES IN BEAM OR SUPPORT PLATES IN COLUMNS/WALLS TO

+(0'-0")

+(0'-0")

+(0'-0")

+(0'-0")

+(0'-0")

+(0'-0")

+(0'-0")
+(0'-0")

PROVIDE UNIFORM BEARING SURFACES FOR P/C SURFACES AS REQUIRED.


10. SHADED AREAS DEPICT EXTENT OF C.I.P. TOPPING.
11. SHADED AREAS DEPICT EXTENT OF TRAFFIC DECK COATING. PRECASTER TO
COORDINATE TEE FINISH AT THESE SURFACES WITH WATERPROOFING
CONTRACTOR.
12. ALL TOPPINGS ON TEES AND POURSTRIPS TO HAVE 3 GALLONS OF CORROSION
INHIBITOR AND 1 1/2 POUNDS OF FIBROUS REINFORCING PER CUBIC YARD OF
DN CONCRETE.
TYP. @ P1 13. ELEVATIONS SHOWN ON THESE PLANS REPRESENT ELEVATIONS AT THE TOP OF HOK Architects, Inc
7 THE PRECAST DOUBLE TEES AT THE COLUMN CENTERLINE, U.N.O. WITH AN 5 Bryant Park

60' - 0"
ELEVATION TARGET SYMBOL (THIS DOES NOT INCLUDE THE HEIGHT OF ANY 1065 Avenue of the Americas, 6th Floor
PGS2.2 WASH/CURB). REFER TO PLAN ELEVATION KEY DETAIL 1/PGS0.2 FOR ADDITIONAL New York, NY 10018, USA
INFORMATION. t +1 212 741 1200 f +1 212 633 1163
14. PROVIDE 1-HOUR FIRE-RATED ENCLOSURE IN UTILITY ROOMS OR ANY OTHER All reproduction & intellectual property rights reserved © 2017
ROOMS AS INDICATED ON THE DRAWINGS. In Association with
15. BASE ELEVATIONS REPRESENT THE BENCHMARK BY WHICH ACTUAL SPOT
P7 TO P8 ELEVATIONS ARE CALCULATED BY ADDING/SUBTRACTING THE ELEVATION SHOWN
@ P1 P1 TO P2 13' - 0" P2 TO P7 PS&S
11 11 16 11 AT A SPECIFIC LOCATION. CIVIL ENGINEERING DEPARTMENT

-(1'-4")
16. THE CONTRACTOR SHALL BE RESPONSIBLE TO ASSURE A MINIMUM OF 8'-2" 67B Mountain Boulevard Ext
-(1'-0")

PGS2.1 PGS3.3 PGS3.2 PGS3.3 HEADROOM CLEARANCE BETWEEN ALL DRIVING SURFACES AND OVERHEAD
-(0'-4")

-(0'-4")

-(0'-4")

-(1'-0")

-(0'-4")
Warren, New Jersey 07059-0039
F.D. F.D. F.D. STRUCTURE AT THIS TIER PRIOR TO PLACING CONCRETE POURSTRIPS AND
TOPPINGS. ATELIER TEN
17. ALL ACCESSIBLE SPACES, UNLOADING ZONES FOR ACCESSIBLE SPACES, AND LIGHTING DESIGN
PC ACCESSIBLE MEANS OF EGRESS SHALL BE MAXIMUM 1:48 SLOPE INCLUDING ALL 45 East 20th Street, 4th Floor
CONSTRUCTION TOLERANCES. NOTIFY ENGINEER OF ANY DISCREPANCIES. New York, NY 10003
-(0'-4")

-(0'-4")

-(3'-0")

+(4'-4")

+(1'-8")

-(1'-0")

-(0'-4")
4 R.D.
-(1'-0")

F.D. TYP. GILSANZ MURRAY STEFICEK, LLP


PGS3.2 2
PGS3.2 TYP. STRUCTURAL ENGINEERS
129 W 27th Street, 5th Floor
8 New York, NY 10001
PGS3.2
COSENTINI ASSOCIATES
MEP ENGINEERS
Two Pennsylvania Plaza , 3rd Floor
New York, NY 10121

181' - 0"
61' - 0"
RAMP DOWN RAMP UP
3 TIMOTHY HAAHS & ASSOCIATES, INC.
-(0'-9")

PARKING STRUCTURE

-(0'-9")
PGS3.3 550 Township Line Road, Suite 100
TYP.
Blue Bell, PA 19422
FUTURE TIER
8" P/C SLAB W/ 2" BASE EL. 382'-8" TM TECHNOLOGY PARTNERS, INC.
C.I.P. TOPPING INFORMATION TECHNOLOGY / SECURITY

(10'- 8")
10 250 West 39th Street. 9th Floor
New York, NY 10018
-(1'-0")

-(1'-0")
+(4'-4")

+(1'-8")
-(0'-4")

-(3'-0")

-(0'-4")
-(0'-4")

PGS3.2
F.D.
R.D. TOP TIER LERCH BATES
@ P1 TYP.
4 BASE EL. 372'-0" FACADE ACCESS
6 PGS3.3 PB 515 Valley Street, Suite 160

(11-10")
CONNECTION TO Maplewood, NJ 07040
PGS3.3
BUILDING PARKING
-(0'-4")

-(0'-4")
F.D. F.D. CERAMI & ASSOCIATES
-(1'-0")

-(1'-0")
-(0'-4")

-(1'-4")
F.D. TYP., SIM.
P2 TO P7 2 1 ACOUSTICS & AUDIO/VISUAL
P1 TO P2 SECOND TIER
11 16 PGS3.2 11 R.D. PGS5.1 404 Fifth Avenue
-(0'-7") BASE EL. 360'-2"
PGS3.3 PGS3.2 PGS3.3 New York, NY 10018

(10'- 0")
COOLING TOWER EGRESS TUNNEL JACOBS DOLAND BEER
SEE S0.1 FOOD SERVICE
FOR LOADS 192 Lexington Avenue, Suite 804

52' - 11"
GROUND TIER
ENTRY New York, NY 10016
BASE EL. 350'-2"
24' - 0"
EXIT
Key Plan

15 NORTH
ISOMETRIC
7
PGS3.3
PGS3.2

+(0'-0")
+(0'-0")
+(0'-0")

+(0'-0")

+(0'-0")

+(0'-0")

+(0'-0")

+(0'-0")

+(0'-0")
PA.3
10' - 8"

14

7' - 1"
PGS3.3 12
PGS3.3 PA

4
1
PGS2.2
PGS3.3
11' - 1" 36' - 5"
TYP. P4 TO P6 Professional Seals

NOT FOR CONSTRUCTION


P7.2

1 SECOND TIER STRUCTURAL PLAN


PGS1.2 1/16" = 1'-0"
BASE ELEVATION: 360'-2" No. Issue Description YYYY-MM-DD

1 ISSUED FOR DESIGN DEVELOPMENT 2016-04-08


2 ISSUED FOR REVISED DD/CM BID 2017-03-27
4 ISSUED FOR EWP #4: LONG LEAD BID 2017-05-19

Drawn by PJM Reviewed by PCA

Project No NBR11102.00

Sheet Title

SECOND TIER
STRUCTURAL PLAN
5/19/2017 1:04:41 PM

Original drawing is 42 x 30 Do not scale contents of this drawing

Sheet Number

PGS1.2

Potrebbero piacerti anche