Jangka Waktu Penyelesaian Pekerjaan : 150 Hari Kalender

HARGA
NO URAIAN PEKERJAAN PEKERJAAN BOBOT (%) BULAN I
(Rp) 1 2 3

0 #REF! - Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:504 Err:504


Err:509
Err:509
0 - Err:504 Err:504

0 #REF! Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

JUMLAH TOTAL Err:509 Err:509


JUMLAH TOTAL DIBULATKAN Err:509
RENCANA KEMAJUAN (%) - Err:509 Err:509 Err:509
RENCANA KEMAJUAN KUMULATIF (%) - Err:509 Err:509 Err:509
KETERANGAN :
1 BULAN = 4 MINGGU
1MINGGU = 7 HARI
MINGGU 3 & 4 = 8 HARI
JADWAL PELAKSANAAN PEKERJAAN
(Time Schedule)

WAKTU PELAKSANAAN : 150 HARI KALENDER


I BULAN II BULAN III BULAN IV
4 1 2 3 4 1 2 3 4 1 2 3 4

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:504 Err:504 Err:504 Err:504 Err:504

Err:504 Err:504 Err:504 Err:504 Err:504

Err:509 Err:509 Err:509 Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:504 Err:504 Err:504 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Masa
BULAN V Skala
Pemeliharan
1 2 3 4
100

Err:504
50

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

010

Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509
Err:509

Err:509

Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
REKAPITULASI
Program : Program Peningkatan Efisiensi Perdagangan Dalam Negeri
Kegiatan : Peningkatan Pasar
Lokasi : Kota Palangka Raya
Thn Angg. : 2013

No. Uraian
1 2
1. FISIK BANGUNAN
Err:509Err:509
Err:509 Err:509
### #REF!
Err:509Err:509
Err:509Err:509
Err:509
Err:509Err:509
Err:509Err:509
Err:509Err:509
Err:509Err:509
JUMLAH BIAYA FISIK
DIBULATKAN

2. BIAYA UMUM
A. BIAYA PERENCANAAN
B. BIAYA PENGAWASAN
C. BIAYA PENGELOLA KEGIATAN
D. BIAYA ALAT TULIS KANTOR
E. BIAYA ADMINISTRASI LELANG
F. VERIFIKASI / KONSULTANSI

JUMLAH BIAYA UMUM

TOTAL BIAYA
DIBULATKAN
TERBILANG # SATU MILYAR SEMBILAN PULUH SEMBILAN JUTA DELAPAN RATUS LIMA PULUH SATU RIB

Disetujui Oleh :
Pejabat Pelaksana Teknis Kegiatan
Dinas Perindustrian dan Perdagangan
Kota Palangka Raya

EDY HENDRATMO, SE.


NIP. 19691019 199703 1 004
Pejabat Pelaksana Teknis Kegiatan
Dinas Perindustrian dan Perdagangan
Kota Palangka Raya

No. Uraian
EDY HENDRATMO, SE.
NIP. 19691019 199703 1 004

Mengetahui :
Kepala Dinas Perindustrian dan Perdagangan
Kota Palangka Raya

Drs. DJUAN
NIP. 19570905 198603 1 007
REKAPITULASI

Harga (Rp)
3

Err:509
Err:509
Err:504
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

50,000,000.00
27,000,000.00
9,500,000.00
1,500,000.00
1,500,000.00
10,000,000.00

99,500,000.00

Err:509
Err:509
LAN PULUH SEMBILAN JUTA DELAPAN RATUS LIMA PULUH SATU RIBU RUPIAH #

Palangka Raya, Maret 2013

Dibuat Oleh :
Konsultan CV. MULTI TEKNIKA
Pusat Kota Palangka Raya

ERNY RAHAJENG WIDAYANI, ST.


Direktur
Konsultan CV. MULTI TEKNIKA
Pusat Kota Palangka Raya

Harga (Rp)
ERNY RAHAJENG WIDAYANI, ST.
Direktur

Mengetahui :
Kepala Dinas Perindustrian dan Perdagangan
Kota Palangka Raya

Drs. DJUAN
NIP. 19570905 198603 1 007
HARGA SATUAN UPAH
KOTA PALANGKA RAYA
Semester II (Juli s.d Desember) Tahun 2016

No. Jenis Upah Tenaga Kerja Satuan Harga

1 2 3 4
1 Mandor Org/Hari Rp 248,325.00
2 Tukang Gali Tanah Org/Hari Rp 138,600.00
3 Kepala Tukang Batu Org/Hari Rp 196,350.00
4 Tukang Batu Org/Hari Rp 138,600.00
5 Pekerja / Pembantu Tukang Batu Org/Hari Rp 103,950.00
6 Kepala Tukang Kayu Org/Hari Rp 181,912.50
7 Tukang Kayu Org/Hari Rp 138,600.00
8 Pekerja / Pembantu Tukang Kayu Org/Hari Rp 92,400.00
9 Kepala Tukang Besi Org/Hari Rp 173,250.00
10 Tukang Besi Org/Hari Rp 115,500.00
11 Pekerja / Pembantu Tukang Besi Org/Hari Rp 98,175.00
12 Kepala Tukang Cat Org/Hari Rp 161,700.00
13 Tukang Cat Org/Hari Rp 138,600.00
14 Pekerja / Pembantu Tukang Cat Org/Hari Rp 92,400.00
15 Pekerja Org/Hari Rp 103,950.00
16 Mekanik Org/Hari Rp 404,250.00
17 Operator Terlatih Org/Hari Rp 490,875.00
18 Operator Kurang Terlatih Org/Hari Rp 340,725.00
19 Pembantu Operator Org/Hari Rp 127,050.00
20 Supir Material/Truck Org/Hari Rp 213,675.00
21 Supir Personil Org/Hari Rp 173,250.00
22 Pembantu Supir Org/Hari Rp 115,500.00
23 Buruh Tak Terlatih Org/Hari Rp 92,400.00
24 Buruh Lapangan Agak Terlatih Org/Hari Rp 98,175.00
25 Buruh Lapangan Terlatih Org/Hari Rp 150,150.00
26 Tukang Listrik Org/Hari Rp 202,125.00
27 Tukang Las Konstruksi Org/Hari Rp 173,250.00
28 Tukang Pancang Org/Hari Rp 173,250.00
29 Tukang Tebas Org/Hari Rp 173,250.00
30 Tukang Anyam Org/Hari Rp 92,400.00
31 Operator Amphibious Excavator Org/Hari Rp 86,625.00
HARGA SATUAN BAHAN/MATERIAL
KOTA PALANGKA RAYA
Semester II (Juli s.d Desember) Tahun 2016

NO. JENIS BAHAN SATUAN


1 2 3

A. Kelompok Batu, Pasir, Tanah dan Material Beton


1 Abu Batu M3
2 Adukan Beton Ready Mix K-150 (Tanpa Pompa + Slang) M3
3 Adukan Beton Ready Mix K-175 (Tanpa Pompa + Slang) M3
4 Adukan Beton Ready Mix K-200 (Tanpa Pompa + Slang) M3
5 Adukan Beton Ready Mix K-225 (Tanpa Pompa + Slang) M3
6 Adukan Beton Ready Mix K-250 (Tanpa Pompa + Slang) M3
7 Adukan Beton Ready Mix K-275 (Tanpa Pompa + Slang) M3
8 Adukan Beton Ready Mix K-300 (Tanpa Pompa + Slang) M3
9 Air Liter
10 Bata Merah Lokal (9,0x20x3,5 cm) Buah
11 Bata Merah Produksi Pulang Pisau (9,5x19x4,0 cm) Buah
12 Bata Roster (Karawang) Buah
13 Batako Buah
14 Batu Andesit Alur M2
15 Batu Candi Polos M2
16 Batu Belah (Tangkiling - Dalam Kota) M3
17 Batu Belah (Tangkiling - Kalampangan) M3
18 Batu Belah 10/15 cm M3
19 Batu Belah 5/7 cm M3
20 Batu Kapur M3
21 Batu Pecah 1 - 2 cm (Split) M3
22 Batu Pecah 2 - 3 cm M3
23 Batu Pecah 2 - 3 cm (Kg) Kg
24 Batu Pecah 3 - 5 cm M3
25 Batu Pecah 5 - 7 cm M3
26 Batu Pecah Tidak Tersaring (Sawur) M3
27 Beton Rooster/Kerawang (Ukuran Kecil) Buah
28 Buis Beton ø 30" x 1 m Buah
29 Buis Beton ø 40" x 1 m Buah
30 Buis Beton ø 50" x 1 m Buah
31 Buis Beton ø 60" x 1 m Buah
32 Buis Beton ø 70" x 1 m Buah
33 Buis Beton ø 80" x 1 m Buah
34 Buis Beton ø 100" x 1 m Buah
35 Kapur Pasang/Kapur Padam Kg
NO. JENIS BAHAN SATUAN
1 2 3

36 Kerikil Sungai M3
37 Pasir Beton M3
38 Pasir Beton (Kg) Kg
39 Pasir Pasang M3
40 Pasir Pasang (Kg) Kg
41 Pasir Urug M3
42 Paving Stone/Conblok Hitam Segi Empat, T 8 cm Buah
43 Paving Stone/Conblok Putih Segi Enam, T 8 cm Buah
44 Semen Portland Kg
45 Semen Portland (Semen PC) @ 40 Kg/Zak Zak
46 Semen Putih Kg
47 Semen Putih (40 Kg/Zak) Zak
48 Semen Warna Kg
49 Semen Grouting @ 25 Kg/Zak M3
50 Sirtu Tak Tersaring/Kerikil M3
51 Tanah Subur M3
52 Tanah Urug Biasa/Granit M3
53 Tanah Urug Pilihan/Tanah Kuning M3
B. Kelompok Kayu
1 Bambu Batang
2 Ijuk Kg
3 Kayu Bakar M3
4 Kayu Balok Klas I (Ulin) 10/10, P 4 m M3
5 Kayu Balok Klas I (Ulin) 5/10, P 4 m M3
6 Kayu Balok Klas II (Banuas) M3
7 Kayu Balok Klas II (Blangiran) M3
8 Kayu Balok Klas II (Lanan) M3
9 Kayu Balok Klas III (Hutan/Campuran) M3
10 Kayu Bekisting M3
11 Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang
12 Kayu Dolken/Kanopel ø 10 - 12 cm, P 4 m Batang
13 Kayu Lapis Triplek 3 mm, 120x240 cm Lembar
14 Kayu Lapis Triplek 4 mm, 120x240 cm Lembar
15 Kayu Lapis Triplek 6 mm, 120x240 cm Lembar
16 Kayu Lapis Triplek 9 mm, 120x240 cm Lembar
17 Kayu Lapis Triplek 12 mm, 120x240 cm Lembar
18 Kayu Lapis Triplek 4 mm, 80x200 cm (Ukuran Piintu) Lembar
19 Kayu Moulding/Papan Lap-Lapan (Alau) Batang
20 Kayu Moulding/Papan Lap-Lapan (Bangkirai) Batang
21 Kayu Papan Klas I (Uliin) M3
22 Kayu Papan Klas II (Banuas) M3
23 Kayu Papan Klas II (Blangiran) M3
24 Kayu Papan Klas II (Lanan) M3
25 Kayu Papan Klas III (Hutan/Campuran) M3
26 Kayu Papan Meranti 2/20, P 4 m M3
NO. JENIS BAHAN SATUAN
1 2 3
27 Kayu Papan Meranti 3/20, P 4 m M3
28 Kayu Papan Meranti 3/30, P 4 m M3
29 Kayu Reng Klas II (Meranti) 3/4, P 4 m Batang
30 Kayu Reng Klas II (Meranti) 2/3, P 4 m Batang
31 List Kayu Profil (Moulding) 2 cm M'
32 List Kayu Profil (Moulding) 3 cm M'
33 List Kayu Profil (Moulding) 4 cm M'
34 List Kayu Profil (Moulding) 5 cm M'
35 Plywood tebal 6 mm Lembar
36 White Board Buah
C. Kelompok Material Penutup Atap, Partisi dan Plafond
1 Alumunium Foil Roll
2 Atap Fiberglass Uk. 80x180 cm Lembar
3 Atap Metal Zincalume Soka, Tbl 0,22 mm (1,2 m2/lembar) Lembar
4 Atap Metal Zincalume Soka, Tbl 0,22 mm (120x240 cm) Lembar
5 Atap Metal Zincalume Spandek, Tbl 0,3 mm, L 1 m M2
6 Atap Plastik Gelombang Lembar
7 Atap Polycarbonat, Tbl 5 mm (2,1x11,8 m) Roll
8 Atap Polycarbonat, Tbl 6 mm, L 2,1 m M2
9 Atap Polycarbonat, Tbl 6 mm (2,1x11,8 m) M2
10 Atap Sirap 4 Lapis Lembar
11 Bubungan Genteng Metal Zincalume Bentuk C, P 75 cm Buah
12 Bubungan Genteng Metal Zincalume Bentuk U, P 75 cm Buah
13 Genteng Zincalume Colour, Tbl 0,25 mm, 1,62 Lbr/per m2 Lembar
14 Genteng Zincalume Colour, Tbl 0,30 mm, 1,62 Lbr/per m2 Lembar
15 Kaso Metal Zincalume C 75x35x0,75 mm, P 6 m Batang
16 List Profil Gypsum Uk. Besar (15 cm) M'
17 List Profil Gypsum Uk. Kecil (5 cm) M'
18 List Profil Gypsum Uk. Sedang (10 cm) M'
19 Papan Plafond Calsiboard, Tbl 3,5 mm, Uk. 120x240 cm (Kalsiboard) Lembar
20 Papan Plafond Calsiboard, Tbl 3,5 mm, Uk. 120x240 cm (Nusaboard) Lembar
21 Papan Plafond Calsiboard, Tbl 4,5 mm, Uk. 120x240 cm (Kalsiboard) Lembar
22 Papan Plafond Calsiboard, Tbl 4,5 mm, Uk. 120x240 cm (Nusaboard) Lembar
23 Papan Plafond Calsiboard, Tbl 6 mm, Uk. 120x240 cm (Kalsiboard) Lembar
24 Papan Plafond Calsiboard, Tbl 6 mm, Uk. 120x240 cm (Nusaboard) Lembar
25 Papan Plafond Gypsum, Tbl 9 mm, Uk. 120x240 cm Lembar
26 Rangka Atap Baja Ringan (Zincalume) C 75x35x0,75 M2
27 Rangka Atap Baja Ringan (Zincalume) C 75x35x0,65 M2
28 Rangka Plafond Baja Ringan (Zincalume) Hollow 30x30x0,3 mm M2
29 Rangka Plafond Baja Ringan (Zincalume) Hollow 20x40x0,3 mm M2
30 Rangka Plafond Baja Ringan (Zincalume) Hollow 40x40x0,3 mm M2
31 Seng Gelombang BJLS 20 (80x180 cm) Lembar
32 Seng Gelombang BJLS 20 (90x240 cm) Lembar
33 Seng Gelombang BJLS 25 (80x180 cm) Lembar
34 Talang PVC Segi Empat Batang
NO. JENIS BAHAN SATUAN
1 2 3

D. Kelompok Baja, Besi, Seng, Alumunium dan Logam Lainnya


1 Alumunium Plat 0,30 mm, L 60 cm M'
2 Baja Profil CNP 75x35x0,9, P 6 m Batang
3 Baja Profil CNP 100x35x1,2, P 6 m Batang
4 Baja Profil CNP 125x35x2,0, P 6 m Batang
5 Baja Profil CNP 150x35x2,0, P 6 m Batang
6 Baja Profil Siku 40x40, Tbl 4,0 mm, P 6 m Batang
7 Baja Profil Siku 40x40, Tbl 3,0 mm, P 6 m Batang
8 Baja Profil Siku 50x50, Tbl 4,8 mm, P 6 m Batang
9 Baja Profil UNP 50x38x5, P 6m Batang
10 Baja Profil UNP 80x45x5, P 6m Batang
11 Baja Profil UNP 100x50x6, P 6m Batang
12 Baja Profil UNP 150x75x6,5, P 6m Batang
13 Baut/Mur Buah
14 Besi Beton Polos Kg
15 Besi Hollow Galvalume 30x30x0,7 mm, P 6 m Batang
16 Besi Hollow Galvalume 40x60x1,0 mm, P 6 m Batang
17 Besi Hollow Galvalume 60x60x1,2 mm, P 6 m Batang
18 Besi Strip Kg
19 Besi Ulir Kg
20 Beugel Plat/Plat Asian Kuda-Kuda 10x15 cm Buah
21 Kawat Ayakan M2
22 Kawat Beton/Bendrat Kg
23 Kawat Bronjong/Kawat Jaring Galvanize, P 240 cm Kg
24 Kawat Duri (25 m/roll) Roll
25 Kawat Harmonika (25 m/roll) Roll
26 Kawat Nyamuk Alumunium M2
27 Pagar BRC (Hot Deep Galvanize) ø 6", T 90 cm, P 240 cm Lembar
28 Paku Anti Karat (Paku Genteng Metal) Kg
29 Paku Asbes Kg
30 Paku Beton (Uk. 4 - 12 cm) Kg
31 Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg
32 Paku Besi (Uk. Kecil/Paku Reng/Paku Sirap) Kg
33 Paku Payung/Paku Seng Kg
34 Paku Ulin Kg
35 Wiremesh 150x150, besi ø 4 mm, Uk. 2,1x54 m Roll
36 Wiremesh 150x150, besi ø 6 mm, Uk. 2,1x54 m Roll
37 Wiremesh 150x150, besi ø 8 mm, Uk. 2,1x54 m Lembar
38 Wiremesh 150x150, besi ø 10 mm, Uk. 2,1x54 m Lembar
E. Kelompok Material Lantai
1 Keramik 20/20 Polos Bh
2 Keramik 20/20 Corak/Warna KM/WC Bh
NO. JENIS BAHAN SATUAN
1 2 3
3 Keramik 20x25 Corak/Warna Bh
4 Keramik 30/30 Corak/Warna Bh
5 Keramik 30/30 Polos Bh
6 Keramik 50/50 Bh
7 Keramik 40/40 (Kasar) Bh
8 Keramik 40/40 (Polished) Bh
9 Keramik 40/40 (Corak) Bh
10 Keramik Granito 60/60 (Polished) Dos
11 Keramik Granito 60/60 (Kasar) Dos
12 Keramik Plint 10/20 cm Bh
13 Keramik List Dinding 7/20 cm Bh
F. Kelompok Material Kaca, Pintu dan Jendela
1 Door Closer Unit
2 Engsel Jendela 3" Pasang
3 Engsel Jendela Untuk Alumunium Buah
4 Engsel Pintu 4" Pasang
5 Engsel Pintu Untuk Alumunium Buah
6 Glass Block 20x20 cm Buah
7 Grendel 2" Buah
8 Grendel 3" Buah
9 Grendel 4" Buah
10 Grendel 10" Buah
11 Grendel Tanam Buah
12 Hak Angin 8" Stainless Steel Buah
13 Hak Angin 9" Stainless Steel Buah
14 Hak Angin 10" Stainless Steel Buah
15 Hak Angin Dorong Buah
16 Handle Jendela Buah
17 Handle Pintu Pasang
18 Handle Alumunium Buah
19 Kaca Polos/Bening 2 mm M2
20 Kaca Polos/Bening 3 mm M2
21 Kaca Polos/Bening 5 mm M2
22 Kaca Polos/Bening 8 mm M2
23 Kaca Es/Buram 3 mm M2
24 Kaca Es/Buram 5 mm M2
25 Kaca Rayband 3 mm M2
26 Kaca Rayband 5 mm M2
27 Kaca One Way 5 mm M2
28 Kaca Nako 5 mm + Rangka 12 Daun Set
29 Kaca Nako 5 mm + Rangka 8 Daun Set
30 Kain Angin Untuk Alumunium Roll
31 Kunci Alumunium Buah
32 Kunci Pintu Tanam Kecil Lengkap (Standart) Buah
33 Kunci Pintu Tanam Lengkap Set
34 Rolling Door Alumunium 0,8 mm Set
G. Kelompok Material Sanitair
NO. JENIS BAHAN SATUAN
1 2 3
1 Bak Cuci Piring Alumunium 1 Lubang Buah
2 Bak Cuci Piring Alumunium 2 Lubang (Tipe L) Buah
3 Bak Mandi Fiberglass Uk. 50x50 (Segi Empat Kecil) Buah
4 Bak Mandi Fiberglass Uk. 60x60 (120 Liter) Buah
5 Bak Mandi Fiberglass Uk. 70x70 (Segi Empat Besar) Buah
6 Bak Mandi Fiberglass Uk. 70x70 (Sudut) Buah
7 Closet Duduk Putih Lengkap (TOTO) Set
8 Closet Duduk Putih Lengkap (INA) Set
9 Closet Duduk Putih Lengkap (American Standart) Set
10 Closet Duduk Warna Lengkap (TOTO) Set
11 Closet Duduk Warna Lengkap (INA) Set
12 Closet Duduk Warna Lengkap (American Standart) Set
13 Closet Jongkok Putih (INA) Buah
14 Closet Jongkok Putih (TOTO) Buah
15 Closet Jongkok Putih (American Standart) Buah
16 Closet Jongkok Warna (INA) Buah
17 Closet Jongkok Warna (TOTO) Buah
18 Closet Jongkok Warna (American Standart) Buah
19 Drain Floor Buah
20 Kran Air Biasa Buah
21 Kran Air Stainless Buah
22 Pompa Air Jet Pump 225 Wat Unit
23 Pompa Air Jet Pump 500 Wat Unit
24 Pompa Air Jet Pump 125 Wat (Panasonic) Unit
25 Pompa Air Jet Pump 125 Wat (Sanyo) Unit
26 Pompa Air Jet Pump 200 Wat (Panasonic) Unit
27 Pompa Air Jet Pump 200 Wat (Sanyo) Unit
28 Seal Tape Buah
29 Shower Bath Kip Buah
30 Shower Tembok Buah
31 Tangki Air/Reservoir 600 Liter Buah
32 Tangki Air/Reservoir 1100 Liter Buah
33 Tangki Air/Reservoir 1200 Liter Buah
34 Tangki Air/Reservoir 2000 Liter Buah
35 Tangki Air/Reservoir 250 Liter Buah
36 Tangki Air/Reservoir 3000 Liter Buah
37 Tangki Air Stainless 2000 Liter Buah
38 Urinoir Putih Standart Lengkap (TOTO) Buah
39 Urinoir Warna Lengkap (TOTO) Buah
40 Wastafel Lengkap Unit
41 Wastafel Lengkap + Cermin Warna Unit
42 Wastafel Lengkap + Tanpa Cermin Buah
H. Kelompok Cat, Perekat dan Pelapis
1 Ampelas Besi Lembar
2 Ampelas Kayu Roll
3 Cat Kayu/Cat Besi Kg
4 Cat Kayu Dasar Kg
NO. JENIS BAHAN SATUAN
1 2 3
5 Cat Marka/Spotlight Kg
6 Cat Tembok Kg
7 Cat Tembok Eksterior Kg
8 Kuas 2" Buah
9 Kuas 3" Buah
10 Kuas 4" Buah
11 Lem Kuning Kg
12 Lem Putih Kg
13 Meni Besi Kg
14 Meni Kayu Kg
15 Minyak Cat/Thinner Liter
16 Minyak Bekisting Liter
17 Plamur Kayu Kg
18 Plamur Tembok Kg
19 Residu/Teer Kayu
20 Roll Cat Buah
21 Sealant Tube
22 Sealen Kaca Tube
23 Waterproof Kg
I. Kelompok Material Mekanikal dan Elektrikal
1 Box MCB 1 Group Unit
2 Box MCB 2 Group Unit
3 Box MCB 3 Group Unit
4 Box Panel 20x30x12 mm Buah
5 Box Panel 20x80x60 mm Buah
6 Box Panel 40"x60x20 mm Buah
7 Box Panel 60"x80x20 mm Buah
8 Fitting Plafond Buah
9 Kabel NYM 4x4 mm Roll
10 Lampu SL 20 Wat (Phillips) Buah
11 Saklar Double Buah
12 Saklar Tunggal Buah
13 Stop Kontak Biasa Buah
14 Stop Kontak Crem Buah
15 Stop Kontak Putar Crem Buah
16 Stop Kontak + Instalasi (Konst. Beton) Titik
17 Stop Kontak + Instalasi (Konst. Kayu) Titik
18 Titik Lampu + Instalasi (Konst. Beton) Titik
19 Titik Lampu + Instalasi (Konst. Kayu) Titik
J. Kelompok Aspal dan Material Pek. Jalan Lainnya
1 Alat Bantu Set
2 Aspal AC 60/70 - 80/100 Kg
K. Kelompok Material, Perpipaan Air Bersih
1 Doof F 2" Buah
2 Doof F 2,5" Buah
3 Doof F 3" Buah
4 Doof F 4" Buah
NO. JENIS BAHAN SATUAN
1 2 3
5 Pipa Galvanized GIP F Ø 2" Batang
6 Pipa Galvanized GIP F Ø 2,5" Batang
7 Pipa Galvanized GIP F Ø 3" Batang
8 Pipa Galvanized GIP Medium B Ø 1/2" Batang
9 Pipa Galvanized GIP Medium B Ø 3/4" Batang
10 Pipa Galvanized GIP Medium B Ø 1" Batang
11 Pipa Galvanized GIP Medium B Ø 1 1/4" Batang
12 Pipa Galvanized GIP Medium B Ø 1 1/2" Batang
13 Pipa Galvanized GIP Medium B Ø 2" Batang
14 Pipa Galvanized GIP Medium B Ø 2,5" Batang
15 Pipa Galvanized GIP Medium B Ø 3" Batang
16 Pipa Galvanized GIP Medium B Ø 4" Batang
17 Pipa PVC AW Ø 1/2" - P. 4 m Batang
18 Pipa PVC AW Ø 3/4" - P. 4 m Batang
19 Pipa PVC AW Ø 1" - P. 4 m Batang
20 Pipa PVC AW Ø 1 1/4" - P. 4 m Batang
21 Pipa PVC AW Ø 1 1/2" - P. 4 m Batang
22 Pipa PVC AW Ø 2" - P. 4 m Batang
23 Pipa PVC AW Ø 2 1/2" - P. 4 m Batang
24 Pipa PVC AW Ø 3" - P. 4 m Batang
25 Pipa PVC AW Ø 4" - P. 4 m Batang
26 Pipa PVC AW Ø 5" - P. 4 m Batang
27 Pipa PVC AW Ø 6" - P. 4 m Batang
28 Pipa PVC AW Ø 8" - P. 4 m Batang
29 Pipa PVC AW Ø 10" - P. 4 m Batang
30 Pipa PVC AW Ø 12" - P. 4 m Batang
31 Pipa PVC D Ø 1 1/4" - P 4 m Batang
L. Kelompok Material/Bahan Lainnya
1 Air Accu Liter
2 Fibreglass gelombang (300 x 80) Lembar
3 Karet m'
4 Kunci Ring Pas Set
5 Minyak Rem Liter
6 Olie Mesin Liter
7 Premium Liter
8 Premium (non Subsidi) Liter
9 Rantai 12 mm m'
10 Soda Api Kering (serbuk) Bungkus
11 Solar (bersubsidi) Liter
12 Solar (Nonsubsidi) Liter
13 Spiritus Liter
14 Wall Paper Roll
HARGA
4

Rp 1,212,750.00
Rp 1,241,625.00
Rp 1,299,375.00
Rp 1,414,875.00
Rp 1,455,300.00
Rp 1,518,825.00
Rp 1,559,250.00
Rp 1,703,625.00
Rp 115.50
Rp 866.25
Rp 1,155.00
Rp 19,635.00
Rp 2,656.50
Rp 242,550.00
Rp 242,550.00
Rp 458,535.00
Rp 516,285.00
Rp 404,250.00
Rp 404,250.00
Rp 288,750.00
Rp 571,725.00
Rp 404,250.00
Rp 1,283.33
Rp 404,250.00
Rp 404,250.00
Rp 635,250.00
Rp 40,425.00
Rp 75,075.00
Rp 103,950.00
Rp 144,375.00
Rp 115,500.00
Rp 127,050.00
Rp 144,375.00
Rp 155,925.00
Rp 30,030.00
HARGA
4

Rp 659,505.00
Rp 169,785.00
Rp 539.00
Rp 100,485.00
Rp 319.00
Rp 82,005.00
Rp 1,848.00
Rp 1,963.50
Rp 1,472.63
Rp 56,017.50
Rp 4,735.50
Rp 140,332.50
Rp 16,170.00
Rp 190,575.00
Rp 635,250.00
Rp 214,599.00
Rp 82,005.00
Rp 195,195.00

Rp 23,100.00
Rp 20,790.00
Rp 300,300.00
Rp 7,507,500.00
Rp 7,796,250.00
Rp 4,446,750.00
Rp 3,465,000.00
Rp 2,818,200.00
Rp 1,813,350.00
Rp 1,732,500.00
Rp 17,325.00
Rp 26,565.00
Rp 69,300.00
Rp 92,400.00
Rp 153,615.00
Rp 218,295.00
Rp 250,635.00
Rp 104,989.50
Rp 40,425.00
Rp 86,625.00
Rp 10,395,000.00
Rp 5,601,750.00
Rp 3,465,000.00
Rp 2,737,350.00
Rp 2,113,650.00
Rp 2,656,500.00
HARGA
4
Rp 2,772,000.00
Rp 2,772,000.00
Rp 14,437.50
Rp 5,775.00
Rp 23,100.00
Rp 25,987.50
Rp 28,875.00
Rp 28,875.00
Rp 255,601.50
Rp 95,865.00

Rp 453,915.00
Rp 75,537.00
Rp 53,707.50
Rp 297,181.50
Rp 155,116.50
Rp 29,221.50
Rp 2,171,400.00
Rp 3,003,000.00
Rp 1,674,750.00
Rp 70,455.00
Rp 24,255.00
Rp 14,437.50
Rp 30,030.00
Rp 43,890.00
Rp 83,737.50
Rp 192,538.50
Rp 98,175.00
Rp 107,877.00
Rp 65,835.00
Rp 60,060.00
Rp 86,625.00
Rp 98,175.00
Rp 167,580.00
Rp 130,515.00
Rp 86,278.50
Rp 84,892.50
Rp 79,695.00
Rp 28,066.50
Rp 32,109.00
Rp 33,379.50
Rp 43,890.00
Rp 70,224.00
Rp 50,242.50
Rp 130,515.00
HARGA
4

Rp 80,388.00
Rp 225,225.00
Rp 235,620.00
Rp 300,300.00
Rp 438,900.00
Rp 241,972.50
Rp 344,767.50
Rp 300,300.00
Rp 133,980.00
Rp 202,125.00
Rp 346,500.00
Rp 1,302,840.00
Rp 2,887.50
Rp 15,015.00
Rp 69,300.00
Rp 86,625.00
Rp 89,512.50
Rp 109,725.00
Rp 15,592.50
Rp 40,425.00
Rp 17,325.00
Rp 20,790.00
Rp 21,714.00
Rp 202,125.00
Rp 164,010.00
Rp 30,030.00
Rp 423,885.00
Rp 28,875.00
Rp 31,185.00
Rp 20,097.00
Rp 17,787.00
Rp 24,255.00
Rp 28,875.00
Rp 23,100.00
Rp 3,003,000.00
Rp 3,667,125.00
Rp 664,125.00
Rp 548,625.00

Rp 2,541.00
Rp 2,772.00
HARGA
4
Rp 3,465.00
Rp 5,925.15
Rp 5,613.30
Rp 20,790.00
Rp 36,288.00
Rp 22,236.48
Rp 18,664.80
Rp 224,647.50
Rp 400,900.50
Rp 231.00
Rp 226.38

Rp 168,630.00
Rp 18,249.00
Rp 114,345.00
Rp 43,890.00
Rp 102,795.00
Rp 28,297.50
Rp 28,875.00
Rp 39,270.00
Rp 109,725.00
Rp 103,950.00
Rp 69,300.00
Rp 24,024.00
Rp 45,045.00
Rp 50,820.00
Rp 23,100.00
Rp 23,100.00
Rp 173,250.00
Rp 144,375.00
Rp 57,750.00
Rp 92,400.00
Rp 98,175.00
Rp 173,250.00
Rp 150,150.00
Rp 168,630.00
Rp 92,400.00
Rp 115,500.00
Rp 519,750.00
Rp 404,250.00
Rp 231,000.00
Rp 20,790.00
Rp 40,425.00
Rp 45,622.50
Rp 207,900.00
Rp 462,000.00
HARGA
4
Rp 259,875.00
Rp 384,037.50
Rp 308,731.50
Rp 207,900.00
Rp 404,250.00
Rp 519,750.00
Rp 2,856,546.00
Rp 2,194,500.00
Rp 1,836,450.00
Rp 2,721,526.50
Rp 3,118,846.50
Rp 2,028,180.00
Rp 300,300.00
Rp 398,475.00
Rp 254,100.00
Rp 231,000.00
Rp 358,050.00
Rp 234,234.00
Rp 68,145.00
Rp 33,495.00
Rp 46,200.00
Rp 2,656,500.00
Rp 3,465,000.00
Rp 438,900.00
Rp 565,950.00
Rp 693,000.00
Rp 831,600.00
Rp 3,234.00
Rp 43,312.50
Rp 115,500.00
Rp 860,475.00
Rp 1,466,850.00
Rp 1,501,500.00
Rp 2,970,660.00
Rp 490,875.00
Rp 3,892,350.00
Rp 5,640,442.50
Rp 2,082,927.00
Rp 1,097,250.00
Rp 750,750.00
Rp 469,623.00
Rp 500,577.00

Rp 10,279.50
Rp 39,270.00
Rp 51,975.00
Rp 39,270.00
HARGA
4
Rp 144,375.00
Rp 105,105.00
Rp 143,220.00
Rp 10,395.00
Rp 17,325.00
Rp 21,367.50
Rp 57,172.50
Rp 23,100.00
Rp 54,747.00
Rp 43,312.50
Rp 28,875.00
Rp 17,325.00
Rp 57,750.00
Rp 28,182.00
Rp 32,340.00
Rp 23,100.00
Rp 40,425.00
Rp 118,965.00
Rp 64,680.00

Rp 11,550.00
Rp 11,550.00
Rp 42,504.00
Rp 155,925.00
Rp 808,500.00
Rp 415,800.00
Rp 808,500.00
Rp 9,817.50
Rp 2,373,525.00
Rp 32,917.50
Rp 16,170.00
Rp 20,212.50
Rp 68,376.00
Rp 17,325.00
Rp 144,375.00
Rp 70,703.33
Rp 120,062.25
Rp 86,625.00
Rp 57,750.00

Rp 138,600.00
Rp 13,860.00

Rp 5,775.00
Rp 6,930.00
Rp 8,085.00
Rp -
HARGA
4
Rp -
Rp -
Rp -
Rp 60,637.50
Rp 69,300.00
Rp 158,812.50
Rp 150,150.00
Rp 173,250.00
Rp 248,325.00
Rp 300,300.00
Rp 433,125.00

Rp 35,458.50
Rp 28,528.50
Rp 39,270.00
Rp 57,750.00
Rp 69,588.75
Rp 89,512.50
Rp 131,670.00
Rp 172,095.00
Rp 267,613.50
Rp 415,800.00
Rp 1,126,125.00
Rp 1,543,080.00
Rp 1,617,000.00
Rp 2,541,000.00
Rp 40,425.00

Rp 19,635.00
Rp 87,780.00
Rp 2,310.00
Rp 464,887.50
Rp 19,635.00
Rp 40,425.00
Rp 7,507.50
Rp 9,240.00
Rp 100,485.00
Rp 63,525.00
Rp 6,352.50
Rp 10,395.00
Rp 33,264.00
Rp 1,258,950.00
ANALISA HARGA SATUAN PEKERJAAN

overhead (%)= -
HARGA SATUAN PEKERJAAN PERSIAPAN

A. 2.2.1.1 Pembuatan 1 M2 pagar sementara dari kayu tinggi 2 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.4000 92,400 36,960
Tukang kayu L.02 OH 0.2000 138,600 27,720
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0200 248,325 4,967
JUMLAH UPAH TENAGA KERJA 73,285
B. BAHAN
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 1.2500 17,325 21,656
Semen Portland Kg 5.0000 1,473 7,363
Pasir pasang (Kg) M3 0.0050 319 2
Kerikil sungai M3 0.0090 659,505 5,936
Kayu Balok Klas II (Lanan) M3 0.0720 2,818,200 202,910
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0600 17,787 1,067
Residu/Teer Kayu Liter 0.4000 32,340 12,936
JUMLAH HARGA BAHAN 251,870
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 325,155


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 325,155

A. 2.2.1.2 Pembuatan 1 M2 pagar sementara dari Seng Gelombang BJLS 20 (80x180 cm) tinggi 2 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.2000 92,400 18,480
Tukang kayu L.02 OH 0.4000 138,600 55,440
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0200 248,325 4,967
JUMLAH UPAH TENAGA KERJA 82,525
B. BAHAN
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 1.2500 17,325 21,656
Semen Portland Kg 2.5000 1,473 3,682
Seng Gelombang BJLS 20 (80x180 cm) Lembar 1.2000 43,890 52,668
Pasir pasang (Kg) M3 0.0050 319 2
Kerikil sungai M3 0.0090 659,505 5,936
Kayu Balok Klas II (Lanan) M3 0.0720 2,818,200 202,910
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0600 17,787 1,067
Meni Besi Liter 0.4500 54,747 24,636
JUMLAH HARGA BAHAN 312,557
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 395,081


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 395,081

A. 2.2.1.3 Pembuatan 1 M2 pagar sementara dari kawat duri tinggi 1,8 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.2000 92,400 18,480
Tukang kayu L.02 OH 0.3000 138,600 41,580
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0200 248,325 4,967
JUMLAH UPAH TENAGA KERJA 68,665
B. BAHAN
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 1.0000 17,325 17,325
Semen Portland Kg 2.0000 1,473 2,945
Kawat duri Kg 25.0000 #N/A #N/A
Pasir pasang (Kg) M3 0.0050 319 2
Kerikil sungai M3 0.0090 659,505 5,936
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0600 17,787 1,067
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.2.1.4 Pengukuran dan pemasangan 1 M' Bouwplank


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 26,161
B. BAHAN
Kayu Balok Klas II (Lanan) M3 0.0120 2,818,200 33,818
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0200 17,787 356
Kayu Papan Klas II (Lanan) M3 0.0070 2,737,350 19,161
JUMLAH HARGA BAHAN 53,336
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 79,496


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 79,496

A. 2.2.1.5 Pembuatan 1 M2 kantor sementara dengan lantai plesteran

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 2.0000 92,400 184,800
Tukang kayu L.02 OH 2.0000 138,600 277,200
Tukang batu L.02 OH 1.0000 138,600 138,600
Kepala tukang kayu L.03 OH 0.3000 181,913 54,574
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 667,590
B. BAHAN
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 1.2500 17,325 21,656
Kayu Balok Klas II (Lanan) M3 0.1800 2,818,200 507,276
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0800 17,787 1,423
Besi strip Kg 1.1000 109,725 120,698
Semen Portland Kg 35.0000 1,473 51,542
Pasir pasang M3 0.1500 100,485 15,073
Pasir pasang (Kg) M3 0.1000 319 32
Kerikil sungai M3 0.1500 659,505 98,926
Bata Merah Lokal (9,0x20x3,5 cm) Bh 30.0000 866 25,988
Alumunium Plat 0,30 mm, L 60 cm Lbr 0.2500 80,388 20,097
Jendela nako Bh 2.0000 #N/A #N/A
Kaca Polos/Bening 5 mm M2 0.0800 98,175 7,854
Kunci Pintu Tanam Kecil Lengkap (Standart) Bh 0.1500 45,623 6,843
Plywood Tebal 4 mm Lbr 0.0600 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.2.1.6 Pembuatan 1 M2 rumah jaga (konstruksi kayu)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 1.0000 92,400 92,400
Tukang kayu L.02 OH 1.5000 138,600 207,900
Kepala tukang kayu L.03 OH 0.1500 181,913 27,287
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 340,003
B. BAHAN
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 3.0000 17,325 51,975
Kayu Balok Klas II (Lanan) M3 0.2760 2,818,200 777,823
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.7000 17,787 12,451
Seng Gelombang BJLS 20 (80x180 cm) Lbr 1.5000 43,890 65,835
JUMLAH HARGA BAHAN 908,084
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,248,087


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,248,087

A. 2.2.1.7 Pembuatan 1 M2 gudang semen dan peralatan


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 1.0000 92,400 92,400
Tukang kayu L.02 OH 2.0000 138,600 277,200
Kepala tukang kayu L.03 OH 0.2000 181,913 36,383
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 418,399
B. BAHAN
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 1.2500 17,325 21,656
Kayu Balok Klas II (Lanan) M3 0.2100 2,818,200 591,822
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.3000 17,787 5,336
Semen Portland Kg 10.5000 1,473 15,463
Pasir pasang (Kg) M3 0.0300 319 10
Kerikil sungai M3 0.0500 659,505 32,975
Seng Gelombang BJLS 20 (80x180 cm) Lbr 1.5000 43,890 65,835
Alumunium Plat 0,30 mm, L 60 cm Lbr 0.2500 80,388 20,097
JUMLAH HARGA BAHAN 753,194
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,171,592


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,171,592

A. 2.2.1.8 Pembuatan 1 M2 bedeng buruh

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 1.0000 92,400 92,400
Tukang kayu L.02 OH 2.0000 138,600 277,200
Kepala tukang kayu L.03 OH 0.2000 181,913 36,383
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 418,399
B. BAHAN
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 1.2500 17,325 21,656
Kayu Balok Klas II (Lanan) M3 0.1860 2,818,200 524,185
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.3000 17,787 5,336
Semen Portland Kg 18.0000 1,473 26,507
Pasir pasang (Kg) M3 0.0300 319 10
Kerikil sungai M3 0.0500 659,505 32,975
Seng Gelombang BJLS 20 (80x180 cm) Lbr 1.5000 43,890 65,835
Plywood tebal 4 mm Lbr 1.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.2.1.9 Pembersihan 1 M2 lapangan dan perataan

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1000 103,950 10,395
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 22,811
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 22,811


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 22,811

A. 2.2.1.10 Pembuatan 1 M2 steger/perancah dari bambu

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 1.0000 92,400 92,400
Tukang kayu L.02 OH 2.0000 138,600 277,200
Kepala tukang kayu L.03 OH 0.2000 181,913 36,383
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 418,399
B. BAHAN
Bambu Batang 1.2500 23,100 28,875
Tali ijuk M3 0.1860 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.2.1.11 Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Tukang kayu L.02 OH 0.3000 138,600 41,580
Kepala tukang kayu L.03 OH 0.0300 181,913 5,457
JUMLAH UPAH TENAGA KERJA 47,037
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.0360 2,737,350 98,545
Kayu Balok Klas II (Lanan) M3 2,818,200 -
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0800 17,787 1,423
JUMLAH HARGA BAHAN 99,968
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 147,005


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 147,005

A. 2.2.1.12 Pembuatan 1 M2 jalan sementara

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.0000 103,950 103,950
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 105,192
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 0.1500 458,535 68,780
Batu Pecah Tidak Tersaring (Sawur) M3 0.0900 635,250 57,173
Pasir pasang M3 0.0100 100,485 1,005
JUMLAH HARGA BAHAN 126,958
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 232,149


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 232,149

A. 2.2.1.13 Bongkaran 1 M3 beton bertulang

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 13.3340 103,950 1,386,069
Mandor L.04 OH 0.6660 248,325 165,384
JUMLAH UPAH TENAGA KERJA 1,551,454
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,551,454


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,551,454

A. 2.2.1.14 Bongkaran 1 M3 dinding tembok bata

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 6.6670 103,950 693,035
Mandor L.04 OH 0.3330 248,325 82,692
JUMLAH UPAH TENAGA KERJA 775,727
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 775,727


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 775,727

A. 2.2.1.15 Pemasangan 1 M2 pagar kawat jaring galvanis panjang 240 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0042 92,400 388
Tukang kayu L.02 OH 0.0040 138,600 554
Kepala tukang kayu L.03 OH 0.0020 181,913 364
Mandor L.04 OH 0.0420 248,325 10,430
JUMLAH UPAH TENAGA KERJA 11,736
B. BAHAN
Kawat jaring Lbr 0.1434 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 2.2.1.16 Pemasangan 1 M2 panel beton pracetak ( 5 x 50 x 213 ) cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3750 103,950 38,981
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0190 248,325 4,718
JUMLAH UPAH TENAGA KERJA 63,381
B. BAHAN
Panel beton pracetak Lbr 0.9860 #N/A #N/A
Kolom beton pracetak Btg 0.5250 #N/A #N/A
Semen Portland Kg 45.0000 1,473 66,268
Pasir pasang (Kg) M3 0.0740 319 24
Koral M3 0.1460 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

HARGA SATUAN PEKERJAAN TANAH

A. 2.3.1.1 Penggalian 1 M3 tanah biasa sedalam 1 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7500 103,950 77,963
Mandor L.04 OH 0.0250 248,325 6,208
JUMLAH UPAH TENAGA KERJA 84,171
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 84,171


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 84,171

A. 2.3.1.2 Penggalian 1 M3 tanah biasa sedalam 2 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.9000 103,950 93,555
Mandor L.04 OH 0.0450 248,325 11,175
JUMLAH UPAH TENAGA KERJA 104,730
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 104,730


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 104,730

A. 2.3.1.3 Penggalian 1 M3 tanah biasa sedalam 3 meter


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.0500 103,950 109,148
Mandor L.04 OH 0.0670 248,325 16,638
JUMLAH UPAH TENAGA KERJA 125,785
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 125,785


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 125,785

A. 2.3.1.4 Penggalian 1 M3 tanah keras sedalam 1 meter


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.0000 103,950 103,950
Mandor L.04 OH 0.0320 248,325 7,946
JUMLAH UPAH TENAGA KERJA 111,896
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 111,896


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 111,896

A. 2.3.1.5 Penggalian 1 M3 tanah cadas sedalam 1 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.5000 103,950 155,925
Mandor L.04 OH 0.0600 248,325 14,900
JUMLAH UPAH TENAGA KERJA 170,825
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 170,825


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 170,825

A. 2.3.1.6 Penggalian 1 M3 tanah lumpur sedalam 1 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.2000 103,950 124,740
Mandor L.04 OH 0.0450 248,325 11,175
JUMLAH UPAH TENAGA KERJA 135,915
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 135,915


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 135,915

A. 2.3.1.7 Pengerjaan Stripping 1 M2 tanah tebing setinggi 1 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0500 103,950 5,198
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 6,439
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 6,439


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 6,439

A. 2.3.1.8 Pembuangan 1 M3 tanah sejauh 30 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3300 103,950 34,304
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 36,787
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 36,787


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 36,787

A. 2.3.1.9 Pengurugan kembali 1 M3 galian tanah


Pengurugan kembali 1 M3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Mandor L.04 OH 0.0083 248,325 2,069
JUMLAH UPAH TENAGA KERJA 28,057
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 28,057


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 28,057

A. 2.3.1.10 Pemadatan Tanah 1 M3 tanah (Per 20 Cm)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.5000 103,950 51,975
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 64,391
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 64,391


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 64,391

A. 2.3.1.11 Pengurugan 1 M3 dengan pasir urug

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 33,668
B. BAHAN
Pasir urug M3 1.2000 82,005 98,406
JUMLAH HARGA BAHAN 98,406
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 132,074


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 132,074

A. 2.3.1.11.a Pengurugan 1 M3 dengan Tanah Urug Biasa/Granit

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 33,668
B. BAHAN
Tanah Urug Biasa/Granit M3 1.2000 82,005 98,406
JUMLAH HARGA BAHAN 98,406
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 132,074


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 132,074

A. 2.3.1.12 Pemasangan 1 M3 lapisan pudel campuran 1kp : 3pp : 7tl

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.8000 103,950 83,160
Tukang batu L.02 OH 0.4000 138,600 55,440
Kepala tukang batu L.03 OH 0.0400 196,350 7,854
Mandor L.04 OH 0.0800 248,325 19,866
JUMLAH UPAH TENAGA KERJA 166,320
B. BAHAN
Kapur Pasang/Kapur Padam M3 0.1350 30,030 4,054
Pasir pasang M3 0.4000 100,485 40,194
Tanah Urug Pilihan/Tanah Kuning M3 0.9480 195,195 185,045
JUMLAH HARGA BAHAN 229,293
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 395,613


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 395,613

A. 2.3.1.13 Pemasangan 1 M3 lapisan pudel campuran 1kp : 5tl

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.8000 103,950 83,160
Tukang batu L.02 OH 0.4000 138,600 55,440
Kepala tukang batu L.03 OH 0.0400 196,350 7,854
Mandor L.04 OH 0.0800 248,325 19,866
JUMLAH UPAH TENAGA KERJA 166,320
B. BAHAN
Kapur Pasang/Kapur Padam M3 0.2400 30,030 7,207
Tanah Urug Pilihan/Tanah Kuning M3 1.2400 195,195 242,042
JUMLAH HARGA BAHAN 249,249
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 415,569


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 415,569

A. 2.3.1.14 Pemasangan 1 M2 lapisan ijuk tebal 10 cm untuk bidang resapan

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1500 103,950 15,593
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 19,317
B. BAHAN
Ijuk Kg 6.0000 20,790 124,740
JUMLAH HARGA BAHAN 124,740
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 144,057


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 144,057

A. 2.3.1.15 Pengurugan 1 M3 Sirtu Tak Tersaring/Kerikil padat

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Mandor L.04 OH 0.0250 248,325 6,208
JUMLAH UPAH TENAGA KERJA 32,196
B. BAHAN
Sirtu Tak Tersaring/Kerikil M3 1.2000 635,250 762,300
JUMLAH HARGA BAHAN 762,300
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 794,496


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 794,496

HARGA SATUAN PEKERJAAN PONDASI

A. 3.2.1.1 Pemasangan 1 M3 pondasi Batu Belah (Tangkiling - Dalam Kota) campuran 1 SP : 3 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.5000 103,950 155,925
Tukang batu L.02 OH 0.7500 138,600 103,950
Kepala tukang batu L.03 OH 0.0750 196,350 14,726
Mandor L.04 OH 0.0750 248,325 18,624
JUMLAH UPAH TENAGA KERJA 293,226
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 1.2000 458,535 550,242
Semen Portland Kg 202.0000 1,473 297,470
Pasir pasang M3 0.4850 100,485 48,735
JUMLAH HARGA BAHAN 896,447
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,189,673


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,189,673

A. 3.2.1.2 Pemasangan 1 M3 pondasi Batu Belah campuran 1 SP : 4 PP


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.5000 103,950 155,925
Tukang batu L.02 OH 0.7500 138,600 103,950
Kepala tukang batu L.03 OH 0.0750 196,350 14,726
Mandor L.04 OH 0.0750 248,325 18,624
JUMLAH UPAH TENAGA KERJA 293,226
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 1.2000 458,535 550,242
Semen Portland Kg 163.0000 1,473 240,038
Pasir pasang M3 0.5200 100,485 52,252
JUMLAH HARGA BAHAN 842,532
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,135,758


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,135,758

A. 3.2.1.3 Pemasangan 1 M3 pondasi Batu Belah (Tangkiling - Dalam Kota) campuran 1 SP : 5 PP


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.5000 103,950 155,925
Tukang batu L.02 OH 0.7500 138,600 103,950
Kepala tukang batu L.03 OH 0.0750 196,350 14,726
Mandor L.04 OH 0.0750 248,325 18,624
JUMLAH UPAH TENAGA KERJA 293,226
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 1.2000 458,535 550,242
Semen Portland Kg 136.0000 1,473 200,277
Pasir pasang M3 0.5440 100,485 54,664
JUMLAH HARGA BAHAN 805,183
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,098,408


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,098,408

A. 3.2.1.6 Pemasangan 1 M3 pondasi Batu Belah (Tangkiling - Dalam Kota) campuran 1 SP : 1 KP : 2 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.5000 103,950 155,925
Tukang batu L.02 OH 0.7500 138,600 103,950
Kepala tukang batu L.03 OH 0.0750 196,350 14,726
Mandor L.04 OH 0.0750 248,325 18,624
JUMLAH UPAH TENAGA KERJA 293,226
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 1.2000 458,535 550,242
Kapur Pasang/Kapur Padam M3 0.1700 30,030 5,105
Semen Portland Kg 0.1700 1,473 250
Pasir pasang M3 0.3400 100,485 34,165
JUMLAH HARGA BAHAN 589,762
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 882,988


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 882,988

A. 3.2.1.7 Pemasangan 1 M3 pondasi Batu Belah (Tangkiling - Dalam Kota) campuran 1 SP : 3 KP : 10 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.5000 103,950 155,925
Tukang batu L.02 OH 0.7500 138,600 103,950
Kepala tukang batu L.03 OH 0.0750 196,350 14,726
Mandor L.04 OH 0.0750 248,325 18,624
JUMLAH UPAH TENAGA KERJA 293,226
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 1.2000 458,535 550,242
Semen Portland Kg 61.0000 1,473 89,830
Kapur Pasang/Kapur Padam M3 0.1470 30,030 4,414
Pasir pasang M3 0.4920 100,485 49,439
JUMLAH HARGA BAHAN 693,925
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 987,151


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 987,151

A. 3.2.1.8 Pemasangan 1 M3 pondasi Batu Belah (Tangkiling - Dalam Kota), campuran 1/4 SP : 1 KP : 4 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.5000 103,950 155,925
Tukang batu L.02 OH 0.7500 138,600 103,950
Kepala tukang batu L.03 OH 0.0750 196,350 14,726
Mandor L.04 OH 0.0750 248,325 18,624
JUMLAH UPAH TENAGA KERJA 293,226
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 1.2000 458,535 550,242
Semen Portland Kg 41.0000 1,473 60,378
Kapur Pasang/Kapur Padam M3 0.1310 30,030 3,934
Pasir pasang M3 0.5230 100,485 52,554
JUMLAH HARGA BAHAN 667,107
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 960,333


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 960,333

A. 3.2.1.9 Pemasangan 1 M3 batu kosong (Anstamping)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7800 103,950 81,081
Tukang batu L.02 OH 0.3900 138,600 54,054
Kepala tukang batu L.03 OH 0.0390 196,350 7,658
Mandor L.04 OH 0.0390 248,325 9,685
JUMLAH UPAH TENAGA KERJA 152,477
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 1.2000 458,535 550,242
Pasir pasang M3 0.4320 100,485 43,410
JUMLAH HARGA BAHAN 593,652
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 746,129


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 746,129

A. 3.2.1.10 Pemasangan 1 M3 pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 KR dan 40% Batu Belah (Tangkiling - Dalam Kota)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 3.4000 103,950 353,430
Tukang batu L.02 OH 0.8500 138,600 117,810
Kepala tukang batu L.03 OH 0.0850 196,350 16,690
Mandor L.04 OH 0.1700 248,325 42,215
JUMLAH UPAH TENAGA KERJA 530,145
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 0.4800 458,535 220,097
Semen Portland Kg 194.0000 1,473 285,689
Pasir pasang (Kg) M3 0.3120 319 100
Kerikil sungai M3 0.4680 659,505 308,648
Besi beton polos Kg 126.0000 15,015 1,891,890
Kawat Beton/Bendrat Kg 1.8000 20,790 37,422
JUMLAH HARGA BAHAN 2,743,846
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 3,273,991


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 3,273,991

A. 3.2.1.11 Pemasangan 1 M3 pondasi sumuran, diameter 100 Cm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 2.4000 103,950 249,480
Tukang batu L.02 OH 0.8000 138,600 110,880
Kepala tukang batu L.03 OH 0.0800 196,350 15,708
Mandor L.04 OH 0.1190 248,325 29,551
JUMLAH UPAH TENAGA KERJA 405,619
B. BAHAN
Batu Belah (Tangkiling - Dalam Kota) M3 0.4500 458,535 206,341
Semen Portland Kg 194.0000 1,473 285,689
Pasir pasang (Kg) M3 0.3120 319 100
Kerikil sungai M3 0.4680 659,505 308,648
JUMLAH HARGA BAHAN 800,778
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,206,397


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,206,397
HARGA SATUAN PEKERJAAN BETON

A. 4.1.1.1 Membuat 1 M3 beton mutu f'c = 7,4 MPa (K 100), Slump (12 ± 2) cm, w/c = 0,87
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 247.0000 1,473 363,738
Pasir pasang (Kg) Kg 869.0000 319 277,211
Batu Pecah 2 - 3 cm (Kg) Kg 999.0000 1,283 1,282,050
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 1,947,832
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,183,573


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,183,573

A. 4.1.1.2 Membuat 1 M3 beton mutu f'c = 9,8 MPa (K 125), Slump (12 ± 2) cm, w/c = 0,78
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 276.0000 1,473 406,445
Pasir pasang (Kg) Kg 828.0000 319 264,132
Batu Pecah 2 - 3 cm (Kg) Kg 1012.0000 1,283 1,298,733
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 1,994,142
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,229,884


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,229,884

A. 4.1.1.3 Membuat 1 M3 beton mutu f'c = 12,2 MPa (K 150), Slump (12 ± 2) cm, w/c = 0,72

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 299.0000 1,473 440,315
Pasir pasang (Kg) Kg 799.0000 319 254,881
Batu Pecah 2 - 3 cm (Kg) Kg 1017.0000 1,283 1,305,150
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,025,178
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,260,920
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,260,920

A. 4.1.1.4 Membuat 1 M3 lantai kerja beton mutu f'c = 7,4 MPa (K 100), Slump (3-6) cm, w/c = 0,87

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.2000 103,950 124,740
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0600 248,325 14,900
JUMLAH UPAH TENAGA KERJA 171,287
B. BAHAN
Semen Portland Kg 230.0000 1,473 338,704
Pasir pasang (Kg) Kg 893.0000 319 284,867
Batu Pecah 2 - 3 cm (Kg) Kg 1027.0000 1,283 1,317,983
Air Liter 200.0000 116 23,100
JUMLAH HARGA BAHAN 1,964,654
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,135,941


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,135,941

A. 4.1.1.5 Membuat 1 M3 beton mutu f'c = 14,5 MPa (K 175), Slump (12 ± 2) cm, w/c = 0,66

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 326.0000 1,473 480,076
Pasir pasang (Kg) Kg 760.0000 319 242,440
Batu Pecah 2 - 3 cm (Kg) Kg 1029.0000 1,283 1,320,550
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,067,898
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,303,640


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,303,640

A. 4.1.1.6 Membuat 1 M3 beton mutu f'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 352.0000 1,473 518,364
Pasir pasang (Kg) Kg 731.0000 319 233,189
Batu Pecah 2 - 3 cm (Kg) Kg 1031.0000 1,283 1,323,117
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,099,502
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,335,243
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,335,243

A. 4.1.1.7 Membuat 1 M3 beton mutu f'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 371.0000 1,473 546,344
Pasir pasang (Kg) Kg 698.0000 319 222,662
Batu Pecah 2 - 3 cm (Kg) Kg 1047.0000 1,283 1,343,650
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,137,488
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,373,230


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,373,230

A. 4.1.1.8 Membuat 1 M3 beton mutu f'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 384.0000 1,473 565,488
Pasir pasang (Kg) Kg 692.0000 319 220,748
Batu Pecah 2 - 3 cm (Kg) Kg 1039.0000 1,283 1,333,383
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,144,452
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,380,193


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,380,193

A. 4.1.1.9 Membuat 1 M3 beton mutu f'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 406.0000 1,473 597,886
Pasir pasang (Kg) Kg 684.0000 319 218,196
Batu Pecah 2 - 3 cm (Kg) Kg 1026.0000 1,283 1,316,700
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,157,614
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,393,356


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,393,356

A. 4.1.1.10 Membuat 1 M3 beton mutu f'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.6500 103,950 171,518
Tukang batu L.02 OH 0.2750 138,600 38,115
Kepala tukang batu L.03 OH 0.0280 196,350 5,498
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA 235,741
B. BAHAN
Semen Portland Kg 413.0000 1,473 608,194
Pasir pasang (Kg) Kg 681.0000 319 217,239
Batu Pecah 2 - 3 cm (Kg) Kg 1021.0000 1,283 1,310,283
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,160,549
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,396,290


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,396,290

A. 4.1.1.11 Membuat 1 M3 beton mutu f'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 2.1000 103,950 218,295
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.1050 248,325 26,074
JUMLAH UPAH TENAGA KERJA 299,751
B. BAHAN
Semen Portland Kg 439.0000 1,473 646,482
Pasir pasang (Kg) Kg 670.0000 319 213,730
Batu Pecah 2 - 3 cm (Kg) Kg 1006.0000 1,283 1,291,033
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,176,078
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,475,830


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,475,830

A. 4.1.1.12 Membuat 1 M3 beton mutu f'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 2.1000 103,950 218,295
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.1050 248,325 26,074
JUMLAH UPAH TENAGA KERJA 299,751
B. BAHAN
Semen Portland Kg 448.0000 1,473 659,736
Pasir pasang (Kg) Kg 667.0000 319 212,773
Batu Pecah 2 - 3 cm (Kg) Kg 1000.0000 1,283 1,283,333
Air Liter 215.0000 116 24,833
JUMLAH HARGA BAHAN 2,180,675
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,480,426


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 2,480,426

A. 4.1.1.13 Membuat 1 M3 beton kedap air dengan strorox - 100

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 2.1000 103,950 218,295
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.1050 248,325 26,074
JUMLAH UPAH TENAGA KERJA 299,751
B. BAHAN
Semen Portland Kg 400.0000 1,473 589,050
Pasir pasang (Kg) M3 48.0000 319 15,312
Kerikil Sungai M3 0.8000 659,505 527,604
Strorox - 100 Kg 1.2000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.1.14 Pemasangan 1 m' PVC Waterstop lebar 150 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0600 103,950 6,237
Tukang batu L.02 OH 0.0300 138,600 4,158
Kepala tukang batu L.03 OH 0.0030 196,350 589
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 11,729
B. BAHAN
Waterstop lebar 150 mm M 1.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.1.15 Pemasangan 1 m' PVC Waterstop lebar 200 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0700 103,950 7,277
Tukang batu L.02 OH 0.0350 138,600 4,851
Kepala tukang batu L.03 OH 0.0040 196,350 785
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 14,651
B. BAHAN
Waterstop lebar 200 mm M 1.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.1.16 Pemasangan 1 m' PVC Waterstop lebar 230 mm - 320 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0800 103,950 8,316
Tukang batu L.02 OH 0.0400 138,600 5,544
Kepala tukang batu L.03 OH 0.0040 196,350 785
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 15,639
B. BAHAN
Waterstop lebar 200 mm M 1.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.1.1.17 Pembesian 10 Kg dengan besi polos atau besi ulir

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0700 98,175 6,872
Tukang batu L.02 OH 0.0700 138,600 9,702
Kepala tukang batu L.03 OH 0.0070 196,350 1,374
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 18,942
B. BAHAN
Besi beton polos Kg 10.5000 15,015 157,658
Kawat Beton/Bendrat Kg 0.1500 20,790 3,119
JUMLAH HARGA BAHAN 160,776
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 179,718


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 179,718
A. 4.1.1.17.a Pembesian 1 Kg dengan besi polos atau besi ulir

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0070 98,175 687
Tukang batu L.02 OH 0.0070 138,600 970
Kepala tukang batu L.03 OH 0.0007 196,350 137
Mandor L.04 OH 0.0004 248,325 99
JUMLAH UPAH TENAGA KERJA 1,894
B. BAHAN
Besi beton polos Kg 1.0500 15,015 15,766
Kawat Beton/Bendrat Kg 0.0150 20,790 312
JUMLAH HARGA BAHAN 16,078
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 17,972


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 17,972

A. 4.1.1.18 Pemasangan 10 Kg kabel presstressed polos/strands

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0500 98,175 4,909
Tukang batu L.02 OH 0.0500 138,600 6,930
Kepala tukang batu L.03 OH 0.0050 196,350 982
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 13,565
B. BAHAN
Besi beton polos Kg 10.5000 15,015 157,658
Kawat Beton/Bendrat Kg 0.1000 20,790 2,079
JUMLAH HARGA BAHAN 159,737
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 173,302


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 173,302

A. 4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0250 98,175 2,454
Tukang batu L.02 OH 0.0250 138,600 3,465
Kepala tukang batu L.03 OH 0.0250 196,350 4,909
Mandor L.04 OH 0.0010 248,325 248
JUMLAH UPAH TENAGA KERJA 11,076
B. BAHAN
Kawat Bronjong/Kawat Jaring Galvanize, P 240 cm Kg 10.2000 21,714 221,483
Kawat Beton/Bendrat Kg 0.0500 20,790 1,040
JUMLAH HARGA BAHAN 222,522
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 233,599


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 233,599

A. 4.1.1.20 Pemasangan 1 M2 bekisting untuk pondasi

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.5200 92,400 48,048
Tukang batu L.02 OH 0.2600 138,600 36,036
Kepala tukang batu L.03 OH 0.0260 196,350 5,105
Mandor L.04 OH 0.0260 248,325 6,456
JUMLAH UPAH TENAGA KERJA 95,646
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.0400 2,737,350 109,494
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.3000 17,787 5,336
Minyak bekisting Liter 0.1000 17,325 1,733
JUMLAH HARGA BAHAN 116,563
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 212,208


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 212,208

A. 4.1.1.21 Pemasangan 1 M2 bekisting untuk sloof

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.5200 92,400 48,048
Tukang batu L.02 OH 0.2600 138,600 36,036
Kepala tukang batu L.03 OH 0.0260 196,350 5,105
Mandor L.04 OH 0.0260 248,325 6,456
JUMLAH UPAH TENAGA KERJA 95,646
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.0450 2,737,350 123,181
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.3000 17,787 5,336
Minyak bekisting Liter 0.1000 17,325 1,733
JUMLAH HARGA BAHAN 130,249
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 225,895


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 225,895

A. 4.1.1.22 Pemasangan 1 M2 bekisting untuk kolom

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.6600 92,400 60,984
Tukang batu L.02 OH 0.3300 138,600 45,738
Kepala tukang batu L.03 OH 0.0330 196,350 6,480
Mandor L.04 OH 0.0330 248,325 8,195
JUMLAH UPAH TENAGA KERJA 121,396
B. BAHAN
Kayu Balok Klas II (Lanan) M3 0.0400 2,818,200 112,728
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.4000 17,787 7,115
Minyak bekisting Liter 0.2000 17,325 3,465
Kayu Papan Klas II (Lanan) M3 0.0150 2,737,350 41,060
Plywood tebal 6 mm Lembar 0.3500 255,602 89,461
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 2.0000 17,325 34,650
JUMLAH HARGA BAHAN 288,479
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 409,875


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 409,875
A. 4.1.1.23 Pemasangan 1 M2 bekisting untuk balok

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.6600 92,400 60,984
Tukang batu L.02 OH 0.3300 138,600 45,738
Kepala tukang batu L.03 OH 0.0330 196,350 6,480
Mandor L.04 OH 0.0330 248,325 8,195
JUMLAH UPAH TENAGA KERJA 121,396
B. BAHAN
Kayu Balok Klas II (Lanan) M3 0.0400 2,818,200 112,728
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.4000 17,787 7,115
Minyak bekisting Liter 0.2000 17,325 3,465
Kayu Papan Klas II (Lanan) M3 0.0180 2,737,350 49,272
Plywood tebal 6 mm Lembar 0.3500 255,602 89,461
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 2.0000 17,325 34,650
JUMLAH HARGA BAHAN 296,691
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 418,087


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 418,087

A. 4.1.1.24 Pemasangan 1 M2 bekisting untuk lantai

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.6600 92,400 60,984
Tukang batu L.02 OH 0.3300 138,600 45,738
Kepala tukang batu L.03 OH 0.0330 196,350 6,480
Mandor L.04 OH 0.0330 248,325 8,195
JUMLAH UPAH TENAGA KERJA 121,396
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.0400 2,737,350 109,494
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.4000 17,787 7,115
Minyak bekisting Liter 0.2000 17,325 3,465
Kayu Balok Klas II (Lanan) M3 0.0150 2,818,200 42,273
Plywood tebal 6 mm Lembar 0.3500 255,602 89,461
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 6.0000 17,325 103,950
JUMLAH HARGA BAHAN 355,757
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 477,154


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 477,154

A. 4.1.1.25 Pemasangan 1 M2 bekisting untuk dinding

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.6600 92,400 60,984
Tukang batu L.02 OH 0.3300 138,600 45,738
Kepala tukang batu L.03 OH 0.0330 196,350 6,480
Mandor L.04 OH 0.0330 248,325 8,195
JUMLAH UPAH TENAGA KERJA 121,396
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.0300 2,737,350 82,121
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.4000 17,787 7,115
Minyak bekisting Liter 0.2000 17,325 3,465
Kayu Balok Klas II (Lanan) M3 0.0200 2,818,200 56,364
Plywood tebal 6 mm Lembar 0.3500 255,602 89,461
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 3.0000 17,325 51,975
Kayu Dolken/Kanopel ø 10 - 12 cm, P 4 m Buah 4.0000 26,565 106,260
JUMLAH HARGA BAHAN 396,760
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 518,156


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 518,156

A. 4.1.1.26 Pemasangan 1 M2 bekisting untuk tangga

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.6600 92,400 60,984
Tukang batu L.02 OH 0.3300 138,600 45,738
Kepala tukang batu L.03 OH 0.0330 196,350 6,480
Mandor L.04 OH 0.0330 248,325 8,195
JUMLAH UPAH TENAGA KERJA 121,396
B. BAHAN
Kayu Balok Klas II (Lanan) M3 0.0300 2,818,200 84,546
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.4000 17,787 7,115
Minyak bekisting Liter 0.1500 17,325 2,599
Kayu Papan Klas II (Lanan) M3 0.0150 2,737,350 41,060
Plywood tebal 6 mm Lembar 0.3500 255,602 89,461
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 2.0000 17,325 34,650
JUMLAH HARGA BAHAN 259,430
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 380,827


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 380,827

A. 4.1.1.27 Pemasangan 1 M2 jembatan untuk pengecoran beton

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang batu L.02 OH 0.0500 138,600 6,930
Kepala tukang batu L.03 OH 0.0050 196,350 982
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 23,758
B. BAHAN
#REF! M3 0.0264 #REF! #REF!
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.6000 17,787 10,672
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 0.5000 17,325 8,663
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #REF!


E. Overhead & Profit - %xD #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 4.1.1.28 Membuat 1 M3 pondasi beton bertulang (150 kg besi + bekisting)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 5.3000 103,950 550,935
Tukang batu L.02 OH 0.2750 138,600 38,115
Tukang kayu L.02 OH 1.3000 138,600 180,180
Tukang besi L.02 OH 1.0500 115,500 121,275
Kepala tukang batu L.03 OH 0.2620 196,350 51,444
Mandor L.04 OH 0.2650 248,325 65,806
JUMLAH UPAH TENAGA KERJA 1,007,755
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.2000 2,737,350 547,470
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 1.5000 17,787 26,681
Minyak bekisting Liter 0.4000 17,325 6,930
Besi beton polos Kg 157.5000 15,015 2,364,863
Kawat Beton/Bendrat Kg 2.2500 20,790 46,778
Semen Portland Kg 336.0000 1,473 494,802
Pasir pasang (Kg) M3 0.5400 319 172
Kerikil sungai M3 0.8100 659,505 534,199
JUMLAH HARGA BAHAN 4,021,894
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 5,029,649


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 5,029,649

A. 4.1.1.29 Membuat 1 M3 sloof beton bertulang (200 kg besi + bekisting)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 5.6500 103,950 587,318
Tukang batu L.02 OH 0.2750 138,600 38,115
Tukang kayu L.02 OH 1.5600 138,600 216,216
Tukang besi L.02 OH 1.4000 115,500 161,700
Kepala tukang batu L.03 OH 0.3230 196,350 63,421
Mandor L.04 OH 0.2830 248,325 70,276
JUMLAH UPAH TENAGA KERJA 1,137,046
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.2700 2,737,350 739,085
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 2.0000 17,787 35,574
Minyak bekisting Liter 0.6000 17,325 10,395
Besi beton polos Kg 210.0000 15,015 3,153,150
Kawat Beton/Bendrat Kg 3.0000 20,790 62,370
Semen Portland Kg 336.0000 1,473 494,802
Pasir pasang (Kg) M3 0.5400 319 172
Kerikil sungai M3 0.8100 659,505 534,199
JUMLAH HARGA BAHAN 5,029,747
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 6,166,792


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 6,166,792

A. 4.1.1.30 Membuat 1 M3 kolom beton bertulang (300 Kg besi + bekisting)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 7.0500 103,950 732,848
Tukang batu L.02 OH 0.2750 138,600 38,115
Tukang kayu L.02 OH 1.6500 138,600 228,690
Tukang besi L.02 OH 2.1000 115,500 242,550
Kepala tukang batu L.03 OH 0.4030 196,350 79,129
Mandor L.04 OH 0.3530 248,325 87,659
JUMLAH UPAH TENAGA KERJA 1,408,990
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.4000 2,737,350 1,094,940
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 4.0000 17,787 71,148
Minyak bekisting Liter 2.0000 17,325 34,650
Besi beton polos Kg 315.0000 15,015 4,729,725
Kawat Beton/Bendrat Kg 4.5000 20,790 93,555
Semen Portland Kg 336.0000 1,473 494,802
Pasir pasang (Kg) M3 0.5400 319 172
Kerikil sungai M3 0.8100 659,505 534,199
Kayu Balok Klas II (Lanan) M3 0.1500 2,818,200 422,730
Plywood tebal 6 mm Lembar 3.5000 255,602 894,605
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 20.0000 17,325 346,500
JUMLAH HARGA BAHAN 8,717,027
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 10,126,017


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 10,126,017

A. 4.1.1.31 Membuat 1 M3 balok beton bertulang (200 Kg besi + bekisting)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 6.3500 103,950 660,083
Tukang batu L.02 OH 0.2750 138,600 38,115
Tukang kayu L.02 OH 1.6500 138,600 228,690
Tukang besi L.02 OH 1.4000 115,500 161,700
Kepala tukang batu L.03 OH 0.3330 196,350 65,385
Mandor L.04 OH 0.3180 248,325 78,967
JUMLAH UPAH TENAGA KERJA 1,232,939
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.3200 2,737,350 875,952
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 3.2000 17,787 56,918
Minyak bekisting Liter 1.6000 17,325 27,720
Besi beton polos Kg 210.0000 15,015 3,153,150
Kawat Beton/Bendrat Kg 3.0000 20,790 62,370
Semen Portland Kg 336.0000 1,473 494,802
Pasir pasang (Kg) M3 0.5400 319 172
Kerikil sungai M3 0.8100 659,505 534,199
Kayu Balok Klas II (Lanan) M3 0.1400 2,818,200 394,548
Plywood tebal 6 mm Lembar 2.8000 255,602 715,684
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 16.0000 17,325 277,200
JUMLAH HARGA BAHAN 6,592,716
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 7,825,655


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 7,825,655

A. 4.1.1.32 Membuat 1 M3 plat beton bertulang (150 Kg besi + bekisting)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 5.3000 103,950 550,935
Tukang batu L.02 OH 0.2750 138,600 38,115
Tukang kayu L.02 OH 1.3000 138,600 180,180
Tukang besi L.02 OH 1.0500 115,500 121,275
Kepala tukang batu L.03 OH 0.2650 196,350 52,033
Mandor L.04 OH 0.2650 248,325 65,806
JUMLAH UPAH TENAGA KERJA 1,008,344
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.3200 2,737,350 875,952
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 3.2000 17,787 56,918
Minyak bekisting Liter 1.6000 17,325 27,720
Besi beton polos Kg 157.5000 15,015 2,364,863
Kawat Beton/Bendrat Kg 2.2500 20,790 46,778
Semen Portland Kg 336.0000 1,473 494,802
Pasir pasang (Kg) M3 0.5400 319 172
Kerikil sungai M3 0.8100 659,505 534,199
Kayu Balok Klas II (Lanan) M3 0.1200 2,818,200 338,184
Plywood tebal 6 mm Lembar 2.8000 255,602 715,684
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 32.0000 17,325 554,400
JUMLAH HARGA BAHAN 6,009,672
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 7,018,016


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 7,018,016

A. 4.1.1.33 Membuat 1 M3 dinding beton bertulang (150 Kg besi + bekisting)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 5.3000 103,950 550,935
Tukang batu L.02 OH 0.2750 138,600 38,115
Tukang kayu L.02 OH 1.3000 138,600 180,180
Tukang besi L.02 OH 1.0500 115,500 121,275
Kepala tukang batu L.03 OH 0.2620 196,350 51,444
Mandor L.04 OH 0.2650 248,325 65,806
JUMLAH UPAH TENAGA KERJA 1,007,755
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.2400 2,737,350 656,964
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 3.2000 17,787 56,918
Minyak bekisting Liter 1.6000 17,325 27,720
Besi beton polos Kg 157.5000 15,015 2,364,863
Kawat Beton/Bendrat Kg 2.2500 20,790 46,778
Semen Portland Kg 336.0000 1,473 494,802
Pasir pasang (Kg) M3 0.5400 319 172
Kerikil sungai M3 0.8100 659,505 534,199
Kayu Balok Klas II (Lanan) M3 0.1600 2,818,200 450,912
Plywood tebal 6 mm Lembar 2.8000 255,602 715,684
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 24.0000 17,325 415,800
JUMLAH HARGA BAHAN 5,764,812
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 6,772,567


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 6,772,567

A. 4.1.1.34 Membuat 1 M3 dinding beton bertulang (200 Kg besi + bekisting)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 5.6500 103,950 587,318
Tukang batu L.02 OH 0.2750 138,600 38,115
Tukang kayu L.02 OH 1.5600 138,600 216,216
Tukang besi L.02 OH 1.4000 115,500 161,700
Kepala tukang batu L.03 OH 0.3230 196,350 63,421
Mandor L.04 OH 0.2830 248,325 70,276
JUMLAH UPAH TENAGA KERJA 1,137,046
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.2500 2,737,350 684,338
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 3.0000 17,787 53,361
Minyak bekisting Liter 1.2000 17,325 20,790
Besi beton polos Kg 210.0000 15,015 3,153,150
Kawat Beton/Bendrat Kg 3.0000 20,790 62,370
Semen Portland Kg 336.0000 1,473 494,802
Pasir pasang (Kg) M3 0.5400 319 172
Kerikil sungai M3 0.8100 659,505 534,199
Kayu Balok Klas II (Lanan) M3 0.1050 2,818,200 295,911
Plywood tebal 6 mm Lembar 2.5000 255,602 639,004
Kayu Dolken/Galam ø 10 - 12 cm, P 4 m Batang 14.0000 17,325 242,550
JUMLAH HARGA BAHAN 6,180,647
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 7,317,692


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 7,317,692

A. 4.1.1.35 Membuat 1 M' kolom praktis beton bertulang (11 x 11) cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1800 103,950 18,711
Tukang batu L.02 OH 0.0200 138,600 2,772
Tukang kayu L.02 OH 0.0200 138,600 2,772
Tukang besi L.02 OH 0.0200 115,500 2,310
Kepala tukang batu L.03 OH 0.0060 196,350 1,178
Mandor L.04 OH 0.0090 248,325 2,235
JUMLAH UPAH TENAGA KERJA 29,978
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.0020 2,737,350 5,475
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0100 17,787 178
Minyak bekisting Liter 17,325 -
Besi beton polos Kg 3.0000 15,015 45,045
Kawat Beton/Bendrat Kg 0.4500 20,790 9,356
Semen Portland Kg 4.0000 1,473 5,891
Pasir pasang M3 0.0060 100,485 603
Kerikil sungai M3 0.0090 659,505 5,936
JUMLAH HARGA BAHAN 72,482
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 102,460


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 102,460

A. 4.1.1.36 Membuat 1 M' ring balok beton bertulang (10 x 15) cm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.2970 103,950 30,873
Tukang batu L.02 OH 0.0330 138,600 4,574
Tukang kayu L.02 OH 0.0330 138,600 4,574
Tukang besi L.02 OH 0.0330 115,500 3,812
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 49,521
B. BAHAN
Kayu Papan Klas II (Lanan) M3 0.0030 2,737,350 8,212
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0200 17,787 356
Minyak bekisting Liter 17,325 -
Besi beton polos Kg 3.6000 15,015 54,054
Kawat Beton/Bendrat Kg 0.0500 20,790 1,040
Semen Portland Kg 5.5000 1,473 8,099
Pasir pasang M3 0.0090 100,485 904
Kerikil sungai M3 0.0150 659,505 9,893
JUMLAH HARGA BAHAN 82,558
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 132,078


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 132,078

HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

A. 4.2.1.1 Pemasangan 1 Kg besi profil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0600 103,950 6,237
Tukang las konstruksi L.03 OH 0.0600 173,250 10,395
Kepala tukang L.03 OH 0.0060 #N/A #N/A
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Besi profil Kg 1.1500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.2 Pemasangan 1 Kg rangka kuda-kuda baja IWF

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0600 103,950 6,237
Tukang las konstruksi L.03 OH 0.0600 173,250 10,395
Kepala tukang L.03 OH 0.0060 #N/A #N/A
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Besi baja IWF Kg 1.1500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.3 Pengerjaan 100 Kg pekerjaan perakitan

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 103,950 10,395
Tukang besi konstruksi L.03 OH 0.1000 #N/A #N/A
Kepala tukang L.03 OH 0.0010 #N/A #N/A
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Solar Ltr 1.0000 #N/A #N/A
Minyak pelumas Ltr 0.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa alat Jam 0.8000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.4 Pembuatan 1 M2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0500 103,950 109,148
Tukang besi konstruksi L.03 OH 1.0500 #N/A #N/A
Kepala tukang L.03 OH 0.1050 #N/A #N/A
Mandor L.04 OH 0.0520 248,325 12,913
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Besi Siku L 30.30.3 Kg 15.0000 #N/A #N/A
Besi Plat Baja Kg 32.8000 #N/A #N/A
Kawat Las Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0400 103,950 4,158
Tukang Besi Konstruksi L.03 OH 0.0200 #N/A #N/A
Kepala Tukang L.03 OH 0.0020 #N/A #N/A
Mandor L.04 OH 0.0020 248,325 497
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Kawat Las Listrik Kg 0.4000 #N/A #N/A
Solar Liter 0.3000 #N/A #N/A
Minyak Pelumas Liter 0.0400 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Sewa Alat Jam 0.1700 - -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.6 Pembuatan 1 M2 rangka jendela besi Scuare Tube (25 x 5) cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6500 103,950 67,568
Tukang las biasa L.03 OH 0.6500 #N/A #N/A
Kepala Tukang L.03 OH 0.0650 #N/A #N/A
Mandor L.04 OH 0.0320 248,325 7,946
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Besi Scuare Tube M 4.7600 #N/A #N/A
Besi Lis Kaca (1 x 1) cm M 4.5220 #N/A #N/A
Pengelasan Cm 20.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.7 Pemasangan 1 M2 pintu rolling door besi

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.2000 103,950 124,740
Tukang las biasa L.03 OH 1.2000 #N/A #N/A
Kepala Tukang L.03 OH 0.1200 #N/A #N/A
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Pintu Gulung Besi M2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.8 Pemasangan 1 M2 pintu lipat (folding door) bahan plastik/PVC

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4400 103,950 45,738
Tukang L.03 OH 0.4400 #N/A #N/A
Kepala Tukang L.03 OH 0.0440 #N/A #N/A
Mandor L.04 OH 0.0220 248,325 5,463
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Pintu lipat M2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.9 Pemasangan 1 M2 sunscreen alluminium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0800 103,950 8,316
Tukang L.03 OH 0.8000 #N/A #N/A
Kepala Tukang L.03 OH 0.0800 #N/A #N/A
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Sunscreen allumunium M2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.10 Pemasangan 1 M2 rolling door alluminium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 103,950 103,950
Tukang khusus allumunium L.03 OH 1.0000 #N/A #N/A
Kepala Tukang L.03 OH 0.1000 #N/A #N/A
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Rolling door allumunium M2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.11 Pemasangan 1 M kusen pintu alluminium


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.0430 103,950 4,470
Tukang khusus allumunium L.03 OH 0.0430 #N/A #N/A
Kepala Tukang L.03 OH 0.0043 #N/A #N/A
Mandor L.04 OH 0.0021 248,325 521
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Profil Alluminium M 1.1000 #N/A #N/A
Skrup Fixer Buah 2.0000 #N/A #N/A
Sealant Tube 0.0600 40,425 2,426
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.12 Pemasangan 1 M2 pintu alluminium strip lebar 8 cm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.0850 103,950 8,836
Tukang khusus allumunium L.03 OH 0.0850 #N/A #N/A
Kepala Tukang L.03 OH 0.0085 #N/A #N/A
Mandor L.04 OH 0.0042 248,325 1,043
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Profil Alluminium M 4.4000 #N/A #N/A
Allumunium strip M 14.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.13 Pemasangan 1 M2 pintu kaca rangka alluminium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0850 103,950 8,836
Tukang allumunium / kaca L.03 OH 0.0850 #N/A #N/A
Kepala Tukang L.03 OH 0.0090 #N/A #N/A
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Pintu allumunium M 4.4000 #N/A #N/A
Profil kaca M 4.5000 #N/A #N/A
sealant Tube 0.2700 40,425 10,915
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.14 Pemasangan 1 M2 Venetions Blinds dan Vertical Blinds

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 103,950 36,383
Tukang L.03 OH 0.3500 #N/A #N/A
Kepala Tukang L.03 OH 0.0350 #N/A #N/A
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Venetions blinds dan vertical blinds (tirai) M2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.15 Pemasangan 1M2 terali besi strip (2 x 3) mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6700 103,950 173,597
Tukang las L.03 OH 1.6700 #N/A #N/A
Kepala Tukang L.03 OH 0.1670 #N/A #N/A
Mandor L.04 OH 0.0830 248,325 20,611
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Besi strip Kg 6.1770 109,725 677,771
Pengelasan M2 27.0800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.16 Pemasangan 1 M2 kawat nyamuk

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 103,950 10,395
Tukang L.03 OH 0.1000 #N/A #N/A
Kepala Tukang L.03 OH 0.0100 #N/A #N/A
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
kawat nyamuk M2 1.1000 #N/A #N/A
Pengelasan Cm 11.1100 #N/A #N/A
Baja strip (0,2 x 2) cm Kg 1.7160 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.17 Pemasangan 1 M2 jendela nako & tralis

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 103,950 20,790
Tukang besi L.03 OH 0.2000 115,500 23,100
Kepala Tukang besi L.03 OH 0.0200 173,250 3,465
Mandor L.04 OH 0.0010 248,325 248
JUMLAH UPAH TENAGA KERJA 47,603
B. BAHAN
Jendela nako M2 1.1000 #N/A #N/A
Skrup fixer Bh 10.0000 #N/A #N/A
Besi strip M 7.0000 109,725 768,075
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.18 Pemasangan 1 M' talang datar / jurai seng BJLS 28 lebar 90 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 103,950 20,790
Tukang L.03 OH 0.2000 #N/A #N/A
Kepala Tukang L.03 OH 0.0200 #N/A #N/A
Mandor L.04 OH 0.0010 248,325 248
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Seng plat M 1.0500 #N/A #N/A
Paku 1 cm - 2,5 cm Kg 0.0150 #N/A #N/A
Papan kayu kelas II atau III M3 0.0190 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.19 Pemasangan 1 M talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 103,950 15,593
Tukang L.03 OH 0.3000 #N/A #N/A
Kepala Tukang L.03 OH 0.0300 #N/A #N/A
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Seng plat M 1.0500 #N/A #N/A
Paku 1 cm - 2,5 cm Kg 0.0100 #N/A #N/A
Papan kayu kelas II atau III M3 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.2.1.20 Pemasangan 1 M2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm, dinding partisi

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 103,950 25,988
Tukang besi L.03 OH 0.2500 115,500 28,875
Kepala Tukang L.03 OH 0.0250 #N/A #N/A
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Rangka metal hollow 40.40.2 mm M' 3.5000 #N/A #N/A
Aksesoris (perkuatan, las dll) Ls 3.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.2.1.21 Pemasangan 1 M2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafond
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 103,950 36,383
Tukang besi L.03 OH 0.3500 115,500 40,425
Kepala Tukang L.03 OH 0.0350 #N/A #N/A
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Rangka metal hollow 40.40.2 mm M' 4.0000 #N/A #N/A
Aksesoris (perkuatan, las dll) Ls 4.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

HARGA SATUAN PEKERJAAN DINDING

A. 4.4.1.1 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.6000 103,950 62,370
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0300 248,325 7,450
JUMLAH UPAH TENAGA KERJA 101,467
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 140.0000 866 121,275
Semen Portland Kg 43.5000 1,473 64,059
Pasir pasang M3 0.0800 100,485 8,039
JUMLAH HARGA BAHAN 193,373
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 294,840


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 294,840
A. 4.4.1.2 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.6000 103,950 62,370
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0300 248,325 7,450
JUMLAH UPAH TENAGA KERJA 101,467
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 140.0000 866 121,275
Semen Portland Kg 32.9500 1,473 48,523
Pasir pasang M3 0.0910 100,485 9,144
JUMLAH HARGA BAHAN 178,942
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 280,409


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 280,409

A. 4.4.1.3 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.6000 103,950 62,370
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0300 248,325 7,450
JUMLAH UPAH TENAGA KERJA 101,467
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 140.0000 866 121,275
Semen Portland Kg 26.5500 1,473 39,098
Pasir pasang M3 0.0930 100,485 9,345
JUMLAH HARGA BAHAN 169,718
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 271,185


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 271,185

A. 4.4.1.4 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.6000 103,950 62,370
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0300 248,325 7,450
JUMLAH UPAH TENAGA KERJA 101,467
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 140.0000 866 121,275
Semen Portland Kg 22.2000 1,473 32,692
Pasir pasang M3 0.1020 100,485 10,249
JUMLAH HARGA BAHAN 164,217
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 265,683


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 265,683

A. 4.4.1.5 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.6000 103,950 62,370
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0300 248,325 7,450
JUMLAH UPAH TENAGA KERJA 101,467
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 140.0000 866 121,275
Semen Portland Kg 18.5000 1,473 27,244
Pasir pasang M3 0.1220 100,485 12,259
JUMLAH HARGA BAHAN 160,778
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 262,244


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 262,244

A. 4.4.1.6 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1 batu campuran 1 SP : 3 KP : 10 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6000 103,950 62,370
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0300 248,325 7,450
JUMLAH UPAH TENAGA KERJA 101,467
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 140.0000 866 121,275
Semen Portland Kg 10.0800 1,473 14,844
Kapur Pasang/Kapur Padam M3 0.0275 30,030 826
Pasir pasang M3 0.0925 100,485 9,295
JUMLAH HARGA BAHAN 146,240
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 247,706


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 247,706

A. 4.4.1.7 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1/2 batu campuran 1 SP : 2 PP
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen Portland Kg 18.9500 1,473 27,906
Pasir pasang M3 0.0380 100,485 3,818
JUMLAH HARGA BAHAN 92,362
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 143,096


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 143,096

A. 4.4.1.8 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1/2 batu campuran 1 SP : 3 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen Portland Kg 14.3700 1,473 21,162
Pasir pasang M3 0.0400 100,485 4,019
JUMLAH HARGA BAHAN 85,819
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 136,552


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 136,552

A. 4.4.1.9 Pemasangan 1 M2 dinding Bata Merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 4 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen Portland Kg 11.5000 1,473 16,935
Pasir pasang M3 0.0430 100,485 4,321
JUMLAH HARGA BAHAN 81,894
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 132,627


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 132,627

A. 4.4.1.10 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1/2 batu campuran 1 SP : 5 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen Portland Kg 9.6800 1,473 14,255
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN 79,414
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 130,148


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 130,148

A. 4.4.1.11 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1/2 batu campuran 1 SP : 6 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen Portland Kg 8.3200 1,473 12,252
Pasir pasang M3 0.0490 100,485 4,924
JUMLAH HARGA BAHAN 77,814
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 128,547


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 128,547

A. 4.4.1.12 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1/2 batu campuran 1 SP : 8 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen Portland Kg 6.5000 1,473 9,572
Pasir pasang M3 0.0500 100,485 5,024
JUMLAH HARGA BAHAN 75,234
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 125,967


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 125,967

A. 4.4.1.13 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1/2 batu campuran 1 SP : 3 KP : 10 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen Portland Kg 4.5000 1,473 6,627
Kapur Pasang/Kapur Padam M3 0.0150 30,030 450
Pasir pasang M3 0.0500 100,485 5,024
JUMLAH HARGA BAHAN 72,739
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 123,472


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 123,472

A. 4.4.1.14 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1/2 batu campuran 1 Semen Portland : 1 KP : 1 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen warna Kg 0.0180 16,170 291
Kapur Pasang/Kapur Padam M3 0.0180 30,030 541
Pasir pasang M3 0.0180 100,485 1,809
JUMLAH HARGA BAHAN 63,278
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 114,011


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 114,011

A. 4.4.1.15 Pemasangan 1 M2 dinding Bata Merah Lokal (9,0x20x3,5 cm) (5x11x22) cm tebal 1/2 batu campuran 1 Semen Portland : 1 KP : 2 PP
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen warna Kg 0.0140 16,170 226
Kapur Pasang/Kapur Padam M3 0.0140 30,030 420
Pasir pasang M3 0.0280 100,485 2,814
JUMLAH HARGA BAHAN 64,098
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 114,831


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 114,831

A. 4.4.1.16 Pemasangan 1 M2 dinding conbloak HB20 campuran 1 SP : 3 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 103,950 36,383
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 64,588
B. BAHAN
HB-20 Bh 12.5000 #N/A #N/A
Semen Portland Kg 30.3200 1,473 44,650
Pasir pasang M3 0.7280 100,485 73,153
Besi angker diameter 8 Kg 0.2800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.1.17 Pemasangan 1 M2 dinding conbloak HB20 campuran 1 SP : 4 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 103,950 36,383
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 64,588
B. BAHAN
HB-20 Bh 12.5000 #N/A #N/A
Semen Portland Kg 24.2600 1,473 35,726
Pasir pasang M3 0.7720 100,485 77,574
Besi angker diameter 8 Kg 0.2800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.18 Pemasangan 1 M2 dinding conbloak HB15 campuran 1 SP : 3 PP


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.3200 103,950 33,264
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0160 248,325 3,973
JUMLAH UPAH TENAGA KERJA 56,225
B. BAHAN
HB-15 Bh 12.5000 #N/A #N/A
Semen Portland Kg 22.7400 1,473 33,487
Pasir pasang M3 0.5500 100,485 55,267
Besi angker diameter 8 Kg 0.2800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.19 Pemasangan 1 M2 dinding conbloak HB15 campuran 1 SP : 4 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3200 103,950 33,264
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0160 248,325 3,973
JUMLAH UPAH TENAGA KERJA 56,225
B. BAHAN
HB-15 Bh 12.5000 #N/A #N/A
Semen Portland Kg 18.2000 1,473 26,802
Pasir pasang M3 0.5820 100,485 58,482
Besi angker diameter 8 Kg 0.2800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.20 Pemasangan 1 M2 dinding conbloak HB10 campuran 1 SP : 3 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
HB-10 Bh 12.5000 #N/A #N/A
Semen Portland Kg 15.1600 1,473 22,325
Pasir pasang M3 0.3640 100,485 36,577
Besi angker diameter 8 Kg 0.2800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.21 Pemasangan 1 M2 dinding conbloak HB10 campuran 1 SP : 4 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
HB-10 Bh 12.5000 #N/A #N/A
Semen Portland Kg 12.1300 1,473 17,863
Pasir pasang M3 0.3880 100,485 38,988
Besi angker diameter 8 Kg 0.2800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.22 Pemasangan 1 M2 dinding terawang (rooster) 12x11x24 campuran 1 SP : 3 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata rooster Bh 30.0000 #N/A #N/A
Semen Portland Kg 14.0000 1,473 20,617
Pasir pasang M3 0.0320 100,485 3,216
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.23 Pemasangan 1 M2 dinding terawang (rooster) 12x11x24 campuran 1 SP : 4 PP


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Bata rooster Bh 30.0000 #N/A #N/A
Semen Portland Kg 11.0000 1,473 16,199
Pasir pasang M3 0.0350 100,485 3,517
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.1.24 Pemasangan 1 M2 dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Bata berongga ekpose Bh 70.0000 #N/A #N/A
Semen Portland Kg 14.0000 1,473 20,617
Pasir pasang M3 0.0320 100,485 3,216
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
HARGA SATUAN PEKERJAAN PLESTERAN

A. 4.4.2.1 Pemasangan 1 M2 plesteran 1 SP : 1 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 15.5040 1,473 22,832
Pasir pasang M3 0.0160 100,485 1,608
JUMLAH HARGA BAHAN 24,439
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 83,084
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 83,084

A. 4.4.2.2 Pemasangan 1 M2 plesteran 1 SP : 2 PP tebal 15 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 10.2240 1,473 15,056
Pasir pasang M3 0.0200 100,485 2,010
JUMLAH HARGA BAHAN 17,066
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 75,711


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 75,711

A. 4.4.2.3 Pemasangan 1 M2 plesteran 1 SP : 3 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 7.7760 1,473 11,451
Pasir pasang M3 0.0230 100,485 2,311
JUMLAH HARGA BAHAN 13,762
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 72,407


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 72,407

A. 4.4.2.4 Pemasangan 1 M2 plesteran 1 SP : 4 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 6.2400 1,473 9,189
Pasir pasang M3 0.0240 100,485 2,412
JUMLAH HARGA BAHAN 11,601
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 70,246


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 70,246
A. 4.4.2.5 Pemasangan 1 M2 plesteran 1 SP : 5 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 5.1840 1,473 7,634
Pasir pasang M3 0.0260 100,485 2,613
JUMLAH HARGA BAHAN 10,247
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 68,892


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 68,892

A. 4.4.2.6 Pemasangan 1 M2 plesteran 1 SP : 6 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 4.4160 1,473 6,503
Pasir pasang M3 0.0270 100,485 2,713
JUMLAH HARGA BAHAN 9,216
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 67,861


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 67,861

A. 4.4.2.7 Pemasangan 1 M2 plesteran 1 SP : 7 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 3.9360 1,473 5,796
Pasir pasang M3 0.0280 100,485 2,814
JUMLAH HARGA BAHAN 8,610
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 67,255


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 67,255

A. 4.4.2.8 Pemasangan 1 M2 plesteran 1 SP : 8 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 3.4560 1,473 5,089
Pasir pasang M3 0.0290 100,485 2,914
JUMLAH HARGA BAHAN 8,003
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 66,649


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 66,649

A. 4.4.2.9 Pemasangan 1 M2 plesteran 1 SP : 1/2 KP : 8 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3600 103,950 37,422
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 60,880
B. BAHAN
Semen Portland Kg 5.7600 1,473 8,482
Kapur Pasang/Kapur Padam M3 0.0030 30,030 90
Pasir pasang M3 0.0130 100,485 1,306
JUMLAH HARGA BAHAN 9,879
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 70,759


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 70,759

A. 4.4.2.10 Pemasangan 1 M2 plesteran 1 SP : 2 KP : 8 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3600 103,950 37,422
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 60,880
B. BAHAN
Semen Portland Kg 3.0000 1,473 4,418
Kapur Pasang/Kapur Padam M3 0.0050 30,030 150
Pasir pasang M3 0.0200 100,485 2,010
JUMLAH HARGA BAHAN 6,578
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 67,458


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 67,458

A. 4.4.2.11 Pemasangan 1 M2 plesteran 1 Semen Portland : 1 KP : 1 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3600 103,950 37,422
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 60,880
B. BAHAN
Semen Portland M3 0.0090 1,473 13
Kapur Pasang/Kapur Padam M3 0.0090 30,030 270
Pasir pasang M3 0.0090 100,485 904
JUMLAH HARGA BAHAN 1,188
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 62,068


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 62,068

A. 4.4.2.12 Pemasangan 1 M2 plesteran 1 Semen Portland : 1 KP : 2 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3600 103,950 37,422
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 60,880
B. BAHAN
Semen Portland M3 0.0070 1,473 10
Kapur Pasang/Kapur Padam M3 0.0070 30,030 210
Pasir pasang M3 0.0150 100,485 1,507
JUMLAH HARGA BAHAN 1,728
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 62,608


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 62,608

A. 4.4.2.13 Pemasangan 1 M2 plesteran 1 SP : 1 PP tebal 20 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.4000 103,950 41,580
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0220 248,325 5,463
JUMLAH UPAH TENAGA KERJA 78,690
B. BAHAN
Semen Portland Kg 13.6320 1,473 20,075
Pasir pasang M3 0.0270 100,485 2,713
JUMLAH HARGA BAHAN 22,788
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 101,478


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 101,478

A. 4.4.2.13 Pemasangan 1 M2 plesteran 1 SP : 2 PP tebal 20 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.4000 103,950 41,580
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0220 248,325 5,463
JUMLAH UPAH TENAGA KERJA 78,690
B. BAHAN
Semen Portland Kg 13.6320 1,473 20,075
Pasir pasang M3 0.0270 100,485 2,713
JUMLAH HARGA BAHAN 22,788
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 101,478


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 101,478

A. 4.4.2.14 Pemasangan 1 M2 plesteran 1 SP : 3 PP tebal 20 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2600 103,950 27,027
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 61,902
B. BAHAN
Semen Portland Kg 10.3680 1,473 15,268
Pasir pasang M3 0.0310 100,485 3,115
JUMLAH HARGA BAHAN 18,383
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 80,285


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 80,285

A. 4.4.2.15 Pemasangan 1 M2 plesteran 1 SP : 4 PP tebal 20 mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.4000 103,950 41,580
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0220 248,325 5,463
JUMLAH UPAH TENAGA KERJA 78,690
B. BAHAN
Semen Portland Kg 8.3200 1,473 12,252
Pasir pasang M3 0.0320 100,485 3,216
JUMLAH HARGA BAHAN 15,468
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 94,158


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 94,158

A. 4.4.2.16 Pemasangan 1 M2 plesteran 1 SP : 5 PP tebal 20 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.4000 103,950 41,580
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0220 248,325 5,463
JUMLAH UPAH TENAGA KERJA 78,690
B. BAHAN
Semen Portland Kg 6.9120 1,473 10,179
Pasir pasang M3 0.0350 100,485 3,517
JUMLAH HARGA BAHAN 13,696
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 92,386


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 92,386

A. 4.4.2.17 Pemasangan 1 M2 plesteran 1 SP : 6 PP tebal 20 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.4000 103,950 41,580
Tukang batu L.02 OH 0.2000 138,600 27,720
Kepala tukang batu L.03 OH 0.0200 196,350 3,927
Mandor L.04 OH 0.0220 248,325 5,463
JUMLAH UPAH TENAGA KERJA 78,690
B. BAHAN
Semen Portland Kg 5.8880 1,473 8,671
Pasir pasang M3 0.0360 100,485 3,617
JUMLAH HARGA BAHAN 12,288
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 90,978


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 90,978

A. 4.4.2.18 Pemasangan 1 M2 plesteran 1 Semen Portland : 1 KP : 2 PP tebal 20 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.4400 103,950 45,738
Tukang batu L.02 OH 0.2200 138,600 30,492
Kepala tukang batu L.03 OH 0.0220 196,350 4,320
Mandor L.04 OH 0.0220 248,325 5,463
JUMLAH UPAH TENAGA KERJA 86,013
B. BAHAN
Semen Portland M3 0.0090 1,473 13
Kapur Pasang/Kapur Padam M3 0.0090 30,030 270
Pasir pasang M3 0.0180 100,485 1,809
JUMLAH HARGA BAHAN 2,092
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 88,105


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 88,105

A. 4.4.2.19 Pemasangan 1 M2 berapen 1 SP : 5 PP tebal 15 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1500 103,950 15,593
Tukang batu L.02 OH 0.0750 138,600 10,395
Kepala tukang batu L.03 OH 0.0080 196,350 1,571
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 29,545
B. BAHAN
Semen Portland Kg 5.1840 1,473 7,634
Pasir pasang M3 0.0260 100,485 2,613
JUMLAH HARGA BAHAN 10,247
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 39,792


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 39,792

A. 4.4.2.20 Pemasangan 1 M' plesteran skoning 1 SP : 3 PP lebar 10 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0800 103,950 8,316
Tukang batu L.02 OH 0.4000 138,600 55,440
Kepala tukang batu L.03 OH 0.0400 196,350 7,854
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 72,603
B. BAHAN
Semen Portland Kg 0.5000 1,473 736
Pasir pasang M3 0.0130 100,485 1,306
JUMLAH HARGA BAHAN 2,043
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 74,646


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 74,646

A. 4.4.2.21 Pemasangan 1 M2 plesteran granit 1 SP : 2 granit tebal 1 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.4500 103,950 46,778
Tukang batu L.02 OH 0.2250 138,600 31,185
Kepala tukang batu L.03 OH 0.0230 196,350 4,516
Mandor L.04 OH 0.0230 248,325 5,711
JUMLAH UPAH TENAGA KERJA 88,190
B. BAHAN
Semen Portland Kg 10.0000 1,473 14,726
Batu granit Kg 15.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.2.22 Pemasangan 1 M2 plesteran traso 1 SP : 2 Traso tebal 1 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.4500 103,950 46,778
Tukang batu L.02 OH 0.2250 138,600 31,185
Kepala tukang batu L.03 OH 0.0230 196,350 4,516
Mandor L.04 OH 0.0230 248,325 5,711
JUMLAH UPAH TENAGA KERJA 88,190
B. BAHAN
Semen Portland Kg 10.0000 1,473 14,726
Batu traso Kg 15.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.2.23 Pemasangan 1 M2 plesteran ciprat 1 SP : 2 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 50,733
B. BAHAN
Semen Portland Kg 4.3200 1,473 6,362
Pasir pasang M3 0.0060 100,485 603
JUMLAH HARGA BAHAN 6,965
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 57,698


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 57,698

A. 4.4.2.24 Pemasangan 1 M2 finishing siar pasangan Bata Merah Lokal (9,0x20x3,5 cm)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1500 103,950 15,593
Tukang batu L.02 OH 0.0750 138,600 10,395
Kepala tukang batu L.03 OH 0.0080 196,350 1,571
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 29,545
B. BAHAN
Semen Portland Kg 3.1080 1,473 4,577
JUMLAH HARGA BAHAN 4,577
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 34,122


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 34,122

A. 4.4.2.25 Pemasangan 1 M2 finishing siar pasangan conblock ekspose

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0700 103,950 7,277
Tukang batu L.02 OH 0.0350 138,600 4,851
Kepala tukang batu L.03 OH 0.0040 196,350 785
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 13,906
B. BAHAN
Semen Portland Kg 1.6000 1,473 2,356
JUMLAH HARGA BAHAN 2,356
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 16,262


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 16,262
A. 4.4.2.26 Pemasangan 1 M2 finishing siar pasangan batu kali, campuran 1 SP : 2 PP

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 58,645
B. BAHAN
Semen Portland Kg 6.3400 1,473 9,336
Pasir pasang M3 0.0120 100,485 1,206
JUMLAH HARGA BAHAN 10,542
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 69,187


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 69,187

A. 4.4.2.27 Pemasangan 1 M2 acian

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2000 103,950 20,790
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 39,097
B. BAHAN
Semen Portland Kg 3.2500 1,473 4,786
JUMLAH HARGA BAHAN 4,786
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 43,883


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 43,883

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A. 4.4.3.1 Pemasangan 1 M2 lantai ubin PC abu-abu ukuran 40 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,093
B. BAHAN
Ubin abu-abu Bh 6.6300 #N/A #N/A
Semen Portland Kg 9.8000 1,473 14,432
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.2 Pemasangan 1 M2 lantai ubin PC abu-abu ukuran 30 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,093
B. BAHAN
Ubin abu-abu Bh 11.8700 #N/A #N/A
Semen Portland Kg 10.0000 1,473 14,726
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.3 Pemasangan 1 M2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2700 103,950 28,067
Tukang batu L.02 OH 0.1350 138,600 18,711
Kepala tukang batu L.03 OH 0.0140 196,350 2,749
Mandor L.04 OH 0.0140 248,325 3,477
JUMLAH UPAH TENAGA KERJA 53,003
B. BAHAN
Ubin abu-abu Bh 26.5000 #N/A #N/A
Semen Portland Kg 10.4000 1,473 15,315
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.4 Pemasangan 1 M2 lantai ubin warna ukuran 40 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,093
B. BAHAN
Keramik 40/40 (Polished) Bh 6.6300 22,236 147,428
Semen Portland Kg 9.8000 1,473 14,432
Semen warna Kg 1.3000 16,170 21,021
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN 187,402
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 236,496


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 236,496

A. 4.4.3.4a Pemasangan 1 M2 lantai ubin warna ukuran 40 cm x 40 cm (KM/WC)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,093
B. BAHAN
Keramik 40/40 (Kasar) Bh 6.6300 36,288 240,589
Semen Portland Kg 9.8000 1,473 14,432
Semen warna Kg 1.3000 16,170 21,021
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN 280,564
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 329,657


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 329,657

A. 4.4.3.5 Pemasangan 1 M2 lantai ubin warna ukuran 30 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2600 103,950 27,027
Tukang batu L.02 OH 0.1300 138,600 18,018
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 50,826
B. BAHAN
Ubin warna Bh 11.8700 #N/A #N/A
Semen Portland Kg 10.0000 1,473 14,726
Semen warna Kg 1.5000 16,170 24,255
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.6 Pemasangan 1 M2 lantai ubin warna ukuran 20 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2700 103,950 28,067
Tukang batu L.02 OH 0.1350 138,600 18,711
Kepala tukang batu L.03 OH 0.0140 196,350 2,749
Mandor L.04 OH 0.0140 248,325 3,477
JUMLAH UPAH TENAGA KERJA 53,003
B. BAHAN
Ubin warna Bh 26.5000 #N/A #N/A
Semen Portland Kg 10.4000 1,473 15,315
Semen warna Kg 1.6200 16,170 26,195
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.7 Pemasangan 1 M2 lantai ubin teraso ukuran 40 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,093
B. BAHAN
Ubin teraso Bh 6.6300 #N/A #N/A
Semen Portland Kg 9.8000 1,473 14,432
Semen warna Kg 1.3000 16,170 21,021
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.8 Pemasangan 1 M2 lantai ubin teraso ukuran 30 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2600 103,950 27,027
Tukang batu L.02 OH 0.1300 138,600 18,018
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 50,826
B. BAHAN
Ubin teraso Bh 11.8700 #N/A #N/A
Semen Portland Kg 10.0000 1,473 14,726
Semen warna Kg 1.5000 16,170 24,255
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.9 Pemasangan 1 M2 lantai ubin granit ukuran 40 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,093
B. BAHAN
Ubin granit Bh 6.6300 #N/A #N/A
Semen Portland Kg 9.8000 1,473 14,432
Semen warna Kg 1.3000 16,170 21,021
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.10 Pemasangan 1 M2 lantai ubin granit ukuran 30 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2600 103,950 27,027
Tukang batu L.02 OH 0.1300 138,600 18,018
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 50,826
B. BAHAN
Ubin granit Bh 11.8700 #N/A #N/A
Semen Portland Kg 10.0000 1,473 14,726
Semen warna Kg 1.5000 16,170 24,255
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.11 Pemasangan 1 M2 lantai ubin terralux ukuran 40 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,093
B. BAHAN
Ubin terralux Bh 6.6300 #N/A #N/A
Semen Portland Kg 9.8000 1,473 14,432
Semen warna Kg 1.3000 16,170 21,021
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.12 Pemasangan 1 M2 lantai ubin terralux ukuran 30 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2600 103,950 27,027
Tukang batu L.02 OH 0.1300 138,600 18,018
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 50,826
B. BAHAN
Ubin terralux Bh 11.8700 #N/A #N/A
Semen Portland Kg 10.0000 1,473 14,726
Semen warna Kg 1.5000 16,170 24,255
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.13 Pemasangan 1 M2 lantai ubin terralux marmer ukuran 60 cm x 60 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2400 103,950 24,948
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0120 248,325 2,980
JUMLAH UPAH TENAGA KERJA 46,916
B. BAHAN
Ubin terralux Bh 3.1000 #N/A #N/A
Semen Portland Kg 9.6000 1,473 14,137
Semen warna Kg 1.5000 16,170 24,255
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.14 Pemasangan 1 M2 lantai ubin terralux marmer ukuran 40 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2500 103,950 25,988
Tukang batu L.02 OH 0.1250 138,600 17,325
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,093
B. BAHAN
Ubin terralux Bh 6.6300 #N/A #N/A
Semen Portland Kg 9.8000 1,473 14,432
Semen warna Kg 1.3000 16,170 21,021
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.15 Pemasangan 1 M2 lantai ubin terralux marmer ukuran 30 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.2600 103,950 27,027
Tukang batu L.02 OH 0.1300 138,600 18,018
Kepala tukang batu L.03 OH 0.0130 196,350 2,553
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 50,826
B. BAHAN
Ubin terralux Bh 11.8700 #N/A #N/A
Semen Portland Kg 10.0000 1,473 14,726
Semen warna Kg 1.5000 16,170 24,255
Pasir pasang M3 0.0450 100,485 4,522
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.16 Pemasangan 1 M' plint ubin pc abu-abu ukuran 15 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint ubin PC Bh 5.3000 #N/A #N/A
Semen Portland Kg 1.6500 1,473 2,430
Pasir pasang M3 0.0040 100,485 402
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.17 Pemasangan 1 M' plint ubin pc abu-abu ukuran 10 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint ubin PC Bh 3.5300 #N/A #N/A
Semen Portland Kg 1.2400 1,473 1,826
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.18 Pemasangan 1 M' plint ubin pc abu-abu ukuran 10 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint ubin PC Bh 2.6500 #N/A #N/A
Semen Portland Kg 1.2400 1,473 1,826
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.19 Pemasangan 1 M' plint ubin warna ukuran 10 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 #N/A #N/A
Tukang batu L.02 OH 0.0900 #N/A #N/A
Kepala tukang batu L.03 OH 0.0090 #N/A #N/A
Mandor L.04 OH 0.0050 #N/A #N/A
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Plint ubin warna Bh 5.3000 Err:504 Err:504
Semen Portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 Err:504 Err:504
Pasir pasang M3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) Err:504


E. Overhead & Profit - %xD Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.20 Pemasangan 1 M' plint ubin warna ukuran 10 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 #N/A #N/A
Tukang batu L.02 OH 0.0900 #N/A #N/A
Kepala tukang batu L.03 OH 0.0090 #N/A #N/A
Mandor L.04 OH 0.0050 #N/A #N/A
JUMLAH UPAH TENAGA KERJA #N/A
B. BAHAN
Plint ubin warna Bh 3.5300 Err:504 Err:504
Semen Portland Kg 1.1400 Err:504 Err:504
Semen warna Kg 0.1000 Err:504 Err:504
Pasir pasang M3 0.0030 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) Err:504


E. Overhead & Profit - %xD Err:504
F. Harga Satuan Pekerjaan (D+E) Err:504

A. 4.4.3.21 Pemasangan 1 M' plint ubin warna ukuran 10 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint ubin warna Bh 2.6500 1,800 4,770
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN 8,367
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 33,206


E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 33,206

A. 4.4.3.22 Pemasangan 1 M' plint ubin teraso ukuran 10 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint ubin warna Bh 3.5300 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.23 Pemasangan 1 M' plint ubin teraso ukuran 10 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint ubin teraso Bh 2.6500 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.24 Pemasangan 1 M' plint ubin granit ukuran 10 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint ubin granit Bh 2.6500 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.25 Pemasangan 1 M' plint ubin granit ukuran 10 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint ubin granit Bh 3.5300 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.26 Pemasangan 1 M' plint ubin teralux kerang ukuran 10 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint teralux kerang Bh 2.6300 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.27 Pemasangan 1 M' plint ubin teralux kerang ukuran 10 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint teralux kerang Bh 3.5300 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.28 Pemasangan 1 M' plint ubin teralux marmer ukuran 10 cm x 60 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint teralux marmer Bh 1.7000 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.29 Pemasangan 1 M' plint ubin teralux marmer ukuran 10 cm x 40 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint teralux marmer Bh 2.6500 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.30 Pemasangan 1 M' plint ubin teralux marmer ukuran 10 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 24,838
B. BAHAN
Plint teralux marmer Bh 3.5300 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Semen warna Kg 0.1000 16,170 1,617
Pasir pasang M3 0.0030 100,485 301
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) #N/A


E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.31 Pemasangan 1 M2 lantai teraso cor di tempat, tebal 3 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3600 103,950 37,422
Tukang batu L.02 OH 0.1800 138,600 24,948
Kepala tukang batu L.03 OH 0.0180 196,350 3,534
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 70,374
B. BAHAN
Teraso cor M3 0.0360 #N/A #N/A
Semen warna Kg 0.1000 16,170 1,617
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.32 Pemasangan 1 M2 lantai keramik artistik 10 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Ubin keramik Bh 53.0000 #N/A #N/A
Semen Portland Kg 8.1900 1,473 12,061
Pasir pasang M3 0.0450 100,485 4,522
Semen warna Kg 2.7500 16,170 44,468
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.33 Pemasangan 1 M2 lantai keramik artistik 10 cm x 10 cm atau 5 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Ubin keramik Bh 106.0000 #N/A #N/A
Semen Portland Kg 8.1900 1,473 12,061
Pasir pasang M3 0.0450 100,485 4,522
Semen warna Kg 3.2000 16,170 51,744
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.34 Pemasangan 1 M2 lantai keramik ukuran 33 cm x 33 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Ubin keramik Bh 10.0000 #N/A #N/A
Semen Portland Kg 8.1900 1,473 12,061
Pasir pasang M3 0.0450 100,485 4,522
Semen warna Kg 1.6200 Err:504 Err:504
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.35 Pemasangan 1 M2 lantai keramik ukuran 30 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Keramik 30 x 30 cm Bh 11.8700 #N/A #N/A
Semen Portland Kg 10.0000 1,473 14,726
Pasir pasang M3 0.0450 100,485 4,522
Semen warna Kg 1.5000 16,170 24,255
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.36 Pemasangan 1 M2 lantai keramik ukuran 20 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Keramik 20/20 Corak/Warna KM/WC Bh 26.5000 2,772 73,458
Semen Portland Kg 10.4000 1,473 15,315
Pasir pasang M3 0.0450 100,485 4,522
Semen warna Kg 1.6200 16,170 26,195
JUMLAH HARGA BAHAN 119,491
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 256,329
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 256,329

A. 4.4.3.37 Pemasangan 1 M2 lantai keramik ukuran 10 cm x 33 cm untuk variasi/border

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.0500 103,950 109,148
Tukang batu L.02 OH 0.5250 138,600 72,765
Kepala tukang batu L.03 OH 0.0530 196,350 10,407
Mandor L.04 OH 0.0530 248,325 13,161
JUMLAH UPAH TENAGA KERJA 205,480
B. BAHAN
Ubin keramik Bh 33.0000 #N/A #N/A
Semen Portland Kg 9.8000 1,473 14,432
Pasir pasang M3 0.0450 100,485 4,522
Semen warna Kg 4.3700 16,170 70,663
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.38 Pemasangan 1 M2 lantai keramik mozaik ukuran 30 cm x 30 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Ubin keramik Bh 11.8700 #N/A #N/A
Semen Portland Kg 14.1500 1,473 20,838
Pasir pasang M3 0.0390 100,485 3,919
Semen warna Kg 2.0000 16,170 32,340
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.39 Pemasangan 1 M' plint keramik ukuran 10 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 29,943
B. BAHAN
Keramik Plint 10/20 cm Bh 5.3000 231 1,224
Semen Portland Kg 1.1000 1,473 1,620
Pasir pasang M3 0.0030 100,485 301
Semen warna Kg 0.0250 16,170 404
JUMLAH HARGA BAHAN 3,550
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 33,493
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 33,493

A. 4.4.3.40 Pemasangan 1 M' plint keramik ukuran 10 cm x 10 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 29,943
B. BAHAN
Plint keramik Bh 10.6000 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Pasir pasang M3 0.0030 100,485 301
Semen warna Kg 0.0500 16,170 809
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.41 Pemasangan 1 M' plint keramik ukuran 5 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0900 103,950 9,356
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 29,943
B. BAHAN
Plint keramik Bh 5.3000 #N/A #N/A
Semen Portland Kg 0.5700 1,473 839
Pasir pasang M3 0.0015 100,485 151
Semen warna Kg 0.0130 16,170 210
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.42 Pemasangan 1 M' plint internal cove artistik 5 cm x 5 cm x 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7500 103,950 77,963
Tukang batu L.02 OH 0.7500 138,600 103,950
Kepala tukang batu L.03 OH 0.0750 196,350 14,726
Mandor L.04 OH 0.0380 248,325 9,436
JUMLAH UPAH TENAGA KERJA 206,075
B. BAHAN
Internal cove (plint sudut) Bh 5.3000 #N/A #N/A
Semen Portland Kg 1.1400 1,473 1,679
Pasir pasang M3 0.0030 100,485 301
Semen warna Kg 0.1000 16,170 1,617
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.43 Pemasangan 1 M2 lantai keramik marmer ukuran 100 cm x 100 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Marmer Bh 1.0600 #N/A #N/A
Semen Portland Kg 8.1900 1,473 12,061
Pasir pasang M3 0.0450 100,485 4,522
Semen warna Kg 0.6500 16,170 10,511
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.44 Pemasangan 1 M2 lantai karpet

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1700 92,400 15,708
Tukang kayu L.02 OH 0.1700 138,600 23,562
Kepala tukang kayu L.03 OH 0.0170 181,913 3,093
Mandor L.04 OH 0.0090 248,325 2,235
JUMLAH UPAH TENAGA KERJA 44,597
B. BAHAN
Karpet M2 1.0500 #N/A #N/A
Lem Kg 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.45 Pemasangan 1 M2 underlayer (pelapis bawah karpet)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1200 92,400 11,088
Tukang kayu L.02 OH 0.1200 138,600 16,632
Kepala tukang kayu L.03 OH 0.0120 181,913 2,183
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 31,393
B. BAHAN
Underlayer M2 1.0500 #N/A #N/A
Lem Kg 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.46 Pemasangan 1 M2 lantai parquet kayu


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.7000 92,400 64,680
Tukang kayu L.02 OH 0.3500 138,600 48,510
Kepala tukang kayu L.03 OH 0.0350 181,913 6,367
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 128,248
B. BAHAN
Parquet M2 1.0500 #N/A #N/A
Lem Kg 0.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.47 Pemasangan 1 M2 lantai kayu gymfloor


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.7000 92,400 64,680
Tukang kayu L.02 OH 0.3500 138,600 48,510
Kepala tukang kayu L.03 OH 0.0350 181,913 6,367
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 128,248
B. BAHAN
Parquet M2 1.0500 #N/A #N/A
Lem Kg 0.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.48 Pemasangan 1 M2 dinding porslen 11cm x 11cm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.0000 103,950 103,950
Tukang batu L.02 OH 0.5000 138,600 69,300
Kepala tukang batu L.03 OH 0.0500 196,350 9,818
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 195,484
B. BAHAN
Porslen Bh 86.0000 #N/A #N/A
Semen Portland Kg 9.3000 1,473 13,695
Pasir pasang M3 0.0180 100,485 1,809
Semen warna Kg 1.5000 16,170 24,255
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.3.49 Pemasangan 1 M2 dinding porslen 10cm x 20cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.9000 103,950 93,555
Tukang batu L.02 OH 0.4500 138,600 62,370
Kepala tukang batu L.03 OH 0.0450 196,350 8,836
Mandor L.04 OH 0.0450 248,325 11,175
JUMLAH UPAH TENAGA KERJA 175,935
B. BAHAN
Porslen Bh 53.0000 #N/A #N/A
Semen Portland Kg 9.3000 1,473 13,695
Pasir pasang M3 0.0180 100,485 1,809
Semen warna Kg 2.7500 16,170 44,468
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.50 Pemasangan 1 M2 dinding porslen 20cm x 20cm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.9000 103,950 93,555
Tukang batu L.02 OH 0.4500 138,600 62,370
Kepala tukang batu L.03 OH 0.0450 196,350 8,836
Mandor L.04 OH 0.0450 248,325 11,175
JUMLAH UPAH TENAGA KERJA 175,935
B. BAHAN
Porslen Bh 26.0000 #N/A #N/A
Semen Portland Kg 9.3000 1,473 13,695
Pasir pasang M3 0.0180 100,485 1,809
Semen warna Kg 1.9400 16,170 31,370
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.51 Pemasangan 1 M2 dinding keramik artistik 10cm x 20cm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.9000 103,950 93,555
Tukang batu L.02 OH 0.4500 138,600 62,370
Kepala tukang batu L.03 OH 0.0450 196,350 8,836
Mandor L.04 OH 0.0450 248,325 11,175
JUMLAH UPAH TENAGA KERJA 175,935
B. BAHAN
Keramik artistik Bh 53.0000 #N/A #N/A
Semen Portland Kg 9.3000 1,473 13,695
Pasir pasang M3 0.0180 100,485 1,809
Semen warna Kg 2.7500 16,170 44,468
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.52 Pemasangan 1 M2 dinding keramik artistik 5cm x 20cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.9000 103,950 93,555
Tukang batu L.02 OH 0.4500 138,600 62,370
Kepala tukang batu L.03 OH 0.0450 196,350 8,836
Mandor L.04 OH 0.0450 248,325 11,175
JUMLAH UPAH TENAGA KERJA 175,935
B. BAHAN
Keramik artistik Bh 106.0000 #N/A #N/A
Semen Portland Kg 9.3000 1,473 13,695
Pasir pasang M3 0.0180 100,485 1,809
Semen warna Kg 2.9000 16,170 46,893
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.53 Pemasangan 1 M2 dinding keramik 10cm x 20cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.9000 103,950 93,555
Tukang batu L.02 OH 0.4500 138,600 62,370
Kepala tukang batu L.03 OH 0.0450 196,350 8,836
Mandor L.04 OH 0.0450 248,325 11,175
JUMLAH UPAH TENAGA KERJA 175,935
B. BAHAN
Keramik Plint 10/20 cm Bh 53.0000 231 12,243
Semen Portland Kg 9.3000 1,473 13,695
Pasir pasang M3 0.0180 100,485 1,809
Semen warna Kg 2.7500 16,170 44,468
JUMLAH HARGA BAHAN 72,215
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 248,150
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 248,150

A. 4.4.3.54 Pemasangan 1 M2 dinding keramik 20cm x 20cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.9000 103,950 93,555
Tukang batu L.02 OH 0.4500 138,600 62,370
Kepala tukang batu L.03 OH 0.0450 196,350 8,836
Mandor L.04 OH 0.0450 248,325 11,175
JUMLAH UPAH TENAGA KERJA 175,935
B. BAHAN
Keramik 20/20 Corak/Warna KM/WC Bh 26.5000 2,772 73,458
Semen Portland Kg 9.3000 1,473 13,695
Pasir pasang M3 0.0180 100,485 1,809
Semen warna Kg 1.9400 16,170 31,370
JUMLAH HARGA BAHAN 120,332
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 296,267
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 296,267

A. 4.4.3.55 Pemasangan 1 M2 dinding marmer 100cm x 100cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.3000 103,950 135,135
Tukang batu L.02 OH 0.6500 138,600 90,090
Kepala tukang batu L.03 OH 0.0650 196,350 12,763
Mandor L.04 OH 0.0650 248,325 16,141
JUMLAH UPAH TENAGA KERJA 254,129
B. BAHAN
Marmer Bh 1.0600 #N/A #N/A
Semen Portland Kg 12.4400 1,473 18,319
Pasir pasang M3 0.0250 100,485 2,512
Semen warna Kg 0.6500 16,170 10,511
Paku 12cm Bh 3.0300 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.56 Pemasangan 1 M2 dinding bata pelapis 3cm x 7cm x 24cm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.0000 103,950 103,950
Tukang batu L.02 OH 0.5000 138,600 69,300
Kepala tukang batu L.03 OH 0.0500 196,350 9,818
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 195,484
B. BAHAN
Bata pelapis Bh 63.0000 #N/A #N/A
Semen Portland Kg 12.4400 1,473 18,319
Pasir pasang M3 0.0250 100,485 2,512
Semen warna Kg 2.7500 16,170 44,468
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.57 Pemasangan 1 M2 dinding batu Andesit Alur


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Batu Andesit Alur M2 1.1000 242,550 266,805
Semen Portland Kg 11.7500 1,473 17,303
Pasir pasang M3 0.0350 100,485 3,517
JUMLAH HARGA BAHAN 287,625
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 424,464
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 424,464

A. 4.4.3.58 Pemasangan 1 M2 dinding batu Candi Polos


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.7000 103,950 72,765
Tukang batu L.02 OH 0.3500 138,600 48,510
Kepala tukang batu L.03 OH 0.0350 196,350 6,872
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 136,839
B. BAHAN
Batu Candi Polos M2 1.1000 242,550 266,805
Semen Portland Kg 11.7500 1,473 17,303
Pasir pasang M3 0.0350 100,485 3,517
JUMLAH HARGA BAHAN 287,625
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 424,464
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 424,464

A. 4.4.3.59 Pemasangan 1 M2 lantai vynil ukuran 30cm x 30cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1500 103,950 15,593
Tukang batu L.02 OH 0.1500 138,600 20,790
Kepala tukang batu L.03 OH 0.0150 196,350 2,945
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 41,314
B. BAHAN
Vynil Bh 11.8700 #N/A #N/A
Lem Kg 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.60 Pemasangan 1 M2 wallpaper lebar 50 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3500 103,950 36,383
Tukang batu L.02 OH 0.0175 138,600 2,426
Kepala tukang batu L.03 OH 0.0170 196,350 3,338
Mandor L.04 OH 0.0020 248,325 497
JUMLAH UPAH TENAGA KERJA 42,643
B. BAHAN
Wallpaper M' 2.2000 #N/A #N/A
Lem Kg 0.2500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.61 Pemasangan 1 M2 floor harderner

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1200 103,950 12,474
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 32,952
B. BAHAN
Floor harderner Kg 5.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.62 Pemasangan 1 M' plint vynil 15cm x 30cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0800 103,950 8,316
Tukang batu L.02 OH 0.0800 138,600 11,088
Kepala tukang batu L.03 OH 0.0080 196,350 1,571
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 21,968
B. BAHAN
Vynil Bh 1.7600 #N/A #N/A
Lem Kg 0.0800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 4.4.3.63 Pemasangan 1 M' plint kayu tebal 2 cm lebar 10 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1200 103,950 12,474
Tukang batu L.02 OH 0.1200 138,600 16,632
Kepala tukang batu L.03 OH 0.0120 196,350 2,356
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 32,952
B. BAHAN
Papan kayu kelas 1 M3 0.0030 #N/A #N/A
Paku/skrup 5 cm Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

HARGA SATUAN PEKERJAAN LANGIT-LANGIT

A.4.5.1.1 Pemasangan 1 M2 langit-langit asbes semen, tebal 4mm, 5mm, dan 6mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0300 92,400 2,772
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 14,741
B. BAHAN
Asbes semen M2 1.1000 #N/A #N/A
Paku tripleks Kg 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.1.2 Pemasangan 1 M2 langit-langit akustik ukuran (30 x 30) cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1200 92,400 11,088
Tukang kayu L.02 OH 0.1200 138,600 16,632
Kepala tukang kayu L.03 OH 0.0120 181,913 2,183
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 31,393
B. BAHAN
Akustik Lembar 12.0000 #N/A #N/A
Paku tripleks Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.1.3 Pemasangan 1 M2 langit-langit akustik ukuran (30 x 60) cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1200 92,400 11,088
Tukang kayu L.02 OH 0.1200 138,600 16,632
Kepala tukang kayu L.03 OH 0.0120 181,913 2,183
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 31,393
B. BAHAN
Gypsum Lembar 5.8000 #N/A #N/A
Skrup fixer Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.1.4 Pemasangan 1 M2 langit-langit ukuran (60 x 120) cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 26,161
B. BAHAN
Gypsum Lembar 1.5000 #N/A #N/A
Skrup fixer Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.1.5 Pemasangan 1 M2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3mm, 4mm & 6mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 26,161
B. BAHAN
Tripleks Lembar 0.3750 #N/A #N/A
Paku tripleks Kg 0.0300 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.1.6 Pemasangan 1 M2 langit-langit lambrisering kayu, tebal 9mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.8000 92,400 73,920
Tukang kayu L.02 OH 0.8000 138,600 110,880
Kepala tukang kayu L.03 OH 0.0800 181,913 14,553
Mandor L.04 OH 0.0400 248,325 9,933
JUMLAH UPAH TENAGA KERJA 209,286
B. BAHAN
Kayu papan Lembar 0.0150 #N/A #N/A
Paku tripleks Kg 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.1.7 Pemasangan 1 M2 langit-langit akustik ukuran (60 x 120)cm berikut rangka allumunium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.5000 92,400 46,200
Tukang kayu L.02 OH 0.5000 138,600 69,300
Kepala tukang kayu L.03 OH 0.0500 181,913 9,096
Mandor L.04 OH 0.0250 248,325 6,208
JUMLAH UPAH TENAGA KERJA 130,804
B. BAHAN
Profil allumunium "T" M 3.6000 #N/A #N/A
Kawat dia. 4mm Kg 0.1500 #N/A #N/A
Ramset Buah 1.0500 #N/A #N/A
Akustik 60 x 120 cm Lembar 1.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.1.7.a Pemasangan 1 M2 langit-langit Gypsum Board, Tbl 9 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.0500 138,600 6,930
Kepala tukang kayu L.03 OH 0.0050 181,913 910
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 18,321
B. BAHAN
Papan Plafond Gypsum, Tbl 9 mm, Uk. 120x240 cm Lembar 0.3640 86,279 31,405
Skrup fixer Kg 0.1100 30,000 3,300
JUMLAH HARGA BAHAN 34,705
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 53,027
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 53,027

A.4.5.1.8 Pemasangan 1 M2 langit-langit akustik ukuran (60 x 120) cm berikut rangka allumunium
Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.5000 92,400 46,200
Tukang kayu L.02 OH 0.5000 138,600 69,300
Kepala tukang kayu L.03 OH 0.0500 181,913 9,096
Mandor L.04 OH 0.0250 248,325 6,208
JUMLAH UPAH TENAGA KERJA 130,804
B. BAHAN
Profil allumunium "T" M 3.6000 #N/A #N/A
Kawat dia. 4mm Kg 0.1500 #N/A #N/A
Ramset Buah 1.0500 #N/A #N/A
Akustik 60 x 120 cm Lembar 1.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.1.9 Pemasangan 1 M' list langit-langit profil gypsum


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0500 92,400 4,620
Tukang kayu L.02 OH 0.0500 138,600 6,930
Kepala tukang kayu L.03 OH 0.0050 181,913 910
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 13,205
B. BAHAN
List Profil Gypsum Uk. Sedang (10 cm) M 1.0500 107,877 113,271
Lem putih Kg 0.0100 23,100 231
JUMLAH HARGA BAHAN 113,502
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 126,706
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 126,706

A.4.5.1.10 Pemasangan 1 M2 rangka langit-langit besi hollow 40.40

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 103,950 36,383
Tukang besi L.03 OH 0.3500 115,500 40,425
Kepala Tukang L.03 OH 0.0350 173,250 6,064
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 87,341
B. BAHAN
Rangka Plafond Baja Ringan (Zincalume) Hollow 40x40x0,3 mm M' 4.0000 33,380 133,518
Aksesoris (perkuatan, las dll) Ls 4.0000 36,717 146,870
JUMLAH HARGA BAHAN 280,388
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 367,729
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 367,729
HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.1 Pemasangan 1 M2 atap genteng palentong kecil


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.0750 138,600 10,395
Kepala tukang kayu L.03 OH 0.0075 181,913 1,364
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 27,606
B. BAHAN
Genteng palentong Bh 25.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.2 Pemasangan 1 M2 atap genteng kodok glazuur

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.0750 138,600 10,395
Kepala tukang kayu L.03 OH 0.0080 181,913 1,455
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 27,697
B. BAHAN
Genteng kodok Bh 25.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.3 Pemasangan 1 M2 atap genteng palentong besar/super

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.0750 138,600 10,395
Kepala tukang kayu L.03 OH 0.0080 181,913 1,455
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 27,697
B. BAHAN
Genteng palentong besar Bh 12.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.4 Pemasangan 1 M' bubung genteng palentong

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.4000 92,400 36,960
Tukang kayu L.02 OH 0.2000 138,600 27,720
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0020 248,325 497
JUMLAH UPAH TENAGA KERJA 68,815
B. BAHAN
Genteng bubung Bh 5.0000 #N/A #N/A
Semen Portland Kg 8.0000 1,473 11,781
pasir pasang M3 0.0320 100,485 3,216
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.5 Pemasangan 1 M' bubung genteng kodok glazuur


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.4000 92,400 36,960
Tukang kayu L.02 OH 0.2000 138,600 27,720
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0020 248,325 497
JUMLAH UPAH TENAGA KERJA 68,815
B. BAHAN
Genteng bubung Bh 5.0000 #N/A #N/A
Semen Portland Kg 8.0000 1,473 11,781
pasir pasang M3 0.0320 100,485 3,216
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.6 Pemasangan 1 M' bubung genteng palentong besar

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.4000 92,400 36,960
Tukang kayu L.02 OH 0.2000 138,600 27,720
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0020 248,325 497
JUMLAH UPAH TENAGA KERJA 68,815
B. BAHAN
Genteng bubung Bh 4.0000 #N/A #N/A
Semen Portland Kg 8.0000 1,473 11,781
pasir pasang M3 0.0320 100,485 3,216
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.7 Pemasangan 1 M2 roof light fiberglass 90x180

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0670 138,600 9,286
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,234
B. BAHAN
Rooflight 90x180 Lembar 0.6000 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 1/2"-1" Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.8 Pemasangan 1 M2 atap asbes gelombang 0,92m x 2,5m x 5mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0750 138,600 10,395
Kepala tukang kayu L.03 OH 0.0080 181,913 1,455
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 26,773
B. BAHAN
Asbes gel 92 x 250 Lembar 0.5000 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.9 Pemasangan 1 M2 atap asbes gelombang 0,92m x 2,25m x 5mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0750 138,600 10,395
Kepala tukang kayu L.03 OH 0.0080 181,913 1,455
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 26,773
B. BAHAN
Asbes gel 92 x 225 Lembar 0.6000 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.10 Pemasangan 1 M2 atap asbes gelombang 0,92m x 2,00m x 5mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 92 x 200 Lembar 0.6000 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.11 Pemasangan 1 M2 atap asbes gelombang 0,92m x 1,80m x 5mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 Err:504 Err:504
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA Err:504
B. BAHAN
Asbes gel 92 x 180 Lembar 0.7500 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.12 Pemasangan 1 M2 atap asbes gelombang 1,05m x 3,00m x 4mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 Err:504 Err:504
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA Err:504
B. BAHAN
Asbes gel 105 x 300 Lembar 0.3500 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.13 Pemasangan 1 M2 atap asbes gelombang 1,05m x 2,70m x 4mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 105 x 270 Lembar 0.4200 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.14 Pemasangan 1 M2 atap asbes gelombang 1,05m x 2,40m x 4mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 105 x 240 Lembar 0.4400 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.15 Pemasangan 1 M2 atap asbes gelombang 1,05m x 2,10m x 4mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 105 x 210 Lembar 0.5100 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.16 Pemasangan 1 M2 atap asbes gelombang 1,05m x 1,50m x 4mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 105 x 150 Lembar 0.8000 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.17 Pemasangan 1 M2 atap asbes gelombang 1,08m x 3,00m x 6mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 108 x 300 Lembar 0.3700 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.18 Pemasangan 1 M2 atap asbes gelombang 1,08m x 2,70m x 6mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 108 x 270 Lembar 0.3800 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.19 Pemasangan 1 M2 atap asbes gelombang 1,08m x 2,40m x 6mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 108 x 240 Lembar 0.4600 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.20 Pemasangan 1 M2 atap asbes gelombang 1,08m x 2,10m x 6mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 108 x 210 Lembar 0.4900 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.21 Pemasangan 1 M2 atap asbes gelombang 1,08m x 1,80m x 6mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1400 92,400 12,936
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 25,650
B. BAHAN
Asbes gel 108 x 180 Lembar 0.5700 #N/A #N/A
Paku pancing 6 x 23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.22 Pemasangan 1 M' bubung stel gelombang 0,92m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0840 92,400 7,762
Tukang kayu L.02 OH 0.1250 138,600 17,325
Kepala tukang kayu L.03 OH 0.0130 181,913 2,365
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 28,445
B. BAHAN
Bubung stel gel. Lembar 2.4000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.23 Pemasangan 1 M' bubung stel gelombang 1,05m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0840 92,400 7,762
Tukang kayu L.02 OH 0.1250 138,600 17,325
Kepala tukang kayu L.03 OH 0.0130 181,913 2,365
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 28,445
B. BAHAN
Bubung stel gel. Lembar 2.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.5.2.24 Pemasangan 1 M' bubung stel gelombang 1,08m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0840 92,400 7,762
Tukang kayu L.02 OH 0.1250 138,600 17,325
Kepala tukang kayu L.03 OH 0.0130 181,913 2,365
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 28,445
B. BAHAN
Bubung stel gel. Lembar 2.0500 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.25 Pemasangan 1 M' nok paten 0,92m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0840 92,400 7,762
Tukang kayu L.02 OH 0.1250 138,600 17,325
Kepala tukang kayu L.03 OH 0.0130 181,913 2,365
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 28,445
B. BAHAN
Nok paten 92cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.26 Pemasangan 1 M' nok paten 1,05m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0840 92,400 7,762
Tukang kayu L.02 OH 0.1250 138,600 17,325
Kepala tukang kayu L.03 OH 0.0130 181,913 2,365
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 28,445
B. BAHAN
Nok paten 105cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.27 Pemasangan 1 M' nok paten 1,08m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0840 92,400 7,762
Tukang kayu L.02 OH 0.1250 138,600 17,325
Kepala tukang kayu L.03 OH 0.0130 181,913 2,365
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 28,445
B. BAHAN
Nok paten 108cm Lembar 1.2000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.28 Pemasangan 1 M' nok stel rata 0,92m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0130 181,913 2,365
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 33,388
B. BAHAN
Nok paten 92cm Lembar 1.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.29 Pemasangan 1 M' nok stel rata 1,05m

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0840 92,400 7,762
Tukang kayu L.02 OH 0.1250 138,600 17,325
Kepala tukang kayu L.03 OH 0.0130 181,913 2,365
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 28,445
B. BAHAN
Nok paten 105cm Lembar 1.1000 #N/A #N/A
Paku skrup 3,5" Bh 6.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.30 Pemasangan 1 M' genteng beton

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.2000 92,400 18,480
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 36,642
B. BAHAN
Genteng beton Bh 11.0000 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 2"-5" Kg 0.0300 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.31 Pemasangan 1 M' genteng aspal

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.2000 92,400 18,480
Tukang kayu L.02 OH 0.3000 138,600 41,580
Kepala tukang kayu L.03 OH 0.0030 181,913 546
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 63,089
B. BAHAN
Genteng aspal Bh 6.9000 #N/A #N/A
Plywood 6mm Lbr 0.3500 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 1/2" - 1" Kg 0.0300 #N/A #N/A
Plastic aerator Bh 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.32 Pemasangan 1 M2 genteng metal

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.2000 92,400 18,480
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0010 248,325 248
JUMLAH UPAH TENAGA KERJA 34,407
B. BAHAN
Atap Zincolume collor (multi roof) Bh 1.0200 #N/A #N/A
#REF! Kg 0.2000 #REF! #REF!
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.33 Pemasangan 1 M' atap sirap kayu

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1660 92,400 15,338
Tukang kayu L.02 OH 0.2500 138,600 34,650
Kepala tukang kayu L.03 OH 0.0250 181,913 4,548
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 56,523
B. BAHAN
Sirap kayu Bh 30.0000 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 1/2" - 1" Kg 0.2000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.34 Pemasangan 1 M' nok genteng beton

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.4000 92,400 36,960
Tukang kayu L.02 OH 0.2000 138,600 27,720
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0200 248,325 4,967
JUMLAH UPAH TENAGA KERJA 73,285
B. BAHAN
Nok genteng beton Bh 3.5000 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 1/2" - 1" Kg 0.0500 #N/A #N/A
Semen Portland Kg 10.8000 1,473 15,904
Pasir pasang M3 0.0320 100,485 3,216
Semen warna Kg 1.0000 16,170 16,170
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.35 Pemasangan 1 M' nok genteng aspal

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1250 92,400 11,550
Tukang kayu L.02 OH 0.2500 138,600 34,650
Kepala tukang kayu L.03 OH 0.0250 181,913 4,548
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 52,238
B. BAHAN
Nok genteng aspal Bh 2.0000 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 1/2" - 1" Kg 0.0500 #N/A #N/A
Kayu balok borneo M3 0.0035 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.36 Pemasangan 1 M' nok genteng metal


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.2500 92,400 23,100
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0130 248,325 3,228
JUMLAH UPAH TENAGA KERJA 49,847
B. BAHAN
Bubungan genteng Multi Color Bh 1.1000 #N/A #N/A
Paku anti karat Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.37 Pemasangan 1 M' nok sirap

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1250 92,400 11,550
Tukang kayu L.02 OH 0.2500 138,600 34,650
Kepala tukang kayu L.03 OH 0.0250 181,913 4,548
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 52,238
B. BAHAN
Seng plat 3 x 6" Lembar 0.4000 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 1/2" - 1" Kg 0.0500 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 2"-5" Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.38 Pemasangan 1 M2 atap Seng Gelombang BJLS 20 (80x180 cm)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1200 92,400 11,088
Tukang kayu L.02 OH 0.0600 138,600 8,316
Kepala tukang kayu L.03 OH 0.0060 181,913 1,091
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 21,985
B. BAHAN
Seng Gelombang BJLS 20 (80x180 cm) Lembar 0.7000 43,890 30,723
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 1/2" - 1" Kg 0.0200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.39 Pemasangan 1 M' nok atap seng

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.0700 138,600 9,702
Kepala tukang kayu L.03 OH 0.0070 181,913 1,273
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 26,325
B. BAHAN
Seng plat 3"x6" bjls 28 Lembar 0.3000 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) 1/2" - 1" Kg 0.0400 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.40 Pemasangan 1 M2 atap alumunium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.7500 138,600 103,950
Kepala tukang kayu L.03 OH 0.0800 181,913 14,553
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 133,853
B. BAHAN
Alumunium gel. tbl. 0,55 Lembar 1.0500 #N/A #N/A
Paku hak pjg. 15 cm Kg 0.0200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.41 Pemasangan 1 M2 nok alumunium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 1.0000 138,600 138,600
Kepala tukang kayu L.03 OH 0.1000 181,913 18,191
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 178,448
B. BAHAN
Nok standar 40 x 18 Lembar 1.2000 #N/A #N/A
Paku hak pjg. 15 cm Kg 0.0400 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.5.2.42 Pemasangan 1 M2 alumunium foil/sisalation

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.0500 138,600 6,930
Kepala tukang kayu L.03 OH 0.0050 181,913 910
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 23,686
B. BAHAN
Alumunium foil M2 1.0500 453,915 476,611
JUMLAH HARGA BAHAN 476,611
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 500,297
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 500,297

HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1 Pembuatan & pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas I

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 7.0000 92,400 646,800
Tukang kayu L.02 OH 21.0000 138,600 2,910,600
Kepala tukang kayu L.03 OH 2.1000 181,913 382,016
Mandor L.04 OH 0.3500 248,325 86,914
JUMLAH UPAH TENAGA KERJA 4,026,330
B. BAHAN
Balok kayu Ulin 5x10 M3 1.1000 #N/A #N/A
Paku ulin Kg 1.2500 23,100 28,875
Lem kayu Kg 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.2 Pembuatan & pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas II atau III

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 6.0000 92,400 554,400
Tukang kayu L.02 OH 18.0000 138,600 2,494,800
Kepala tukang kayu L.03 OH 1.8000 181,913 327,443
Mandor L.04 OH 0.3000 248,325 74,498
JUMLAH UPAH TENAGA KERJA 3,451,140
B. BAHAN
#REF! M3 1.2000 #REF! #REF!
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 1.2500 17,787 22,234
Lem kayu Kg 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #REF!
E. Overhead & Profit - %xD #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.3 Pembuatan & pemasangan 1 M2 pintu klamp standar, kayu klas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.3500 92,400 32,340
Tukang kayu L.02 OH 1.0500 138,600 145,530
Kepala tukang kayu L.03 OH 0.1050 181,913 19,101
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 201,441
B. BAHAN
Papan kayu M3 0.0400 #N/A #N/A
Paku 5-7 cm Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.4 Pembuatan & pemasangan 1 M2 pintu klamp sederhana, kayu klas III

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.3500 92,400 32,340
Tukang kayu L.02 OH 1.0500 138,600 145,530
Kepala tukang kayu L.03 OH 0.1050 181,913 19,101
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 201,441
B. BAHAN
Papan kayu M3 0.0400 #N/A #N/A
Paku 5-7 cm Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.5 Pembuatan & pemasangan 1 M2 daun pintu panel, kayu klas I atau II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 1.0000 92,400 92,400
Tukang kayu L.02 OH 3.0000 138,600 415,800
Kepala tukang kayu L.03 OH 0.3000 181,913 54,574
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 575,190
B. BAHAN
Papan Kayu Meranti, Lanan M3 0.0400 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0500 17,787 889
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.6 Pembuatan & pemasangan 1 M2 pintu dan jendela kaca, kayu klas I atau II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.8000 92,400 73,920
Tukang kayu L.02 OH 2.4000 138,600 332,640
Kepala tukang kayu L.03 OH 0.2400 181,913 43,659
Mandor L.04 OH 0.0400 248,325 9,933
JUMLAH UPAH TENAGA KERJA 460,152
B. BAHAN
Papan Kayu Meranti, Lanan M3 0.0240 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.3000 17,787 5,336
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.7 Pembuatan & pemasangan 1 M2 pintu dan jendela jalusi, kayu klas I atau II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 1.0000 92,400 92,400
Tukang kayu L.02 OH 3.0000 138,600 415,800
Kepala tukang kayu L.03 OH 0.3000 181,913 54,574
Mandor L.04 OH 0.0500 248,325 12,416
JUMLAH UPAH TENAGA KERJA 575,190
B. BAHAN
Papan Kayu Meranti, Lanan M3 0.0640 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.5000 17,787 8,894
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.8 Pembuatan 1 M2 daun pintu plywood rangkap, rangka kayu klas II tertutup (lebar sampai 90 cm)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.7000 92,400 64,680
Tukang kayu L.02 OH 2.1000 138,600 291,060
Kepala tukang kayu L.03 OH 0.2100 181,913 38,202
Mandor L.04 OH 0.0350 248,325 8,691
JUMLAH UPAH TENAGA KERJA 402,633
B. BAHAN
Papan kayu M3 0.0250 #N/A #N/A
Paku 1cm - 2,5cm Kg 0.0300 #N/A #N/A
Lem kayu Kg 0.5000 #N/A #N/A
Plywood 4mm (90 x 220)cm Lembar 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.9 Pembuatan 1 M2 pintu plywood rangkap, rangka expose kayu kelas II atau III

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.8000 92,400 73,920
Tukang kayu L.02 OH 2.4000 138,600 332,640
Kepala tukang kayu L.03 OH 0.2400 181,913 43,659
Mandor L.04 OH 0.0400 248,325 9,933
JUMLAH UPAH TENAGA KERJA 460,152
B. BAHAN
Papan kayu M3 0.0256 #N/A #N/A
Paku 1cm - 2,5cm Kg 0.0300 #N/A #N/A
Lem kayu Kg 0.5000 #N/A #N/A
Plywood 4mm (90 x 220)cm Lembar 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.10 Pemasangan 1 M2 jalusi kusen, kayu kelas I atau II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.6700 92,400 61,908
Tukang kayu L.02 OH 2.0000 138,600 277,200
Kepala tukang kayu L.03 OH 0.2000 181,913 36,383
Mandor L.04 OH 0.3350 248,325 83,189
JUMLAH UPAH TENAGA KERJA 458,679
B. BAHAN
Papan Kayu Meranti, Lanan M3 0.0600 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.1500 17,787 2,668
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.6.1.11 Pemasangan 1 M2 teakwood rangkap, rangka expose kayu kelas I

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.8000 92,400 73,920
Tukang kayu L.02 OH 2.4000 138,600 332,640
Kepala tukang kayu L.03 OH 0.2400 181,913 43,659
Mandor L.04 OH 0.0400 248,325 9,933
JUMLAH UPAH TENAGA KERJA 460,152
B. BAHAN
Papan kayu M3 0.0250 #N/A #N/A
Paku 1cm - 2,5cm Kg 0.0300 #N/A #N/A
Lem kayu Kg 0.3000 #N/A #N/A
Teakwood 4mm (90 x 220)cm Kg 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.12 Pemasangan 1 M2 teakwood rangkap lapis formika, rangka expose kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.8500 92,400 78,540
Tukang kayu L.02 OH 2.5500 138,600 353,430
Kepala tukang kayu L.03 OH 0.2550 181,913 46,388
Mandor L.04 OH 0.0430 248,325 10,678
JUMLAH UPAH TENAGA KERJA 489,036
B. BAHAN
Papan kayu M3 0.0250 #N/A #N/A
Paku 1cm - 2,5cm Kg 0.0300 #N/A #N/A
Lem kayu Kg 0.8000 #N/A #N/A
Teakwood 4mm (90 x 220)cm Lembar 1.0000 #N/A #N/A
Formika Lembar 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.13 Pemasangan 1 M3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 4.0000 92,400 369,600
Tukang kayu L.02 OH 12.0000 138,600 1,663,200
Kepala tukang kayu L.03 OH 1.2000 181,913 218,295
Mandor L.04 OH 0.2000 248,325 49,665
JUMLAH UPAH TENAGA KERJA 2,300,760
B. BAHAN
#REF! M3 1.1000 #REF! #REF!
Besi strip Kg 15.0000 109,725 1,645,875
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 5.6000 17,787 99,607
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #REF!
E. Overhead & Profit - %xD #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.14 Pemasangan 1 M3 konstruksi kuda-kuda expose, kayu kelas I

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 6.7000 92,400 619,080
Tukang kayu L.02 OH 20.1000 138,600 2,785,860
Kepala tukang kayu L.03 OH 2.0100 181,913 365,644
Mandor L.04 OH 0.3350 248,325 83,189
JUMLAH UPAH TENAGA KERJA 3,853,773
B. BAHAN
Balok kayu M3 1.2000 #N/A #N/A
Besi strip tebal 5mm Kg 15.0000 #N/A #N/A
Paku 12 cm Kg 5.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.15 Pemasangan 1 M3 konstruksi gordeng, kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 6.7000 92,400 619,080
Tukang kayu L.02 OH 20.1000 138,600 2,785,860
Kepala tukang kayu L.03 OH 2.0100 181,913 365,644
Mandor L.04 OH 0.3350 248,325 83,189
JUMLAH UPAH TENAGA KERJA 3,853,773
B. BAHAN
#REF! M3 1.1000 #REF! #REF!
Besi strip Kg 15.0000 109,725 1,645,875
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 3.0000 17,787 53,361
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #REF!
E. Overhead & Profit - %xD #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.16 Pemasangan 1 M2 rangka atap genteng keramik, kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 26,161
B. BAHAN
Kaso-kaso 5 x 7 cm M3 0.0140 #N/A #N/A
Reng 2 x 3 cm M3 0.0360 #N/A #N/A
Paku 5 dan 10 cm Kg 0.2500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.17 Pemasangan 1 M2 rangka atap genteng beton, kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 26,161
B. BAHAN
Kaso-kaso 5 x 7 cm M3 0.0140 #N/A #N/A
Reng (3 x 4) cm M3 0.0570 #N/A #N/A
Paku 5 dan 10 cm Kg 0.2500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.18 Pemasangan 1 M2 rangka atap sirap, kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1200 92,400 11,088
Tukang kayu L.02 OH 0.1200 138,600 16,632
Kepala tukang kayu L.03 OH 0.0120 181,913 2,183
Mandor L.04 OH 0.0060 248,325 1,490
JUMLAH UPAH TENAGA KERJA 31,393
B. BAHAN
Kayu kelas II M3 0.0140 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0570 17,787 1,014
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.19 Pemasangan 1 M2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.3000 138,600 41,580
Kepala tukang kayu L.03 OH 0.0300 181,913 5,457
Mandor L.04 OH 0.0750 248,325 18,624
JUMLAH UPAH TENAGA KERJA 79,522
B. BAHAN
#REF! M3 0.0154 #REF! #REF!
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.2000 17,787 3,557
JUMLAH HARGA BAHAN #REF!
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #REF!
E. Overhead & Profit - %xD #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.20 Pemasangan 1 M2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.2000 92,400 18,480
Tukang kayu L.02 OH 0.3000 138,600 41,580
Kepala tukang kayu L.03 OH 0.0300 181,913 5,457
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 68,001
B. BAHAN
Kayu Balok Klas II (Lanan) M3 0.0163 2,818,200 45,937
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.2500 17,787 4,447
JUMLAH HARGA BAHAN 50,383
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 118,384
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 118,384

A.4.6.1.21 Pemasangan 1 M' listplank ukuran (3 x 20) cm, kayu kelas I atau kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.2000 138,600 27,720
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 41,840
B. BAHAN
Papan Kayu Meranti, Lanan M3 0.0108 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.1000 17,787 1,779
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.22 Pemasangan 1 M' listplank ukuran (3 x 30) cm, kayu kelas I atau kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.2000 138,600 27,720
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 41,840
B. BAHAN
Papan Kayu Meranti, Lanan M3 0.0110 #N/A #N/A
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.0500 17,787 889
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.23 Pemasangan 1 M2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.4500 138,600 62,370
Kepala tukang kayu L.03 OH 0.0450 181,913 8,186
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 86,403
B. BAHAN
Kayu Balok Klas II (Lanan) M3 0.0280 2,818,200 78,910
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.1500 17,787 2,668
JUMLAH HARGA BAHAN 81,578
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 167,980
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 167,980

A.4.6.1.24 Pemasangan 1 M2 dinding pemisah teakwood rangkap, rangka kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1500 92,400 13,860
Tukang kayu L.02 OH 0.4500 138,600 62,370
Kepala tukang kayu L.03 OH 0.0450 181,913 8,186
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 86,403
B. BAHAN
Balok kayu M3 0.0280 #N/A #N/A
Paku 5cm & 10cm Kg 0.1500 #N/A #N/A
Teakwood 4mm, 120 x 240 cm Lembar 0.8600 #N/A #N/A
Lem kayu Kg 0.5600 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.25 Pemasangan 1 M2 dinding pemisah plywood/calsiboard rangkap, rangka kayu kelas II

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.2000 92,400 18,480
Tukang kayu L.02 OH 0.6000 138,600 83,160
Kepala tukang kayu L.03 OH 0.0600 181,913 10,915
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 115,038
B. BAHAN
Kayu Balok Klas II (Lanan) M3 0.0280 2,818,200 78,910
Paku Besi (Uk. Besar/Sedang, 4 - 12 cm) Kg 0.1500 17,787 2,668
Papan Plafond Calsiboard, Tbl 6 mm, Uk. 120x240 cm (Nusaboard) Lembar 0.8600 130,515 112,243
Lem Putih Kg 0.5600 23,100 12,936
JUMLAH HARGA BAHAN 206,757
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 321,795
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 321,795

A.4.6.1.26 Pemasangan 1 M2 dinding lambrisering dari papan kayu kelas I

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.6000 92,400 55,440
Tukang kayu L.02 OH 1.8000 138,600 249,480
Kepala tukang kayu L.03 OH 0.1800 181,913 32,744
Mandor L.04 OH 0.0300 248,325 7,450
JUMLAH UPAH TENAGA KERJA 345,114
B. BAHAN
Papan kayu M3 0.0070 #N/A #N/A
Paku 5 & 10 Kg 0.1000 #N/A #N/A
Paku skrup 10 cm Kg 0.1500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.6.1.27 Pemasangan 1 M2 dinding lambrisering dari plywood ukuran (120 x 240) cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0250 92,400 2,310
Tukang kayu L.02 OH 0.0750 138,600 10,395
Kepala tukang kayu L.03 OH 0.0080 181,913 1,455
Mandor L.04 OH 0.0010 248,325 248
JUMLAH UPAH TENAGA KERJA 14,409
B. BAHAN
Plywood 4 mm Lembar 0.4000 #N/A #N/A
Paku 1 dan 2,5 Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.1.28 Pemasangan 1 M2 dinding bilik, rangka Kayu Balok Klas II (Lanan) atau IV

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.1000 92,400 9,240
Tukang kayu L.02 OH 0.0500 138,600 6,930
Kepala tukang kayu L.03 OH 0.0050 181,913 910
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 18,321
B. BAHAN
Bilik bambu M2 1.5000 #N/A #N/A
Kaso-kaso 5 x 7 M3 0.0140 #N/A #N/A
Paku Kg 0.0120 #N/A #N/A
List kayu 2/4 M3 0.0030 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.1 Pemasangan 1 buah Kunci Pintu Tanam Kecil Lengkap (Standart) antik

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0600 92,400 5,544
Tukang kayu L.02 OH 0.6000 138,600 83,160
Kepala tukang kayu L.03 OH 0.0600 181,913 10,915
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 100,364
B. BAHAN
Kunci Pintu Tanam Kecil Lengkap (Standart) Bh 1.0000 45,623 45,623
JUMLAH HARGA BAHAN 45,623
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 145,986
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 145,986

A.4.6.2.2 Pemasangan 1 buah Kunci Pintu Tanam Kecil Lengkap (Standart)


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0100 92,400 924
Tukang kayu L.02 OH 0.5000 138,600 69,300
Kepala tukang kayu L.03 OH 0.0500 181,913 9,096
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 80,561
B. BAHAN
Kunci Pintu Tanam Kecil Lengkap (Standart) ISEO/setara Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0050 92,400 462
Tukang kayu L.02 OH 0.5000 138,600 69,300
Kepala tukang kayu L.03 OH 0.0500 181,913 9,096
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 79,603
B. BAHAN
Kunci Pintu Tanam Kecil Lengkap (Standart) KM Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.4 Pemasangan 1 buah kunci silinder

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0050 92,400 462
Tukang kayu L.02 OH 0.5000 138,600 69,300
Kepala tukang kayu L.03 OH 0.0500 181,913 9,096
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 79,603
B. BAHAN
Kunci silinder Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.5 Pemasangan 1 buah engsel pintu

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0150 92,400 1,386
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0008 248,325 199
JUMLAH UPAH TENAGA KERJA 25,103
B. BAHAN
Engsel lokal 4" (pintu) Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0100 92,400 924
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0005 248,325 124
JUMLAH UPAH TENAGA KERJA 16,727
B. BAHAN
Engsel lokal 3" (Jendela) Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.7 Pemasangan 1 buah engsel angin

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0100 92,400 924
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0005 248,325 124
JUMLAH UPAH TENAGA KERJA 16,727
B. BAHAN
Engsel kupu-kupu Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.8 Pemasangan 1 buah spring knip

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0150 92,400 1,386
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 26,891
B. BAHAN
Spring knip Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.9 Pemasangan 1 buah kait angin


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0150 92,400 1,386
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 26,891
B. BAHAN
Hak angin Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.10 Pemasangan 1 buah door closer

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0500 92,400 4,620
Tukang kayu L.02 OH 0.5000 138,600 69,300
Kepala tukang kayu L.03 OH 0.0500 181,913 9,096
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 83,761
B. BAHAN
Door closer Bh 1.0000 168,630 168,630
JUMLAH HARGA BAHAN 168,630
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 252,391
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 252,391

A.4.6.2.11 Pemasangan 1 buah kunci slot

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0200 92,400 1,848
Tukang kayu L.02 OH 0.2000 138,600 27,720
Kepala tukang kayu L.03 OH 0.0200 181,913 3,638
Mandor L.04 OH 0.0010 248,325 248
JUMLAH UPAH TENAGA KERJA 33,455
B. BAHAN
Grendel lokal Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.12 Pemasangan 1 buah door holder

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0500 92,400 4,620
Tukang kayu L.02 OH 0.5000 138,600 69,300
Kepala tukang kayu L.03 OH 0.0500 181,913 9,096
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 83,761
B. BAHAN
Door holder Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.13 Pemasangan 1 buah door stop

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0100 92,400 924
Tukang kayu L.02 OH 0.1000 138,600 13,860
Kepala tukang kayu L.03 OH 0.0100 181,913 1,819
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 17,845
B. BAHAN
Door stop Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.14 Pemasangan 1 buah rel pintu sorong

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0600 92,400 5,544
Tukang kayu L.02 OH 0.6000 138,600 83,160
Kepala tukang kayu L.03 OH 0.0600 181,913 10,915
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 100,364
B. BAHAN
Rel pintu sorong Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.15 Pemasangan 1 buah kunci lemari

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0250 92,400 2,310
Tukang kayu L.02 OH 0.2500 138,600 34,650
Kepala tukang kayu L.03 OH 0.0250 181,913 4,548
Mandor L.04 OH 0.0013 248,325 323
JUMLAH UPAH TENAGA KERJA 41,831
B. BAHAN
kunci lemari Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.6.2.16 Pemasangan 1 M2 kaca tebal 3mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0150 92,400 1,386
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0008 248,325 199
JUMLAH UPAH TENAGA KERJA 25,103
B. BAHAN
Kaca tebal 3mm M2 1.1000 #N/A #N/A
Sealant Kg 0.0500 40,425 2,021
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.17 Pemasangan 1 M2 kaca tebal 5mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0150 92,400 1,386
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0008 248,325 199
JUMLAH UPAH TENAGA KERJA 25,103
B. BAHAN
Kaca Polos/Bening 5 mm M2 1.1000 98,175 107,993
Sealant Kg 0.0500 40,425 2,021
JUMLAH HARGA BAHAN 110,014
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 135,117
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 135,117

A.4.6.2.18 Pemasangan 1 M2 kaca tebal 8mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0170 92,400 1,571
Tukang kayu L.02 OH 0.1700 138,600 23,562
Kepala tukang kayu L.03 OH 0.0170 181,913 3,093
Mandor L.04 OH 0.0009 248,325 223
JUMLAH UPAH TENAGA KERJA 28,449
B. BAHAN
Kaca tebal 8mm M2 1.1000 #N/A #N/A
Sealant Kg 0.0700 40,425 2,830
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.19 Pemasangan 1 M2 kaca buram tebal 12mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0250 92,400 2,310
Tukang kayu L.02 OH 0.2500 138,600 34,650
Kepala tukang kayu L.03 OH 0.0250 181,913 4,548
Mandor L.04 OH 0.0013 248,325 323
JUMLAH UPAH TENAGA KERJA 41,831
B. BAHAN
Kaca buram 12mm M2 1.1000 #N/A #N/A
Sealant Kg 0.0700 40,425 2,830
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.20 Pemasangan 1 M2 kaca cermin tebal 5mm


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0150 92,400 1,386
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 26,891
B. BAHAN
Kaca cermin 5mm M2 1.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.21 Pemasangan 1 M2 kaca cermin tebal 8mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0170 92,400 1,571
Tukang kayu L.02 OH 0.1700 138,600 23,562
Kepala tukang kayu L.03 OH 0.0170 181,913 3,093
Mandor L.04 OH 0.0090 248,325 2,235
JUMLAH UPAH TENAGA KERJA 30,460
B. BAHAN
Kaca cermin 8mm M2 1.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.22 Pemasangan 1 M2 kaca wireglassed tebal 5mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0150 92,400 1,386
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 26,891
B. BAHAN
Kaca wireglassed 5mm M2 1.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.23 Pemasangan 1 M2 kaca patri tebal 5mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0750 92,400 6,930
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 31,442
B. BAHAN
Kaca patri 5mm M2 1.1000 #N/A #N/A
Sealant Kg 0.0500 40,425 2,021
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.24 Pemasangan 1 M2 kaca patri tebal 5mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang kayu L.01 OH 0.0750 92,400 6,930
Tukang kayu L.02 OH 0.1500 138,600 20,790
Kepala tukang kayu L.03 OH 0.0150 181,913 2,729
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 31,442
B. BAHAN
Kaca patri 5mm M2 1.1000 #N/A #N/A
Sealant Kg 0.0500 40,425 2,021
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.1 1 M2 Pengikisan / pengerokan permukaan cat lama

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.1500 92,400 13,860
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 14,605
B. BAHAN
Soda api Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.2 1 M2 Pencucian bidang permukaan tembok yang pernah dicat

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.1500 92,400 13,860
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 14,605
B. BAHAN
Sabun Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.3 1 M2 Pengerokan karat pada permukaan baja cara manual

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.1500 92,400 13,860
Mandor L.04 OH 0.0080 248,325 1,987
JUMLAH UPAH TENAGA KERJA 15,847
B. BAHAN
Sabun Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.4 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0700 92,400 6,468
Tukang cat L.02 OH 0.0090 138,600 1,247
Kepala tukang cat L.03 OH 0.0060 161,700 970
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 9,431
B. BAHAN
Meni Kayu Kg 0.2000 43,313 8,663
Plamur Kayu Kg 0.1500 57,750 8,663
Cat kayu dasar Kg 0.1700 39,270 6,676
Cat Kayu/Cat Besi Kg 0.2600 51,975 13,514
Kuas 4" Bh 0.0100 21,368 214
Minyak Cat/Thinner Kg 0.0300 28,875 866
Ampelas Kayu Lbr 0.2000 39,270 7,854
JUMLAH HARGA BAHAN 46,448
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 55,879
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 55,879

A.4.7.1.5 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0700 92,400 6,468
Tukang cat L.02 OH 0.1050 138,600 14,553
Kepala tukang cat L.03 OH 0.0040 161,700 647
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 22,413
B. BAHAN
Cat menie kayu Kg 0.2000 #N/A #N/A
Plamur Kg 0.1500 #N/A #N/A
Cat kayu dasar Kg 0.1700 39,270 6,676
Cat Kayu TKS Kg 0.3500 #N/A #N/A
Kuas Bh 0.0100 #N/A #N/A
Minyak cat Kg 0.0300 #N/A #N/A
Ampelas Lbr 0.2000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.6 Pelaburan 1 M2 bidang kayu baru dengan teak oil

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0400 92,400 3,696
Tukang cat L.02 OH 0.0630 138,600 8,732
Kepala tukang cat L.03 OH 0.0630 161,700 10,187
Mandor ` OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 23,360
B. BAHAN
Teak oil Ltr 0.3600 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.7 Pelaburan 1 M2 bidang kayu baru dengan politur

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0400 92,400 3,696
Tukang cat L.02 OH 0.0600 138,600 8,316
Kepala tukang cat L.03 OH 0.0160 161,700 2,587
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 15,344
B. BAHAN
Politur Ltr 0.1500 #N/A #N/A
Politur jadi Ltr 0.3720 #N/A #N/A
Ampelas Lembar 2.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.8 Pelaburan 1 M2 bidang kayu baru dengan cat Residu/Teer Kayu dan ter

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.1000 92,400 9,240
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 9,985
B. BAHAN
Residu/Teer Kayu Ltr 0.3500 32,340 11,319
JUMLAH HARGA BAHAN 11,319
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 21,304
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 21,304

A.4.7.1.9 Pelaburan 1 M2 bidang kayu baru dengan vernis

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.1600 92,400 14,784
Tukang cat L.02 OH 0.1600 138,600 22,176
Kepala tukang cat L.03 OH 0.0160 161,700 2,587
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 40,292
B. BAHAN
Vernis Ltr 0.1500 #N/A #N/A
Dempul Kg 0.0500 #N/A #N/A
Ampelas Lembar 0.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.10 Pengecatan 1 M2 tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0200 92,400 1,848
Tukang cat L.02 OH 0.0630 138,600 8,732
Kepala tukang cat L.03 OH 0.0063 161,700 1,019
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 12,343
B. BAHAN
Plamur Tembok Kg 0.1000 28,182 2,818
Cat Dasar Tembok Kg 0.1000 50,000 5,000
Cat Tembok Kg 0.2600 105,105 27,327
JUMLAH HARGA BAHAN 35,146
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 47,489
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 47,489

A.4.7.1.11 Pengecatan 1 M2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0280 92,400 2,587
Tukang cat L.02 OH 0.0420 138,600 5,821
Kepala tukang cat L.03 OH 0.0042 161,700 679
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 9,833
B. BAHAN
Cat dasar tembok Kg 0.1200 #N/A #N/A
Cat Tembok Dulux, Jotun Exterior Kg 0.1800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A.4.7.1.12 Pelaburan 1 M2 tembok dengan kalkarium

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0280 92,400 2,587
Tukang cat L.02 OH 0.0420 138,600 5,821
Kepala tukang cat L.03 OH 0.0042 161,700 679
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 9,833
B. BAHAN
Kalkarium Kg 0.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.13 Pelaburan 1 M2 tembok dengan Kapur Pasang/Kapur Padam sirih

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.1500 92,400 13,860
Tukang cat L.02 OH 0.0010 138,600 139
Kepala tukang cat L.03 OH 0.0001 161,700 16
Mandor L.04 OH 0.0025 248,325 621
JUMLAH UPAH TENAGA KERJA 14,636
B. BAHAN
Kapur Pasang/Kapur Padam sirih Kg 0.1500 #N/A #N/A
Ampelas Lbr 0.1000 #N/A #N/A
Alang-alang Ikat 0.2500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.14 Pelaburan 1 M2 tembok lama dengan Kapur Pasang/Kapur Padam sirih (pemeliharaan)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0400 92,400 3,696
Tukang cat L.02 OH 0.0050 138,600 693
Kepala tukang cat L.03 OH 0.0005 161,700 81
Mandor L.04 OH 0.0025 248,325 621
JUMLAH UPAH TENAGA KERJA 5,091
B. BAHAN
Kapur Pasang/Kapur Padam sirih Kg 0.3000 #N/A #N/A
Ampelas Lbr 0.2000 #N/A #N/A
Alang-alang Ikat 0.2500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.15 Pemasangan 1 M2 wallpaper

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0200 92,400 1,848
Tukang cat L.02 OH 0.2000 138,600 27,720
Kepala tukang cat L.03 OH 0.0200 161,700 3,234
Mandor L.04 OH 0.0025 248,325 621
JUMLAH UPAH TENAGA KERJA 33,423
B. BAHAN
Wallpaper M2 1.2000 #N/A #N/A
Lem Kg 0.2000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.16 Pengecatan 1 M2 permukaan baja dengan menie besi

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0200 92,400 1,848
Tukang cat L.02 OH 0.2000 138,600 27,720
Kepala tukang cat L.03 OH 0.0200 161,700 3,234
Mandor L.04 OH 0.0025 248,325 621
JUMLAH UPAH TENAGA KERJA 33,423
B. BAHAN
Menie besi Kg 0.1000 #N/A #N/A
Kuas Bh 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.16 Pengecatan 1 M2 permukaan baja dengan menie besi

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0200 92,400 1,848
Tukang cat L.02 OH 0.2000 138,600 27,720
Kepala tukang cat L.03 OH 0.0200 161,700 3,234
Mandor L.04 OH 0.0025 248,325 621
JUMLAH UPAH TENAGA KERJA 33,423
B. BAHAN
Menie besi Kg 0.1000 #N/A #N/A
Kuas Bh 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.17 Pengecatan 1 M2 permukaan baja dengan menie besi dengan perancah

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.2500 92,400 23,100
Tukang cat L.02 OH 0.2250 138,600 31,185
Kepala tukang cat L.03 OH 0.0225 161,700 3,638
Mandor L.04 OH 0.0075 248,325 1,862
JUMLAH UPAH TENAGA KERJA 59,786
B. BAHAN
Menie besi Kg 0.1000 #N/A #N/A
Pengencer Ltr 0.0100 #N/A #N/A
Kuas Bh 0.0100 #N/A #N/A
Perancah kayu M3 0.0020 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.18 Pengecatan 1 M2 permukaan baja galvanis secara manual 4 lapis

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.2500 92,400 23,100
Tukang cat L.02 OH 0.2500 138,600 34,650
Kepala tukang cat L.03 OH 0.0250 161,700 4,043
Mandor L.04 OH 0.0013 248,325 323
JUMLAH UPAH TENAGA KERJA 62,115
B. BAHAN
Menie A Kg 0.1000 #N/A #N/A
Menie B Kg 0.1000 #N/A #N/A
Cat Kg 0.0800 #N/A #N/A
Kuas Bh 0.0100 #N/A #N/A
Pengencer Ltr 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.19 Pengecatan 1 M2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.0600 92,400 5,544
Tukang cat L.02 OH 0.0600 138,600 8,316
Kepala tukang cat L.03 OH 0.0120 161,700 1,940
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 16,545
B. BAHAN
Cat Kg 0.3000 #N/A #N/A
Kuas Bh 0.0100 #N/A #N/A
Pengencer Ltr 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.20 Pengecatan 1 M2 permukaan baja galvanis secara manual sistem 3 lapis

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.4000 92,400 36,960
Tukang cat L.02 OH 0.8000 138,600 110,880
Kepala tukang cat L.03 OH 0.0800 161,700 12,936
Mandor L.04 OH 0.0200 248,325 4,967
JUMLAH UPAH TENAGA KERJA 165,743
B. BAHAN
Cat dasar Kg 0.1100 #N/A #N/A
Cat antara Kg 0.1700 #N/A #N/A
Cat penutup Kg 0.0800 #N/A #N/A
Kuas Bh 0.0100 #N/A #N/A
Pengencer Ltr 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A.4.7.1.21 Pengecatan 1 M2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang cat L.01 OH 0.4000 92,400 36,960
Tukang cat L.02 OH 0.7000 138,600 97,020
Kepala tukang cat L.03 OH 0.0700 161,700 11,319
Mandor L.04 OH 0.0200 248,325 4,967
JUMLAH UPAH TENAGA KERJA 150,266
B. BAHAN
Cat dasar Kg 0.3000 #N/A #N/A
Pengencer Ltr 0.0100 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A. 5.1.1.1 Pemasangan 1 buah closet duduk/monoblock

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 3.3000 103,950 343,035
Tukang batu L.02 OH 1.1000 138,600 152,460
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.1600 248,325 39,732
JUMLAH UPAH TENAGA KERJA 537,191
B. BAHAN
Closet Duduk Putih Lengkap (TOTO) Unit 1.0000 2,856,546 2,856,546
Perlengkapan x 6% dari harga % 0.0600 3,027,939 181,676
JUMLAH HARGA BAHAN 3,038,222
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,575,413
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 3,575,413

A. 5.1.1.2 Pemasangan 1 buah closet jongkok porslen

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.0000 103,950 103,950
Tukang batu L.02 OH 1.5000 138,600 207,900
Kepala tukang batu L.03 OH 0.1500 196,350 29,453
Mandor L.04 OH 0.1600 248,325 39,732
JUMLAH UPAH TENAGA KERJA 381,035
B. BAHAN
Closet jongkok keramik Unit 1.0000 #N/A #N/A
Semen Portland Kg 6.0000 1,473 8,836
Pasir pasang M3 0.0100 100,485 1,005
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.3 Pemasangan 1 buah closet jongkok teraso

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.0000 103,950 103,950
Tukang batu L.02 OH 1.5000 138,600 207,900
Kepala tukang batu L.03 OH 0.1500 196,350 29,453
Mandor L.04 OH 0.1600 248,325 39,732
JUMLAH UPAH TENAGA KERJA 381,035
B. BAHAN
Closet jongkok keramik Unit 1.0000 #N/A #N/A
Semen Portland Kg 6.0000 1,473 8,836
Pasir pasang M3 0.0100 100,485 1,005
Bata Merah Lokal (9,0x20x3,5 cm) Bh 7.0000 866 6,064
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.4 Pemasangan 1 buah urinoir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.2000 103,950 124,740
Tukang batu L.02 OH 1.4500 138,600 200,970
Kepala tukang batu L.03 OH 0.1500 196,350 29,453
Mandor L.04 OH 0.0600 248,325 14,900
JUMLAH UPAH TENAGA KERJA 370,062
B. BAHAN
Urinoir Warna Putih Merk INA Unit 1.0000 #N/A #N/A
Semen Portland Kg 6.0000 1,473 8,836
Pasir pasang M3 0.0100 100,485 1,005
Perlengkapan x 35% dari harga % 30.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.5 Pemasangan 1 buah wastafel

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 1.2000 103,950 124,740
Tukang batu L.02 OH 1.4500 138,600 200,970
Kepala tukang batu L.03 OH 0.1500 196,350 29,453
Mandor L.04 OH 0.0600 248,325 14,900
JUMLAH UPAH TENAGA KERJA 370,062
B. BAHAN
Wastafel Lengkap Unit 1.2000 750,750 900,900
Semen Portland Kg 6.0000 1,473 8,836
Pasir pasang M3 0.0100 100,485 1,005
Perlengkapan x 35% dari harga % 12.0000 135,655 16,279
JUMLAH HARGA BAHAN 927,019
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,297,081
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,297,081

A. 5.1.1.6 Pemasangan 1 buah bathcuip porselen

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0750 103,950 7,796
Tukang batu L.02 OH 0.7500 138,600 103,950
Kepala tukang batu L.03 OH 0.0750 196,350 14,726
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 127,217
B. BAHAN
Bathcuip Unit 1.0000 #N/A #N/A
Perlengkapan % 20.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.7 Pemasangan 1 buah bak fibreglass vol 1 M3

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 3.0000 103,950 311,850
Tukang batu L.02 OH 4.5000 138,600 623,700
Kepala tukang batu L.03 OH 0.0500 196,350 9,818
Mandor L.04 OH 0.9000 248,325 223,493
JUMLAH UPAH TENAGA KERJA 1,168,860
B. BAHAN
Bak fibreglass Unit 1.0000 #N/A #N/A
Perlengkapan % 12.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.8 Pemasangan 1 buah bak mandi Bata Merah Lokal (9,0x20x3,5 cm) vol 0,30 M3

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 6.0000 103,950 623,700
Tukang batu L.02 OH 3.0000 138,600 415,800
Kepala tukang batu L.03 OH 0.3000 196,350 58,905
Mandor L.04 OH 0.0300 248,325 7,450
JUMLAH UPAH TENAGA KERJA 1,105,855
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 150.0000 866 129,938
Semen Portland Kg 120.0000 1,473 176,715
Pasir pasang M3 0.3000 100,485 30,146
Porselen 11x11 Bh 360.0000 #N/A #N/A
Semen warna Kg 6.0000 16,170 97,020
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.9 Pemasangan 1 buah bak mandi teraso vol 0,30 M3

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 3.0000 103,950 311,850
Tukang batu L.02 OH 4.5000 138,600 623,700
Kepala tukang batu L.03 OH 0.0500 196,350 9,818
Mandor L.04 OH 0.9000 248,325 223,493
JUMLAH UPAH TENAGA KERJA 1,168,860
B. BAHAN
Bak fibreglass Unit 1.0000 #N/A #N/A
Perlengkapan Ls 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.10 Pemasangan 1 buah bak air fibreglass vol 1 M3

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3000 103,950 31,185
Tukang batu L.02 OH 0.4500 138,600 62,370
Kepala tukang batu L.03 OH 0.0450 196,350 8,836
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 106,116
B. BAHAN
Bak fiber glass uk. 60x60 cm Segi Empat Unit 1.0000 #N/A #N/A
Perlengkapan x 35% dari harga % 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.11 Pemasangan 1 buah bak beton volume 1 M3


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 3.5000 103,950 363,825
Tukang batu L.02 OH 4.5000 138,600 623,700
Kepala tukang batu L.03 OH 0.0500 196,350 9,818
Mandor L.04 OH 0.0180 248,325 4,470
JUMLAH UPAH TENAGA KERJA 1,001,812
B. BAHAN
Beton 1:2:3 (K-175) M3 0.9000 #N/A #N/A
Baja tulangan Kg 180.0000 #N/A #N/A
Kayu bekesting M2 8.0000 #N/A #N/A
Ubin porselen Bh 500.0000 #N/A #N/A
Perlengkapan % 0.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.12 Pemasangan 1 buah bak cuci piring stainless steel

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0300 103,950 3,119
Tukang batu L.02 OH 0.3000 138,600 41,580
Kepala tukang batu L.03 OH 0.0300 196,350 5,891
Mandor L.04 OH 0.0150 248,325 3,725
JUMLAH UPAH TENAGA KERJA 54,314
B. BAHAN
Bak cuci piring Unit 1.0000 #N/A #N/A
waterdrain Bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.13 Pemasangan 1 buah bak cuci piring teraso

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0500 103,950 5,198
Tukang batu L.02 OH 0.5000 138,600 69,300
Kepala tukang batu L.03 OH 0.0500 196,350 9,818
Mandor L.04 OH 0.0250 248,325 6,208
JUMLAH UPAH TENAGA KERJA 90,523
B. BAHAN
Bak cuci piring Unit 1.0000 #N/A #N/A
Waterdrain Bh 1.0000 #N/A #N/A
Semen Portland Kg 20.0000 1,473 29,453
Pasir pasang M3 0.0500 100,485 5,024
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.14 Pemasangan 1 buah floor drain

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0100 103,950 1,040
Tukang batu L.02 OH 0.1000 138,600 13,860
Kepala tukang batu L.03 OH 0.0100 196,350 1,964
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 18,105
B. BAHAN
Drain Floor Unit 1.0000 68,145 68,145
JUMLAH HARGA BAHAN 68,145
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 86,250
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 86,250

A. 5.1.1.15 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 2.1600 103,950 224,532
Tukang batu L.02 OH 0.7200 138,600 99,792
Kepala tukang batu L.03 OH 0.0720 196,350 14,137
Mandor L.04 OH 0.0110 248,325 2,732
JUMLAH UPAH TENAGA KERJA 341,193
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 40.0000 866 34,650
Semen Portland Kg 44.0000 1,473 64,796
Pasir pasang M3 0.0700 100,485 7,034
Pasir pasang (Kg) M3 0.0600 319 19
Kerikil sungai M3 0.0700 659,505 46,165
Baja tulangan Kg 1.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.16 Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 3.2000 103,950 332,640
Tukang batu L.02 OH 1.1500 138,600 159,390
Kepala tukang batu L.03 OH 0.0110 196,350 2,160
Mandor L.04 OH 0.0160 248,325 3,973
JUMLAH UPAH TENAGA KERJA 498,163
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 70.0000 866 60,638
Semen Portland Kg 77.0000 1,473 113,392
Pasir pasang M3 0.1300 100,485 13,063
Pasir pasang (Kg) M3 0.0900 319 29
Kerikil sungai M3 0.0200 659,505 13,190
Baja tulangan Kg 2.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.17 Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 3.2000 103,950 332,640
Tukang batu L.02 OH 1.1500 138,600 159,390
Kepala tukang batu L.03 OH 0.0110 196,350 2,160
Mandor L.04 OH 0.0160 248,325 3,973
JUMLAH UPAH TENAGA KERJA 498,163
B. BAHAN
Bata Merah Lokal (9,0x20x3,5 cm) Bh 123.0000 866 106,549
Semen Portland Kg 114.0000 1,473 167,879
Pasir pasang M3 0.1840 100,485 18,489
Pasir pasang (Kg) M3 0.1200 319 38
Kerikil sungai M3 0.0330 659,505 21,764
Baja tulangan Kg 4.8500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.18 Pemasangan 1 M' pipa galvanis diameter 1/2"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0540 103,950 5,613
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0270 248,325 6,705
JUMLAH UPAH TENAGA KERJA 26,559
B. BAHAN
Pipa galvanis M 1.2000 #N/A #N/A
Perlengkapan Ls 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 5.1.1.19 Pemasangan 1 buah kran diameter ½" atau ¾"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0100 103,950 1,040
Tukang batu L.02 OH 0.4000 138,600 55,440
Kepala tukang batu L.03 OH 0.0400 196,350 7,854
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 65,575
B. BAHAN
Kran Air Stainless Buah 1.0000 46,200 46,200
Seal tape Buah 0.0250 3,234 81
JUMLAH HARGA BAHAN 46,281
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 111,856
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 111,856

A. 5.1.1.20 Pemasangan 1 M' pipa galvanis diameter ¾"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0540 103,950 5,613
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0270 248,325 6,705
JUMLAH UPAH TENAGA KERJA 26,559
B. BAHAN
Pipa galvanis 3/4" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.21 Pemasangan 1 M' pipa galvanis diameter 1"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0540 103,950 5,613
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0270 248,325 6,705
JUMLAH UPAH TENAGA KERJA 26,559
B. BAHAN
Pipa galvanis 1" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.22 Pemasangan 1 M' pipa galvanis diameter 1 ½"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1080 103,950 11,227
Tukang batu L.02 OH 0.1800 138,600 24,948
Kepala tukang batu L.03 OH 0.0180 196,350 3,534
Mandor L.04 OH 0.0050 248,325 1,242
JUMLAH UPAH TENAGA KERJA 40,951
B. BAHAN
Pipa galvanis 1½" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.23 Pemasangan 1 M' pipa galvanis diameter 3"


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1350 103,950 14,033
Tukang batu L.02 OH 0.2250 138,600 31,185
Kepala tukang batu L.03 OH 0.0230 196,350 4,516
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 51,473
B. BAHAN
Pipa galvanis 3" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.24 Pemasangan 1 M' pipa galvanis diameter 4"


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1350 103,950 14,033
Tukang batu L.02 OH 0.2250 138,600 31,185
Kepala tukang batu L.03 OH 0.0230 196,350 4,516
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 51,473
B. BAHAN
Pipa galvanis 4" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.25 Pemasangan 1 M' pipa PVC tipe AW diameter 1/2"


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0360 103,950 3,742
Tukang batu L.02 OH 0.0600 138,600 8,316
Kepala tukang batu L.03 OH 0.0060 196,350 1,178
Mandor L.04 OH 0.0020 248,325 497
JUMLAH UPAH TENAGA KERJA 13,733
B. BAHAN
Pipa PVC AW Ø 1/2" - P. 4 m M 1.2000 8,865 10,638
Perlengkapan % 0.3500 10,000 3,500
JUMLAH HARGA BAHAN 14,138
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 27,871
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 27,871

A. 5.1.1.26 Pemasangan 1 M' pipa PVC tipe AW diameter 3/4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0360 103,950 3,742
Tukang batu L.02 OH 0.0600 138,600 8,316
Kepala tukang batu L.03 OH 0.0060 196,350 1,178
Mandor L.04 OH 0.0020 248,325 497
JUMLAH UPAH TENAGA KERJA 13,733
B. BAHAN
Pipa PVC AW Ø 3/4" - P. 4 m M 1.2000 7,132 8,559
Perlengkapan % 0.3500 10,000 3,500
JUMLAH HARGA BAHAN 12,059
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 25,792
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 25,792

A. 5.1.1.27 Pemasangan 1 M' pipa PVC tipe AW diameter 1"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0360 103,950 3,742
Tukang batu L.02 OH 0.0600 138,600 8,316
Kepala tukang batu L.03 OH 0.0060 196,350 1,178
Mandor L.04 OH 0.0020 248,325 497
JUMLAH UPAH TENAGA KERJA 13,733
B. BAHAN
Pipa PVC 1" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.28 Pemasangan 1 M' pipa PVC tipe AW diameter 1½"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0540 103,950 5,613
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 20,599
B. BAHAN
Pipa PVC 1½" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.29 Pemasangan 1 M' pipa PVC tipe AW diameter 2"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0540 103,950 5,613
Tukang batu L.02 OH 0.0900 138,600 12,474
Kepala tukang batu L.03 OH 0.0090 196,350 1,767
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 20,599
B. BAHAN
Pipa PVC AW Ø 2" - P. 4 m M 1.2000 22,378 26,854
Perlengkapan % 0.3500 10,000 3,500
JUMLAH HARGA BAHAN 30,354
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 50,953
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 50,953

A. 5.1.1.30 Pemasangan 1 M' pipa PVC tipe AW diameter 2½"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0810 103,950 8,420
Tukang batu L.02 OH 0.1350 138,600 18,711
Kepala tukang batu L.03 OH 0.0135 196,350 2,651
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 30,775
B. BAHAN
Pipa PVC 2½" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.31 Pemasangan 1 M' pipa PVC tipe AW diameter 3"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0810 103,950 8,420
Tukang batu L.02 OH 0.1350 138,600 18,711
Kepala tukang batu L.03 OH 0.0135 196,350 2,651
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 30,775
B. BAHAN
Pipa PVC 3" M 1.2000 #N/A #N/A
Perlengkapan % 0.3500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.32 Pemasangan 1 M' pipa PVC tipe AW diameter 4"

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0810 103,950 8,420
Tukang batu L.02 OH 0.1350 138,600 18,711
Kepala tukang batu L.03 OH 0.0135 196,350 2,651
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 30,775
B. BAHAN
Pipa PVC AW Ø 4" - P. 4 m M 1.2000 66,903 80,284
Perlengkapan % 0.3500 10,000 3,500
JUMLAH HARGA BAHAN 83,784
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 114,559
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 114,559

A. 5.1.1.33 Pemasangan 1 M' pipa air limbah jenis pipa tanah Ø 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0800 103,950 8,316
Tukang batu L.02 OH 0.0400 138,600 5,544
Kepala tukang batu L.03 OH 0.0040 196,350 785
Mandor L.04 OH 0.0040 248,325 993
JUMLAH UPAH TENAGA KERJA 15,639
B. BAHAN
Pipa tanah Buah 1.6000 #N/A #N/A
Semen Portland Kg 35.0000 1,473 51,542
Pasir pasang M3 0.0140 100,485 1,407
Pasir urug M3 0.0140 82,005 1,148
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.34 Pemasangan 1 M' pipa air limbah jenis pipa tanah Ø 15 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.0600 103,950 6,237
Tukang batu L.02 OH 0.0300 138,600 4,158
Kepala tukang batu L.03 OH 0.0030 196,350 589
Mandor L.04 OH 0.0030 248,325 745
JUMLAH UPAH TENAGA KERJA 11,729
B. BAHAN
Pipa tanah dia. 15 cm Buah 1.6000 #N/A #N/A
Semen Portland Kg 0.6800 1,473 1,001
Pasir pasang M3 0.0130 100,485 1,306
Pasir urug M3 0.0110 82,005 902
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.35 Pemasangan 1 M' pipa beton Ø 15 - 20 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.1400 103,950 14,553
Tukang batu L.02 OH 0.0700 138,600 9,702
Kepala tukang batu L.03 OH 0.0070 196,350 1,374
Mandor L.04 OH 0.0070 248,325 1,738
JUMLAH UPAH TENAGA KERJA 27,368
B. BAHAN
Pipa tanah dia. 15 - 20 cm Buah 1.1000 #N/A #N/A
Semen Portland Kg 0.0270 1,473 40
Pasir pasang M3 3.9200 100,485 393,901
Pasir urug M3 0.0560 82,005 4,592
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

A. 5.1.1.36 Pemasangan 1 M' pipa beton Ø 30 - 100 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang batu L.01 OH 0.3800 103,950 39,501
Tukang batu L.02 OH 0.1900 138,600 26,334
Kepala tukang batu L.03 OH 0.0190 196,350 3,731
Mandor L.04 OH 0.0190 248,325 4,718
JUMLAH UPAH TENAGA KERJA 74,284
B. BAHAN
Pipa tanah dia. 30 - 100 cm Buah 1.1000 #N/A #N/A
Bata Merah Lokal (9,0x20x3,5 cm) M3 0.5500 866 476
Semen Portland Kg 10.3000 1,473 15,168
Pasir pasang M3 0.0610 100,485 6,130
Pasir urug M3 0.0690 82,005 5,658
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

HARGA SATUAN PEKERJAAN LISTRIK

SNI LISTRIK 01 Pemasangan 1 Titik Instalasi Lampu TL 2 x 18 Wat


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0100 98,175 982
Tukang besi L.02 OH 0.0600 115,500 6,930
JUMLAH UPAH TENAGA KERJA 7,912
B. BAHAN
Pipa PVC AW Ø 5" - P. 4 m Btg 0.8000 415,800 332,640
Kabel NYA 4 mm M 10.0000 #N/A #N/A
Isolator Bh 4.0000 #N/A #N/A
Inbow Dos Bh 1.0000 #N/A #N/A
Fitting Plafond Set 1.0000 9,818 9,818
Trafo Sinar Bh 1.0000 #N/A #N/A
Starter Sinar Bh 1.0000 #N/A #N/A
Lampu SL 20 Wat (Phillips) Bh 1.0000 32,918 32,918
Isoolasi Kecil Roll 1.0000 #N/A #N/A
Alat Pelengkapan Ls 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #N/A
E. Overhead & Profit - %xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A

SNI LISTRIK 02 Pemasangan 1 Titik Instalasi Lampu


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0100 98,175 982
Tukang besi L.02 OH 0.0600 115,500 6,930
JUMLAH UPAH TENAGA KERJA 7,912
B. BAHAN
Pipa PVC 5/8" Btg 0.8000 10,150 8,120
Kabel NYM 4x4 mm M 10.0000 23,735 237,353
Isolator Bh 4.0000 17,000 68,000
Inbow Dos Bh 1.0000 4,350 4,350
Fitting Plafond Set 1.0000 9,818 9,818
Lampu SL 20 Wat (Phillips) Bh 2.0000 32,918 65,835
Isoolasi Kecil Roll 1.0000 3,000 3,000
Alat Pelengkapan Ls 1.0000 5,000 5,000
JUMLAH HARGA BAHAN 401,475
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 409,387
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 409,387

SNI LISTRIK 03 Pemasangan 1 Titik Intsalasi Stop Kontak

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0100 98,175 982
Tukang besi L.02 OH 0.0600 115,500 6,930
JUMLAH UPAH TENAGA KERJA 7,912
B. BAHAN
Pipa PVC 5/8" Btg 0.8000 10,150 8,120
Kabel NYM 4x4 mm M 10.0000 23,735 237,353
Isolator Bh 4.0000 17,000 68,000
Inbow Dos Bh 4.0000 4,350 17,400
Stop Kontak Biasa Bh 1.0000 68,376 68,376
Isoolasi Kecil Roll 1.0000 3,000 3,000
Alat Pelengkapan Ls 1.0000 5,000 5,000
JUMLAH HARGA BAHAN 407,249
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 415,160
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 415,160

SNI LISTRIK 04 Pemasangan 1 Titik Instalasi Saklar Tunggal

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0100 98,175 982
Tukang besi L.02 OH 0.0600 115,500 6,930
JUMLAH UPAH TENAGA KERJA 7,912
B. BAHAN
Pipa PVC 5/8" Btg 0.8000 10,150 8,120
Kabel NYM 4x4 mm M 10.0000 23,735 237,353
Isolator Bh 4.0000 23,735 94,941
Inbow Dos Bh 1.0000 17,000 17,000
Saklar Tunggal Set 1.0000 20,213 20,213
Isoolasi Kecil Roll 1.0000 3,000 3,000
Alat Pelengkapan Ls 1.0000 5,000 5,000
JUMLAH HARGA BAHAN 385,626
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 393,538
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 393,538

SNI LISTRIK 05 Pemasangan 1 Titik Instalasi Saklar Ganda

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0100 98,175 982
Tukang besi L.02 OH 0.0600 115,500 6,930
JUMLAH UPAH TENAGA KERJA 7,912
B. BAHAN
Pipa PVC 5/8" Btg 0.8000 10,150 8,120
Kabel NYM 4x4 mm M 10.0000 23,735 237,353
Isolator Bh 4.0000 23,735 94,941
Inbow Dos Bh 1.0000 23,735 23,735
Saklar Double Set 1.0000 16,170 16,170
Isoolasi Kecil Roll 1.0000 3,000 3,000
Alat Pelengkapan Ls 1.0000 5,000 5,000
JUMLAH HARGA BAHAN 388,319
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 396,231
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 396,231

SNI LISTRIK 06 Pemasangan 1 Set Panel /MCB Box 2 Pass

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja / Pembantu tukang besi L.01 OH 0.0100 98,175 982
Tukang besi L.02 OH 0.0600 115,500 6,930
JUMLAH UPAH TENAGA KERJA 7,912
B. BAHAN
Pipa PVC AW Ø 5" - P. 4 m Btg 0.8000 415,800 332,640
Kabel NYA 4 mm M 10.0000 23,735 237,353
MCB 4 Amper Bh 4.0000 42,504 170,016
Box Panel Bh 1.0000 155,925 155,925
Isoolasi Kecil Roll 1.0000 5,000 5,000
Alat Pelengkapan Ls 1.0000 150,000 150,000
JUMLAH HARGA BAHAN 1,050,934
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,058,845
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 1,058,845

HARGA SATUAN PEKERJAAN BONGKARAN

L.4 1 M2 Bongkaran dinding tembok dan membersihkan

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 2.0000 103,950 207,900
Tukang Kayu L.04 OH 0.1000 138,600 13,860
JUMLAH UPAH TENAGA KERJA 221,760
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 221,760
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 221,760

L.5 1 M2 Bongkaran Lantai Tegel

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 2.0000 103,950 207,900
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 210,383
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 210,383
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 210,383

L.6 1 M2 Mengupas Plesteran

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.5000 103,950 51,975
Mandor L.04 OH 0.0025 248,325 621
JUMLAH UPAH TENAGA KERJA 52,596
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 52,596
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 52,596

L.7 1 M2 Membongkar atap bahan tidak dipakai lagi


Jumlah Harga
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.0100 103,950 1,040
Mandor L.04 OH 0.0200 248,325 4,967
JUMLAH UPAH TENAGA KERJA 6,006
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 6,006
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 6,006

L.8 1 M2 Membongkar atap seng

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0500 103,950 5,198
Mandor L.04 OH 0.0100 248,325 2,483
JUMLAH UPAH TENAGA KERJA 7,681
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,681
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 7,681

L.9 1 M3 Membongkar pondasi Batu Belah (Tangkiling - Dalam Kota)

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 4.0000 103,950 415,800
Mandor L.04 OH 0.4000 248,325 99,330
JUMLAH UPAH TENAGA KERJA 515,130
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 515,130
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 515,130

L.10 1 M2 Membongkar Rangka atap

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0200 103,950 2,079
Tukang kayu L.02 OH 0.0600 138,600 8,316
Kepala tukang kayu L.03 OH 0.0060 181,913 1,091
Mandor L.04 OH 0.0100 248,325 2,483

JUMLAH UPAH TENAGA KERJA 13,970


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 13,970
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 13,970

L.11 1 M2 Membongkar dinding, lantai, plafond kayu

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 103,950 20,790
Tukang kayu L.02 OH 0.0600 138,600 8,316
Kepala tukang kayu L.03 OH 0.0060 181,913 1,091
Mandor L.04 OH 0.0100 248,325 2,483

JUMLAH UPAH TENAGA KERJA 32,681


B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 32,681
E. Overhead & Profit - %xD -
F. Harga Satuan Pekerjaan (D+E) 32,681
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

ANALISA

HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.1
A. 2.2.1.2
A. 2.2.1.3
A. 2.2.1.4
A. 2.2.1.5
A. 2.2.1.6
A. 2.2.1.7
A. 2.2.1.8
A. 2.2.1.9
A. 2.2.1.10
A. 2.2.1.11
A. 2.2.1.12
A. 2.2.1.13
A. 2.2.1.14
A. 2.2.1.15
A. 2.2.1.16

HARGA SATUAN PEKERJAAN TANAH


A. 2.3.1.1
A. 2.3.1.2
A. 2.3.1.3
A. 2.3.1.4
A. 2.3.1.5
A. 2.3.1.6
A. 2.3.1.7
A. 2.3.1.8
A. 2.3.1.9
A. 2.3.1.10
A. 2.3.1.11
A. 2.3.1.11.a
A. 2.3.1.12
A. 2.3.1.13
A. 2.3.1.14
A. 2.3.1.15

HARGA SATUAN PEKERJAAN PONDASI


A. 3.2.1.1
A. 3.2.1.2
A. 3.2.1.3
A. 3.2.1.4
A. 3.2.1.5
A. 3.2.1.6
A. 3.2.1.7
A. 3.2.1.8
A. 3.2.1.9
A. 3.2.1.10
A. 3.2.1.11

HARGA SATUAN PEKERJAAN BETON


A. 4.1.1.1
A. 4.1.1.2
A. 4.1.1.3
A. 4.1.1.4
A. 4.1.1.5
A. 4.1.1.6
A. 4.1.1.7
A. 4.1.1.8
A. 4.1.1.9
A. 4.1.1.10
A. 4.1.1.11
A. 4.1.1.12
A. 4.1.1.13
A. 4.1.1.14
A. 4.1.1.15
A. 4.1.1.16
A. 4.1.1.17
A. 4.1.1.17.a
A. 4.1.1.18
A. 4.1.1.19
A. 4.1.1.20
A. 4.1.1.21
A. 4.1.1.22
A. 4.1.1.23
A. 4.1.1.24
A. 4.1.1.25
A. 4.1.1.26
A. 4.1.1.27
A. 4.1.1.28
A. 4.1.1.29
A. 4.1.1.30
A. 4.1.1.31
A. 4.1.1.32
A. 4.1.1.33
A. 4.1.1.34
A. 4.1.1.35
A. 4.1.1.36

HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


A. 4.2.1.1
A. 4.2.1.2
A. 4.2.1.3
A. 4.2.1.4
A. 4.2.1.5
A. 4.2.1.6
A. 4.2.1.7
A. 4.2.1.8
A. 4.2.1.9
A. 4.2.1.10
A. 4.2.1.11
A. 4.2.1.12
A. 4.2.1.13
A. 4.2.1.14
A. 4.2.1.15
A. 4.2.1.16
A. 4.2.1.17
A. 4.2.1.18
A. 4.2.1.19
A. 4.2.1.20
A. 4.2.1.21

HARGA SATUAN PEKERJAAN DINDING


A. 4.4.1.1
A. 4.4.1.2
A. 4.4.1.3
A. 4.4.1.4
A. 4.4.1.5
A. 4.4.1.6
A. 4.4.1.7
A. 4.4.1.8
A. 4.4.1.9
A. 4.4.1.10
A. 4.4.1.11
A. 4.4.1.12
A. 4.4.1.13
A. 4.4.1.14
A. 4.4.1.15
A. 4.4.1.16
A. 4.4.1.17
A. 4.4.1.18
A. 4.4.1.19
A. 4.4.1.20
A. 4.4.1.21
A. 4.4.1.22
A. 4.4.1.23
A. 4.4.1.24

HARGA SATUAN PEKERJAAN PLESTERAN


A. 4.4.2.1
A. 4.4.2.2
A. 4.4.2.3
A. 4.4.2.4
A. 4.4.2.5
A. 4.4.2.6
A. 4.4.2.7
A. 4.4.2.8
A. 4.4.2.9
A. 4.4.2.10
A. 4.4.2.11
A. 4.4.2.12
A. 4.4.2.13
A. 4.4.2.13
A. 4.4.2.14
A. 4.4.2.15
A. 4.4.2.16
A. 4.4.2.17
A. 4.4.2.18
A. 4.4.2.19
A. 4.4.2.20
A. 4.4.2.21
A. 4.4.2.22
A. 4.4.2.23
A. 4.4.2.24
A. 4.4.2.25
A. 4.4.2.26
A. 4.4.2.27

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A. 4.4.3.1
A. 4.4.3.2
A. 4.4.3.3
A. 4.4.3.4
A. 4.4.3.4a
A. 4.4.3.5
A. 4.4.3.6
A. 4.4.3.7
A. 4.4.3.8
A. 4.4.3.9
A. 4.4.3.10
A. 4.4.3.11
A. 4.4.3.12
A. 4.4.3.13
A. 4.4.3.14
A. 4.4.3.15
A. 4.4.3.16
A. 4.4.3.17
A. 4.4.3.18
A. 4.4.3.19
A. 4.4.3.20
A. 4.4.3.21
A. 4.4.3.22
A. 4.4.3.23
A. 4.4.3.24
A. 4.4.3.25
A. 4.4.3.26
A. 4.4.3.27
A. 4.4.3.28
A. 4.4.3.29
A. 4.4.3.30
A. 4.4.3.31
A. 4.4.3.32
A. 4.4.3.33
A. 4.4.3.34
A. 4.4.3.35
A. 4.4.3.36
A. 4.4.3.37
A. 4.4.3.38
A. 4.4.3.39
A. 4.4.3.40
A. 4.4.3.41
A. 4.4.3.42
A. 4.4.3.43
A. 4.4.3.44
A. 4.4.3.45
A. 4.4.3.46
A. 4.4.3.47
A. 4.4.3.48
A. 4.4.3.49
A. 4.4.3.50
A. 4.4.3.51
A. 4.4.3.52
A. 4.4.3.53
A. 4.4.3.54
A. 4.4.3.55
A. 4.4.3.56
A. 4.4.3.57
A. 4.4.3.58
A. 4.4.3.59
A. 4.4.3.60
A. 4.4.3.61
A. 4.4.3.62
A. 4.4.3.63

HARGA SATUAN PEKERJAAN LANGIT-LANGIT


A.4.5.1.1
A.4.5.1.2
A.4.5.1.3
A.4.5.1.4
A.4.5.1.5
A.4.5.1.6
A.4.5.1.7
A.4.5.1.7.a
A.4.5.1.8
A.4.5.1.9
A.4.5.1.10

HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.1
A.4.5.2.2
A.4.5.2.3
A.4.5.2.4
A.4.5.2.5
A.4.5.2.6
A.4.5.2.7
A.4.5.2.8
A.4.5.2.9
A.4.5.2.10
A.4.5.2.11
A.4.5.2.12
A.4.5.2.13
A.4.5.2.14
A.4.5.2.15
A.4.5.2.16
A.4.5.2.17
A.4.5.2.18
A.4.5.2.19
A.4.5.2.20
A.4.5.2.21
A.4.5.2.22
A.4.5.2.23
A.4.5.2.24
A.4.5.2.25
A.4.5.2.26
A.4.5.2.27
A.4.5.2.28
A.4.5.2.29
A.4.5.2.30
A.4.5.2.31
A.4.5.2.32
A.4.5.2.33
A.4.5.2.34
A.4.5.2.35
A.4.5.2.36
A.4.5.2.37
A.4.5.2.38
A.4.5.2.39
A.4.5.2.40
A.4.5.2.41
A.4.5.2.42

HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1
A.4.6.1.2
A.4.6.1.3
A.4.6.1.4
A.4.6.1.5
A.4.6.1.6
A.4.6.1.7
A.4.6.1.8
A.4.6.1.9
A.4.6.1.10
A.4.6.1.11
A.4.6.1.12
A.4.6.1.13
A.4.6.1.14
A.4.6.1.15
A.4.6.1.16
A.4.6.1.17
A.4.6.1.18
A.4.6.1.19
A.4.6.1.20
A.4.6.1.21
A.4.6.1.22
A.4.6.1.23
A.4.6.1.24
A.4.6.1.25
A.4.6.1.26
A.4.6.1.27
A.4.6.1.28

HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.1
A.4.6.2.2
A.4.6.2.3
A.4.6.2.4
A.4.6.2.5
A.4.6.2.6
A.4.6.2.7
A.4.6.2.8
A.4.6.2.9
A.4.6.2.10
A.4.6.2.11
A.4.6.2.12
A.4.6.2.13
A.4.6.2.14
A.4.6.2.15
A.4.6.2.16
A.4.6.2.17
A.4.6.2.18
A.4.6.2.19
A.4.6.2.20
A.4.6.2.21
A.4.6.2.22
A.4.6.2.23
A.4.6.2.24
HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1
A.4.7.1.2
A.4.7.1.3
A.4.7.1.4
A.4.7.1.5
A.4.7.1.6
A.4.7.1.7
A.4.7.1.8
A.4.7.1.9
A.4.7.1.10
A.4.7.1.11
A.4.7.1.12
A.4.7.1.13
A.4.7.1.14
A.4.7.1.15
A.4.7.1.16
A.4.7.1.17
A.4.7.1.17
A.4.7.1.18
A.4.7.1.19
A.4.7.1.20
A.4.7.1.21

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A. 5.1.1.1
A. 5.1.1.2
A. 5.1.1.3
A. 5.1.1.4
A. 5.1.1.5
A. 5.1.1.6
A. 5.1.1.7
A. 5.1.1.8
A. 5.1.1.9
A. 5.1.1.10
A. 5.1.1.11
A. 5.1.1.12
A. 5.1.1.13
A. 5.1.1.14
A. 5.1.1.15
A. 5.1.1.16
A. 5.1.1.17
A. 5.1.1.18
A. 5.1.1.19
A. 5.1.1.20
A. 5.1.1.21
A. 5.1.1.22
A. 5.1.1.23
A. 5.1.1.24
A. 5.1.1.25
A. 5.1.1.26
A. 5.1.1.27
A. 5.1.1.28
A. 5.1.1.29
A. 5.1.1.30
A. 5.1.1.31
A. 5.1.1.32
A. 5.1.1.33
A. 5.1.1.34
A. 5.1.1.35
A. 5.1.1.36

HARGA SATUAN PEKERJAAN LISTRIK


SNI LISTRIK 01
SNI LISTRIK 02
SNI LISTRIK 03
SNI LISTRIK 04
SNI LISTRIK 05
SNI LISTRIK 06
HARGA SATUAN PEKERJAAN BONGKARAN
L.4
L.5
L.6
L.7
L.8
L.9
L.10
L.11
L.12
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

URAIAN PEKERJAAN

HARGA SATUAN PEKERJAAN PERSIAPAN


Pembuatan 1 M2 pagar sementara dari kayu tinggi 2 meter
Pembuatan 1 M2 pagar sementara dari seng gelombang tinggi 2 meter
Pembuatan 1 M2 pagar sementara dari kawat duri tinggi 1,8 meter
Pengukuran dan pemasangan 1 M' Bouwplank
Pembuatan 1 M2 kantor sementara dengan lantai plesteran
Pembuatan 1 M2 rumah jaga (konstruksi kayu)
Pembuatan 1 M2 gudang semen dan peralatan
Pembuatan 1 M2 bedeng buruh
Pembersihan 1 M2 lapangan dan perataan
Pembuatan 1 M2 steger/perancah dari bambu
Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm
Pembuatan 1 M2 jalan sementara
Bongkaran 1 M3 beton bertulang
Bongkaran 1 M3 dinding tembok bata
Pemasangan 1 M2 pagar kawat jaring galvanis panjang 240 cm
Pemasangan 1 M2 panel beton pracetak ( 5 x 50 x 213 ) cm

HARGA SATUAN PEKERJAAN TANAH


Penggalian 1 M3 tanah biasa sedalam 1 meter
Penggalian 1 M3 tanah biasa sedalam 2 meter
Penggalian 1 M3 tanah biasa sedalam 3 meter
Penggalian 1 M3 tanah keras sedalam 1 meter
Penggalian 1 M3 tanah cadas sedalam 1 meter
Penggalian 1 M3 tanah lumpur sedalam 1 meter
Pengerjaan Stripping 1 M2 tanah tebing setinggi 1 meter
Pembuangan 1 M3 tanah sejauh 30 meter
Pengurugan kembali 1 M3 galian tanah
Pemadatan Tanah 1 M3 tanah (Per 20 Cm)
Pengurugan 1 M3 dengan pasir urug
Pengurugan 1 M3 dengan tanah urug
Pemasangan 1 M3 lapisan pudel campuran 1kp : 3pp : 7tl
Pemasangan 1 M3 lapisan pudel campuran 1kp : 5tl
Pemasangan 1 M2 lapisan ijuk tebal 10 cm untuk bidang resapan
Pengurugan 1 M3 sirtu padat

HARGA SATUAN PEKERJAAN PONDASI


Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 3 PP
Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 4 PP
Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 5 PP
Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 6 PP
Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 8 PP
Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 1 KP : 2 PP
Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP
Pemasangan 1 M3 pondasi batu belah, campuran 1/4 SP : 1 KP : 4 PP
Pemasangan 1 M3 batu kosong (Anstamping)
Pemasangan 1 M3 pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 KR dan 40% batu belah
Pemasangan 1 M3 pondasi sumuran, diameter 100 Cm

HARGA SATUAN PEKERJAAN BETON


Membuat 1 M3 beton mutu f'c = 7,4 MPa (K 100), Slump (12 ± 2) cm, w/c = 0,87
Membuat 1 M3 beton mutu f'c = 9,8 MPa (K 125), Slump (12 ± 2) cm, w/c = 0,78
Membuat 1 M3 beton mutu f'c = 12,2 MPa (K 150), Slump (12 ± 2) cm, w/c = 0,72
Membuat 1 M3 lantai kerja beton mutu f'c = 7,4 MPa (K 100), Slump (3-6) cm, w/c = 0,87
Membuat 1 M3 beton mutu f'c = 14,5 MPa (K 175), Slump (12 ± 2) cm, w/c = 0,66
Membuat 1 M3 beton mutu f'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Membuat 1 M3 beton mutu f'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Membuat 1 M3 beton mutu f'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Membuat 1 M3 beton mutu f'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Membuat 1 M3 beton mutu f'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Membuat 1 M3 beton mutu f'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Membuat 1 M3 beton mutu f'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Membuat 1 M3 beton kedap air dengan strorox - 100
Pemasangan 1 m' PVC Waterstop lebar 150 mm
Pemasangan 1 m' PVC Waterstop lebar 200 mm
Pemasangan 1 m' PVC Waterstop lebar 230 mm - 320 mm
Pembesian 10 Kg dengan besi polos atau besi ulir
Pembesian 1 Kg dengan besi polos atau besi ulir
Pemasangan 10 Kg kabel presstressed polos/strands
Pemasangan 10 kg jaring kawat baja (wiremesh)
Pemasangan 1 M2 bekisting untuk pondasi
Pemasangan 1 M2 bekisting untuk sloof
Pemasangan 1 M2 bekisting untuk kolom
Pemasangan 1 M2 bekisting untuk balok
Pemasangan 1 M2 bekisting untuk lantai
Pemasangan 1 M2 bekisting untuk dinding
Pemasangan 1 M2 bekisting untuk tangga
Pemasangan 1 M2 jembatan untuk pengecoran beton
Membuat 1 M3 pondasi beton bertulang (150 kg besi + bekisting)
Membuat 1 M3 sloof beton bertulang (200 kg besi + bekisting)
Membuat 1 M3 kolom beton bertulang (300 Kg besi + bekisting)
Membuat 1 M3 balok beton bertulang (200 Kg besi + bekisting)
Membuat 1 M3 plat beton bertulang (150 Kg besi + bekisting)
Membuat 1 M3 dinding beton bertulang (150 Kg besi + bekisting)
Membuat 1 M3 dinding beton bertulang (200 Kg besi + bekisting)
Membuat 1 M' kolom praktis beton bertulang (11 x 11) cm
Membuat 1 M' ring balok beton bertulang (10 x 15) cm

HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


Pemasangan 1 Kg besi profil
Pemasangan 1 Kg rangka kuda-kuda baja IWF
Pengerjaan 100 Kg pekerjaan perakitan
Pembuatan 1 M2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Pengerjaan 10 cm pengelasan dengan las listrik
Pembuatan 1 M2 rangka jendela besi Scuare Tube (25 x 5) cm
Pemasangan 1 M2 pintu rolling door besi
Pemasangan 1 M2 pintu lipat (folding door) bahan plastik/PVC
Pemasangan 1 M2 sunscreen alluminium
Pemasangan 1 M2 rolling door alluminium
Pemasangan 1 M kusen pintu alluminium
Pemasangan 1 M2 pintu alluminium strip lebar 8 cm
Pemasangan 1 M2 pintu kaca rangka alluminium
Pemasangan 1 M2 Venetions Blinds dan Vertical Blinds
Pemasangan 1M2 terali besi strip (2 x 3) mm
Pemasangan 1 M2 kawat nyamuk
Pemasangan 1 M2 jendela nako & tralis
Pemasangan 1 M' talang datar / jurai seng BJLS 28 lebar 90 cm
Pemasangan 1 M talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm
Pemasangan 1 M2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm, dinding partisi
Pemasangan 1 M2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafond

HARGA SATUAN PEKERJAAN DINDING


Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 KP : 10 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 2 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 3 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 4 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 5 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 6 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 8 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 3 KP : 10 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SM : 1 KP : 1 PP
Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SM : 1 KP : 2 PP
Pemasangan 1 M2 dinding conbloak HB20 campuran 1 SP : 3 PP
Pemasangan 1 M2 dinding conbloak HB20 campuran 1 SP : 4 PP
Pemasangan 1 M2 dinding conbloak HB15 campuran 1 SP : 3 PP
Pemasangan 1 M2 dinding conbloak HB15 campuran 1 SP : 4 PP
Pemasangan 1 M2 dinding conbloak HB10 campuran 1 SP : 3 PP
Pemasangan 1 M2 dinding conbloak HB10 campuran 1 SP : 4 PP
Pemasangan 1 M2 dinding terawang (rooster) 12x11x24 campuran 1 SP : 3 PP
Pemasangan 1 M2 dinding terawang (rooster) 12x11x24 campuran 1 SP : 4 PP
Pemasangan 1 M2 dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP

HARGA SATUAN PEKERJAAN PLESTERAN


Pemasangan 1 M2 plesteran 1 SP : 1 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 2 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 3 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 4 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 5 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 6 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 7 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 8 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 1/2 KP : 8 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 2 KP : 8 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SM : 1 KP : 1 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SM : 1 KP : 2 PP tebal 15 mm
Pemasangan 1 M2 plesteran 1 SP : 1 PP tebal 20 mm
Pemasangan 1 M2 plesteran 1 SP : 2 PP tebal 20 mm
Pemasangan 1 M2 plesteran 1 SP : 3 PP tebal 20 mm
Pemasangan 1 M2 plesteran 1 SP : 4 PP tebal 20 mm
Pemasangan 1 M2 plesteran 1 SP : 5 PP tebal 20 mm
Pemasangan 1 M2 plesteran 1 SP : 6 PP tebal 20 mm
Pemasangan 1 M2 plesteran 1 SM : 1 KP : 2 PP tebal 20 mm
Pemasangan 1 M2 berapen 1 SP : 5 PP tebal 15 mm
Pemasangan 1 M' plesteran skoning 1 SP : 3 PP lebar 10 cm
Pemasangan 1 M2 plesteran granit 1 SP : 2 granit tebal 1 cm
Pemasangan 1 M2 plesteran traso 1 SP : 2 Traso tebal 1 cm
Pemasangan 1 M2 plesteran ciprat 1 SP : 2 PP
Pemasangan 1 M2 finishing siar pasangan bata merah
Pemasangan 1 M2 finishing siar pasangan conblock ekspose
Pemasangan 1 M2 finishing siar pasangan batu kali, campuran 1 SP : 2 PP
Pemasangan 1 M2 acian

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


Pemasangan 1 M2 lantai ubin PC abu-abu ukuran 40 cm x 40 cm
Pemasangan 1 M2 lantai ubin PC abu-abu ukuran 30 cm x 30 cm
Pemasangan 1 M2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm
Pemasangan 1 M2 lantai ubin warna ukuran 40 cm x 40 cm
Pemasangan 1 M2 lantai ubin warna ukuran 40 cm x 40 cm (KM/WC)
Pemasangan 1 M2 lantai ubin warna ukuran 30 cm x 30 cm
Pemasangan 1 M2 lantai ubin warna ukuran 20 cm x 20 cm
Pemasangan 1 M2 lantai ubin teraso ukuran 40 cm x 40 cm
Pemasangan 1 M2 lantai ubin teraso ukuran 30 cm x 30 cm
Pemasangan 1 M2 lantai ubin granit ukuran 40 cm x 40 cm
Pemasangan 1 M2 lantai ubin granit ukuran 30 cm x 30 cm
Pemasangan 1 M2 lantai ubin terralux ukuran 40 cm x 40 cm
Pemasangan 1 M2 lantai ubin terralux ukuran 30 cm x 30 cm
Pemasangan 1 M2 lantai ubin terralux marmer ukuran 60 cm x 60 cm
Pemasangan 1 M2 lantai ubin terralux marmer ukuran 40 cm x 40 cm
Pemasangan 1 M2 lantai ubin terralux marmer ukuran 30 cm x 30 cm
Pemasangan 1 M' plint ubin pc abu-abu ukuran 15 cm x 20 cm
Pemasangan 1 M' plint ubin pc abu-abu ukuran 10 cm x 30 cm
Pemasangan 1 M' plint ubin pc abu-abu ukuran 10 cm x 40 cm
Pemasangan 1 M' plint ubin warna ukuran 10 cm x 20 cm
Pemasangan 1 M' plint ubin warna ukuran 10 cm x 30 cm
Pemasangan 1 M' plint ubin warna ukuran 10 cm x 40 cm
Pemasangan 1 M' plint ubin teraso ukuran 10 cm x 30 cm
Pemasangan 1 M' plint ubin teraso ukuran 10 cm x 40 cm
Pemasangan 1 M' plint ubin granit ukuran 10 cm x 40 cm
Pemasangan 1 M' plint ubin granit ukuran 10 cm x 30 cm
Pemasangan 1 M' plint ubin teralux kerang ukuran 10 cm x 40 cm
Pemasangan 1 M' plint ubin teralux kerang ukuran 10 cm x 30 cm
Pemasangan 1 M' plint ubin teralux marmer ukuran 10 cm x 60 cm
Pemasangan 1 M' plint ubin teralux marmer ukuran 10 cm x 40 cm
Pemasangan 1 M' plint ubin teralux marmer ukuran 10 cm x 30 cm
Pemasangan 1 M2 lantai teraso cor di tempat, tebal 3 cm
Pemasangan 1 M2 lantai keramik artistik 10 cm x 20 cm
Pemasangan 1 M2 lantai keramik artistik 10 cm x 10 cm atau 5 cm x 20 cm
Pemasangan 1 M2 lantai keramik ukuran 33 cm x 33 cm
Pemasangan 1 M2 lantai keramik ukuran 30 cm x 30 cm
Pemasangan 1 M2 lantai keramik ukuran 20 cm x 20 cm
Pemasangan 1 M2 lantai keramik ukuran 10 cm x 33 cm untuk variasi/border
Pemasangan 1 M2 lantai keramik mozaik ukuran 30 cm x 30 cm
Pemasangan 1 M' plint keramik ukuran 10 cm x 20 cm
Pemasangan 1 M' plint keramik ukuran 10 cm x 10 cm
Pemasangan 1 M' plint keramik ukuran 5 cm x 20 cm
Pemasangan 1 M' plint internal cove artistik 5 cm x 5 cm x 20 cm
Pemasangan 1 M2 lantai keramik marmer ukuran 100 cm x 100 cm
Pemasangan 1 M2 lantai karpet
Pemasangan 1 M2 underlayer (pelapis bawah karpet)
Pemasangan 1 M2 lantai parquet kayu
Pemasangan 1 M2 lantai kayu gymfloor
Pemasangan 1 M2 dinding porslen 11cm x 11cm
Pemasangan 1 M2 dinding porslen 10cm x 20cm
Pemasangan 1 M2 dinding porslen 20cm x 20cm
Pemasangan 1 M2 dinding keramik artistik 10cm x 20cm
Pemasangan 1 M2 dinding keramik artistik 5cm x 20cm
Pemasangan 1 M2 dinding keramik 10cm x 20cm
Pemasangan 1 M2 dinding keramik 20cm x 20cm
Pemasangan 1 M2 dinding marmer 100cm x 100cm
Pemasangan 1 M2 dinding bata pelapis 3cm x 7cm x 24cm
Pemasangan 1 M2 dinding batu Andesit Alur
Pemasangan 1 M2 dinding batu Candi Polos
Pemasangan 1 M2 lantai vynil ukuran 30cm x 30cm
Pemasangan 1 M2 wallpaper lebar 50 cm
Pemasangan 1 M2 floor harderner
Pemasangan 1 M' plint vynil 15cm x 30cm
Pemasangan 1 M' plint kayu tebal 2 cm lebar 10 cm

HARGA SATUAN PEKERJAAN LANGIT-LANGIT


Pemasangan 1 M2 langit-langit asbes semen, tebal 4mm, 5mm, dan 6mm
Pemasangan 1 M2 langit-langit akustik ukuran (30 x 30) cm
Pemasangan 1 M2 langit-langit akustik ukuran (30 x 60) cm
Pemasangan 1 M2 langit-langit akustik ukuran (60 x 120) cm
Pemasangan 1 M2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3mm, 4mm & 6mm
Pemasangan 1 M2 langit-langit lambrisering kayu, tebal 9mm
Pemasangan 1 M2 langit-langit akustik ukuran (60 x 120)cm berikut rangka allumunium
Pemasangan 1 M2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9mm
Pemasangan 1 M2 langit-langit akustik ukuran (60 x 120)cm berikut rangka allumunium
Pemasangan 1 M' list langit-langit profil gypsum
Pemasangan 1 M2 rangka langit-langit besi hollow 40.40

HARGA SATUAN PEKERJAAN PENUTUP ATAP


Pemasangan 1 M2 atap genteng palentong kecil
Pemasangan 1 M2 atap genteng kodok glazuur
Pemasangan 1 M2 atap genteng palentong besar/super
Pemasangan 1 M' bubung genteng palentong
Pemasangan 1 M' bubung genteng kodok glazuur
Pemasangan 1 M' bubung genteng palentong besar
Pemasangan 1 M2 roof light fiberglass 90x180
Pemasangan 1 M2 atap asbes gelombang 0,92m x 2,5m x 5mm
Pemasangan 1 M2 atap asbes gelombang 0,92m x 2,25m x 5mm
Pemasangan 1 M2 atap asbes gelombang 0,92m x 2,00m x 5mm
Pemasangan 1 M2 atap asbes gelombang 0,92m x 1,80m x 5mm
Pemasangan 1 M2 atap asbes gelombang 1,05m x 3,00m x 4mm
Pemasangan 1 M2 atap asbes gelombang 1,05m x 2,70m x 4mm
Pemasangan 1 M2 atap asbes gelombang 1,05m x 2,40m x 4mm
Pemasangan 1 M2 atap asbes gelombang 1,05m x 2,10m x 4mm
Pemasangan 1 M2 atap asbes gelombang 1,05m x 1,50m x 4mm
Pemasangan 1 M2 atap asbes gelombang 1,08m x 3,00m x 6mm
Pemasangan 1 M2 atap asbes gelombang 1,08m x 2,70m x 6mm
Pemasangan 1 M2 atap asbes gelombang 1,08m x 2,40m x 6mm
Pemasangan 1 M2 atap asbes gelombang 1,08m x 2,10m x 6mm
Pemasangan 1 M2 atap asbes gelombang 1,08m x 1,80m x 6mm
Pemasangan 1 M' bubung stel gelombang 0,92m
Pemasangan 1 M' bubung stel gelombang 1,05m
Pemasangan 1 M' bubung stel gelombang 1,08m
Pemasangan 1 M' nok paten 0,92m
Pemasangan 1 M' nok paten 1,05m
Pemasangan 1 M' nok paten 1,08m
Pemasangan 1 M' nok stel rata 0,92m
Pemasangan 1 M' nok stel rata 1,05m
Pemasangan 1 M' genteng beton
Pemasangan 1 M' genteng aspal
Pemasangan 1 M2 genteng metal
Pemasangan 1 M' atap sirap kayu
Pemasangan 1 M' nok genteng beton
Pemasangan 1 M' nok genteng aspal
Pemasangan 1 M' nok genteng metal
Pemasangan 1 M' nok sirap
Pemasangan 1 M2 atap seng gelombang
Pemasangan 1 M' nok atap seng
Pemasangan 1 M2 atap alumunium
Pemasangan 1 M2 nok alumunium
Pemasangan 1 M2 alumunium foil/sisalation

HARGA SATUAN PEKERJAAN KAYU


Pembuatan & pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas I
Pembuatan & pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas II atau III
Pembuatan & pemasangan 1 M2 pintu klamp standar, kayu klas II
Pembuatan & pemasangan 1 M2 pintu klamp sederhana, kayu klas III
Pembuatan & pemasangan 1 M2 daun pintu panel, kayu klas I atau II
Pembuatan & pemasangan 1 M2 pintu dan jendela kaca, kayu klas I atau II
Pembuatan & pemasangan 1 M2 pintu dan jendela jalusi, kayu klas I atau II
Pembuatan 1 M2 daun pintu plywood rangkap, rangka kayu klas II tertutup (lebar sampai 90 cm)
Pembuatan 1 M2 pintu plywood rangkap, rangka expose kayu kelas II atau III
Pemasangan 1 M2 jalusi kusen, kayu kelas I atau II
Pemasangan 1 M2 teakwood rangkap, rangka expose kayu kelas I
Pemasangan 1 M2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Pemasangan 1 M3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Pemasangan 1 M3 konstruksi kuda-kuda expose, kayu kelas I
Pemasangan 1 M3 konstruksi gordeng, kayu kelas II
Pemasangan 1 M2 rangka atap genteng keramik, kayu kelas II
Pemasangan 1 M2 rangka atap genteng beton, kayu kelas II
Pemasangan 1 M2 rangka atap sirap, kayu kelas II
Pemasangan 1 M2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Pemasangan 1 M2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Pemasangan 1 M' listplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Pemasangan 1 M' listplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Pemasangan 1 M2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Pemasangan 1 M2 dinding pemisah teakwood rangkap, rangka kayu kelas II
Pemasangan 1 M2 dinding pemisah plywood rangkap, rangka kayu kelas II
Pemasangan 1 M2 dinding lambrisering dari papan kayu kelas I
Pemasangan 1 M2 dinding lambrisering dari plywood ukuran (120 x 240) cm
Pemasangan 1 M2 dinding bilik, rangka kayu kelas III atau IV

HARGA SATUAN PEKERJAAN KUNCI DAN KACA


Pemasangan 1 buah kunci tanam antik
Pemasangan 1 buah kunci tanam biasa
Pemasangan 1 buah kunci kamar mandi
Pemasangan 1 buah kunci silinder
Pemasangan 1 buah engsel pintu
Pemasangan 1 buah engsel jendela kupu-kupu
Pemasangan 1 buah engsel angin
Pemasangan 1 buah spring knip
Pemasangan 1 buah kait angin
Pemasangan 1 buah door closer
Pemasangan 1 buah kunci slot
Pemasangan 1 buah door holder
Pemasangan 1 buah door stop
Pemasangan 1 buah rel pintu sorong
Pemasangan 1 buah kunci lemari
Pemasangan 1 M2 kaca tebal 3mm
Pemasangan 1 M2 kaca tebal 5mm
Pemasangan 1 M2 kaca tebal 8mm
Pemasangan 1 M2 kaca buram tebal 12mm
Pemasangan 1 M2 kaca cermin tebal 5mm
Pemasangan 1 M2 kaca cermin tebal 8mm
Pemasangan 1 M2 kaca wireglassed tebal 5mm
Pemasangan 1 M2 kaca patri tebal 5mm
Pemasangan 1 M2 kaca patri tebal 5mm
HARGA SATUAN PEKERJAAN PENGECATAN
1 M2 Pengikisan / pengerokan permukaan cat lama
1 M2 Pencucian bidang permukaan tembok yang pernah dicat
1 M2 Pengerokan karat pada permukaan baja cara manual
1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
Pelaburan 1 M2 bidang kayu baru dengan teak oil
Pelaburan 1 M2 bidang kayu baru dengan politur
Pelaburan 1 M2 bidang kayu baru dengan cat residu dan ter
Pelaburan 1 M2 bidang kayu baru dengan vernis
Pengecatan 1 M2 tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Pengecatan 1 M2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Pelaburan 1 M2 tembok dengan kalkarium
Pelaburan 1 M2 tembok dengan kapur sirih
Pelaburan 1 M2 tembok lama dengan kapur sirih (pemeliharaan)
Pemasangan 1 M2 wallpaper
Pengecatan 1 M2 permukaan baja dengan menie besi
Pengecatan 1 M2 permukaan baja dengan menie besi dengan perancah
Pengecatan 1 M2 permukaan baja dengan menie besi dengan perancah
Pengecatan 1 M2 permukaan baja galvanis secara manual 4 lapis
Pengecatan 1 M2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Pengecatan 1 M2 permukaan baja galvanis secara manual sistem 3 lapis
Pengecatan 1 M2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


Pemasangan 1 buah closet duduk/monoblock
Pemasangan 1 buah closet jongkok porslen
Pemasangan 1 buah closet jongkok teraso
Pemasangan 1 buah urinoir
Pemasangan 1 buah wastafel
Pemasangan 1 buah bathcuip porselen
Pemasangan 1 buah bak fibreglass vol 1 M3
Pemasangan 1 buah bak mandi batu bata vol 0,30 M3
Pemasangan 1 buah bak mandi teraso vol 0,30 M3
Pemasangan 1 buah bak air fibreglass vol 1 M3
Pemasangan 1 buah bak beton volume 1 M3
Pemasangan 1 buah bak cuci piring stainless steel
Pemasangan 1 buah bak cuci piring teraso
Pemasangan 1 buah floor drain
Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm
Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm
Pemasangan 1 M' pipa galvanis diameter 1/2"
Pemasangan 1 buah kran diameter ½" atau ¾"
Pemasangan 1 M' pipa galvanis diameter ¾"
Pemasangan 1 M' pipa galvanis diameter 1"
Pemasangan 1 M' pipa galvanis diameter 1 ½"
Pemasangan 1 M' pipa galvanis diameter 3"
Pemasangan 1 M' pipa galvanis diameter 4"
Pemasangan 1 M' pipa PVC tipe AW diameter 1/2"
Pemasangan 1 M' pipa PVC tipe AW diameter 3/4"
Pemasangan 1 M' pipa PVC tipe AW diameter 1"
Pemasangan 1 M' pipa PVC tipe AW diameter 1½"
Pemasangan 1 M' pipa PVC tipe AW diameter 2"
Pemasangan 1 M' pipa PVC tipe AW diameter 2½"
Pemasangan 1 M' pipa PVC tipe AW diameter 3"
Pemasangan 1 M' pipa PVC tipe AW diameter 4"
Pemasangan 1 M' pipa air limbah jenis pipa tanah Ø 20 cm
Pemasangan 1 M' pipa air limbah jenis pipa tanah Ø 15 cm
Pemasangan 1 M' pipa beton Ø 15 - 20 cm
Pemasangan 1 M' pipa beton Ø 30 - 100 cm

HARGA SATUAN PEKERJAAN LISTRIK


Pemasangan 1 Titik Instalasi Lampu TL 2 x 18 Wat
Pemasangan 1 Titik Instalasi Lampu SL 18 Wat
Pemasangan 1 Titik Intsalasi Stop Kontak
Pemasangan 1 Titik Instalasi Saklar Tunggal
Pemasangan 1 Titik Instalasi Saklar Ganda
Pemasangan 1 Set Panel /MCB Box 2 Pass
HARGA SATUAN PEKERJAAN BONGKARAN
1 M2 Bongkaran Dinding Tembok dan Membersihkan
1 M2 Bongkaran Lantai Tegel
1 M2 Mengupas Plesteran
1 M2 Membongkar atap bahan tidak dipakai lagi
1 M2 Membongkar atap seng
1 M3 Membongkar pondasi batu belah
1 M2 Membongkar Rangka atap
1 M2 Membongkar dinding, lantai, plafond kayu
1 M3 Membongkar Kuda - kuda /Gelagar Jembatan
HARGA

Rp 325,155
Rp 395,081
#N/A
Rp 79,496
#N/A
Rp 1,248,087
Rp 1,171,592
#N/A
Rp 22,811
#N/A
Rp 147,005
Rp 232,149
Rp 1,551,454
Rp 775,727
#N/A
#N/A

Rp 84,171
Rp 104,730
Rp 125,785
Rp 111,896
Rp 170,825
Rp 135,915
Rp 6,439
Rp 36,787
Rp 28,057
Rp 64,391
Rp 132,074
Rp 132,074
Rp 395,613
Rp 415,569
Rp 144,057
Rp 794,496

Rp 1,189,673
Rp 1,135,758
Rp 1,098,408
Err:509
Err:509
Rp 882,988
Rp 987,151
Rp 960,333
Rp 746,129
Rp 3,273,991
Rp 1,206,397

Rp 2,183,573
Rp 2,229,884
Rp 2,260,920
Rp 2,135,941
Rp 2,303,640
Rp 2,335,243
Rp 2,373,230
Rp 2,380,193
Rp 2,393,356
Rp 2,396,290
Rp 2,475,830
Rp 2,480,426
#N/A
#N/A
#N/A
#N/A
Rp 179,718
Rp 17,972
Rp 173,302
Rp 233,599
Rp 212,208
Rp 225,895
Rp 409,875
Rp 418,087
Rp 477,154
Rp 518,156
Rp 380,827
#REF!
Rp 5,029,649
Rp 6,166,792
Rp 10,126,017
Rp 7,825,655
Rp 7,018,016
Rp 6,772,567
Rp 7,317,692
Rp 102,460
Rp 132,078

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

Rp 294,840
Rp 280,409
Rp 271,185
Rp 265,683
Rp 262,244
Rp 247,706
Rp 143,096
Rp 136,552
Rp 132,627
Rp 130,148
Rp 128,547
Rp 125,967
Rp 123,472
Rp 114,011
Rp 114,831
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

Rp 83,084
Rp 75,711
Rp 72,407
Rp 70,246
Rp 68,892
Rp 67,861
Rp 67,255
Rp 66,649
Rp 70,759
Rp 67,458
Rp 62,068
Rp 62,608
Rp 101,478
Rp 101,478
Rp 80,285
Rp 94,158
Rp 92,386
Rp 90,978
Rp 88,105
Rp 39,792
Rp 74,646
#N/A
#N/A
Rp 57,698
Rp 34,122
Rp 16,262
Rp 69,187
Rp 43,883

#N/A
#N/A
#N/A
Rp 236,496
Rp 329,657
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Err:504
Err:504
Rp 33,206
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 256,329
#N/A
#N/A
Rp 33,493
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 248,150
Rp 296,267
#N/A
#N/A
Rp 424,464
Rp 424,464
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 53,027
#N/A
Rp 126,706
Rp 367,729

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 500,297

#N/A
#REF!
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#REF!
#N/A
#REF!
#N/A
#N/A
#N/A
#REF!
Rp 118,384
#N/A
#N/A
Rp 167,980
#N/A
Rp 321,795
#N/A
#N/A
#N/A

Rp 145,986
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 252,391
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 135,117
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 55,879
#N/A
#N/A
#N/A
Rp 21,304
#N/A
Rp 47,489
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

Rp 3,575,413
#N/A
#N/A
#N/A
Rp 1,297,081
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 86,250
#N/A
#N/A
#N/A
#N/A
Rp 111,856
#N/A
#N/A
#N/A
#N/A
#N/A
Rp 27,871
Rp 25,792
#N/A
#N/A
Rp 50,953
#N/A
#N/A
Rp 114,559
#N/A
#N/A
#N/A
#N/A

#N/A
Rp 409,387
Rp 415,160
Rp 393,538
Rp 396,231
Rp 1,058,845
Rp 221,760
Rp 210,383
Rp 52,596
Rp 6,006
Rp 7,681
Rp 515,130
Rp 13,970
Rp 32,681
Rp 1,406,213
BACK UP DATA
Kementerian Negara/Lem: PERUM LPPNPI CABANG PRATAMA PALANGKA RAYA
Pekerjaan : PEMBANGUNAN GEDUNG BARU AIRNAV
Lokasi : Gedung Tower Bandar Udara Tjilik Riwut Palangka Raya
Jl. Adonis Samad Palangka Raya
Tahun Anggaran :

Lebar/
No Uraian Pekerjaan Panjang
Luas
1 2 3
A. PEKERJAAN PENDAHULUAN
1 Pek. Perencanaan
2 Pek. Pembongkaran tempat parkir, pembersihan awal dan akhir lokasi
3 Pek. Pengukuran dan pemasangan bouwplank
4 Pembuatan papan nama kegiatan

B. PEKERJAAN TANAH
1 Pek. Galian tanah untuk pondasi
Pek. Pondasi footplate uk. 120x120x25 cm 1.4 1.4
Pek. Pondasi footplate uk. 60x60x20 cm 0.8 0.8
2 Pek. Galian tanah untuk sloof
Pek. Sloof uk. 30x50 cm 107.73 0.3
Pek. Sloof uk. 20x30 cm 21.4 0.2
3 Urugan kembali tanah galian
4 Pek. Pemasangan kayu galam pjg. 4 m'
5 Urugan pasir bawah pondasi tbl. 3 cm
Pek. Pondasi footplate uk. 120x120x25 cm 1.2 1.2
Pek. Pondasi footplate uk. 60x60x20 cm 0.6 0.6
6 Urugan pasir bawah lantai tbl. 5 cm 138.33

C. PEKERJAAN BETON BERTULANG


1 Pek. Cor lantai kerja pondasi tbl. 7 cm
Pek. Pondasi footplate uk. 120x120x25 cm 1.2 1.2
Pek. Pondasi footplate uk. 60x60x20 cm 0.6 0.6
2 Pek. Cor lantai tumbuk bawah lantai tbl. 7 cm 138.33
3 Pek. Pondasi footplate uk. 120x120x25 cm
· Pek. Pembesian 79.593 kg/m3
· Pek. Bekesting 4.8
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 1.2 1.2
4 Pek. Pondasi footplate uk. 60x60x20 cm
· Pek. Pembesian 86.829 kg/m3
· Pek. Bekesting 2.4
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 0.60 0.60
5 Pek. Sloof uk. 30x50 cm
· Pek. Pembesian 97.68 kg/m3
· Pek. Bekesting 1.30
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 0.30
6 Pek. Sloof uk. 20x30 cm
· Pek. Pembesian 148.281 kg/m3
· Pek. Bekesting 0.80
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 0.2
7 Pek. Kolom uk. 30x50 cm
· Pek. Pembesian 97.68 kg/m3
· Pek. Bekesting 9.2 1.60
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 9.2 0.3
8 Pek. Kolom praktis uk. 11x11 cm 4
9 Pek. Balok lantai uk. 30x50 cm
· Pek. Pembesian 97.68 kg/m3
· Pek. Bekesting 1.30
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 0.3
###
Pek. Balok lantai uk. 20x40 cm
· Pek. Pembesian 143.889 kg/m3
· Pek. Bekesting 1.00
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 0.2
###
Pek. Balok dak uk. 20x40 cm
· Pek. Pembesian 143.889 kg/m3
· Pek. Bekesting 1.00
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 0.2
###
Pek. Balok dak uk. 20x30 cm
· Pek. Pembesian 148.281 kg/m3
· Pek. Bekesting 0.80
· Pek. Cor beton, f'c = 19,3 MPa (K 225) 0.2
###
Pek. Balok gantung uk. 10x15 cm
###
Pek. Plat lantai tbl. 12 cm 24.5 4.15
###
Pek. Tangga dan bordes
tangga 2 0.9281
bordes 2.15 1.4

D. PEKERJAAN PASANGAN DINDING DAN PLESTERAN


1 Pas. Dinding 1/2 bata camp. 1 SP : 4 PP
Lantai 1 103.38
Lantai 2 84.975
2 Pek. Plesteran tbl. 15 cm camp. 1 SP : 4 PP
3 Pek. Acian dinding, kolom dan tangga
dinding
tangga
4 Pas. Dinding Kaca berwarna (Tinted Glass) tbl 10 mm + rangka al 159.46
5 Pas. Dinding batu alam jenis Andesit Alur 4.112
6 Pas. Dinding batu alam jenis Batu Candi polos 24.76
7 Pas. Glassblock uk. 20x20 cm

E. PEKERJAAN KERAMIK DAN LANGIT-LANGIT


1 Pas. Keramik lantai, bodres dan trap tangga uk. 40 x 40 cm
2 Pas. Keramik lantai KM/WC uk. 20x20 cm
3 Pas. Keramik dinding KM/WC uk. 20x20 cm
4 Pas. Plint keramik dinding KM/WC uk. 10x20 cm 23.7
5 Pas. Step Nosing 2
6 Pek. Rangka langit-langit hollow uk. 40x40x0,3 mm
7 Pas. Penutup langit-langit Gypsum Board tbl. 9 mm

F. PEKERJAAN PINTU DAN JENDELA RAYBAN RANGKA ALUMUNIUM


1 Pek. Pintu utama tipe PJ1
2 Pek. Pintu geser tipe P1
3 Pek. Pintu gudang dan ruang rapat tipe P2
4 Pek. Pintu KM/WC tipe P3
5 Pek. Pintu shaft tipe P4
6 Pek. Jendela J1

G. PEKERJAAN CAT-CATAN
1 Pek. Mengecat dinding
2 Pek. Mengecat plafond

H. PEKERJAAN SANITASI DAN PLUMBING


1 Pekerjaan Sanitasi dan Aksesoris
· Pas. Closet duduk merk TOTO atau setara
· Pas. Jet shower
· Pas. Shower bath
· Pas. Wastafel merk TOTO atau setara
· Pas. Floor drain
2 Pekerjaan Sistem Instalasi Air Bersih
· Pasang pipa penghubung ke reservoar PVC Ø 3/4"
· Pasang pipa PVC Ø 1/2"
· Pasang pipa PVC Ø 3/4"
3 Pekerjaan Sistem Instalasi Air Kotor
· Pasang roof drain
· Pasang pipa PVC Ø 2"
· Pasang pipa PVC Ø 4"
4 Pekerjaan Septictank
· Pek. Galian pondasi
· Pek. Pasang Dinding Bata Tebal 1/2 Bata Camp. 1 : 4
· Pek. Plesteran Tebal 15 mm Camp. 1 : 4 (satu sisi)
· Pek. Acian / Mengondrong
· Pasang Pipa Air Limbah Padat Ø 4 "
· Pasang Pipa Air Limbah Cair Ø 2 "

I. PEKERJAAN ELEKTRIKAL
1 Pas. Titik instalasi lampu SL 20 Watt Fitting Downlight
2 Pas. Stop kontak lengkap dengan instalasi
3 Pas. Instalasi saklar tunggal
4 Pas. Instalasi saklar ganda
5 Pas. Box panel

J. PEKERJAAN LAIN-LAIN
1 Pek. Papan nama instansi Letter timbul plat Acrylic
2 Pek. Railing tangga 12.507
3 Waterproofing 24.5 4.15
DATA
ALANGKA RAYA

Riwut Palangka Raya

Tinggi/
Jumlah
Uraian Perhitungan Volume
Tebal 3 4

1.000 Pkt
1.000 Pkt
215.484 M2
1.000 Bh

52.608 M3
1.5 16 47.040 M3
1.45 6 5.568 M3
17.443 M3
0.5 16.159 M4
0.3 1.284 M5
17.536 M3
144.000 Btg
0.756 M3
0.03 16 0.691 M3
0.03 6 0.065 M3
0.05 6.917 M3

1.764 M3
0.07 16 1.613 M3
0.07 6 0.151 M3
0.07 9.683 M3

458.456 Kg
16 76.800 M2
0.25 16 5.760 M3

37.510 Kg
6 14.400 M2
0.20 6 0.432 M3

1578.387 Kg
107.73 140.043 M2
0.50 107.73 16.159 M3

190.393 Kg
21.4 17.120 M2
0.30 21.4 1.284 M3

1347.984 Kg
10 147.200 M2
0.50 10 13.800 M3
21 84.000 M'

1204.394 Kg
82.2 106.860 M2
0.50 82.2 12.330 M3

282.022 Kg
24.5 24.500 M2
0.40 24.5 1.960 M3

946.214 Kg
82.2 82.200 M2
0.40 82.2 6.576 M3

214.414 Kg
24.1 19.280 M2
0.30 24.1 1.446 M3
1.000 M'
0.12 12.201 M3
4.615 M3
2 3.712 M3
0.15 2 0.903 M3

570.358 M2
4 413.500 M2
4 339.900 M2
1140.715 M2
1144.428 M2
1140.715 M2
3.712 M2
159.460 M2
4.112 M2
24.760 M2
270 270.000 Bh

189.276 M2
6.568 M2
35.550 M2
23.700 M'
40 80.000 M'
171.844 M2
171.844 M2

1 1.000 M2
8 8.000 M2
2 2.000 M2
6 6.000 M2
1 1.000 M2
2 2.000 M2

1140.715 M2
171.844 M2

5.000 Bh
5.000 Bh
5.000 Bh
5.000 Bh
5.000 Bh

M'
M'
M'

6.000 Bh
M'
M'

4.845 M3
12.150 M2
18.225 M2
18.225 M2
8.000 M'
8.000 M'

27.000 Bh
20.000 Bh
20.000 Bh
7.000 Bh
1.000 Bh
1.000 Bh
12.507 M'
101.675 M2
RENCANA ANGGARAN BIAYA
(RAB)

Kementerian Negara/Le : PERUM LPPNPI CABANG PRATAMA PALANGKA RAYA


Pekerjaan : PEMBANGUNAN GEDUNG BARU AIRNAV
Lokasi : Gedung Tower Bandar Udara Tjilik Riwut Palangka Raya
Jl. Adonis Samad Palangka Raya
Tahun Anggaran :

NO. URAIAN PEKERJAAN ANALISA VOLUME

1 2 3 4

A. PEKERJAAN PENDAHULUAN
1 Pek. Perencanaan Ls 1.000 Pkt
2 Pek. Pembongkaran tempat parkir, pembersihan awal Ls 1.000 Pkt
3 Pek. Pengukuran dan pemasangan bouwplank A. 2.2.1.4 215.484 M2
4 Pembuatan papan nama kegiatan Ls 1.000 Bh
SUB JU

B. PEKERJAAN TANAH
1 Pek. Galian tanah untuk pondasi A. 2.3.1.2 52.608 M3
2 Pek. Galian tanah untuk sloof A. 2.3.1.1 17.443 M3
3 Urugan kembali tanah galian A. 2.3.1.9 17.536 M3
4 Pek. Pemasangan kayu galam pjg. 4 m' Ls 144.000 Btg
5 Urugan pasir bawah pondasi tbl. 3 cm A. 2.3.1.11 0.756 M3
6 Urugan pasir bawah lantai tbl. 5 cm A. 2.3.1.11 6.917 M3
SUB JU

C. PEKERJAAN BETON BERTULANG


1 Pek. Cor lantai kerja pondasi tbl. 7 cm A. 4.1.1.4 1.764 M3
2 Pek. Cor lantai tumbuk bawah lantai tbl. 7 cm A. 4.1.1.7 9.683 M3
3 Pek. Pondasi footplate uk. 120x120x25 cm
Pek.
· A. 4.1.1.17.a 458.456 Kg
Pembesian
Pek.
· A. 4.1.1.20 76.800 M2
Bekesting
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 5.760 M3
4 Pek. Pondasi footplate uk. 60x60x20 cm
· Pek. Pembesian A. 4.1.1.17.a 37.510 Kg
NO. URAIAN PEKERJAAN ANALISA VOLUME

1 2 3 4
· Pek. Bekesting A. 4.1.1.20 14.400 M2
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 0.432 M3
5 Pek. Sloof uk. 30x50 cm
· Pek. Pembesian A. 4.1.1.17.a ### Kg
· Pek. Bekesting A. 4.1.1.21 140.043 M2
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 16.159 M3
6 Pek. Sloof uk. 20x30 cm
· Pek. Pembesian A. 4.1.1.17.a 190.393 Kg
· Pek. Bekesting A. 4.1.1.21 17.120 M2
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 1.284 M3
7 Pek. Kolom uk. 30x50 cm
· Pek. Pembesian A. 4.1.1.17.a ### Kg
· Pek. Bekesting A. 4.1.1.22 147.200 M2
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 13.800 M3
8 Pek. Kolom praktis uk. 11x11 cm A. 4.1.1.35 84.000 M'
NO. URAIAN PEKERJAAN ANALISA VOLUME

1 2 3 4
9 Pek. Balok lantai uk. 30x50 cm
· Pek. Pembesian A. 4.1.1.17.a ### Kg
· Pek. Bekesting A. 4.1.1.23 106.860 M2
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 12.330 M3
###
Pek. Balok lantai uk. 20x40 cm
· Pek. Pembesian A. 4.1.1.17.a 282.022 Kg
· Pek. Bekesting A. 4.1.1.23 24.500 M2
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 1.960 M3
###
Pek. Balok dak uk. 20x40 cm
· Pek. Pembesian A. 4.1.1.17.a 946.214 Kg
· Pek. Bekesting A. 4.1.1.23 82.200 M2
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 6.576 M3
###
Pek. Balok dak uk. 20x30 cm
· Pek. Pembesian A. 4.1.1.17.a 214.414 Kg
· Pek. Bekesting A. 4.1.1.23 19.280 M2
· Pek. Cor beton, f'c = 19,3 MPa (K 225) A. 4.1.1.11 1.446 M3
###
Pek. Balok gantung uk. 10x15 cm A. 4.1.1.36 1.000 M'
###
Pek. Plat lantai tbl. 12 cm A. 4.1.1.32 12.201 M3
###
Pek. Tangga dan bordes A. 4.1.1.32 4.615 M3
SUB JU

D. PEKERJAAN PASANGAN DINDING DAN PLESTERAN


1 Pas. Dinding 1/2 bata camp. 1 SP : 4 PP A. 4.4.1.9 570.358 M2
2 Pek. Plesteran tbl. 15 cm camp. 1 SP : 4 PP A. 4.4.2.4 ### M2
3 Pek. Acian dinding, kolom dan tangga A. 4.4.2.27 ### M2
4 Pas. Dinding Kaca berwarna (Tinted Glass) tbl 10 Ls 159.460 M2
mm + rangka alumunium
5 Pas. Dinding batu alam jenis Andesit Alur A. 4.4.3.57 4.112 M2
6 Pas. Dinding batu alam jenis Batu Candi polos A. 4.4.3.58 24.760 M2
7 Pas. Glassblock uk. 20x20 cm Ls 270.000 Bh
SUB JU

E. PEKERJAAN KERAMIK DAN LANGIT-LANGIT


1 Pas. Keramik lantai, bodres dan trap tangga uk. 40 x A. 4.4.3.4 189.276 M2
2 Pas. Keramik lantai KM/WC uk. 20x20 cm A. 4.4.3.36 6.568 M2
3 Pas. Keramik dinding KM/WC uk. 20x20 cm A. 4.4.3.54 35.550 M2
NO. URAIAN PEKERJAAN ANALISA VOLUME

1 2 3 4
4 Pas. Plint keramik dinding KM/WC uk. 10x20 cm A. 4.4.3.39 23.700 M'
5 Pas. Step Nosing A. 4.4.3.21 80.000 M'
6 Pek. Rangka langit-langit hollow uk. 40x40x0,3 mm A.4.5.1.10 171.844 M2
7 Pas. Penutup langit-langit Gypsum Board tbl. 9 mm A.4.5.1.7.a 171.844 M2
SUB JU

F. PEKERJAAN PINTU DAN JENDELA RAYBAN RANGKA ALUMUNIUM


1 Pek. Pintu utama tipe PJ1 Ls 1.000 M2
2 Pek. Pintu geser tipe P1 Ls 8.000 M2
3 Pek. Pintu gudang dan ruang rapat tipe P2 Ls 2.000 M2
4 Pek. Pintu KM/WC tipe P3 Ls 6.000 M2
5 Pek. Pintu shaft tipe P4 Ls 1.000 M2
6 Pek. Jendela J1 Ls 2.000 M2
SUB JU
NO. URAIAN PEKERJAAN ANALISA VOLUME

1 2 3 4

G. PEKERJAAN CAT-CATAN
1 Pek. Mengecat dinding A.4.7.1.10 ### M2
2 Pek. Mengecat plafond A.4.7.1.4 171.844 M2
SUB JU

H. PEKERJAAN SANITASI DAN PLUMBING


1 Pekerjaan Sanitasi dan Aksesoris
· Pas. Closet duduk merk TOTO atau setara A. 5.1.1.1 5.000 Bh
· Pas. Jet shower Ls 5.000 Bh
· Pas. Shower bath Ls 5.000 Bh
· Pas. Wastafel merk TOTO atau setara A. 5.1.1.5 5.000 Bh
· Pas. Floor drain A. 5.1.1.14 5.000 Bh
2 Pekerjaan Septictank
· Pek. Galian pondasi A. 2.3.1.2 4.845 M3
· Pek. Pasang Dinding Bata Tebal 1/2 Bata Camp. 1 A. 4.4.1.9 12.150 M2
· Pek. Plesteran Tebal 15 mm Camp. 1 : 4 (satu sisi A. 4.4.2.4 18.225 M2
· Pek. Acian / Mengondrong A. 4.4.2.27 18.225 M2
· Pasang Pipa Air Limbah Padat Ø 4 " A. 5.1.1.32 8.000 M'
· Pasang Pipa Air Limbah Cair Ø 2 " A. 5.1.1.29 8.000 M'
SUB JU

I. PEKERJAAN ELEKTRIKAL
1 Pas. Titik instalasi lampu SL 20 Watt Fitting DownlighSNI LISTRIK 02 27.000 Bh
2 Pas. Stop kontak lengkap dengan instalasi SNI LISTRIK 03 20.000 Bh
3 Pas. Instalasi saklar tunggal SNI LISTRIK 04 20.000 Bh
4 Pas. Instalasi saklar ganda SNI LISTRIK 05 7.000 Bh
5 Pas. Box panel SNI LISTRIK 06 1.000 Bh
SUB JU

J. PEKERJAAN LAIN-LAIN
1 Pek. Papan nama instansi Letter timbul plat Acrylic Ls 1.000 Bh
2 Pek. Railing tangga Ls 12.507 M'
3 Waterproofing Ls 101.675 M2
SUB JU
ANGGARAN BIAYA
(RAB)

ar Udara Tjilik Riwut Palangka Raya

HARGA SATUAN JUMLAH


(Rp) (Rp)
5 6

3,500,000.00 3,500,000.00
709,000.00 709,000.00
79,496.34 17,130,173.43
300,000.00 300,000.00
SUB JUMLAH A 21,639,173.43

104,729.63 5,509,616.11
84,170.63 1,468,167.17
28,056.88 492,005.36
15,600.00 2,246,400.00
132,074.25 99,848.13
132,074.25 913,516.64
SUB JUMLAH B 10,729,553.42

2,135,940.58 3,767,799.19
2,373,229.65 22,980,851.30

17,971.80 8,239,273.79
212,208.15 16,297,585.92
2,475,829.58 14,260,778.40

17,971.80 674,124.52
HARGA SATUAN JUMLAH
(Rp) (Rp)
5 6
212,208.15 3,055,797.36
2,475,829.58 1,069,558.38

17,971.80 28,366,450.10
225,894.90 31,634,886.53
2,475,829.58 40,006,311.28

17,971.80 3,421,701.39
225,894.90 3,867,320.69
2,475,829.58 3,178,965.19

17,971.80 24,225,698.85
409,874.85 60,333,577.92
2,475,829.58 34,166,448.25
102,460.05 8,606,644.20
HARGA SATUAN JUMLAH
(Rp) (Rp)
5 6

17,971.80 21,645,135.28
418,086.90 44,676,766.13
2,475,829.58 30,526,978.76

17,971.80 5,068,450.89
418,086.90 10,243,129.05
2,475,829.58 4,852,625.98

17,971.80 17,005,169.92
418,086.90 34,366,743.18
2,475,829.58 16,281,055.34

17,971.80 3,853,411.38
418,086.90 8,060,715.43
2,475,829.58 3,580,049.58
132,078.29 132,078.29
7,018,015.79 85,626,810.59
7,018,015.79 32,390,950.05
SUB JUMLAH C ###

132,626.92 75,644,770.36
70,245.95 80,130,617.20
43,882.78 50,220,666.03
685,000.00 109,230,100.00
424,463.94 1,745,395.74
424,463.94 10,509,727.25
34,500.00 9,315,000.00
SUB JUMLAH D ###

236,495.69 44,762,957.73
256,329.15 1,683,492.96
296,267.32 10,532,303.14
HARGA SATUAN JUMLAH
(Rp) (Rp)
5 6
33,493.27 793,790.44
33,205.52 2,656,441.80
367,728.90 63,191,894.77
53,026.56 9,112,280.53
SUB JUMLAH E ###

1,575,000.00 1,575,000.00
476,000.00 3,808,000.00
320,000.00 640,000.00
290,000.00 1,740,000.00
100,000.00 100,000.00
42,000.00 84,000.00
SUB JUMLAH F 7,947,000.00
HARGA SATUAN JUMLAH
(Rp) (Rp)
5 6

47,488.99 54,171,407.02
55,878.90 9,602,436.93
SUB JUMLAH G ###

3,575,412.83 17,877,064.13
107,470.00 537,350.00
250,000.00 1,250,000.00
1,297,081.17 6,485,405.85
86,249.63 431,248.13

104,729.63 507,415.03
132,626.92 1,611,417.05
70,245.95 1,280,232.35
43,882.78 799,763.69
114,559.03 916,472.20
50,953.18 407,625.40
SUB JUMLAH H ###

409,386.75 11,053,442.25
415,160.25 8,303,205.00
393,537.75 7,870,755.00
396,230.50 2,773,613.50
1,058,845.25 1,058,845.25
SUB JUMLAH I ###

3,550,000.00 3,550,000.00
480,000.00 6,003,264.00
120,000.00 12,201,000.00
SUB JUMLAH J ###
### ###
### ###

NO. URAIAN PEKERJAAN

1 2
### ###
1 ###
2 ###
3 ###
4 ###

### ###
### ###
2 ###
### ###

### ###
### ###

### ###
### Pek. Sloof uk. 20/30
· Pek. Perakitan dan pembesian
Tulangan
Cincin

· Pek. Bekesting
· Pek. Beton fc' = 16,9 Mpa (K200)
2 Pek. Kolom praktis KP uk. 11/11 cm
Tulangan
Cincin
3 Pek. Ringbalk uk. 15/20 cm
1 Pek. Perakitan dan pembesian
Tulangan
Cincin
2 Pek. Bekesting
3 Pek. Beton fc' = 16,9 Mpa (K200)

### ###
### ###
Kusen Jendela
Kusen Pintu
Luas Dinding
### ###
### ###

### ###
### Pas. Keramik lantai uk. 40 x 40 cm

### ###
### ###
### ###
### ###
### ###
### ###
### ###

### ###
### ###
Kusen Jendela
Kusen Pintu
### ###
RENCANA ANGGARAN BIAYA

VOLUME Panjang x Lebar x Tinggi x Luas 1 x Luas 2 x

1.000 ###
17.900 M2 17.9
77.000 M2 7 11
27.000 M' 27

116.28 ### 20.4 1 5.7


1.0608 ### 20.4 0.8 0.0325
22.11 ### 11 6.7 0.3

1.7136 M3 20.4 0.8 0.105

M3 0.2 0.3
108.140 Kg
66.266 17.9
41.874 1.1

6.56 M2 16.4 0.4


1.074 M2 17.9 0.2 0.3
114.941 Kg
71.6954 4.15
43.2457666667 0.7

82.245 Kg
44.177 17.9
38.067 1
7.16 M2 17.9 0.4
0.537 M3 17.9 0.15 0.2

91.98 M2 91.98
2.58
2.55
23.4 4.15 97.11
91.98 M2 91.98
91.98 M2 91.98

44.8 M2 44.8

183.064 M2 183.064
183.064 M2 7.7 23.77451
4 M' 4
44.8 M2 44.8
44.8 M2 44.8
27.4 M' 27.4

0.198 M3
0.162 8.1 0.05 0.1
0.036 7.2 0.05 0.1
2.3 M2 1 2.3
Luas 3 x Jumlah 1 x Jumlah 2 x Jumlah 3 x Kg

1 ###
Pkt
###

###
2 ###
###

###
6 0.617
119.3333333 0.319

###
###
###
4 7 0.617
27.66666667 7 0.319

###
4 0.617
119.3333333 0.319
###
###

###
4

###
###

###

###
###
###
###
###
###

###
4

###
NO. URAIAN PEKERJAAN
1 2
### ###
### Pas. Kunci tanam pintu
### Pas. Engsel pintu
### Pas. Grendel pintu

### ###
### #REF!
### #REF!
Kusen Jendela
Kusen Pintu
Daun Pintu
### #REF!

### ###
### ###
### ###
### ###
### ###
### ###
1.00 Bh
1.00 Bh
1.00 Bh

91.98
41.9 M2
32.4 M2 8.1
7.2 M2 7.2
2.3 M2 1 2.3
129.1 M2 129.1

1.00
4.00
1.00
1.00
2.00
1 ###
1 ###
1 ###

###
###
4

###

###
###
###
###
###
### #REF!
### #REF!

No.

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###
REKAPITULASI RENCANA ANGGARAN BIAYA

URAIAN PEKERJAAN

JUMLAH TOTAL

DIBULATKAN

TERBILANG : ## ##
### ###
### ###

NO. URAIAN PEKERJAAN VOLUME

1 2
### ###
1 ### 1.000 ###
2 ### 17.900 M2
3 ### 77.000 M2
4 ### 27.000 M'

### ###
### Pek. Galian tanah pondasi Footplate
Footplate 1 42.336
Footplate 2 8.064
Footplate 3 4.2
2 Pek. Urugan Kembali 17.688 ###
### Pek. Urugan tanah urug 22.11 ###

### ###
1 Pek. Pondasi Foot Plate FP1 100x100x30
· Pek. Perakitan dan pembesian 589.12 Kg
Horisontal 294.56
Vertical 294.56
· Pek. Bekesting 16.8 M2
· Pek. Beton fc' = 16,9 Mpa (K200) 4.2 M3
2 Pek. Pondasi Foot Plate FP2 100x100x30
· Pek. Perakitan dan pembesian 462.88 Kg
Horisontal 231.44
Vertical 231.44
· Pek. Bekesting 13.2 M2
· Pek. Beton fc' = 16,9 Mpa (K200) 3.3
3 Pek. Pondasi Foot Plate FP3 80x80x25
· Pek. Perakitan dan pembesian 235.648
Horisontal 117.824
Vertical 117.824
· Pek. Bekesting 5.6
· Pek. Beton fc' = 16,9 Mpa (K200) 1.12

### ###
### Pek. Sloof uk. 20/30 (S1)
· Pek. Perakitan dan pembesian 1072.677 Kg
Tulangan
Horisoltal 681.696
Vertical 96.100

Cincin 294.881
· Pek. Bekesting 53.64 M2
· Pek. Beton fc' = 16,9 Mpa (K200) 5.364 M3

2 Pek. Kolom K1 uk. 25/40 cm


Pek. Perakitan dan pembesian 1392.931 Kg
Tulangan 1078.090
Cincin 314.841
Pek. Bekesting 111.020
Pek. Beton fc' = 16,9 Mpa (K200) 8.540

3 Pek. Kolom K2 uk. 25/30 cm


1 Pek. Perakitan dan pembesian 1078.431
Tulangan 808.567
Cincin 269.864
2 Pek. Bekesting 93.94 M2
3 Pek. Beton fc' = 16,9 Mpa (K200) 6.405 M3
4 Pek. Kolom praktis KP uk. 11/11 cm 1.21 M1
5 Pek. Balok induk BI uk. 25/50 cm
Pek. Perakitan dan pembesian 3032.92946667 Kg
Tulangan
Horisontal 1249.776
Vertikal 1190.759
Cincin
Horisontal 303.36
Vertikal 289.035
Pek. Bekesting 140.6 M2
Horisontal 72
Vertikal 68.6
Pek. Beton fc' = 16,9 Mpa (K200) 17.575 M3
Horisontal 9
Vertikal 8.575

6 Pek. Balok anak BA uk. 25/35 cm


Pek. Perakitan dan pembesian 2103.376
Tulangan
Horisontal 506.88
Vertikal 482.944
Cincin
Horisontal 570.24
Vertikal 543.312
Pek. Bekesting 105.28
Horisontal 50.4 m2
Vertikal 54.88 m2

Pek. Beton fc' = 16,9 Mpa (K200) 13.16


Horisontal 6.3
Vertikal 6.86

7 Pek. Listplank beton LP uk. 10/80 cm


Pek. Perakitan dan pembesian 412.608
Horisontal 412.608
Pek. Bekesting 38.4 M2
Pek. Beton fc' = 16,9 Mpa (K200) 1.92 M3
8 Pek. Plat lantai t = 12 cm
Pek. Perakitan dan pembesian
Tulangan 5454.367
Horisontal 4715.52
Vertical 738.846666667

Pek. Bekesting 228 M2


Pek. Beton fc' = 16,9 Mpa (K200) 27.36 M3
9 Pek. Ringbalk uk. 15/20 cm 551.876
Pek. Perakitan dan pembesian 340.156
Tulangan
Horisontal 176.832
Vertical 163.324

Cincin 211.72
Horisontal 151.68
Vertical 60.04
Pek. Bekesting 55.4 M2
Pek. Beton fc' = 16,9 Mpa (K200) 4.155 m3
10 Pek. Tangga
Pek. Perakitan dan pembesian 206
Pek. Bekesting 14
Pek. Beton fc' = 16,9 Mpa (K200) 1.5
11 Pek. Bordes t = 12 cm
Pek. Perakitan dan pembesian 20.56
Pek. Bekesting 6
Pek. Beton fc' = 16,9 Mpa (K200) 0.72
### ###
### ### 310.55 M2
Kusen Jendela 38.7
Kusen Pintu 7.65
Luas Dinding
### ### 310.55 M2
### ### 310.55 M2

### ###
### Pas. Keramik lantai uk. 40 x 40 cm 228 M2

### ###
### ### 183.064 M2
### ### 183.064 M2
### ### 4 M'
### ### 228 M2
### ### 228 M2
### ### 27.4 M'

### ###
### ### 0.198 M3
Kusen Jendela 0.162
Kusen Pintu 0.036
### ### 2.3 M2
RENCANA ANGGARAN BIAYA

Panjang x Lebar x Tinggi x Luas 1 x Luas 2 x Luas 3 x

17.9
7 11
27

1.2 1.2 1.4


1.2 1.2 1.4
1 1 1.4
0 0.8 0.0325
11 6.7 0.3

13.333
13.333
4 0.3
1 1 0.3

13.333
13.333
4 0.3
1 1 0.3
10.667
10.667
3.2 0.25
0.8 0.8 0.25

24
1.45

1.1
29.8 0.6
29.8 0.2 0.3

6.1
1.4
1.3 6.1
0.25 0.4 6.1

6.1
1.2
1.1 6.1
0.25 0.3 6.1
0.11 0.11 4

24
9.8

1.6
1.6

24 1
9.8 1

24 0.25 0.5
9.8 0.25 0.5

24
9.8

1.35
1.35

24 0.7
9.8 0.7

24 0.25 0.35
9.8 0.25 0.35

42
24 1.6
24 0.1 0.8

24
9.5

24 9.5
24 9.5 0.12
24
9.5

0.8
0.8
138.5 0.4
138.5 0.15 0.2
310.55
2.58
2.55
86 4.15 356.9
310.55
310.55

228

183.064
7.7 23.77451
4
228
228
27.4

8.1 0.05 0.1


7.2 0.05 0.1
1 2.3
Jumlah 1 x Jumlah 2 x Jumlah 3 x Kg

1 ###
Pkt
###

###
21
4
3
2 ###
###

14 1.578
14 1.578
14
14

11 1.578
11 1.578
11
11
7 1.578
7 1.578
7
7

###

6 3 1.578
6 7 1.578

169.6666667 4 0.395
3 ###
3 ###

###

8 14 1.578
40.66666667 14 0.395
14
14

###
6 14 1.578
40.66666667 14 0.395
14 ###
14 ###
25

11 3 1.578
11 7 1.578

160 3 0.395
65.33333333 7 0.395

3
7

3
7

8 3 0.88
8 7 0.88

160 3 0.88
65.33333333 7 0.88

3
8

3 0.88
8 0.88

5.333333333 3 0.614

160 2 0.614
63.33333333 2 0.614
4 3 0.614
4 7 0.614

160 3 0.395
63.33333333 3 0.395
###
15
3

###
###

###

###
###
###
###
###
###

###
4

###
NO. URAIAN PEKERJAAN
1 2
### ###
### Pas. Kunci tanam pintu 1.00 Bh
### Pas. Engsel pintu 1.00 Bh
### Pas. Grendel pintu 1.00 Bh

### ###
### #REF!
### #REF! 41.9 M2
Kusen Jendela 32.4 M2
Kusen Pintu 7.2 M2
Daun Pintu 2.3 M2
### #REF! 129.1 M2

### ###
### ### 1.00
### ### 4.00
### ### 1.00
### ### 1.00
### ### 2.00
310.55

8.1
7.2
1 2.3
129.1
1 ###
1 ###
1 ###

###
###
4

###

###
###
###
###
###
REKAPI

### #REF!
### #REF!

No.

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###
REKAPITULASI RENCANA ANGGARAN BIAYA

URAIAN PEKERJAAN

JUMLAH TOTAL

DIBULATKAN

TERBILANG : ## ##
RENCANA ANGGARAN BIAYA

### ###
### ###

NO. URAIAN PEKERJAAN ANALISA

1 2 3
### ###
### ### Ls
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### Ls
### ### #REF!

### ###
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!

### ###
### ###
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
### ###
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
### ###
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
### ###
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
### ###
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
· #REF! #REF!
### ###
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ### #REF!
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ###
####REF! #REF!
####REF! #REF!
####REF! #REF!
### ###
#REF! #REF!
#REF! #REF!
#REF! #REF!

### ###
### ### #REF!
### ### #REF!
### ### #REF!

### ###
### ### #REF!

### ###
### ### Ls
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!

### ###
### ### #REF!
### ### #REF!
CANA ANGGARAN BIAYA

HARGA SATUAN JUMLAH


VOLUME
(Rp) (Rp)
4 5 6

#REF! ### 584,000.00 #REF!


368.70 ### Err:504 Err:504
368.70 ### Err:504 Err:504
290.65 ### Err:504 Err:504
#REF! ### Err:504 #REF!
41.60 ### Err:504 Err:504
#REF! ### Err:504 #REF!
#REF! ### Err:504 #REF!
77.77 ### Err:504 Err:504
#REF! ### Err:504 #REF!
71.60 ### Err:504 Err:504
67.67 ### Err:504 Err:504
1.00 Pkt 5,000,000.00 5,000,000.00
136.60 ### Err:504 Err:504

JUMLAH A #REF!

21.32 ### Err:504 Err:504


19.59 ### Err:504 Err:504
42.34 ### Err:504 Err:504
8.06 ### Err:504 Err:504
4.20 ### Err:504 Err:504
31.84 ### Err:504 Err:504
20.30 ### Err:504 Err:504
6.06 ### Err:504 Err:504

JUMLAH B Err:504
1.94 ### Err:504 Err:504
0.97 ### Err:504 Err:504
8.16 ### Err:504 Err:504

1.78 ### Err:504 Err:504


0.89 ### Err:504 Err:504
7.50 ### Err:504 Err:504

3.02 ### Err:504 Err:504


1.51 ### Err:504 Err:504
1,159.44 ### Err:504 Err:504
25.20 ### Err:504 Err:504
6.30 ### Err:504 Err:504

0.58 ### Err:504 Err:504


0.29 ### Err:504 Err:504
220.85 ### Err:504 Err:504
4.80 ### Err:504 Err:504
1.20 ### Err:504 Err:504

0.30 ### Err:504 Err:504


0.15 ### Err:504 Err:504
139.13 ### Err:504 Err:504
3.60 ### Err:504 Err:504
0.90 ### Err:504 Err:504

JUMLAH C Err:504
3.35 ### Err:504 Err:504
1.68 ### Err:504 Err:504
991.44 ### Err:504 Err:504
50.28 ### Err:504 Err:504
5.03 ### Err:504 Err:504

#REF! ### Err:504 #REF!


#REF! ### Err:504 #REF!
#REF! ### Err:504 #REF!

#REF! ### Err:504 #REF!


#REF! ### Err:504 #REF!
#REF! ### Err:504 #REF!
72.00 ### Err:504 Err:504

#REF! ### Err:504 #REF!


#REF! ### Err:504 #REF!
17.58 ### Err:504 Err:504

2,033.00 ### Err:504 Err:504


120.00 ### Err:504 Err:504
21.68 ### Err:504 Err:504

276.00 ### Err:504 Err:504


68.80 ### Err:504 Err:504
3.44 ### Err:504 Err:504

3,553.00 ### Err:504 Err:504


216.00 ### Err:504 Err:504
25.92 ### Err:504 Err:504

527.00 ### Err:504 Err:504


61.82 ### Err:504 Err:504
3.37 ### Err:504 Err:504

206.00 ### Err:504 Err:504


14.00 ### Err:504 Err:504
1.50 ### Err:504 Err:504
20.56 ### Err:504 Err:504
6.00 ### Err:504 Err:504
0.72 ### Err:504 Err:504

JUMLAH D Err:504

296.91 ### Err:504 Err:504


593.82 ### Err:504 Err:504
593.82 ### Err:504 Err:504

JUMLAH E Err:504

220.80 ### Err:504 Err:504

JUMLAH F Err:504

- ### 253,600.00 -
375.29 ### Err:504 Err:504
21.13 ### Err:504 Err:504
216.00 ### Err:504 Err:504
216.00 ### Err:504 Err:504
66.00 ### Err:504 Err:504

JUMLAH G Err:504

0.25 ### Err:504 Err:504


6.30 ### Err:504 Err:504

JUMLAH H Err:504
NO. URAIAN PEKERJAAN ANALISA
1 2 3
### ###
### ### #REF!
### ### #REF!
### ### #REF!

### ###
### #REF! #REF!

### #REF! #REF!

### #REF! #REF!

### ###
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
### ### #REF!
HARGA SATUAN JUMLAH
VOLUME
(Rp) (Rp)
4 5 6

9.00 ### Err:504 Err:504


27.00 ### Err:504 Err:504
9.00 ### Err:504 Err:504

JUMLAH I Err:504

593.82 ### Err:504 Err:504

49.56 ### Err:504 Err:504

216.00 ### Err:504 Err:504

JUMLAH J Err:504

3.00 ### Err:504 Err:504


56.00 ### Err:504 Err:504
9.00 ### Err:504 Err:504
11.00 ### Err:504 Err:504
9.00 ### Err:504 Err:504

JUMLAH L Err:504
REKAPITULASI RENCANA ANGGARAN BIAYA

### #REF!
### #REF!

No. URAIAN PEKERJAAN

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

### ###

JUMLAH TOTAL

DIBULATKAN

TERBILANG : ## Satu Milyar Seratus Empat Puluh Tiga Juta Delapan Ratus Semb
SI RENCANA ANGGARAN BIAYA

JUMLAH
AN PEKERJAAN
(Rp)

#REF!

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

AH TOTAL #REF!

ULATKAN #REF!

Puluh Tiga Juta Delapan Ratus Sembilan Puluh Tiga Juta Rupiah ##
REKAPITULASI
RENCANA ANGGARAN BIAYA

Kementerian Negara/Le : PERUM LPPNPI CABANG PRATAMA PALANGKA RAYA


Pekerjaan : PEMBANGUNAN GEDUNG BARU AIRNAV
Lokasi : Gedung Tower Bandar Udara Tjilik Riwut Palangka Raya
Jl. Adonis Samad Palangka Raya
Tahun Anggaran :

NO. URAIAN PEKERJAAN

A. PEKERJAAN PENDAHULUAN

B. PEKERJAAN TANAH

C. PEKERJAAN BETON BERTULANG

D. PEKERJAAN PASANGAN DINDING DAN PLESTERAN

E. PEKERJAAN KERAMIK DAN LANGIT-LANGIT

F. PEKERJAAN PINTU DAN JENDELA RAYBAN RANGKA ALUMUNIUM

G. PEKERJAAN CAT-CATAN

H. PEKERJAAN SANITASI DAN PLUMBING

I. PEKERJAAN ELEKTRIKAL

J. PEKERJAAN LAIN-LAIN

JUMLAH
PEMBULATAN
PPN 10%
JUMLAH TOTAL

TERBILANG : ## SATU MILIAR EMPAT RATUS TIGA BELAS JUTA LIMA RATUS RIBU RUPIAH #
IAYA

ALANGKA RAYA

wut Palangka Raya

JUMLAH

Rp 21,639,173.43

Rp 10,729,553.42

Rp626,463,843.12

Rp336,796,276.57

Rp132,733,161.36

Rp 7,947,000.00

Rp 63,773,843.95

Rp 32,103,993.82

Rp 31,059,861.00

Rp 21,754,264.00

###
###
Rp128,500,000.00
###

LIMA RATUS RIBU RUPIAH ##


SECT TUL POKOK SENGK BESI
1 FP 100.100.30 14 Ø 14 Ø
2 K POND 20 40 6 Ø 14 Ø 8 130.30 Kg/m3
3 K POND 20 30 6 Ø 12 Ø 8 132.84 Kg/m3
4 SLOOF 20 30 6 Ø 12 Ø 8 132.84 Kg/m3
5 K1 20 40 8 Ø 14 Ø 8 160.56 Kg/m3
6 K2 20 20 6 Ø 12 Ø 8 186.09 Kg/m3
20 30 6 Ø 14 Ø 8 164.95 Kg/m3
7 B1 20 30 6 Ø 14 Ø 8 164.95 Kg/m3
8 B2 15 20 4 Ø 12 Ø 6 153.15 Kg/m3

0.25
T BH
20
1.1 14
1.1 1

3.85 14
3.85 4
3.325 2
PERUM LPPNPI
CABANG PRATAMA PALANGKA
RAYA

RENCANA ANGGARAN BIAYA

PEKERJAAN
: PEMBANGUNAN GEDUNG BARU AIRNAV

LOKASI
: Gedung Tower Bandar Udara Tjilik Riwut Palangka Raya
Jl. Adonis Samad Palangka Raya

TAHUN ANGGARAN 2017