Company: Eneva
Location: Jaguatirica
Facility: Jaguatirica II
PHA Method: HAZOP
PHA Type: Initial
Process:
Combined Cycle Ge
File Description:
Date:
Process Description:
Chemicals:
Purpose:
Scope:
Objectives:
0.3. No flow of 0.3.1. manual valve closed 0.3.1.1. air leakage into the 0.4. lock open the sealwater
sealwater to the pump . Condensate valves 18LCW11/12/13
pump contamination with oxygen AA001
18LCB11/12/13
AP001 0.5. Include transmitter with
low pressure alarm in line
18LGW10BR002 (sealwater
header)
0.4. Less Flow 0.4.2. Minimum flow 0.4.2.1. Insuficient condensate 0.6. Techint will study this
recirculation loop feed to boilers and production and make a proposal
18LCB40AA101 control failure loss
0.4.4. Manual valve closed at 0.4.4.1. Pump damage 0.7. 18LCB11/12/13 AP001
18LCB11/12/13 AP001 pumps Pumps suction valves should
suction be locked open
1.8. More flow in 1.8.1. control loop 1.8.1.1. Loss of efficiency in 1.2. implement an alarm
cold bypass 11LAB90AA101 failure steam cycle when the valve
11LAB90AA101 position
differs with the control loop
command
3.5. Less Flow 3.5.2. Minimum flow 3.5.2.1. Insuficient condensate 3.2. each pump will hav a
recirculation loop control failure feed to boilers and production minimum flow protection loop
loss according to contract
specifications
3.5.4. Manual valve closed at 3.5.4.1. Pump damage 3.3. Pumps suction valves
pumps suction should be locked open
13.4.2. Manual valve closed 13.4.2.1. Damage to cooled 13.3. Include low flow alarm
10PGB50AA001 or equipment in 10PGB20CF001
10PGB10AA001 at air cooler
13.6.3. Control loop failure 13.6.3.1. Damage to cooled 13.5. Study temperature
10PGB10CT001 equipment control architecture in
10PGB10AH001 to reduce
possibility of complete loss of
cooling in case of control
malfunction
14.3. Higher Level 14.3.1. 18LFC10DL001 control 14.3.1.1. overflow of 14.2. Overflow of condensate
failure condensate to drain system from 18LFC10BB001 will be
directed to 11LCQ20BB001
because of probability of high
temperature
25.8. More Flow 25.8.1. PCV31131 failing open 25.8.1.1. Excess flow through 25.4. Study including closure
vaporizer and possible liquid in of SDV 31116 in this safety
the outlet line and liquid to gas loop
turbine
27.1.4. Closure of SDVs at 27.1.4.1. Increase in isotanks 27.2. Compressor shall stop
compressor discharge pressure up to pressurization on high discharge pressure
gas pressure. No hazardous
consequence
27.1.5. Closure of manual valve 27.1.5.3. Compressor damage 27.3. Compressor shall stop
at compressor suction BFE on low suction pressure
40102, 40101
27.1.6. Closure of SDV at 27.1.6.3. Compressor damage 27.4. Compressor shall stop
compressor suction on low suction pressure
27.2. Lower 27.2.1. suction pressure control 27.2.1.1. compressor damage. 27.5. Compressor shall stop
Pressure loop fails with valve closed No tanks damage is on low suction pressure
considered possible
27.4. Higher 27.4.1. interstage air cooler 27.4.1.1. compressor damage 27.8. Compressor will stop on
Temperature fans failure high interstage temperature
28.4.3. Manual valve closed in 28.4.3.2. lack of vaporization 28.3. Study including closure
the circuit 30EKT10/20AA001or capacity. Liquid to of SDV 31116 in this safety
BF-91011 or BF 91003 or BF- turbine.Possible piping loop
91020/22, or BF-91043/44 or damage for low temperature
BF-91042 downstream vaporizer
28.6. Less Flow 28.6.3. TT-31117 TV-31117 28.6.3.1. lack of vaporization 28.5. Study including closure
Temperature control failure capacity. Liquid to turbine of SDV 31116 in this safety
failure or manual valve closed loop
in these lines BFE-31009,BFE-
31011 or BFE-31014
39.2.2. PCV 42450or 39.2.2.1. fuel gas regulator in 39.2. heaters must have a
PCV42500 fail open heaters out of range of inlet pressure regulator
pressure uncontrolled
combustion heaters damage