1. Consequence analysis will aid in preparation of


a) Risk ranking of equipment
b) To understand the probability of failures
c) To understand about equipment history

2. Method used for consequence analysis should demonstrate the ability to provide
a) Just an analysis
b) No out put is required
c) The required level of discrimination between higher and lower consequence equipment items.

3. Loss of containment is
a) Loss of fluid to the external environment.
b) Container loss at the port authority.
c) Risk related to containers.
d) B & C

4. Which of the following measures are not covered under consequence analysis?
a) Safety
b) Cost
c) Affected area
d) Environment damage
e) None of the above.

5. Affected area in the consequence analysis is


a) The amount of surface area that experience an effect greater than pre limiting value.
b) The amount of surface area that experience an effect lesser than pre limiting value
c) Area near the failure area.
d) None of the above.

6. RBI program typically focuses on


a) Acute toxic risks that create immediate danger rather than chronic risks from low level exposure.
b) Only deals the chronic risks.
c) Low level risks and less toxic consequences.

7. RBI program will not consider the following release of common liquids such as
a) Hot water, Steam
b) Acids
c) Caustics.
d) None of the above.

8. The main Production consequences for RBI are


a) Financial.
b) Failures.
c) Equipment deterioration
Page 2 of 2

Questionnaire
RBI - QUIZ – 2

Name:____________________________________________ Date:_____________
Please circle or tick the correct one. Please note that there is only one correct answer.

9. Maintenance impact in RBI program will be generally be measured in monitory terms and typically
includes
a) Repair
b) Equipment replacement.
c) A & B

10. Risk is calculated as product of


a) Probability X consequences
b) Consequence X rate of deterioration
c) Life of equipment X consequences

11. Users across the world will refer for more information on Risk acceptance.
a) ASME sec VIII
b) API 579, fitness for purpose.
c) A comparison of criteria for acceptance of Risk by Pressure vessel research council (PVRC).
d) None of the above.

12. Inspection and maintenance planning using risk assessment will follow
a) Items/ equipment require inspection
b) Inspection Technique
c) Extent of inspection.
d) All the above.

13. Sensitivity analysis will help in improving the risk analysis.


a) Quality and accuracy
b) Benefit cannot be achieved.
c) Will drastically adverse the quality and accuracy.

14. General way of communicating the risk analysis is


a) Risk analysis comprehensive report
b) Using a risk matrix
c) This is confidential and to be used by only team.

15. Different weighting is given to consequence category than probability


a) Will be symmetrical matrix
b) Will be asymmetrical matrix
c) Having no relation with the individual weighting.

16. Risks that are judged acceptable during RBI analysis


a) No mitigation may be required and no further action necessary.
b) Inspection monitoring is required.
c) Reevaluation is to be done about the facts by a team.

17. Following are the ways of risk mitigation during RBI Management
a) By Inspection/condition monitoring.
b) Consequence mitigation
c) Probability of mitigation
d) All the above.