RESUMEN DE METRADO DE REPLANTEO FINAL CONTRATO Nº 3 SECTOR A-13

OBRA : "AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO PARA SARGENTO LORENTZ - SEGUNDA ETAPA"
UBICACIÓN : A.H HACIA EL DESARROLLO
PLANO : A-13 A - 13

AGUA POTABLE

PUEBLO DIAMETRO EXCAVACION REFINE INSTALACION RELLENO PRUEBA HIDRAULICA ELIMINACION CONEXIÓN DOMICILIARIA
TN. TS TR TN. TS TR TN. TS TR TN. TS TR TN. TS TR TN. TS TR TN. TS TR

A.H HACIA 90 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10
DESARROLLO 110 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75
160 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40

TOTAL TUBERIA 90mm 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10
TOTAL TUBERIA 110mm 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75
TOTAL TUBERIA 160mm 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40

ALCANTARILLADO

PUEBLO DIAMETRO EXCAVACION REFINE INSTALACION PRUEBA HIDRAULICA RELLENO ELIMINACION CONEXIÓN DOMICILIARIA
TN. TS TR TN. TS TR TN. TS TR TN. TS TR TN. TS TR TN. TS TR TN. TS TR

A.H HACIA 160 0.00 12.10 697.92 0.00 12.10 697.92 0.00 12.45 709.32 0.00 12.45 709.32 0.00 12.10 697.92 0.00 12.10 697.92
DESARROLLO 200 0.00 89.15 90.20 0.00 89.15 90.20 0.00 91.35 92.80 0.00 91.35 92.80 0.00 89.15 90.20 0.00 89.15 90.20

TOTAL TUBERIA 160mm 0.00 12.10 697.92 0.00 12.10 697.92 0.00 12.45 709.32 0.00 12.45 709.32 0.00 12.10 697.92 0.00 12.10 697.92
TOTAL TUBERIA 200mm 0.00 89.15 90.20 0.00 89.15 90.20 0.00 91.35 92.80 0.00 91.35 92.80 0.00 89.15 90.20 0.00 89.15 90.20

BUZONETAS BUZONES

BUZONETAS TERRENO TERRENO TERRENO BUZONES TERRENO TERRENO TERRENO


TOTAL TOTAL
HASTA 1.00 NORMAL SEMIROCO ROCOSO HASTA 1.00 NORMAL SEMIROCO ROCOSO
A,H HACIA EL
DESARROLLO 0 0 39 39 0 6 8 14
TOTAL 0 0 39 39 TOTAL 0 6 8 14

CONEXIONES DE AGUA
ACCESORIOS
POTABLE

PUEBLOS TERRENO TERRENO TERRENO TIPO DE ACCESORIOS CANT. TIPO CANT.


TOTAL
NORMAL SEMIROCO ROCOSO VALV. COM 90 VALVULA DE
A,H HACIA EL VALV. COM 110 4 AIRE
DESARROLLO 0.00 5.00 65.00 70 TOTAL 4 TOTAL 1
TOTAL 0 5 65 70

EMPALME
CONEXIONES DE
ALCANTARILLADO
PARTIDA METRADO UND
PUEBLOS TERRENO TERRENO TERRENO EMPALME A CAMARA
TOTAL
NORMAL SEMIROCO ROCOSO REDUCTORA DE 2 UND
A.H PRESION
FORTALEZA 0.00 6.00 64.00 70
TOTAL 0 6 64 70
RED DE AGUA POTABLE: SECTOR A- 13

FORMATO DE METRADOS
RED DE AGUA POTABLE

OBRA : "AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO PARA SARGENTO LORENTZ - SEGUNDA ETAPA" HECHO POR : ESTEBAN VIVANCO HERNANDEZ
UBICACIÓN : A.G.F HACIA EL DESARROLLO REVISADO POR :
PLANO : A-13 FECHA :02-06-2008

TUBERIA : DN 75, 90 MM PVC-UF

UBICACIÓN EXCAVACION REFINE ENTUBADO 90" RELLENO PRUEBA HIDRAULICA ELIMINACION


CONEXIONES DOMICILIARIAS
TIPO SEMI SEMI SEMI
SUELO
A.A.H.H., PUEBLO,
URBANIZACION
CALLE TRAZO NORMAL ROCA ROCA TR TN SR TR NORMAL ROCA ROCA NORMAL ROCA ROCA
(m) (m) (m) TN SR (mm) (mm) (mm) (m) (m) (m) TN SR TR (m) (m) (m) TN SR TR
PJE. VOLCANES 31.20 TR 31.20 31.20 31.20 31.20 31.20 31.20
PJE. TULIPANES 33.30 TR 33.30 33.30 33.30 33.30 33.30 33.30
A.H HACIA EL 3.75 TR 3.75 3.75 3.75 3.75 3.75 3.75
DESARROLLO PASAJE GIRALDES 34.00 TR 34.00 34.00 34.00 34.00 34.00 34.00
1.90 TR 1.90 1.90 1.90 1.90 1.90 1.90
AV. IMPERIAL 14.00 SR 14.00 14.00 14.00 14.00 14.00 14.00
18.50 TR 18.50 18.50 18.50 18.50 18.50 18.50
0.90 TR 0.90 0.90 0.90 0.90 0.90 0.90
2.10 TR 2.10 2.10 2.10 2.10 2.10 2.10
1.25 TR 1.25 1.25 1.25 1.25 1.25 1.25
11.50 TR 11.50 11.50 11.50 11.50 11.50 11.50
1.10 TR 1.10 1.10 1.10 1.10 1.10 1.10
0.40 TR 0.40 0.40 0.40 0.40 0.40 0.40
5.40 TR 5.40 5.40 5.40 5.40 5.40 5.40
PJE. CIPRESES 57.00 TR 57.00 57.00 57.00 57.00 57.00 57.00
15.70 TR 15.70 15.70 15.70 15.70 15.70 15.70
3.50 TR 3.50 3.50 3.50 3.50 3.50 3.50
1.20 TR 1.20 1.20 1.20 1.20 1.20 1.20
PJE. ROBLES 60.55 TR 60.55 60.55 60.55 60.55 60.55 60.55
3.10 TR 3.10 3.10 3.10 3.10 3.10 3.10
1.65 TR 1.65 1.65 1.65 1.65 1.65 1.65
PJE. BELEN 17.20 TR 17.20 17.20 17.20 17.20 17.20 17.20
13.15 TR 13.15 13.15 13.15 13.15 13.15 13.15
PJE. S/N 13.20 TR 13.20 13.20 13.20 13.20 13.20 13.20
4.20 TR 4.20 4.20 4.20 4.20 4.20 4.20
PJE. OLIMPO 8.40 TR 8.40 8.40 8.40 8.40 8.40 8.40
26.50 TR 26.50 26.50 26.50 26.50 26.50 26.50
11.70 TR 11.70 11.70 11.70 11.70 11.70 11.70
3.40 TR 3.40 3.40 3.40 3.40 3.40 3.40
19.20 TR 19.20 19.20 19.20 19.20 19.20 19.20
17.10 TR 17.10 17.10 17.10 17.10 17.10 17.10
1.30 TR 1.30 1.30 1.30 1.30 1.30 1.30
3.60 TR 3.60 3.60 3.60 3.60 3.60 3.60
1.70 TR 1.70 1.70 1.70 1.70 1.70 1.70
33.80 TR 33.80 33.80 33.80 33.80 33.80 33.80
6.10 TR 6.10 6.10 6.10 6.10 6.10 6.10
0.80 TR 0.80 0.80 0.80 0.80 0.80 0.80
5.30 TR 5.30 5.30 5.30 5.30 5.30 5.30
3.45 TR 3.45 3.45 3.45 3.45 3.45 3.45
AV. PUNO 10.25 SR 10.25 10.25 10.25 10.25 10.25 10.25

TOTAL 502.35 0.00 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 0.00 0.00
UBICACIÓN EXCAVACION REFINE ENTUBADO 110" RELLENO PRUEBA HIDRAULICA ELIMINACION
CONEXIONES DOMICILIARIAS
TIPO SEMI SEMI SEMI
A.A.H.H., PUEBLO, SUELO
URBANIZACION
CALLE TRAZO NORMAL ROCA ROCA TR TN SR TR NORMAL ROCA ROCA NORMAL ROCA ROCA
(m) (m) (m) TN SR (mm) (mm) (mm) (m) (m) (m) TN SR TR (m) (m) (m) TN SR TR
AV. IMPERIAL 1.25 TR 1.25 1.25 1.25 1.25 1.25 1.25
1.25 TR 1.25 1.25 1.25 1.25 1.25 1.25
A.H HACIA EL 5.20 TR 5.20 5.20 5.20 5.20 5.20 5.20
DESARROLLO 16.50 TR 16.50 16.50 16.50 16.50 16.50 16.50
17.60 TR 17.60 17.60 17.60 17.60 17.60 17.60
3.80 TR 3.80 3.80 3.80 3.80 3.80 3.80
12.85 TR 12.85 12.85 12.85 12.85 12.85 12.85
3.50 TR 3.50 3.50 3.50 3.50 3.50 3.50
1.90 TR 1.90 1.90 1.90 1.90 1.90 1.90
0.80 TR 0.80 0.80 0.80 0.80 0.80 0.80
0.80 TR 0.80 0.80 0.80 0.80 0.80 0.80
0.40 TR 0.40 0.40 0.40 0.40 0.40 0.40
14.45 TR 14.45 14.45 14.45 14.45 14.45 14.45
0.80 SR 0.80 0.80 0.00 0.80 0.00 0.80 0.00 0.80 0.00 0.80 0.00
41.70 SR 41.70 41.70 41.70 41.70 41.70 41.70
0.90 SR 0.90 0.90 0.90 0.90 0.90 0.90
9.90 SR 9.90 9.90 9.90 9.90 9.90 9.90
0.70 SR 0.70 0.70 0.70 0.70 0.70 0.70
0.70 SR 0.70 0.70 0.70 0.70 0.70 0.70
7.35 SR 7.35 7.35 7.35 7.35 7.35 7.35
AV. PUNO 0.65 SR 0.65 0.65 0.65 0.65 0.65 0.65
5.70 SR 5.70 5.70 5.70 5.70 5.70 5.70
PJE. CIPRESES 0.50 TR 0.50 0.50 0.50 0.50 0.50 0.50
PJE. NOGALES 31.80 TR 31.80 31.80 31.80 31.80 31.80 31.80
36.30 TR 36.30 36.30 36.30 36.30 36.30 36.30
0.70 TR 0.70 0.70 0.70 0.70 0.70 0.70
0.45 TR 0.45 0.45 0.45 0.45 0.45 0.45
0.45 TR 0.45 0.45 0.45 0.45 0.45 0.45
0.70 TR 0.70 0.70 0.70 0.70 0.70 0.70
5.25 TR 5.25 5.25 5.25 5.25 5.25 5.25
PJE S/N (PARAL. A LA 37.10 TR 37.10 37.10 37.10 37.10 37.10 37.10
AV. PUNO) 9.90 TR 9.90 9.90 9.90 9.90 9.90 9.90
6.30 TR 6.30 6.30 6.30 6.30 6.30 6.30

TOTAL 278.15 0.00 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 0.00 0.00

UBICACIÓN EXCAVACION REFINE ENTUBADO 160" RELLENO PRUEBA HIDRAULICA ELIMINACION


CONEXIONES DOMICILIARIAS
TIPO
SEMI SEMI SEMI
A.A.H.H., PUEBLO, SUELO
URBANIZACION CALLE TRAZO NORMAL ROCA ROCA TR TN SR TR NORMAL ROCA ROCA NORMAL ROCA ROCA
(m) (m) (m) TN SR (mm) (mm) (mm) (m) (m) (m) TN SR TR (m) (m) (m) TN SR TR
PJE. LOS CEDROS 52.85 TR 52.85 52.85 52.85 52.85 52.85 52.85
2.15 TR 2.15 2.15 2.15 2.15 2.15 2.15
A.H HACIA EL 8.00 TR 8.00 8.00 8.00 8.00 8.00 8.00
DESARROLLO 21.80 SR 21.80 21.80 21.80 21.80 21.80 21.80
AV. IMPERIAL 0.50 TR 0.50 0.50 0.50 0.50 0.50 0.50
4.40 TR 4.40 4.40 4.40 4.40 4.40 4.40
13.50 TR 13.50 13.50 13.50 13.50 13.50 13.50
TOTAL 103.20 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 0.00 0.00

EXCAVACION REFINE ENTUBADO RELLENO PRUEBA ELIMINACION CONEX. DOMIC.


DIAM.
N SR R N SR R N SR R N SR R N SR R N SR R N SR R
90 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 24.25 478.10 0.00 0.00 0.00
110 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 68.40 209.75 0.00 0.00 0.00
160 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 21.80 81.40 0.00 0.00 0.00
TOTAL 0.00 92.65 687.85 0.00 92.65 687.85 0.00 92.65 687.85 0.00 92.65 687.85 0.00 92.65 687.85 0.00 92.65 687.85 0.00 0.00 0.00
RED DE ALCANTARILLADO: SAN RAMON DE PANGOA

FORMATO DE METRADOS
COLECTORES DE ALCANTARILLADO

OBRA : "AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO PARA SARGENTO LORENTZ - SEGUNDA ETAPA" HECHO POR : ESTEBAN VIVANCO HERNANDEZ
UBICACIÓN : A.H HACIA EL DESARROLLO REVISADO POR :
PLANO : A-13 FECHA :02-06-2008

PRUEBAS
BUZON COTAS DE TAPA COTAS DE FONDO ALTURA DE EXCAVACION LONG DEL TRAMO EXCAVACION SEGÚN TERRENO REFINE ENTUBADO RELLENO ELIMINACION CONEXIONES D
Tipo
PENDIENTE HORIZONTAL INCLINADA ZANJA EXC LONGITUD TUBERIA NIVELACI ALINEAMI P.HIFRAU
Suelo
DEL AL ARRIBA ABAJO ARRIBA ABAJO ARRIBA ABAJO PROMEDIO ENTRE EJE ENTRE EJE (no incl Diam. TUBERIA (DN) SR TR TN SR TR TN SR TR ON ENTO LICA TN
DE BUZON DE BUZON Buzon) PVC - U UF NORMAL SEMIROCA ROCA TN TN SR TR
PJE. SIN NOMBRE
BP-01 BP-02 826.70 822.20 825.50 820.10 1.20 2.10 1.65 7.42% 72.80 73.00 71.50 71.80 160 N 71.50 71.50 71.80 71.50 71.50 71.80
BP-02 BP-03 822.20 814.50 819.00 812.60 3.20 1.90 2.55 9.72% 65.82 66.13 64.63 64.93 160 N 64.63 64.63 64.93 64.63 64.63 64.93
BP-03 BP-07 814.50 810.00 812.60 808.80 1.90 1.20 1.55 6.42% 59.23 59.35 57.85 58.15 200 N 57.85 57.85 58.15 57.85 57.85 58.15
PJE. SIN NOMBRE
BP-28 BP-27 820.80 821.10 819.60 819.30 1.20 1.80 1.50 0.73% 40.86 40.86 39.36 39.66 160 N 39.36 39.36 39.66 39.36 39.36 39.66
BP-27 BP-02 821.10 822.20 819.30 819.00 1.80 3.20 2.50 0.73% 40.86 40.86 39.36 39.66 160 R 39.36 39.36 39.66 39.36 39.36 39.66
PJE. SIN NOMBRE
BP-02 BP-09 822.20 820.30 821.00 819.10 1.20 1.20 1.20 3.02% 62.82 62.85 61.35 61.65 160 R 61.35 61.35 61.65 61.35 61.35 61.65
PJE CIPRESES
Z-264 Z-265 18.82 17.92 18.22 160 R 17.92 17.92 18.22 17.92 17.92 18.22
Z-265 Z-271 16.80 15.90 16.20 160 R 15.90 15.90 16.20 15.90 15.90 16.20
Z-261 Z-262 8.38 7.48 7.78 160 R 7.48 7.48 7.78 7.48 7.48 7.78
Z-262 Z-263 10.35 9.45 9.75 160 R 9.45 9.45 9.75 9.45 9.45 9.75
Z-263 Z-263A 5.50 4.60 4.90 160 R 4.60 4.60 4.90 4.60 4.60 4.90
Z-263A BZ-371 2.20 0.95 1.30 160 R 0.95 0.95 1.30 0.95 0.95 1.30
PJE ROBLES 0.00
Z-268 Z-270 15.65 14.75 15.05 160 R 14.75 14.75 15.05 14.75 14.75 15.05
Z-270 Z-258 9.70 8.80 9.10 160 R 8.80 8.80 9.10 8.80 8.80 9.10
Z-258 Z-259 7.80 6.90 7.20 160 R 6.90 6.90 7.20 6.90 6.90 7.20
Z-259 Z-260 18.83 17.93 18.23 160 R 17.93 17.93 18.23 17.93 17.93 18.23
Z-260 Z-269A 7.55 6.65 6.95 160 R 6.65 6.65 6.95 6.65 6.65 6.95
Z-269A Z-269 5.30 4.40 4.70 160 R 4.40 4.40 4.70 4.40 4.40 4.70
Z-269 BZ-370 2.55 1.30 1.65 160 R 1.30 1.30 1.65 1.30 1.30 1.65
PJE BELEN
Z-258 Z-271 19.80 18.90 19.20 160 R 18.90 18.90 19.20 18.90 18.90 19.20
Z-271 Z-272 19.87 18.97 19.27 160 R 18.97 18.97 19.27 18.97 18.97 19.27
Z-298 Z-299 9.65 8.75 9.05 160 R 8.75 8.75 9.05 8.75 8.75 9.05
Z-299 Z-302 6.65 5.75 6.05 160 R 5.75 5.75 6.05 5.75 5.75 6.05
Z-302 BZ-303 12.00 10.75 11.10 160 R 10.75 10.75 11.10 10.75 10.75 11.10
PJE NOGALES
Z-266 Z-267 9.60 8.70 9.00 160 R 8.70 8.70 9.00 8.70 8.70 9.00
Z-267 Z-272 11.40 10.50 10.80 160 R 10.50 10.50 10.80 10.50 10.50 10.80
Z-272 Z-273 17.10 16.20 16.50 160 R 16.20 16.20 16.50 16.20 16.20 16.50
Z-273 BZ-372 15.95 14.70 15.05 160 R 14.70 14.70 15.05 14.70 14.70 15.05
PJE CEDROS
Z-274 Z-275 29.84 28.94 29.24 160 R 28.94 28.94 29.24 28.94 28.94 29.24
Z-275 Z-276 17.53 16.63 16.93 160 R 16.63 16.63 16.93 16.63 16.63 16.93
Z-276 Z-277 7.60 6.70 7.00 160 R 6.70 6.70 7.00 6.70 6.70 7.00
Z-277 BZ-373A 8.10 6.85 7.20 160 R 6.85 6.85 7.20 6.85 6.85 7.20
PJE OLIMPO 0.00
Z-278 Z-279 16.50 15.60 15.90 160 R 15.60 15.60 15.90 15.60 15.60 15.90
Z-279 Z-280 19.90 19.00 19.30 160 R 19.00 19.00 19.30 19.00 19.00 19.30
Z-280 BZ-373A 13.35 12.10 12.45 160 SR 12.10 12.10 12.45 12.10 12.10 12.45
BZ-373A BZ-373 27.40 25.80 26.20 200 SR 25.80 25.80 26.20 25.80 25.80 26.20
Z-300 Z-301 12.10 11.20 11.50 160 R 11.20 11.20 11.50 11.20 11.20 11.50
Z-301 Z-302 25.90 25.00 25.30 160 R 25.00 25.00 25.30 25.00 25.00 25.30
Z-282 BZ-283 4.95 3.70 4.05 160 R 3.70 3.70 4.05 3.70 3.70 4.05
BZ-283 BZ-375 9.55 7.95 8.35 200 R 7.95 7.95 8.35 7.95 7.95 8.35
AV. IMPERIAL
BZ-366 BZ-367 13.95 12.35 12.75 200 SR 12.35 12.35 12.75 12.35 12.35 12.75
BZ-367 BZ-368 18.55 16.95 17.35 200 R 16.95 16.95 17.35 16.95 16.95 17.35
BZ-368 BZ-369 9.35 7.75 8.15 200 R 7.75 7.75 8.15 7.75 7.75 8.15
BZ-369 BZ-370 15.10 13.50 13.90 200 R 13.50 13.50 13.90 13.50 13.50 13.90
BZ-370 BZ-371 17.25 15.65 16.05 200 R 15.65 15.65 16.05 15.65 15.65 16.05
BZ-371 BZ-372 20.20 18.60 19.00 200 R 18.60 18.60 19.00 18.60 18.60 19.00
BZ-372 BZ-373 14.15 12.55 12.95 200 SR/R 2.75 9.80 2.75 9.80 2.95 10.00 2.75 9.80 2.75 9.80 2.95 10.00
BZ-373 BZ-374 27.50 25.90 26.30 200 SR 25.90 25.90 26.30 25.90 25.90 26.30
BZ-374 BZ-375 8.35 6.75 7.15 200 SR 6.75 6.75 7.15 6.75 6.75 7.15
AV. PUNO
BZ-303 BZ-375 17.20 15.60 16.00 200 SR 15.60 15.60 16.00 15.60 15.60 16.00

948.82 889.37 905.92 0.00 101.25 788.12 0.00 101.25 788.12 0.00 103.80 802.12 0.00 101.25 788.12 0.00 101.25 788.12 0.00 103.80 802.12 0.00

EXCAVACION REFINE ENTUBADO PRUEBAS RELLENO ELIMINACION CONEX. DOMIC.


DIAM.
N SR R N SR R N SR R N SR R N SR R N SR R N SR R
160 12.10 697.92 12.10 697.92 12.45 709.32 12.45 709.32 12.10 697.92 12.10 697.92 0.00
200 89.15 90.20 89.15 90.20 91.35 92.80 91.35 92.80 89.15 90.20 89.15 90.20 0.00 0.00

TUB. 160mm 0.00 12.10 697.92 0.00 12.10 697.92 0.00 12.45 709.32 0.00 12.45 709.32 0.00 12.10 697.92 0.00 12.10 697.92 0.00 0.00 0.00
TUB. 200mm 0.00 89.15 90.20 0.00 89.15 90.20 0.00 91.35 92.80 0.00 91.35 92.80 0.00 89.15 90.20 0.00 89.15 90.20 0.00 0.00 0.00
LADO: SAN RAMON DE PANGOA

ORMATO DE METRADOS
CTORES DE ALCANTARILLADO

CONEXIONES DOMICILIARIAS

SR TR

0.00 0.00
RED DE ALCANTARILLADO BUZONETAS A-13

FORMATO DE METRADOS
CAJA DE REGISTRO, BUZONETAS Y BUZONES T I
MOVIMIENTO DE TIERRA

OBRA : "AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO PARA


SARGENTO LORENTZ - SEGUNDA ETAPA"
UBICACIÓN : A.H HACIA DESARROLLO A - 13
PLANO : A-13

BUZONETAS
CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO
Tipo T ROCOSO
Suelo
BUZON PROF. LOSA DE ACARRE MARCO Y MEDIA SOLAQU
EXCAV MURO TECHO ELIM TOTAL
FONDO O TAPA CAÑA EO
Z-249 1.00 TR 1 1 1 1 1 1 1 1 1
Z-250 1.00 TR 1 1 1 1 1 1 1 1 1
Z-251 1.00 TR 1 1 1 1 1 1 1 1 1
Z-252 0.80 TR 1 1 1 1 1 1 1 1 1
Z-253 0.80 TR 1 1 1 1 1 1 1 1 1
Z-254 1.00 TR 1 1 1 1 1 1 1 1 1
Z-255 1.00 TR 1 1 1 1 1 1 1 1 1
Z-256 1.00 TR 1 1 1 1 1 1 1 1 1
Z-258 0.80 TR 1 1 1 1 1 1 1 1 1
Z-259 0.80 TR 1 1 1 1 1 1 1 1 1
Z-260 1.00 TR 1 1 1 1 1 1 1 1 1
Z-261 0.80 TR 1 1 1 1 1 1 1 1 1
Z-262 0.80 TR 1 1 1 1 1 1 1 1 1
Z-263 1.00 TR 1 1 1 1 1 1 1 1 1
Z-263A 1.00 TR 1 1 1 1 1 1 1 1 1
Z-264 0.80 TR 1 1 1 1 1 1 1 1 1
Z-265 0.80 TR 1 1 1 1 1 1 1 1 1
Z-266 0.80 TR 1 1 1 1 1 1 1 1 1
Z-267 0.80 TR 1 1 1 1 1 1 1 1 1
Z-268 0.80 TR 1 1 1 1 1 1 1 1 1
Z-269 1.00 TR 1 1 1 1 1 1 1 1 1
Z-269 A 1.00 TR 1 1 1 1 1 1 1 1 1
Z-270 0.80 TR 1 1 1 1 1 1 1 1 1
Z-271 0.80 TR 1 1 1 1 1 1 1 1 1
Z-272 0.80 TR 1 1 1 1 1 1 1 1 1
Z-273 1.00 TR 1 1 1 1 1 1 1 1 1
Z-274 0.80 TR 1 1 1 1 1 1 1 1 1
Z-275 0.80 TR 1 1 1 1 1 1 1 1 1
Z-276 0.80 TR 1 1 1 1 1 1 1 1 1
Z-277 1.00 TR 1 1 1 1 1 1 1 1 1
Z-278 0.80 TR 1 1 1 1 1 1 1 1 1
Z-279 0.80 TR 1 1 1 1 1 1 1 1 1
Z-280 1.00 TR 1 1 1 1 1 1 1 1 1
Z-282 0.80 TR 1 1 1 1 1 1 1 1 1
Z-298 0.80 TR 1 1 1 1 1 1 1 1 1
Z-299 0.80 TR 1 1 1 1 1 1 1 1 1
Z-300 0.80 TR 1 1 1 1 1 1 1 1 1
Z-301 0.80 TR 1 1 1 1 1 1 1 1 1
Z-302 1.00 TR 1 1 1 1 1 1 1 1 1

TOTAL 39 39 39 39 39 39 39 39 39 39

BUZONETAS TN SR ROCA
A,H HACIA HASTA 1.00 ###
EL DESARROLLO

RED DE ALCANTARILLADO BUZONES A-13

FORMATO DE METRADOS
CAJA DE REGISTRO, BUZONETAS Y BUZONES T I
MOVIMIENTO DE TIERRA

OBRA : "AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO PARA SARGENTO LORENTZ - SEGUNDA ETAPA"

UBICACIÓN : A.H HACIA DESARROLLO A - 13


PLANO : A-13

BUZONES BUZONES
CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO
Tipo TERRENO SEMIROCOSO TERRENO ROCOSO
Suelo
BUZON PROF. LOSA DE ACARRE MARCO Y MEDIA SOLAQU LOSA DE MARCO Y
EXCAV MURO TECHO ELIM TOTAL EXCAV ACARREO MURO TECHO MEDIA CAÑA SOLAQUEO ELIM TOTAL
FONDO O TAPA CAÑA EO FONDO TAPA
BZ-257 1.24 R 1 1 1 1 1 1 1 1 1
BZ-283 1.21 R 1 1 1 1 1 1 1 1 1
BZ-303 1.23 SR 1 1 1 1 1 1 1 1 1
BZ-366 1.36 SR 1 1 1 1 1 1 1 1 1
BZ-367 1.38 R 1 1 1 1 1 1 1 1 1
BZ-368 1.51 R 1 1 1 1 1 1 1 1 1
BZ-369 1.34 R 1 1 1 1 1 1 1 1 1
BZ-370 1.33 R 1 1 1 1 1 1 1 1 1
BZ-371 1.26 R 1 1 1 1 1 1 1 1 1
BZ-372 1.43 R 1 1 1 1 1 1 1 1 1
BZ-373 1.29 SR 1 1 1 1 1 1 1 1 1
BZ-373A 1.20 SR 1 1 1 1 1 1 1 1 1
BZ-374 1.32 SR 1 1 1 1 1 1 1 1 1
BZ-375 1.25 SR 1 1 1 1 1 1 1 1 1

TOTAL 6 6 6 6 6 6 6 6 6 6 8 8 8 8 8 8 8 8 8 8

BUZONES TN SR ROCA
A,H HACIA HASTA 1.20 6.000 8.000
EL DESARROLLO
OBRA: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y
ALCANTARILLADO PARA SARGENTO LORENTZ - SEGUNDA ETAPA
UBICACIÓN: A.H HACIA EL DESARROLLO
PLANO: A-13
CONTRATISTA:
FECHA:02/06/08
HECHO: ESTEBAN VIVANCO

CONEXIONES DOMICILIARIAS DE AGUA POTABLE

MZ LT TERRENO TN SR TR
W 5 TR 1
6 TR 1
10 TR 1
11 TR 1
12 TR 1
13 TR 1
14 TR 1
X 1 TR 1
2 TR 1
3 TR 1
4 TR 1
5 TR 1
Y 1 TR 1
2 TR 1
3 TR 1
4 TR 1
5 TR 1
Z 1 TR 1
2 TR 1
3 TR 1
4 TR 1
S 1 TR 1
3 TR 1
5 SR 1
7 TR 1
8 TR 1
10 TR 1
R 1 TR 1
2 TR 1
4 TR 1
5 TR 1
T 1 TR 1
2 TR 1
3 TR 1
4 TR 1
U 1 TR 1
2 TR 1
3 TR 1
4 TR 1
V 2 TR 1
3 TR 1
5 TR 1
6 TR 1
Q 1 TR 1
3 TR 1
4 TR 1
C 10 TR 1
11 TR 1
12 TR 1
13 TR 1
D 1 TR 1
2 TR 1
3 TR 1
4 TR 1
5 TR 1
P 5 TR 1
2 TR 1
K 1 TR 1
2 SR 1
3 TR 1
4 SR 1
5 SR 1
6 TR 1
L 2 SR 1
3 TR 1
4 TR 1
5 TR 1
6 TR 1
7 TR 1
8 TR 1
TOTAL 0.00 5.00 65.00

CONEXIONES DE AGUA
POTABLE

PUEBLOS TERRENO TERRENO TERRENO


TOTAL
NORMAL SEMIROCO ROCOSO
A.H HACIA
DESARROLL 0.00 5.00 65.00 70
TOTAL 0 5 65 70
OBRA: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y
ALCANTARILLADO PARA SARGENTO LORENTZ - SEGUNDA ETAPA
UBICACIÓN: A.H HACIA EL DESARROLLO
PLANO: A-13
CONTRATISTA:
FECHA:02/06/08
HECHO: ESTEBAN VIVANCO
CONEXIONES DOMICILIARIAS DE
ALCANTARILLADO

MZ LT TERRENO TN SR TR
W 5 TR 1
6 TR 1
10 TR 1
11 TR 1
12 TR 1
13 TR 1
14 TR 1
X 1 TR 1
2 TR 1
3 TR 1
4 TR 1
5 TR 1
Y 1 TR 1
2 TR 1
3 TR 1
4 TR 1
5 TR 1
Z 1 TR 1
2 TR 1
3 TR 1
4 TR 1
S 1 TR 1
3 TR 1
5 SR 1
7 TR 1
8 TR 1
10 TR 1
R 1 TR 1
2 TR 1
4 TR 1
5 TR 1
T 1 TR 1
2 TR 1
3 TR 1
4 TR 1
U 1 TR 1
2 TR 1
3 TR 1
4 TR 1
V 2 TR 1
3 TR 1
5 TR 1
6 TR 1
Q 1 TR 1
3 TR 1
4 TR 1
C 10 TR 1
11 TR 1
12 TR 1
13 SR 1
D 1 TR 1
2 TR 1
3 TR 1
4 TR 1
5 TR 1
P 5 TR 1
2 TR 1
K 1 TR 1
2 SR 1
3 TR 1
4 SR 1
5 SR 1
6 TR 1
L 2 SR 1
3 TR 1
4 TR 1
5 TR 1
6 TR 1
7 TR 1
8 TR 1
TOTAL 0.00 6.00 64.00

CONEXIONES DE
ALCANTARILLADO

PUEBLOS TERRENO TERRENO TERRENO


TOTAL
NORMAL SEMIROCO ROCOSO
A.H HACIA
DESARROLL 0.00 6.00 64.00 70
TOTAL 0 6 64 70
FORMATO DE METRADOS
PARTIDAS ADICIONALES

OBRA : "AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y


ALCANTARILLADO PARA SARGENTO LORENTZ - SEGUNDA ETAPA"
UBICACIÓN : A.H HACIA EL DESARROLLO
PLANO : A-13
HECHO : ESTEBAN VIVANCO

VALVULAS COMPUERTAS

DATOS

TRAMO UBICACIÓN UNIDAD TOTAL


BUZON DIAMETRO

VALVULAS
COMPUERTAS
1 VALV - 1 110 AV. IMPERIAL 1.00
2 VALV - 2 110 AV. IMPERIAL 1.00
3 VALV - 3 110 AV. IMPERIAL 1.00
4 VALV - 4 110 AV. IMPERIAL 1.00
4.00

VALVULA DE AIRE

DATOS

TRAMO UBICACIÓN UNIDAD TOTAL

A.H HACIA EL DESARROLLO


1 VALV -AIRE TR PJE. NOGALES 1.00
1.00

EMPALME

PARTIDA METRADO UND

EMPALME A CAMARA
REDUCTORA DE PRESION 2 UND
MATERIALES UTILIZADOS EN A.H HACIA EL DESARROLLO CONTRATO Nº3

MATERIALES METRADO REPLANTEO CANTIDAD DE TUBOS 5% DE DESPERDICIOS TOTAL


ALCANTARILLADO
TUBO DE 200 mm 184.15 31.5 1.6 33.1
TUBO DE 160 mm 721.77 123.4 6.2 129.5
TUBO DE 110 mm
CAJAS DE CONCRETO 70 70.0

AGUA
TUBO DE 160 mm 103.20 17.6 0.9 18.5
TUBO DE 110 mm 278.15 47.5 2.4 49.9
TUBO DE 90 mm 502.35 85.9 4.3 90.2
TUBO DE 75 mm

CONEXIONES
CAJA DE CONCRETO
CAJA DE POLIETILENO 70 70

VALVULAS
VALV. COM 110 4.00 4
VALV. COM 90
VALV. COM 75