Sei sulla pagina 1di 63

Construction Design and Management

Construction Phase Plan

Prepared
For

CAVANNA HOMES
WWW.CAVANNA,CO.UK
Project Plymouth Airport (Main Site) 504K Phase 1
Dwellings 100
Address 504K Plymouth Airport
Contract C0134
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
Document Control Sheet
PROJECT NAME: PLYMOUTH AIRPORT (MAIN SITE) 504K PHASE ONE
DOCUMENT REFERENCE: CO134

Version: Detail: Prepared By: Checked By: Checked By: Checked By:

Pre Start 6/07/2011


Pack Fred Martin Cavanna Alistair Brierley
Sureshkumar CDM
Approved
Pre Start 25/10/11 D Smith
Pack R1
Signature Signature Signature

Date Date Date


CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

Contents
OVERVIEW ............................................................................................................................................................ 5
1.0 This Health & Safety Plan ................................................................................................................................ 7
1.1 Principal Contractors Responsibilities ............................................................................................................... 8
1.2 CDM STANDARDS AND OBJECTIVES FOR THE PROJECT ............................................................................ 9
2.0 SUMMARY PROJECT INFORMATION ....................................................................................................... 11
2.1 Project Name ............................................................................................................................................... 11
2.2 Project Address ............................................................................................................................................ 11
2.3 Description and Scope of Works ................................................................................................................... 11
2.4 Outline Method Statement ............................................................................................................................ 11
2.5 Form of Contract .......................................................................................................................................... 11
2.6 Existing Environment ..................................................................................................................................... 11
2.7 Previous Land Use ......................................................................................................................................... 11
2.8 Surrounding Area .......................................................................................................................................... 12
2.9 Existing Services ............................................................................................................................................ 12
2.10 Existing Structures....................................................................................................................................... 12
2.11 Ground Conditions ..................................................................................................................................... 12
Site investigations ............................................................................................................................................... 12
2.12 Existing Traffic Systems ................................................................................................................................ 12
2.13 Programme ................................................................................................................................................. 12
3.0 Management Team Organisation & Responsibilities .................................................................................. 13
3.1 Management Team Function .......................................................................................................................... 13
3.2 Project Organisation and Personnel ................................................................................................................ 13
3.3 Responsibilities ............................................................................................................................................. 14
4.0 Safety Risk Registers ...................................................................................................................................... 16
4.1 The Design (address hazards on hazard plan only) ........................................................................................... 17
Please see haz01 appendix 11 ............................................................................................................................. 20
5.0 IDENTIFICATION AND EFFECTIVE MANAGEEMNT OF ACTIVITIES WITH RISK TO HEALTH AND
SAFETY ................................................................................................................................................................ 20
5.1 Risk Assessments .......................................................................................................................................... 21
General Statement .............................................................................................................................................. 21
Arrangements for Securing the Health and Safety of Workers ............................................................................... 22
5.2 Safety Method Statements.............................................................................................................................. 22
6.0 ARRANGEMENTS TO GIVE DIRECTIONS AND TO CO-ORDINATE OTHER CONTRACTORS .... 24
6.1 Safety Training .............................................................................................................................................. 24
6.2 Safety Inspections .......................................................................................................................................... 24
6.3 Safety Meetings ............................................................................................................................................. 24
7.0 ARRANGEMENTS FOR VETTING CONTRACTORS, SUPPLIERS OF MATERIALS AND PLANT WITH
REGARD TO HEALTH AND SAFETY .............................................................................................................. 25
7.1 Contractors .................................................................................................................................................. 25
7.2 Plant ............................................................................................................................................................. 25
7.3 Machinery ..................................................................................................................................................... 25
7.4 Noise ........................................................................................................................................................... 25
7.5 COSHH Arrangements.................................................................................................................................. 26
Control of Substances Hazardous to Health Regulations (COSHH) 2002 ...................................................... 26
8.0 WASTE MANGEMENT ARRANGEMENTS ............................................................................................... 27
8.1 Lighting Arrangements ................................................................................................................................... 27
9.0 MANAGEMENT MEETINGS AND INITIATIVES ...................................................................................... 27
10.0 Design Work Carried Out During the Construction Phase ..................................................................... 27
11.0 Emergency Arrangements .......................................................................................................................... 28
11.1 Accident Procedure including reporting as required by RIDDOR 95 ............................................................... 28
11.2 Fire Action Plan ........................................................................................................................................... 29
11.3 Evacuation Procedure .................................................................................................................................. 29
Excavations and Earthworks; Confined Spaces Operations ............................................................................. 29
Excavations and Earthworks ................................................................................................................................ 29
11.4 Fire Prevention ........................................................................................................................................... 30
Highly Flammable Liquids (HFL) and Liquefied Petroleum Gases (LPG)....................................................... 30
Storage and Use of Highly Flammable Liquids (HFL) .............................................................................................. 30
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
Storage and Use of Liquefied Petroleum Gases (LPG) ........................................................................................... 31
11.5 Emergency Contact Telephone Numbers ................................................................................................. 31
12.0 MAINTENANCE OF WELFARE FACILITIES .......................................................................................... 31
12.1 Personal Protective Clothing ........................................................................................................................ 32
13.0 Provision of Information .............................................................................................................................. 32
13.1 Information for contractors & co-ordination & co-operation of contractors.................................................... 32
13.2 Training ...................................................................................................................................................... 33
13.3 Health & Safety Information ......................................................................................................................... 33
13.4 Display of Statutory Notices ........................................................................................................................ 34
13.5 Site Registers and Documentation ................................................................................................................ 34
14.0 CONSULTING AND CO-ORDINATING THE VIEWS OF PEOPLE ..................................................... 34
15.0 Site Rules ...................................................................................................................................................... 35
16.0 THE HEALTH AND SAFETY FILE ............................................................................................................ 35
16.1 Arrangements will be made for relevant Contractors and consultants to pass on all relevant information ......... 35
16.2 Cavanna Homes will collect and collate the requisite information ................................................................... 35
16.3 Safety Standards and Objectives for the Project............................................................................................. 35
17.0 MONITORING ............................................................................................................................................. 36
17.1 Project Review ............................................................................................................................................ 36
Appendix 1 EMERGENCY INFORMATION ...................................................................................................... 37
Appendix 2 MEDICAL NOTIFICATION FORM ............................................................................................... 39
Appendix 3 SITE FIRE SAFETY PLAN .............................................................................................................. 40
1.1 Fire Plan Principles .................................................................................................................................. 40
1.2 Fire Prevention Procedures ...................................................................................................................... 40
1.3 Means of Escape ...................................................................................................................................... 42
1.4 Fire Fighting ............................................................................................................................................ 43
1.5 Fire Emergency Protocol ........................................................................................................................ 43
1.6 What to Do in Case of Fire .................................................................................................................... 45
Appendix 4: EMERGENCY PROCEDURES ....................................................................................................... 46
Appendix 5: OUTLINE METHOD STATEMENT ............................................................................................. 47
Appendix 6 CONSTRUCTION PROGRAMME ................................................................................................. 53
Appendix 7 NOTIFIABLE PARTICULARS........................................................................................................ 55
Appendix 8 SITE PLAN ....................................................................................................................................... 57
Appendix 9 TRAFFIC ACTION PLAN .............................................................................................................. 58
Appendix 10 F10 ................................................................................................................................................... 60
Appendix 11 HAZ I DRAWING .......................................................................................................................... 62
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
OVERVIEW

A general description of the type of work activities involved in the project


• Construction of 100 dwellings
• Strip foundations
• Foul and Storm drainage to connect to mains off-site drainage and part storm drainage to soakaways
• Timber frame construction with crane.
• Traditional brick, stone and block construction
• Infrastructure services and house services
• Timber roof construction
• Membrane Radon barrier
• Boundary walls
• Off-site service diversions

A statement of the project timescales or programme.


• Appendix 6 Construction programme for project Proposed start date 4th November 2011 with
anticipated completion date of 20th March 2013. For more detailed breakdown please see build
programme. Key Stage reference included.

Details of Client,
CDM Co- Alistair Brierley Comp Design 01392 874499
ordinator
Client Cavanna Homes (Cornwall) Ltd 01803 618688
Planning Cavanna Homes (Cornwall) Ltd
Supervisor
Principal Cavanna Homes (Cornwall) Ltd
Contractor
Project Manager Cavanna Homes (Cornwall) Ltd
Architect RPS Group 01454 853000

Engineer TWP 01392 276046


Quantity Surveyor David Beach 01803 618697
Service PBA
Consultant
Landscape RPS Group 01454 853000
Consultant

Other
Consultants

Relevant Consultant
Bodies
• HSE Construction Division – Plymouth
Ballard House
West Hoe Road
Plymouth PL1 3BL
NHBC
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
• NHBC Buildmark House
Chiltern Avenue
Amersham
Bucks HP6 5AP
NHBC (as above)
• Building
Control/LA
• Utilities British Gas
Maidenhead Road
Windsor
Berkshire SL4 5GD Emergency leaks ………..call Transco 0800 111 999

British Telecommunications PLC


81 Newgate Street
London EC1A 7AJ

Scottish and Southern Energy…….…Emergency smell gas 0800 111999


Malthouse Avenue
Cardiff Gate
Cardiff CF23 8AU

South West Water ……………………..………..Leaks 0800 169 1144


Peninsula House
Rydon Lane
Exeter EX2 7HR

Western Power Distribution………… Gas emergencies 0800 111 999


Victoria Road
Barnstaple EX32 8PR

The Environment Agency ……………………Flood line 0845 602 6340


• Pollution
/Flooding
Environmental
Health

Safety Advisors The Building Safety Group


5 Pinkers Court
Brairlands Office Park
Gloucester Road
Rudgeway
Bristol
BS35 3QH … .………………………………………..….01454 414877
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

1.0 THIS HEALTH & SAFETY PLAN

This Construction Phase Plan has been developed from the Pre-construction Information provided by the
client and Comprehensive Design Ltd and will be further developed as the Project progresses through the
construction phase.

This Health and Safety Plan is a dynamic document that will change and develop throughout the project. All
persons working on or visiting the site will be made aware of the availability of this plan and its contents.

This document will be clearly displayed and available to all persons working on/visiting the site.

Arrangements for display of the notifiable particulars


Our company standard Health and Safety notice board is clearly displayed in the site office
• Appendix 7 diagram of Notifiable Particulars

Health and Safety goals for the project


Are aim is to maintain a hazard free site with no risk to the Health and Safety of site personnel/ Visitors and
members of the public.

Arrangements for achieving/applying the Health and Safety goals, targets, key performance
indicators etc
Each sub-contractor / specialist consultant is asked to provide method statements and risk assessments two
weeks prior to starting on site. These are produced at the pre-let meeting which is organised by the Site
Manager and Quantity Surveyor.
Our key performances indicators to achieve our goals are
1. Our record of daily/weekly plant inspections
2. Site Manager scaffold inspections
3. Safety adviser’s report which identifies hazards, which are collated into an annual report which
is forwarded to our Health and safety Director which he would then compare with the
previous year. Armed with this information our Health & Safety goal is the reduce the amount
of hazards found within our development
4. Site Managers visual inspection is recorded in the site diary
5. Roles and responsibilities are found in section 3.2

How the Health and Safety is to be monitored


Our Safety advisors The British Safety Group (BSG) monitor the site fortnightly and produce a safety report
which is monitored, and any action points are address immediately by the Site Manager, Build Manager and
Construction Director

The health and safety is reviewed


During the;
• Monthly sales safety report
• Monthly Site meeting
• Bi-monthly Active project Meeting
• Visual inspections daily by site Manager
• Post project review
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
1.1 Principal Contractors Responsibilities

Cavanna Homes will ensure the following obligations identified by the Construction (Design & Management)
Regulations 2007 and other applicable legislation are complied with:-
(a) To develop the Construction Phase health and safety plan into a working project document, ensuring that
it contains all the necessary information.
(b) Make clear to all contractors and operatives on the site (through site inductions) both the Clients
requirements and Cavanna Homes site specific rules. Project Safety information will be disseminated
through site inductions and weekly briefs/talks with operatives and contractors representatives.
(c) Take reasonable steps to ensure that all contractors [including the self-employed] co-operate as far as is
necessary to enable each of them to comply with relevant statutory provisions.
(d) Restrict site access to operational areas and allow only authorised persons or approved site operatives.
(e) Obtain from other contractors engaged to work on the project method statements and risk assessments
pertaining to their own operations particularly where they may impact on others.
(f) Maintain the Safety Notice Board and the display of all Statutory Notices.
(g) Advise the CDM Coordinator of any discoveries or proposals regarding design matters.
(h) Procure the appointment of competent designers or contractors as far as is reasonably practicable
through the use of the supply chain management process.
(i) Monitor the health and safety performance of persons and companies working on the Project.
(j) Secure all information that will be required for inclusion in the handover of CD and Health and Safety file
so that the building owners / users can safely use and maintain the building.
(k) Maintain the provision of training and safety information to all those working on site that may suffer risk
to their own health, safety and welfare whilst working on the Project.
(l) Encourage an open door policy and blame free safety culture in the reporting of hazards and useful work
practices. The statutory requirement of all operatives to look after their own safety and not engage in
activities which will put others at risk /cause them harm will be underlined.

The Health & Safety Executive has been advised of this project on Notification of Project Form 10. A copy of
this form is annexed at Appendix 10 for record purposes.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

1.2 CDM STANDARDS AND OBJECTIVES FOR THE PROJECT

It is the intention of this company that:


• Activities shall be carried out in accordance with relevant statutory provisions to include the Construction
Design & Management Regulations 2007;
• Facilities will be provided for both employer/employee and project team consultations on CDM matters,
and information arising which has a health and safety/risk implication will be disseminated to those who
may be so affected;
• Management of the Project shall include the encouragement and maintenance of the co-operation
between all employees and individual project parties (i.e. consultants and contractors) working on the
Project;
• Expert advice and assistance will be obtained where necessary to discharge obligations and duties
identified within the CDM Regulations
• The works shall be completed in accordance with the quality standards specified, to programme and
budget as per Client instruction

The Company regards the provision of a safe and healthy working environment on construction sites as a
principal objective. This objective can only be achieved by the co-operation of the Company, employees,
subcontractors, the client and his representatives and the main contractor. Co-operation must be at all levels
within these different organisations through the structures established under the Construction Design and
Management Regulations (CDM).

The Company will collaborate with all parties to provide the organisation, advice and resources to meet this
commitment so far as is reasonably practicable. Authority to implement this policy is defined for all those who
have a responsibility for health and safety.

The Company has established a series of management procedures to ensure that health and safety issues
retain a high profile during all stages of the Company’s activities. Such procedures are devised to conform to
the requirements of CDM.

It is the responsibility of the Company to:

1. Sustain and carry out this policy by all means at their disposal;

2. Provide adequate safety and job training for all employees with particular attention to special safety training
where appropriate;

3. Comply with the requirements of the relevant legislation, to undertake risk assessments of all activities and
to ensure that safe systems of work and a safe working environment are put in place.

4. Ensure that the operations of the Company are carried out without risk to the health and safety of third
parties.

The Company will seek to maintain a constant interest in all aspects of safety by effective consultation with all
parties concerning hazards and incidents which affect health and safety at work and to prevent any adjustment
or damage to plant and equipment which may create a hazard.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

Site Managers and Build Managers are responsible for the safety of employees, subcontractors and visitors in
their charge and must ensure that policies and procedures are made known and are observed. It is their
responsibility to ensure the effective delegation of these duties during their absence.

Employees, subcontractors and visitors to site are responsible for observing Company policies and
procedures and for ensuring that at all times they work in a manner consistent with the safety of themselves
and others.

The effectiveness of health and safety measures will be monitored continuously in order to ensure that both
policy and practice are appropriate at all times to the activities of the Company.

All those involved in the construction phase have a statutory duty to comply with this Construction Phase
Plan and to provide Cavanna Homes with any information which they have, which is needed to keep the Plan
up to date. Anyone wishing to seek advice on compliance should contact Cavanna Homes.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

2.0 SUMMARY PROJECT INFORMATION

2.1 Project Name Plymouth Airport Main Site Phase One (C0134)

Plymouth Airport, Main Site


2.2 Project Address

2.3 Description and Construction of 100 Dwellings, and associated infrastructure


Scope of Works works
• Traditional block, stone and brick construction
• Timber frame construction
• Private and Adopted drainage
• Private courtyards
• Timber / block & beam floors
• Trussed timber roofs
• Natural slate roofs and Concrete tiles
• Through coloured render

Normal working hours 8.00am – 6.00pm (Monday – Friday)


and 8.30am - 1.00pm (Saturdays)
Work on site outside these times is prohibited unless arrangements have been
made with the Site Manager for competent supervision to be on site. Lone
working will not be permitted.

2.4 Outline Method Is appended at Appendix 5 as a framework but the method statements will be
Statement reviewed and expanded during the project

2.5 Form of Contract N/A


The availability of existing drawings and information has been extensively
2.6 Existing researched by the Cavanna Homes, design team and all relevant information is
Environment included in the pre construction information and design drawings/employers
requirements.

2.7 Previous Land Use Former Airfield and part unused Runway
2.7.1 Soil Investigation
Information included in the pre-construction information pack.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

2.8 Surrounding Area This parcel of development land is a brown field site, part of the
Plymouth City Airport airfield and unused runway.

The north west boundary is bounded by existing properties and


has no secure boundary with this proposed development.

The east boundary is de-marked with a 3m high security fencing

The south boundary is de-marked with a 3m high security fencing


separating the land from the existing Plymbridge Road.

The east boundary is bounded by newly erected security fencing by


PCA and this fencing is likely to be removed in the future as part of
the New link road construction on this boundary.

2.9 Existing Services There are no overhead services exists in this site. There are many
underground services in the vicinity of the site. Existing service
drawings are available for reference during the construction process.

2.10 Existing Structures N/A


2.10.1 Asbestos Report N/A
The following reports have been produced and available for
2.11 Ground Conditions reference:-
Energy Statement
Site investigations
Acoustic Report and Recommendations by RPS acoustics
Soakaway Test Report by Ruddlesden Geotechnical
Ground Conditions Report by Peter Brett Associates
Ecological Assessment by Acorn Ecology Ltd
Archaeology report by AC Archaeology
Risk assessment by BAE Systems
Drainage assessment by Faber Maunsell
Environmental Statement
Flood risk Assessment
Health Impact Assessment
Ground conditions Assessment
Transport Assessment
Sustainability statement

2.12 Existing Traffic This site is serviced through a gated access currently servicing some out
Systems buildings. This access will be utilised as the construction access for the
initial duration of the project. (See APPENDIX 5 construction vehicle
movements page 59)

2.13 Programme FOR BRIEF CONSTRUCTION PROGRAMME See Appendix 6


CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

3.0 MANAGEMENT TEAM ORGANISATION & RESPONSIBILITIES

3.1 Management Team Function


Cavanna Homes has selected a team who have a wealth of experience with this type of project covering all
disciplines which will be deployed in order to achieve the Project goals.

The team function will:-


• Integrate with the Consultants to achieve the best solutions for the Project.
• Work as one with the Professional Team and the Client's Management Team to achieve the objectives
and safety goals embraced by the Client and published within this document.
• Develop a team philosophy with Contractors so that there is a mutual understanding as to what must be
achieved to meet the Client's expectations.
• Employ our depth of management knowledge and previous experiences of undertaking similar projects to
achieve the best outcome for the Client.
• Bring the Project in on time, and budget, to meet the Clients aspirations.

3.2 Project Organisation and Personnel

Cavanna Homes has adopted the following management structure for this project:-

BOARD OF HEAD OF
DIRECTORS CONSTRUCTION

SAFETY
BUILD ADVISOR
MANAGER

QUANTITY SITE
SURVEYOR MANAGER

MATERIALS SITE CONTRACTORS


PURCHASER OPERATIVES

CONTRACTORS
OPERATIVE

A Health and Safety “organigram” or chart


CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

Martin Cavanna Group Director Health & Safety


Fred Sureshkumar Head of Construction
David Smith Build Manager
Ian Rankin Site Manager
Dave Beach Quantity Surveyor
Charlie Jones Material Purchaser
Kevin Moyle Customer Service Inspector
TBA Forklift operative
Safety Advisor British Safety Group (BSG)

3.3 Responsibilities
Head of construction

a) Promote a positive health and safety culture by creating an interest and enthusiasm for health and safety
in all activities and set a good example (including wearing appropriate protective clothing and equipment).
b) Implement the Company health and safety policies and procedures.
c) Administer the health and safety policies throughout the Company by appointing a director to be
responsible for health and safety.
d) Ensure the policy is reviewed regularly with the health and safety director and updated, as necessary.
e) Make adequate financial provision for implementing the health and safety policies.
f) Carry out site and office inspections/audits as and when required.
g) Investigate and issue detailed reports on incidents and accidents when required.
h) Ensure suitable and sufficient welfare facilities are provided and maintained on sites and in offices.
i) Provide adequate advice to employees on all health and safety issues.
j) Promote and encourage the planning and implementation of effective measures to minimize risk and
reduction of accidents.
k) Ensure all reportable accidents/incidents are notified to the Health and Safety Executive.
j) Ensure compliance with the Company Health and Safety policies and procedures.
l) Disseminate health and safety information, to include any changes to the procedures.

Build Manager

a) Promote a positive health and safety culture by creating an interest and enthusiasm for health and safety
in all activities and set a good example (including wearing appropriate protective clothing and
equipment).
b) Be aware of the appropriate statutory health and safety requirements affecting the operations of the
Company.
c) Ensure all managers and employees under their control have received the required training in health and
safety.
d) Ensure all managers and employees under their control are aware of their health and safety
responsibilities.
e) Ensure health and safety factors are considered at all stages in the work process and sufficient resource
is made available to maintain safe working methods and equipment.
f) Co-operate with The Group Director for Health and Safety, Head of Construction and Safety Advisors.
g) Ensure an Office Health and Safety Co-ordinator is appointed for each office using the appropriate form.
h) Ensure compliance with the Company policies and procedures and reprimand any managers and
employees for failure to satisfactorily discharge their responsibilities for health and safety.
i) Allocate sufficient resources (including financial) to enable the Health and Safety policies and procedures
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
to function effectively.
j) Ensure all reportable accidents/incidents are immediately notified to the appropriate persons.
k) Where responsible for sites, ensure a site health and safety co-ordinator is appointed for each site using
the standard form.
l) Where responsible for sites, ensure that inspections and audits are carried out as required.
m) Where responsible for sites, ensure that offices/sites are laid out and maintained to secure site safety,
clear access/egress/emergency routes and that welfare facilities are well maintained.
n) Assist the Site Manager in the safe running of the site and ensure that the site is organized so that work
is carried out with minimal risk to employees, contractors and all others affected.
o) Ensure the adequacy of contractor’s risk assessments and method statements for all activities and
oversee any high-risk activities or temporary works. Act as a point of contact for contractors whose
activities will impact on others operating on/using the site.
P) Ensure permits to work are issued, recorded and signed off for all appropriate works.
q) Ensure that induction procedures are in place and implemented for everyone who works on site or visits
the site, and ensure that emergency arrangements are included within the induction and displayed on the
site notice boards.

Site Manager –

a) Promote a positive health and safety culture by creating an interest and enthusiasm for health
and safety in all activities and set a good example (including wearing appropriate protective
clothing and equipment).
b) Ensure the Site Health & Safety Coordinator undertakes his duties and support him.
c) Ensure everyone on site is aware of their responsibilities with regard to health and safety.
d) Ensure compliance with the Company policies and procedures and reprimand any employees
for failure to satisfactorily discharge their responsibilities for health and safety.
e) Co-operate with the Group Director for Health and Safety, Managers and Advisors.
f) Ensure that inspections and audits are carried out as required.
g) Ensure that a risk assessment has been carried out for any equipment, work activity or
substance hazardous to employees’ health and safety, ensure appropriate control measures,
training, instruction, protective clothing etc, have been provided and that there is supporting
documentation.
h) Ensure that all plant/equipment/machinery (including office equipment) is safe, fitted with any
necessary guards or safety devices and is serviced and maintained as recommended by the
manufacturer (including testing for electrical safety as required by the relevant Regulations).
i) Ensure that sites/ offices are laid out and maintained to secure site safety, clear
access/egress/emergency routes and that suitable welfare facilities are provided and
maintained.
j) Ensure there are sufficient first aiders on site; that there are suitable first aid facilities on site;
and that notices giving the location of the nearest hospital with accident and emergency
facilities are clearly displayed in appropriate locations.
k) Ensure all reportable accidents/incidents are immediately notified to the appropriate persons.
j) Carry out a minimum daily walkover of the site and ensure that all hazards and risks are being
addressed.
l) Keep all registers/records/reports as detailed within the Company Health and Health and
Safety Manual, up to date and within a safe place.
m) Ensure that all statutory notices are displayed on site notice boards, and those first aid
facilities, and fire fighting equipment is maintained.
n) Ensure safety information is provided for everyone who works on site or visits the site; obtain
feedback of any health and safety issues and inform the Group Director for Health and Safety
Build Manager/Advisor.

Assistant/Foreman
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
a) Co-operate with the Group Director for Health and Safety, Managers and Advisors.
b) Ensure that sites/ offices are laid out and maintained to secure site safety, clear access/egress/emergency
routes and that suitable welfare facilities are provided and maintained.
c) Ensure that all plant/equipment/machinery (including office equipment) is safe, fitted with any necessary
guards or safety devices and is serviced and maintained as recommended by the manufacturer (including
testing for electrical safety as required by the relevant Regulations).
d) Ensure all reportable accidents/incidents are immediately notified to the appropriate persons.
e) Ensure safety information is provided for everyone who works on site or visits the site; obtain feedback
of any health and safety issues and inform The Group Director for Health and Safety, Build
Manager/Advisor.
f) Promote a positive health and safety culture by creating an interest and enthusiasm for health and safety
in all activities and set a good example (including wearing appropriate protective clothing and
equipment).

Forklift Driver

a) Co-operate with the Group Director for Health and Safety, Managers and Advisors.
b) Ensure that all plant/equipment/machinery (including office equipment) is safe, fitted with any necessary
guards or safety devices and is serviced and maintained as recommended by the manufacturer (including
testing for electrical safety as required by the relevant Regulations).
c) Ensure all reportable accidents/incidents are immediately notified to the appropriate persons.
d) Ensure safety information is provided for everyone who works on site or visits the site; obtain feedback
of any health and safety issues and inform The Group Director for Health and Safety, Build
Manager/Advisor.
e) Promote a positive health and safety culture by creating an interest and enthusiasm for health and safety
in all activities and set a good example (including wearing appropriate protective clothing and
equipment).

Contractors

All contractors will operate in accordance with the Company’s procedures, site specific rules
and Clients requirements, as explained both within the site induction process and in the contract
documentation

All contractors shall co-operate with each other to facilitate the safe operation of site activity
All contractors either failing to meet those site rules that are governed by zero tolerance or those failing to
comply with safe practices/provision of safe tools and equipment will be asked to remove themselves and their
equipment from the site.

4.0 SAFETY RISK REGISTERS

Arrangements for compliance by others with any rules in the plan


The first H&S review is undertaken at the post tender review where the contractor is asked to produce a risk
assessment and method statement two weeks prior to commencing on site. This gives the Contractors the
opportunity to raise any issues they may have within the proposed programme dates that may relate to timing
issues with other trades All specific site issues will be explained to the contractor at this meeting and if any
problems they may have with any other contractors and their co-operation with them. All site operatives are
inducted prior to starting on site by the Site Manager and daily checks by Site Manager will take place to make
sure all sub-contractor are carrying out al programmed dates that were agreed at pre-let stage and if
necessary agreed new programme dates. Site Manager will monitor this closely to avoid any un-necessary
clashes to the programme.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
4.1 The Design (address hazards on hazard plan only)

This section highlights the significant hazards identified by Cavanna Homes and the design team as a result of
the design. Cavanna Homes will manage these hazards during the construction process and will ensure that
this Section is kept up to date at all times.

4.2.1 Hazard Control Owner


Significant
Construction PC/
Risks Contracto
r

Site set up Unauthorised Cavanna to ensure that the site is clearly delineated and Cavanna
(Working in a access into the only authorised personnel to enter the work area all site
restricted area) work area visitors to sign in and out for a period of 8 weeks. Cavanna
Homes to erect fencing to all site perimeters once
compound is erected and open site visitor’s entrance via
existing access from Plymbridge Road

Working at Fall of materials Safe access will be provided to all work faces. Competent Cavanna
height or Personnel personnel working in accordance with approved risk Contractor’
assessments and method statements will erect access plant
and platforms. All access plant and materials will be both
maintained and checked as required.

Overhead Fall of materials Cavanna to ensure that adequate protection is provided Cavanna
Work (Clash of or personnel from works being undertaken overhead if they cannot be Contractor’
trades) avoided.

Lifting heavy Falling materials Cavanna is to ensure that competent operators using Cavanna
plant, / plant adequate lifting equipment in accordance with an approved Contractor’
equipment, and RA/MS carry out all lifting. PC will be responsible for
materials ensuring that copies of operator and plant certification are
provided with the RA/MS, and produced at the induction
stage.

Persons falling Service holes Secure barriers to be fixed around all openings or Cavanna
down Holes and lift shafts plates/timber fixed over service holes. Contractor’
Persons Fall of persons Constant monitoring of housekeeping. Maintaining of Cavanna
tripping/slipping causing injury access/egress routes at all times. Contractor’

Falling materials See overhead Cavanna


work Contractor’
Manual handling Dropping Cavanna to control the delivery and movement of Cavanna
material, materials to ensure that the loads being carried by Contractor’
Crushing, Injury individuals do not exceed those that can be safely lifted /
moved.

Working on live Live services Cavanna to ensure that all areas are surveyed prior to any Cavanna
services works being executed. All works will be undertaken by a Contractor’
competent contractor working to an approved RA/MS and
in accordance with the procedures contained within this
H&S Plan. Permits as detailed within the H & S Manual to
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
be used.

Demolition Demolition N/A N/A

Control of Excessive noise Ensure that all noisy operations are carried out between Cavanna
noise the hours of 8.00am – 6pm Mon-Fri and 8.30am – 1.00pm Contractor’
Sat. Excessively noisy operations will be subject to noise
assessments. All noisy works will be carried out.

Control of dust Dust Ensure that when dusty operations are carried out that
suitable extraction facilities are deployed and that all Cavanna
operatives are wearing the correct RPE Contractor’
Light spray of water
Disposal of Waste The site is kept in a clean and tidy manner. All waste is Cavanna
waste put into segregated skips and then removed from site. Contractor’
Cavanna
Site Waste Management Plan to be implemented
Protection of Works Cavanna will protect any existing structures that may be Cavanna
existing affected by the works. Contractor’
structures
Prevention of Unauthorised Cavanna will ensure that the site is clearly delineated and
unauthorised access into the only authorised persons allowed entering the work area. Cavanna
access work area Protective Haras fencing will be erected to stop un Contractor’
authorised persons from entering.

Working with Fall of persons Fragile materials to be identified. Depending on location Cavanna
or near fragile causing injury the use of guardrails, toe boards, barriers, suitable Contractor’
materials personal suspension and fall arrest equipment will be
provided. Method statements & Risk assessments to be
provided.

Storage of Inhalation, Recommendations as detailed on manufacturer’s health &


hazardous burns, risk of safety data sheets on storage to be complied with. Gases Cavanna
materials fire and flammable liquids to be stored as required by the HFL Contractor’
DSEA Regs. 2002

Fire Fire Cavanna fire plan will ensure that the works are executed
in accordance with the procedures set out in the Cavanna
document as appendix 3 section 1.5 Contractor’
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
Risk Control
4.1.3
Significant
Hazardous
Specified
Materials
Anchor Inhalations Cavanna will ensure that all such adhesives are installed by C
adhesives of competent personnel working to an approved RA/MS, which o
dangerous has been compiled following a thorough investigation of the n
fumes. adhesives COSHH details. The COSHH data sheet will be t
appended to the RA/MS and retained on site.

Insulation quilt Skin Cavanna will ensure that all insulation is installed by competent Contractor
irritation personnel working to an approved RA/MS which has been
etc. compiled following a thorough investigation of the COSHH
details. The COSHH data sheet will be appended to the RA/MS
and retained on site in the H&S plan.

Sealants Inhalation of Cavanna will ensure that all sealants are installed by competent Contractor
dangerous personnel working to an approved RA/MS which has been
fume, Skin compiled following a thorough investigation of the COSHH
irritation details. The COSHH data sheet will be appended to the RA/MS
etc.
and retained on site in the H&S plan.

Silicones Fumes & Cavanna will ensure that all silicone is installed by competent Contractor
Skin personnel working to an approved RA/MS which has been
irritation compiled following a thorough investigation of the COSHH
etc. details. The COSHH data sheet will be appended to the
RA/MS and retained on site in the H&S plan.

Adhesives, Fumes, Cavanna will ensure that all adhesives, solvent, and isocymate Contractor
Solvent, and Skin based products are installed by competent personnel working
Isocynate based irritation to an approved RA/MS which has been compiled following a
products etc. thorough investigation of the COSHH details. The COSHH
data sheet will be appended to the RA/MS and retained on site
in the H&S plan.

Grout and Fumes, Cavanna will ensure that all grout and mastic are installed by Contractor
mastics Skin competent personnel working to an approved RA/MS which
irritation has been compiled following a thorough investigation of the
etc. COSHH details. The COSHH data sheet will be appended to
the RA/MS and retained on site in the H&S plan.

Paint and Paint Fumes, Cavanna will ensure that all paint and paint sprays are applied Contractor
sprays Skin by competent personnel working to an approved RA/MS which
irritation has been compiled following a thorough investigation of the
etc. COSHH details. The COSHH data sheet will be appended to
the RA/MS and retained on site in the H&S plan.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
4.1.4
Significant
Hazardous
Methods or
Sequences (as
a result of the
Design)
Trespass Public/ NW Site boundary has no security fencing, gardens with gated 0011001
001 Workers access back onto site

Falls Worker/ Insufficient working room for construction or future


002 Future maintenance
residents

Headroom Worker/ Access for delivery vehicles/removal lorries serving Plots 108.
003 Future The rear parking court is the only place a delivery vehicle can
004 residents park without blocking drives or turning areas

Falling objects Public Risk of injury to public due to close proximity of cycleway and
005 highway

Buried Services Workers Services to be detoured into Sutton Harbour Group


006 landscaping area, deep excavation required from edge og
highway
Explosion Public/ There is a moderate risk of encountering WW2 German
007 Workers unexploded ordinance (UXO) during excavation work
010 Existing gas tank to be removed
Low Flying Public/ While the airport is operating, there is the change of low flying
Aircraft Workers aircraft striking any tall items of plant such as cranes
008
Aircraft Public/ While the airport is operating, there is the change of an aircraft
Emergency Workers making an emergency landing
Landing
009

PLEASE SEE HAZ01 APPENDIX 11


CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

5.0 IDENTIFICATION AND EFFECTIVE MANAGEEMNT OF ACTIVITIES WITH RISK TO


HEALTH AND SAFETY
Arrangements for ensuring every other contractor provide Health & Safety information to their
workers and provide necessary training.
Contractually this is covered in the post tender review. At the induction stage all workers will be asked if
they have read the company risk assessment and method statements prior to starting on site and understand
Cavanna Homes Health & Safety objectives at the post-tender review

5.1 Risk Assessments


General Statement
Risk assessments form the central strand of a self-regulated safety management system. Successful completion
of them provides sound economic benefits to the organisation as well as satisfying legal requirements.
This policy is intended to reduce risks to the health and safety of employees and others who may be affected
by the way in which we conduct our business.

For site wide elements these will be developed by Cavanna Homes prior to commencement of any works as
part of the establishment process to include:
(a) The storage and distribution of materials

(b) Access to the works

(c) Working at height

(d) Control and disposal of waste

(e) The provision and use of temporary services e.g. Electricity

(f) Commissioning, including use of permit to work systems e.g. limitation of access, hot works etc.

(g) Exclusion of unauthorised people.

All Contractors will be required to submit an overall project method statement and details of high risk
activities / activities which will impact on others working on site 2 weeks prior starting on site.

All method statements and risk assessments will be accepted by us prior to contractors etc being allowed to
commence works on the site.

Additional periodic risk assessments will need to be made as required by Regulation 3 of the Management of
Health & Safety at Work Regulations 1999 as ‘risk’ activities arise. Where these activities affect others, the
relevant assessment and information shall be made known to them.

Risk assessments will be used to identify operations or areas where permits to work are required as part of
our control procedures. The Site Manager shall be responsible for the issue of permits to work to include the
following activities:
(a) Hot works
(b) Working within an area where openings in floors exist
(c) Electrical adaptations to existing live supplies
(d) Adaptations to existing surfaces under conservation orders.
(e) Drilling/coring into the structure
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
(f) Working in confined spaces
(g) Alterations to fire protection
Those involved in the risk assessment process will receive appropriate training.
Arrangements for Securing the Health and Safety of Workers

1. Elimination of Hazards
The organisation will ensure all hazards will be eliminated, so far as is reasonably practicable. If this is
not possible, the remaining risks will either be avoided or reduced to an acceptable level. The
measures introduced to achieve this will follow the principles of prevention and aim to combat risks at
source.

2. Assessment of Risk
If hazards cannot be eliminated or risks avoided, an assessment of risks will be carried out by
competent persons. The following factors will be considered during the assessment.

a. Likelihood
Whether the likelihood of the harm arising from the hazard is:
i. unlikely;
ii. likely;
iii. highly likely.

b. Severity
Consideration will be made of whether the severity of harm from the hazard is likely to be:
i. slightly harmful;
ii. harmful;
iii. very harmful.
Reference will be made to accident book records, reporting of Injuries, Diseases and Dangerous
Occurrences Regulations 1995 forms, sickness and ill-health records, first-aid records and incident (near
miss) records when reaching this decision.

5.2 Safety Method Statements

The Safety Method Statement should contain the following details as a guide:

• Description of the works


• Where the activity is to be carried out on site. This is important if work is being carried out in an
occupied building.
• Supervisors: The identity of person(s) with special responsibilities.
• The identity of hazards and specific precautions to be taken.
• The personal protective equipment to be used.
• Safety of the Public and Occupiers.
• Services: position of existing and whether they are live.
• Environmental controls.
• Emergency procedures and telephone numbers including means of communication.

The Method Statement should be short and concise. It should be kept in mind that it should inform the
operative how he can carry out his work task safely and what to look out for before he commences work.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
Each Contractor will prepare and issue a Method Statement and Risk Assessment for their element of the
work address items (a)-(i), which will be retained on site for information within the site safety filing system.
Method statements and risk assessments for each contractor’s works will be reviewed before their works
commence.

Contractors will provide Risk Assessments/Method Statements that accurately detail how they propose to
carry out their works. Risk Assessments /Method Statements will be issued to Cavanna Homes prior to works
being undertaken. Cavanna Homes will check the adequacy of the Risk Assessment/Method Statement against
their Standard Safety Procedure checklists.

Only when a Risk Assessment/Method Statement has been agreed by Cavanna Homes will the Contractor
start the works. Not withstanding the contents of a Risk Assessment/Method Statement, should Cavanna
Homes judge a Contractors method of work to be unsafe, then Cavanna Homes will instruct the Contractor
to suspend operations until an improved method can be arranged. Contractors are responsible for their safe
systems of work.

The following trade contract method statements will be produced with specific documents being produced for
high-risk activities, (this list will be expanded as the Project progresses as part of the Project Risk Register):

Activity Name of contractor Approximate Duration


and Start Date

Ground works Steve Hoskins


Bricklayers
Timer Frames Prestoplan
Carpenters
Decorators
Electrician
Fencing
Floor/wall tiling
Landscaping
Mastic
Plumbing/Heating
Dryliner
Ext rendering
Loft insulation
Roof Tiling
Scaffolding
Kitchens
Cleaners
Railings
Floor screed
Windows
Garage Doors
Street Lighting
Beam and Block
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

6.0 ARRANGEMENTS TO GIVE DIRECTIONS AND TO CO-ORDINATE OTHER


CONTRACTORS

6.1 Safety Training

All Cavanna Homes personnel will undergo both an induction on Company safety procedures and a site-
specific induction before being allowed to work on site.

All Cavanna Homes personnel visiting site must undergo an induction on Company safety procedures and be
escorted around the site.

Contractors will undergo a site specific induction before being allowed to work on site, and must take
responsibility for the safety and task specific training of their own personnel.

All visitors to the site will be escorted. Visitors who are not wearing appropriate PPE will be refused entry; to
include delivery personnel etc.

6.2 Safety Inspections

Cavanna Homes, Group Director for Health & Safety and Head of Construction will carry out random site
inspections and audits and produce a report. Action on all non-conformances will be agreed with the Site
Manager as part of the visit and shall be closed out by the Site Manager.

The Site Manager will monitor the activity of Contractors; non-conformances identified by the latter will
result in contacting the Contractors Safety representative and explaining the consequences by way of a formal
letter.

Anyone found not to be working safely will be removed from site.

6.3 Safety Meetings

Safety matters will be on the agenda of the following meetings:

• At post tender meetings, safety aspects of the project will be discussed and contractors proposals
taken into account.
• Pre-start meetings with Site Managers may be held with the Contractors prior to their
commencement on site. Safety representatives will be identified and contractor’s proposals for
monitoring safety will be agreed.
• Site based meetings (between appropriate parties) will also cover any abnormal safety issues as these
meetings are held to ensure everyone on site knows what is changing in regard to normal activity.
Specific hazards will be highlighted here as a reminder.
• Toolbox talks will be encouraged to allow specialist Contractors to go through their method
statements with their own Team and other interested parties on site.
• Toolbox talks will be given to site operatives/Contractors on an ad-hoc basis by The Principal
Contractor staff where it is deemed necessary to hold a talk on a particular aspect of safety.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
7.0 ARRANGEMENTS FOR VETTING CONTRACTORS, SUPPLIERS OF MATERIALS AND
PLANT WITH REGARD TO HEALTH AND SAFETY

If we need to use a contractor who is not on our Selected Contractors list then arrangements need to be
made to issue them with a pre-qualification questionnaire so that we can assure ourselves that they are a
competent contractor, prior to their start on site.

7.1 Contractors
Arrangements for identifying where works by one contractor and their assessment/control of
risk may affect the work of another.

Competency checks will include the provision of the following information, as a minimum:
(Regulations 4 CDM 2007 Competency)

(a) Health and Safety Policy.


(b) Insurance details.
(c) Management structure.
(d) Risk and COSHH assessments and Site Specific Method Statements.
(e) Confirmation that they will comply with The Principal Contractor Health & Safety Plan.
(f) Up-to-date product literature as appropriate and as will be required for the CDM Health and Safety
handover file.
(g) Confirmation that plant to be used is properly selected and maintained.
(h) Confirmation that plant/equipment operators are properly trained.
(i) Training details
(j) Accident/incident/enforcement notices and court action details.

These documents will be filed within the Safety Filing System in files designated to individual contractors.

7.2 Plant

Only qualified operatives will be allowed to operate plant and machinery. Training certificates are required and
must be handed to the Site Manager prior to commencement on site.

All operation certification for plant equipment, scaffold and lifting appliances must be evidenced prior to that
activity being allowed to commence on site.

7.3 Machinery

All plant involved in lifting operations on site must have current valid lifting certification as detailed in the
Lifting Operations + Lifting Regulations 1998, copies of the certification and current weekly inspections will be
held in the Site Safety Records folder.

7.4 Noise

Operations shall be subject to noise assessment if required and control measures implemented. All Trade-
contractors are to implement best practicable means to minimise noise in accordance with current statutory
regulations and local requirements. Where necessary Trade-contractors will include within their proposed
method statement a noise assessment that states how they will mitigate noise emissions. The Site Manager will
instruct the stoppage of any operation they deem to be unreasonably noisy.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
All Contractors will ensure that Personal Protective Equipment to comply with Noise at Work Regulations
2005 is issued to their own operatives. Cognisance is to be taken of local authority noise restrictions on
permissible working hours.

7.5 COSHH Arrangements

Any Contractor bringing onto site any hazardous substance must notify the Site Manager and be in possession
of a suitable COSHH assessment and material data sheet.

COSHH assessments will be filed within individual contractor files, which can be made available in the event of
an emergency, and listed on the COSHH Site Register.

All substances are to be stored as detailed by manufacturer’s health and safety data sheets.

All containers on site must be labelled.

Control of Substances Hazardous to Health Regulations (COSHH) 2002

Any material used, or encountered during work, which has the potential for harming health, will be subject to
an Assessment carried out under the Control of Substances Hazardous to Health Regulations 2002.
Hazardous substances include:-

1. Substances used directly in work activities (e.g. adhesives, paints, cleaning agents)
2. Substances generated during work activities (e.g. fumes)
3. Naturally occurring substances (e.g. grain dust)
4. Biological agents (e.g. bacteria and other micro-organisms)

When using such substances we shall:-

• Having consulted the material safety data sheet or safety label, assess the risks to health arising from
the hazardous substances used in or created by your workplace activities.
• Decide what precautions are needed. We shall not carry out work which could expose our
employees to hazardous substances without first considering the risks and the necessary precautions,
and what else we need to do to comply with COSHH
• Prevent or adequately control exposure. We shall prevent our employees being exposed to
hazardous substances. Where preventing exposure is not reasonably practicable, then we shall
adequately control it.
• Ensure that control measures are used and maintained properly and that safety procedures are
followed.
• Monitor the exposure of employees to hazardous substances, if necessary
• Carry out appropriate health surveillance where our assessment has shown this is necessary or where
COSHH sets specific requirements.
• Prepare plans and procedures to deal with accidents, incidents and emergencies involving hazardous
substances, where necessary.
• Ensure employees are properly informed, trained and supervised.

Water/liquid/gas electrical hazards on/or adjacent to the site which need control measures
This is covered within the Cavanna Homes Health and Safety policy on page 51. This is issued to all new sub-
contractors prior to starting work on site. All Cavanna staff are issued with a copy of the Health and Safety
Policy when they join the company. Any revisions to the policy are forwarded when issued
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

8.0 WASTE MANGEMENT ARRANGEMENTS

The Waste Management plan is currently being produced by Reconomy Solutions and will be in place prior
the superstructures starting on site
.
There is a Site Waste Management Plan on site which clearly shows the waste disposal instructions. Coloured
instructions are placed on the Site notice board and in the canteen facilities.

8.1 Lighting Arrangements

Temp lighting is only required in the houses when daylight is not sufficient. This is at the Site Manager’s
discretion but work will cease if sufficient daylight is not available.

9.0 MANAGEMENT MEETINGS AND INITIATIVES

The Site Manager is the point of contact for discussing and taking views on Health and Safety for all persons
working on site.

Contractors coming on to site for the first time will meet with the Site Manager to discuss emergency
arrangements and procedures, the provision and use of plant and equipment to be used by the contractor, and
discuss how the contractors works will be carried out to avoid risks to others.

Various meetings will be held throughout the course of the contract; as detailed below, minutes from which
will be circulated to the appropriate parties.

Type Frequency

Post tender review 1 per Contractor prior to start on site


Site Meetings Monthly
Progress Meetings Monthly
Commercial Meetings Every 2 months
Management Review As necessary
Design Team Monthly and is included in the monthly Site meeting,

10.0 Design Work Carried Out During the Construction Phase

Prior to commencement on site, all hazard identification elements raised as part of the Design process shall be
highlighted to the appropriate persons involved in construction, where it is felt there may be an impact;
particularly where residual risks/hazards are expected to be designed out as part of the construction process.

All construction works, which involve design proposals/changes, will be related to the Client and CDM
Coordinator as required by the Construction Design and Management Regulations 2007
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
11.0 EMERGENCY ARRANGEMENTS
(a) The emergency arrangements for this site will be explained to inductees as part of the site induction, and
details posted on the Site Safety Notice board.
(b) This site will have a dedicated, First Aider (Cavanna Homes Site Manager)
(c) A site Emergency can be one or more of the following: fire, accident, bomb threat or any other incident
deemed an emergency by management.
(d) In the event of a fire emergency all operatives are required to proceed immediately to the Fire Assembly
Point and remain there until they have been accounted for and given permission to leave. No one is
allowed to stop to gather tools or leave the site without notice. Any visitors to site will be accompanied
at all times and informed of the emergency procedure.
(e) As fire arrangements are subject to change as construction progresses, The Site Manager will have a duty
to bring this to the attention of site operatives and Contractors.
(f) In the event of any of the emergency services being required to attend site, the Site Manager will make
himself known to the emergency services on fire escape directions and details of any flammable chemicals
stored on site.
(g) Site-specific Emergency arrangements are appended as Appendix 6.

11.1 Accident Procedure including reporting as required by RIDDOR 95

(a) All accidents on site must be reported even if no medical attention is given; to include visitors to the
site and delivery drivers etc. The Site Manager shall use the Accident Reporting Procedure accordingly,
advising the Company Group Director for Health & Safety, Manager/Advisor where appropriate so that
we are compliant with RIDDOR 1995. The Site Manager will oversee all entries made in the Site
Accident Log which will be kept in the site office.
(b) The person discovering the accident will raise the alarm verbally or by use of mobile telephones.
(c) In the event of an incident/accident, all personnel will assemble at their designated assembly point, if a
warning signal is given.
(d) The Site Manager will check the total headcount and if necessary mobilise an emergency rescue team to
look for unaccounted persons. This will only be brought into operation once the risks of further
accidents have been assessed and it is considered safe to enter the working zone.
(e) The Site Manager will then determine the nature of the situation and any possible casualties and
telephone the emergency services as required (999) i.e. fire/ambulance to attend site.
(f) The Site Manager shall arrange a safe access and egress for emergency vehicles to the scene of the
accident. He/she will then inform the Head of Construction / Build Manager and Safety representative as
detailed in the Accident Reporting Procedure together with the CDM Coordinator.
(g) Following an accident or dangerous occurrence a complete investigation will then be carried out by the
specialist contractor along with Cavanna Homes which would be conducted in accordance with the
procedures highlighted in RIDDOR 1995. The HSE will be informed using the appropriate F2508 form
and using the Incident Contact Centre Website
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
11.2 Fire Action Plan

The site-specific plan is appended as Appendix 4 Emergency Procedures

11.3 Evacuation Procedure

Site-specific procedures will be explained to site personnel through the site-specific safety induction and
updates will be raised at the weekly meetings.

Evacuation Procedures and the Current Fire Plan will be posted on the Notice boards.
Excavations and Earthworks; Confined Spaces Operations

Excavations and Earthworks


This Company recognises that excavation is a hazardous operation.
‘Excavation includes any earthwork, trench, well, shaft, tunnel or underground working’
We will ensure that all practicable steps shall be taken where necessary to prevent danger to any person,
including where necessary, the provision of supports or battering etc to ensure that:-

1. any excavation or part does not collapse;


2. no material from the side, roof or adjacent to any excavation is dislodged or falls;
3. no person is buried or trapped in an excavation by dislodged or falling materials;
4. no part of an excavation or ground adjacent to it, shall be overloaded with materials or
equipment;
5. construction work will not be carried out in an excavation that has supports or battering
provided unless the excavation, equipment and materials that affect its safety has been
inspected by a competent person:-
a) at the start of the shift;
b) after any event likely to affect its strength or stability;
c) after any material unintentionally falls into the excavation;
d) the person carrying out the inspection is satisfied work in the excavation can continue
safely;
6. tests will be carried out on landfill sites for gases and other contaminants with appropriate
action taken if found;
7. safety helmets will be worn in and near excavations;
8. information, instruction and training on the use of laser devices will be given;
9. underground services shall be traced and steps taken to protect them and they will be located
and digging carried out by hand within 500mm of the service
10. suitable precautions must be taken to prevent undermining or weakening of nearby
structures;
11. overhead power lines will be protected against accidental contact by machine
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
11.4 Fire Prevention

It is our policy to carry out works so as to eliminate risk from fire and, to this end, have adopted the Code of
Practice laid down in HSE guidance “Fire Prevention on Construction Sites”.

(a) Fire extinguishers, fire notices, fire detection, alarm systems and fire exit signs will be provided for all
working areas.
(b) Materials and rubbish stored on site will be kept to a minimum.
(c) Rubbish will be cleared from the site on a regular basis and site working and access areas kept clean.
(d) Where flammable material or LPG must be kept on site, they will be stored in fireproof cages/containers
away from fire exit routes and potential fire hazards.
(e) Site accommodation will be of a half-hour fire resisting construction and Class 1 spread of flame, and
protection materials shall generally meet ‘Class 1 spread of flame standard’.
(f) A “No Smoking” rule will be imposed in all working areas, storage areas or wherever there are fire
hazards.
(g) We will operate a “Hot Works Permit system” particularly where the works involve a naked flame. In the
event of a fire the person discovering the fire shall raise the alarm and immediately report the situation to
the Site Manager.
(h) A person may attack the fire with the appliances provided only if they are trained to do so and as long as
there is no risk to themselves or others.
(i) If the fire cannot be safely tackled then all persons shall immediately leave the site by the nearest egress
and report to the person in charge of the assembly point; normally the Site Health & Safety Co-ordinator.
(j) The person in charge shall make a record of all those who have vacated the building and ensure that the
emergency services have been called.

These procedures will be developed as necessary and identified during site inductions.

Highly Flammable Liquids (HFL) and Liquefied Petroleum Gases (LPG)

Storage and Use of Highly Flammable Liquids (HFL)

1. The Dangerous Substances and Explosive Atmosphere Regulations 2002 will be complied with at all times.
2. Containers of all HFL’s will be identified and properly marked.
3. Quantities of HFL’s, less than 50 litres, will be stored in properly marked, lockable, ventilated metal
bins.
4. bulk storage (more than 50 litres) of HFL’s will be in securely locked cages or a well ventilated, secure
building, apart from other buildings and clearly marked HIGHLY FLAMMABLE LIQUIDS - NO
SMOKING and suitable fire extinguishers provided.
5. Where HFLs are used inside buildings no naked flames, spark-producing tools or smoking will be
permitted and suitable fire extinguishers will be provided.
6. HFL fumes and vapours will be dispersed by adequate ventilation.
7. A flameproof motor will be used if mechanical ventilation is required to disperse fumes etc.
8. Manufacturers or suppliers data sheets and COSHH assessments will be provided.
9. Warning notices and barriers will prevent unauthorised entry into buildings /areas where HFLs are
being used.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
Storage and Use of Liquefied Petroleum Gases (LPG)

L P G s (butane and propane) are highly flammable gases that are heavier than air and when mixed with air
form highly explosive mixtures. When used we will ensure:-

1. The company complies with the Dangerous Substances and Explosive Atmospheres Regulations 2002.
2. LPG cylinders will not be stored in buildings or containers but in a compound or cage at least 4m
from any building or other structures or sources of ignition.
3. Signs will be displayed indicating the presence of LPG and prohibiting smoking.
4. Except for special applications, LPG cylinders will always be used and stored upright.
5. After use, all LPG cylinders will be returned to the store.
6. When stored, used and full LPG cylinders will be stored separately and segregated from oxygen
cylinders. Suitable fire extinguishers shall be in place.
7. When being transported cylinders will be kept upright and secured. Vehicles will display warning
notices and carry a TREM card, be equipped with suitable fire extinguishers and the driver trained in
emergency procedures.
8. Hoses and connections between LPG cylinders and any tool or appliance will be inspected before use
for leakage and comply with current safety standards.
9. Under no circumstance will heat be applied to any LPG cylinder.
10. When not in use the gas will be turned off at the cylinder valve.
11. Where there is evidence of an LPG leakage the following action will be taken:-
a. gas turned off at cylinder valve;
b. all doors and windows opened;
c. area will be vacated and Site Manager to be informed; and
d. Electrical switches and telephones WILL NOT BE OPERATED.
12. In the event a cylinder catches fire, the fire service will be contacted immediately and no attempt
otherwise made to fight the fire.

11.5 Emergency Contact Telephone Numbers

A list of emergency contact telephone numbers is included in this plan. These details will be displayed in a
prominent position in the site office adjacent to the telephone.

12.0 MAINTENANCE OF WELFARE FACILITIES

Welfare arrangements will be provided in compliance with the CDM Regulations 2007.

The following facilities will be available on site and cleaned daily:-

(a) Toilet and wash hand basins with hot and cold water.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
(b) Canteen with hot food facilities.
(c) Mess room/area. Seating with back support
(d) A source of clean drinking water
(e) A first aid box (which will be kept in the site office).
(f) Sufficient and suitable fire fighting equipment.
(g) A heated drying room, where appropriate.

Under a shared welfare agreement as set out in the Health and Safety (First Aid) regulations 1981,and where
required by contract, the contractor will be responsible for providing their own qualified First
Aider/Appointed Person and their own first aid box; all accidents/incidents must also be reported to Cavanna
Homes Site Manager/ Construction Director (Health & Safety Co-ordinator) and Build Manager.

Site-specific arrangements for Cavanna Homes are described in the Site Specific safety Induction appended as
Appendix 2.

12.1 Personal Protective Clothing

The need for PPE is clearly identified during the induction process, highlighting were and what needs to be
worn. Specialist contactors will indentify at the pre-let stage the need for any specialist PPE required in
relation to the tasks within the programme.
• Identification of need is covered within the site induction
• A store will be provided for the PPE requirements of the Sub-Contractors
• If circumstances change training will be identified by the Site Manager or by the sub-contractor. This
training will be given as and when required to the site operative.

13.0 PROVISION OF INFORMATION


Arrangements for obtaining feedback from workers and giving advice, and the co-ordination of
the information
The Site Manager will receive feedback on a daily basis from workers and co-ordinate this information to
whom he feels necessary.

Workforce consultation procedures.


There is as “Open Door” policy, within our company were procedures are constantly evolving and all trades
will be up dated as required this will include toolbox talks, with them being invited to submit written
comments.

13.1 Information for contractors & co-ordination & co-operation of contractors


Contractors will be informed in writing at tender stage of:

• Risks to their health and safety arising from the environment in which the project is to be carried out.

• Copies of any relevant existing method statements/risk assessments for activities which impact/have a
possibility of impact on individual Contractors will be issued to them and all risks highlighted for
discussion during their tender visit to site, to include the developed Construction Phase Health &
Safety Plan.

• Initial site induction training will also be carried out. The relevant induction forms will be completed
and signed by the person receiving the induction and details will be recorded on site.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

• Contractors employed directly by Cavanna Homes will come under the Cavanna Homes jurisdiction
and be subject to our site rules and observances.

• Maintenance person’s etc visiting site for a short duration will receive a short induction and be
escorted on/off site and accompanied during their ‘visit’. These persons will only be allowed onto site
if they are dressed appropriately for the prevailing site conditions.
.

• All Contractors will be made aware of the developed Construction Phase Health & Safety Plan, as well
as being inducted.

13.2 Training

Toolbox talks will be provided for general health and safety matters basis as and when requested.

All Contractors will provide information on the suitability and the training undertaken by their operatives as
part of their Health and Safety documentation prior to commencing any works.

All Contractors are to carry out toolbox or task health and safety talks with their operatives on key points of
Health and Safety. Where the need arises, specific toolbox or task talks will be carried with the operatives
concerned.

All Toolbox talks and site briefs will be recorded on the appropriate form by the Contractors.

13.3 Health & Safety Information

All persons visiting or working on the Project will sign in/out of site before proceeding to their work area.

Operatives who operate plant or machinery must have documented evidence that they are qualified to do so
prior to commencing their work.

As part of the site induction, Contractors are asked if they have read and understood their own method
statement/risk assessment and sign to say that they have. If they have not, the Contractor will be asked to
carry out a Toolbox talk with his own operatives prior to commencement of works on site.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
13.4 Display of Statutory Notices

Statutory notices will be displayed on site in accordance with current legislation and include:

(a) Health & Safety at Work law Poster (which include the Safety Representative details for The Principal
Contractor)
(b) Employers Liability Insurance
(c) Revised F10
(d) Emergency arrangements (First Aider(s), Fire Assembly Point, , Contact numbers for
Hospital/Police/Fire Brigade)
(e) Fire Evacuation Arrangements and Site Plan detailing fire points etc
(f)

13.5 Site Registers and Documentation


The following will be available on site:

(a) Accident Log


(b) Record of inspections required under the Lifting Operations & Lifting Equipment Regulations 1998.
(c) Record of scaffold inspections as required by the Work at height Regulations 2005.
(d) Waste transfer notes.
(e) COSHH hazard data sheets, risk assessment.
(f) Electrical equipment registers, Maintenance checks and records.
(g) Plant inspection records.
(h) Risk assessments.
(i) Method Statements.
(j) Health surveillance.
(g) Emergency procedures.
(h) Manual handling assessments.
(i) Record of toolbox talks.
(j) Record of Site Inductions.
(k) Copies of the following Cavanna Homes information notices will be displayed on site.

14.0 CONSULTING AND CO-ORDINATING THE VIEWS OF PEOPLE


Contractors will carry out their statutory duties to consult with their workforce: results of these
consultations will be passed to Cavanna Homes, and where deemed necessary minutes will be issued to the
appropriate parties.

The Safety Plan and other health and safety related matters will be formally reviewed at regular meetings
which will be held on site. Attendance at these meetings will be obligatory for Contractors. Representatives of
the Build Manager and the Client will be invited to attend.

Cavanna Homes operates a policy of active safety management involving contractors and operatives in brief,
recorded daily site safety meetings. The purposes are to focus on safety issues concerning the day’s planned
activities and discuss any lessons to be learned from the previous days.

Site safety issues will be co-ordinated by the Site Manager, with the support of the Group Director for Health
& Safety, Co-ordinator/ Head of Construction and Build Manager

A team approach to safety will be encouraged with suggestions from all site personnel welcome.

The results of risk assessments and investigations of accidents and dangerous occurrences will be reported to
the whole workforce by site briefing to maintain the level of safety awareness.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
Temporary Works design and construction will be co-ordinated by a TWC (Temporary Works Co-
ordinator) appointed in writing by Cavanna Homes.

For elements of work designed by Cavanna Homes a Design Co-ordinator (DC) will be appointed to co-
ordinate the design process and liaise between the parties. Approval of these designs will be by the Project
Manager’s designated representative

15.0 SITE RULES

The site rules will be notified through the Construction Phase Health and Safety Plan, reinforced through site
inductions and clearly displayed at all times. Site Rules can be found in Appendix 1 of this document.

16.0 THE HEALTH AND SAFETY FILE

16.1 Arrangements will be made for relevant Contractors and consultants to pass on all
relevant information

Arrangements will be made for relevant Contractors and consultants to pass on all relevant information for
inclusion in the Handover CD-O&M Health & Safety File to Cavanna Homes.

16.2 Cavanna Homes will collect and collate the requisite information

Cavanna Homes will collect and collate the requisite information from each Contractor/sub-contractor and
issue it to the CDM Coordinator two weeks prior to practical completion.

16.3 Safety Standards and Objectives for the Project

The Company will, in undertaking the works, (briefly outlined in 2.3, and as detailed within the specification of
works), aspire to:
• Achieve zero fatalities, zero permanent disabilities and improve safety performance year on year;
• Comply with all current Health and Safety Legislation and Approved Codes of Practice;
• Ensure compliance with Cavanna Homes safety requirements and publish these as part of the Project
requirements;
• Work with and advise the Client in his aspiration to provide a ‘better’ environment for his employees;
• Maintain safe and unimpeded access and egress from the site, particularly for emergencies, and minimise
the disruption to neighbours, (both vehicular and pedestrian);
• Identify and address all risks arising from both our, and our contractors activities to include fire;
• Police and co-ordinate, through our Site Health & Safety Co-ordinator the use of safe procedures, tools,
plant, equipment and the appropriate use of Personal Protective Equipment (PPE);
• Work with the Clients direct contractors to maintain safety and site co-operation;
• Employ a Safety Manager/Advisor to carry out safety audits and inspections;
• Maintain adequate levels of welfare facilities for the work force, including contractors;
• Assess the impact of site activities on the environment and manage to minimise it;
• Identify and provide health and safety training to promote awareness of safety of self and others where
necessary.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

17.0 MONITORING

The Site Manager will actively monitor health and safety performance on site.

He will carry out daily inspections of the works and will highlight to the Contractor concerned, any breaches
of the regulations or bad practice that may be a danger to themselves or others working in the area.

Cavanna Homes Head of Construction and Build Manager will make regular visits to the site and written
reports will be issued to the Site, requisite Managers and the SMT (If required). All non-conformances will be
closed out by a re-visit or completion of the follow up form.

Cavanna Homes Directors make periodic safety tours and advise the Site Manager of any corrective action
needed.

Monitoring of site Health and Safety will also be discussed at the weekly Contractors Liaison Meetings where
related subjects will be raised, discussed and actioned.

All Contractors, Consultants and visitors have a responsibility to comply with the Site Specific rules and
statutory regulations. Ignorance is no defence.

17.1 Project Review

On completion of the Project an internal review will take place to assess how the standards set compare with
those actually achieved in order that any shortcomings can be addressed in future projects.

Throughout the Project and again upon completion each Contractor is assessed to determine not only the
quality of the work produced but also the cooperation and attention actually given to safety compared to
standards set out within this Plan.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

APPENDIX 1 EMERGENCY INFORMATION

The Principal Contractor is Cavanna Homes (Cornwall) Ltd

The SITE MANAGER is Ian Rankin

The Client is Cavanna Homes (Cornwall) Ltd

The CDM Coordinator is Alistair Brierley, comprehensive Designs Ltd

The Site First Aider is Ian rankin

The First Aid Kit is located Within the Site Manager’s office

The Fire Alarm Warning is A Klaxon and fire, fire, fire,

The Fire Assembly Point is As per drawing Haz 01 as explained in individual site inductions

The Fire Marshall is Ian Rankin

The nearest Hospital is Plymouth, Deriford

For FIRE/POLICE EMERGENCY DIAL 999

The Local HSE is in Plymouth 01752 226024 (see Emergency procedures for more information appendix 4)

THIS IS A NO-SMOKING SITE

THIS IS A HARD HAT SITE, unless the Site Manager decides otherwise and he is unlikely to do so.

ALL personnel arriving/leaving site must report into the Site Office, be inducted and sign in/out.

The Hours of Work are 8.00am to 6.00pm Mon to Fri


8.30am to 1.00pm Sat (by prior agreement)

Canteen/Toilet facilities are located in the existing client site office area compound

Limited parking on site and the surrounding streets. Under no circumstances should
contractor’s vehicles be left outside the adjacent premises.

ALL ACCIDENTS/DANGEROUS OCCURRENCES/NEAR MISSES must be reported


CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

The following Company rules ALSO apply to this site:-

Cavanna Homes operates a zero-tolerance stance on many safety related issues.

If you have not signed in, you are not here for FIRE, FIRST AID or FINANCIAL PAYMENT. Once you have
been inducted you have a duty to inform others who you suspect have not been informed of these rules. All
inductees will be issued with an induction sticker valid for this site only. Failure to comply will result in removal
from site.

The first induction is provided free of charge by Cavanna Homes. Any persons who are found to be in breach of
these site rules may be required to be re-inducted. Cavanna Homes reserves the right to charge an
administration fee for this additional induction.

Persons suspected of being under the influence of Drugs/Alcohol will be asked to leave site.
Persons displaying racist, sexist, violent or threatening behaviour WILL be asked to leave site and not
return.

You must not trespass upon adjoining areas except where permission has been granted, to facilitate the
execution of your work. Compliance with safety signs at all times.

You must comply with method statements/risk assessments written for your activity, and comply with
the arrangements described therein. Unless you state otherwise, it will be assumed that you have read and
understood this.

Suitable and sufficient PPE must be worn as appropriate, provided by your Employer. All areas on site are
deemed to be hard hat, high- viz and protective footwear areas unless designated otherwise by the Site
Manager.

Eating and drinking is only permitted in the designated areas. Currently the only designated area is the
canteen.

This site operates on 110V supply only and radio’s are allowed at a low volume are allowed.

You may only operate plant and equipment that you are trained/authorised to use, and carry out
tasks for which you are authorised and competent.

If you suspect that plant/equipment/scaffold is unsafe please notify the Site Manager immediately.

If you see any hazards on site, either real or potential, inform the Site Manager immediately: there are
hazard identification cards on site attached to the Safety Notice board for this purpose – you may remain
anonymous if you choose to, but no feedback on actions taken will be provided in this case.

Do not block routes for access/egress/escape or fire exits on the site.

Maintain a safe place of work by being tidy and removing your rubbish as the work progresses.

No person may work from height other than from a secure platform with guardrails and toe boards. All
mobile work platforms must be locked down when in use. You should not erect a mobile tower
unless you are either competent to do so /are supervised by a competent person. You are requested to
declare to the Site Manager, details of any physical condition and or the taking of medication, if you feel
that this would have an effect on your work. A separate form is available and required to be filled in for this
and any information given will be kept in the strictest confidence and returned to you/destroyed when you
leave site.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

APPENDIX 2 MEDICAL NOTIFICATION FORM

Medical Notification Form

NAME: ……………………………………………………………………

COMPANY: …………………………………………………………………………………………..

MEDICATION (and dosage if applicable): ……………………………………………………...

……………………………………………………………………………………………………………

REASON FOR MEDICATION: ……………………………………………………………………

TIMING/DURATION OF MEDICATION: ……………………………………………………….

Was this prescribed by a Doctor? YES / NO

SIDE EFFECTS: ……………………………………………………………………………………..

ALLERGIES: …………………………………………………………………………………………

Date of Last Tetanus Injection: ……………………………………………………………………

CONTACT NAME/No in case of EMERGENCY: ……………………………………………….

……………………………………………………………………………………………………………
I believe that the information given here to be correct.

SIGNED: DATE:
Date Received:

Received By (print name): Signature:

THIS FORM WILL BE KEPT IN THE STRICTEST CONFIDENCE & USED ONLY IN AN EMERGENCY: YOU
MAY ASK FOR IT TO BE DESTROYED WHEN YOU LEAVE SITE.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

APPENDIX 3 SITE FIRE SAFETY PLAN

SITE FIRE SAFETY PLAN FOR PLYMOUTH AIRPORT (MAIN SITE) 504K PHASE 1

1.1 Fire Plan Principles

1.1.1 Site specific fire arrangements will be briefed to all site operatives through the initial site
specific induction
1.1.2 The site shall have a designated Cavanna Homes Site Fire Warden (Site Manager)
1.1.3 Fire alarms, call points and extinguishers must be maintained on occupied floors.
1.1.4 Floors under the control of Cavanna Home will have alarm call points and extinguishers
maintained at all times
1.1.5 Where the work takes place in an occupied building then the buildings own fire warning
system will be used with the permission of the occupier.

1.2 Fire Prevention Procedures

• The overall responsibility for the prevention of fire rests with Cavanna Homes.

• All Cavanna Homes sites are no-smoking sites, except for the designated area and no burning is
allowed.

• The Design Team and Client will, where possible, specify materials of a non-flammable nature.

• Cavanna Homes is responsible for ensuring adherence to the Project fire plan and procedure, and
will:

i) Provide and maintain in good working order, suitable and sufficient fire fighting
Equipment and establish safe and adequate fire assembly points.
ii) Maintain means of safe access and egress in all areas at all times.
iii) Liaise with the Design Team and Client to secure permanent fire fighting
Equipment will be brought into service as soon as possible.
iv) Include fire patrols as part of the site safety inspections.
v) Conduct fire evacuation tests regularly as per the Company’s test procedures.
vi) Update the fire plans as the Project progresses and inform site operatives accordingly.
vii) Provide secure storage for flammable/highly flammable liquid and compressed gas.

• The Contractor is responsible for:

viii) Complying with all relevant statutory requirements and directives relating
to fire prevention as laid down by Cavanna Homes.
ix) Using, where possible, materials of a non-flammable nature for temporary works,
packaging etc.
iii) Ensuring that safe systems of work are carried out on site.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
iv) Advising Cavanna Homes of all COSHH materials brought onto site, to include data
sheets.

In addition, all Contractors will:

1 Appoint one or more fire-wardens, in writing, with a copy to Cavanna Homes. The fire-
warden(s) will:

a) Ensure adherence to all parts of this Procedure.

b) Instruct and train operatives and all persons under their control in all relevant
aspects of fire prevention on site.
c) Persons under their control in all relevant

2 Obtain approval from Cavanna Homes before erection/alteration/adaptation or extension of


any temporary facilities.

3 Liaise with, and obtain written approval from Cavanna Homes for all use and storage
requirements of flammable liquids and gases.

4 Not use polyurethane or isocyanate foams in permanent works or for temporary


protection within the buildings.

5 Obtain Permits to Work for all hot work.

6 Examine at short intervals all hot work involving naked flames and
sparks both during the work and after the work has finished.

7 Petrol/diesel powered equipment should be so located that their exhausts are well
away from combustible materials. Engines should be shut off during refuelling
operations. Only electrically driven or air operated equipment should be used unless
absolutely necessary, - written permission is to be obtained from the Head of Construction
before any petrol or diesel plant is brought to the site.

8 Oxygen cylinders should be stored well away from readily combustible materials and
acetylene or other fuel gas cylinders. It is preferable that the storage of oxygen
cylinders should be separated from other stores by fire resistant materials. Storage
areas should be well ventilated.
Liquid petroleum gas cylinders containing propane or butane should be stored in the open,
well away from any heat source, in secure, well ventilated and suitably labelled storage areas.
All oxy/acetylene welding/cutting sets must be fitted with a spanner/key for emergency
isolation. Flash back arresters are also obligatory.

9 It is essential that all cylinders not in use should be returned to the storage areas immediately
after use and not left within the buildings under construction or within temporary huts.
Correct bottle trolleys are to be used for transporting cylinders. Wherever possible, all
compressed gas cylinders in use will be returned to the appropriate storage area at the end of
the working day. In exceptional circumstances, the Contractor will seek the written approval
from Cavanna Homes for the establishment of an area on site for the temporary storage of
cylinders. Such an area will be clearly identified as such. Portable cylinders supplying
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
installations should be located out of doors where possible, if impossible a written method
statement must detail all precautions to be taken and when two or more are used together
they should be suitably manifolded using properly designed fittings.

10 Comply fully with Cavanna Homes procedures relating to fire safety at all times.

The guidance note "Fire Prevention on Construction Sites" has been considered in the writing of these
procedures and all parties shall co-operate to ensure that all statutory requirements are met.
Housekeeping will be maintained to a high standard to ensure that combustible materials do not build
up and cause a fire hazard.

• The ‘Temporary Electric’s’ Sub-contractor appointed by Cavanna Homes will carry out regular
inspections and tests on all electrical equipment and fittings.

• Cavanna Homes and all Contractors will:

1. Target a zero loss rate due to fire.


2. Comply with all statutory requirements relating to fire safety including e.g. flammable
substances, fire detection and alarm, means of escape etc.
3 Ensure a fire certificate for all temporary accommodation has been
obtained prior to occupation of such premises.
4. Ensure that open fires are not started for any reason whatsoever.

1.3 Means of Escape

1.3.1 All works must be designed and erected so that a safe route is always available to a final exit
(place of safety). These routes must be clearly identified, with a maximum travel distance in
accordance with the relevant standards.

1.3.2 All walls including windows and doors which form part of an escape route or staircase
enclosure must have minimum fire resistances of not less than half an hour.

1.3.3 Doors to protected staircases and escape passageways must be provided with self-closing
devices and must be kept closed when not in use.

1.3.4 Buildings in which flammable and highly flammable liquids are stored or used must be provided
with at least one segregated and fire protected means of escape.

1.3.5 Standards must be agreed by the local enforcing authorities after a basic proposal has been
accepted by Cavanna Homes.

1.3.6 Fire escape routes are to be kept unobstructed and, if necessary, illuminated at all times.
When work necessitates the use of naked flames, for example in service voids and other
similar locations having a high probability of fire, a portable fire extinguisher is to be readily
available, and must only commence once a Permit to Work has been authorised by Cavanna
Homes.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

1.4 Fire Fighting

1.4.1 Cavanna Homes will establish a site procedure for dealing with a fire emergency that takes
into account the hazards involved and any special features in the area. The procedure includes
the following points:

i) Sounding a warning alarm.


ii) Dealing with a fire.
iii) Closing down of operations.
iv) Evacuation of the area.
v) Assembly at marshalling points and carrying out of roll calls.
vi) Locating missing persons.

1.4.2 The Cavanna Homes Site Manager/ Fire Warden will instruct and train all personnel under his
control in fire precautions and the actions to be taken in the event of fire. He will also
instruct and train all supervisors (above operative level) in the correct use of fire fighting
equipment.

1.4.3 Cavanna Homes will arrange for adequate numbers of hand extinguishers of a suitable type to
be available and maintained within the permanent works as they develop until such time as
permanent provision is secured.
1.4.4 All fire fighting equipment will be properly maintained, examined and tested in accordance
with the manufacturer's instructions, and shall conform to the requisite British Standard.

1.5 Fire Emergency Protocol

• In the event of the discovery of any fire, the nearest local fire alarm will be activated by
the discoverer of the fire. (Temporary fire points will be readily accessible until such time
as the permanent alarms are installed).

• All personnel within audible distance of the alarm will immediately evacuate the area and
report to the assembly/muster point.

• The Cavanna Homes site office must be notified immediately by the quickest practical
means by the discoverer of the fire.

• Cavanna Homes site office personnel will establish where possible:-

i) The exact location of the fire.


ii) The extent and nature of the fire.
iii) Whether there are any casualties.
iv) The evacuation status.

• Cavanna Homes site office will immediately:-

i) Activate the fire Alarm (if not already activated)


ii) Contact the appropriate emergency services requesting
assistance. Advise CLIENT.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
iii) Ensure all areas are quickly evacuated and site personnel are
at assembly points.

• WITHOUT TAKING ANY PERSONAL RISKS, and if reasonably safe to do so, an


attempt may be made to extinguish the fire by using the nearest appropriate
extinguishers.

• All Contractors' Supervisors will report to Cavanna Homes representative at the


assembly point and verify that all personnel under his control are accounted for as a
result of the evacuation.

• Cavanna Homes will arrange for the Emergency Services to be met at the Main Gate, give
them copies of the Floor Fire Plans and guide them to the incident.

• Upon arrival of the Emergency Services, Cavanna Homes Site Manager will brief the
Officer in Charge, and provide such assistance as may be requested.

If, after an assessment of the situation, a total evacuation of the construction site is warranted, this
will be authorised by Cavanna Homes and the warning system for evacuation activated.

• Upon hearing the evacuation sirens/bells:-

i) All hot work will be stopped and all flames extinguished.


ii) All machinery, vehicles etc will be switched off.
iii) Any machinery blocking access routes will be moved to facilitate access by the
emergency services.
iv) All personnel will proceed to the appropriate fire assembly points, at front of
club house/centre of pitch where each supervisor will confirm the attendance
of their operatives to Cavanna Homes Site Manager/ Fire Warden.

• The results will be relayed to Cavanna Homes Head of Construction and Build Manager
who will liaise with the Client, in deciding upon any action in the event of personnel
being missing.

• No personnel will return to work until the "all clear" has been relayed from Cavanna
Homes Site Manager/Site Fire Warden to all relevant personnel.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

1.6 What to Do in Case of Fire

WHAT TO DO IN CASE OF FIRE

A IF YOU DISCOVER A FIRE OR SMOKE

(i) OPERATE THE FIRE ALARM IMMEDIATELY BY CALLING FIRE,


FIRE, FIRE OR ACTIVATING A RED FIRE ALARM CALL POINT

(ii) LEAVE THE BUILDING/SITE BY THE NEAREST AVAILABLE FIRE


EXIT AND PROCEED TO THE ASSEMBLY AREA AT THE FRONT
GATE.

FIRE FIGHTING EQUIPMENT MAY BE USED ONLY IF YOU


HAVE BEEN TRAINED AND IT IS SAFE TO DO

B FIRE EVACUATION PROCEDURE

(i) THE ALERT SIGNAL IS A SERIES OF SHORT SIGNALS ON THE


KLAXON ALARM AND FIRE, FIRE, FIRE. REMAIN AT YOUR
WORK PLACE BUT BE PREPARED TO LEAVE IF NECESSARY.
AWAIT FURTHER INSTRUCTIONS, FROM THE FIRE MARSHAL.

(ii) THE EVACUATION SIGNAL IS A CONTINUOUS SOUNDING OF


THE ALARM,

(iii) ON HEARING THIS, LEAVE THE SITE/BUILDING BY THE


NEAREST AVAILABLE EXIT AND PROCEED TO THE ASSEMBLY
POINT, WHICH IS AT THE FRONT GATE.

C NOTE:
DO NOT USE THE LIFTS
DO NOT STOP TO COLLECT PERSONAL BELONGINGS
DO NOT RE-ENTER THE BUILDING
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

Appendix 4: EMERGENCY PROCEDURES


Cavanna Homes
EMERGENCY PROCEDURE

CLIENT:. Cavanna Homes (Cornwall) Ltd (Known as Cavanna Homes during this document)

SITE ADDRESS: Plymouth Airport (Main Site) 504K Phase 1

TELEPHONE NUMBER: 01803 618688 FAX NUMBER: 01803 618689

SITE MANAGER Ian Rankin

APPOINTED PERSONS
(FIRST AID): Ian Rankin

EMERGENCY SERVICES: 999 Ask for service needed


Fire (if people are trapped) Give YOUR Name
Ambulance Give Site address
Police (If there is a fatality) Be Clear
Give directions if required
KEEP CALM

AMBULANCE (Local Number) 01752 695400 Number : 999

FIRE BRIGADE (Local Number) 01752 333600 Number : 999

POLICE (Local Number) 0845 277 7444 Number : 999

LOCAL HOSPITAL 01752 202082 Number : 999


(With A+E Facilities) Derriford

H.S.E. 0870 154 55 00 or Tel: 01752 226024


Construction Division – Plymouth
Ballard House
West Hoe Road

RIDDOR Tel; 0845 300 99 23

SAFETY ADVISOR (Cavanna Homes) Name: Building safety Group


Tel: 01454 618444
Mobile: 07712 792944

SITE HEALTH & SAFETY CO-ORDINATOR: Name: Martin Cavanna, Cavanna Homes (Cornwall) Ltd

MOBILE TELEPHONE NUMBER: 07850 229005

ELECTRICITY Number British Gas 0800 048 02020


GAS Number 0800 048 02020
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
WATER Number 0800 169 1144
TELECOM 100 Ask for dial before dig 0800 800 1500

APPENDIX 5: OUTLINE METHOD STATEMENT

CAVANNA HOMES (CORNWALL) LTD


METHOD STATEMENT AND CONSTRUCTION PHASE PLAN
CONSTRUCTION OF 100 DWELLINGS

(a) Project description

This project consists of 100 open market properties of which 15 constructed with timber frame.
The accommodation is a mixture of 2, 3 and 4 bed terraced and town houses.

The main infrastructure roads and drainage for this development will link the existing highway
and the drainage network in Plymbridge Road. Existing services within the vicinity of the new
proposed new access will require lowering to provide adequate protection under the new road
construction. This alteration will be carried out by all relevant service authorities. The
construction access will be via the existing access from Plymbridge Road. The construction area
will be accessed by a haul road allowing the site estate road to be constructed inside the existing
security fencing. Adequate temporary signage will be provided to warn the pedestrians and the
road users. The estate roads will be at a later date to link up the Plymbridge Road as soon the
off-site works are nearing the completion stage. The road link will be made once the estate road
is ready to receive the base course tarmac and safe access can be achieved to exit the site.

It is anticipated the road construction and some of the plot foundations will be carried out at the
same time. There will be two separate ground work teams engaged in the initial construction
works. For the initial 8 week period all the infrastructure works will be carried out within the
site secure boundary.

Sutton Harbour Group is responsible for the provision of off site foul and surface water
connections for this development. These connections will be required and should be made
available by the Sutton Harbour Group before early December 2011. During these works
consideration must be given to maintain the traffic flows and the pedestrians using Plymbridge
Road. The off-site drainage will be constructed as part of the requisition and the management of
the contract will be administered by South West Water. The contractor will be responsible for
providing all relevant signage and notifications in advance of the works. It is anticipated these
works are likely to commence shortly and the outlet connections are made available by early
December 2011.

There are proposals to construct onsite soakaway systems within the courtyard areas to drain
some part of the onsite roads and the private drives. It is anticipated that all roads and drainage
works will be completed prior to commencement of any house superstructure works on site.
However, it is likely the foundations of plots 13-32 may be accelerated in advance during the
construction of the roads and sewers to achieve an early opening of a show home.

During the construction period a 1.8m high close board fencing will be installed to protect the
existing trees and hedgerows. All operatives will be inducted with respect to the site safety rules
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
and Traffic Management Plan. All risk assessments and the method of works will be carried out
by the nominated supervisor from the ground works contractor.

Prior to excavations all service authorities will be contacted to establish the position of the
existing main services within the site and footpaths and at the entrance to the site. Main services
will be located by either hand dug trial holes or CAT locator as appropriate.

Sutton Harbour Group is responsible to bring all the main services to the site boundary and the
onsite main service extension needs to be progressed as soon as the onsite roads are completed
to base course. The onsite services will be managed by the site team and continued from the
entrance into the site by the appropriate service contractor.

The ground works contractor will be responsible to remove all excavated materials off site. The
material disposal will be carefully managed inline with the project Traffic management plan. All
removal will be through the existing construction access. It is necessary to improve the visibility
at the entrance and this will be discussed and agreed in advance with the Highway Authority.

The main vehicular access to the construction area will be stoned and maintained clean
throughout the operation to keep the existing roads clean. The spoil will be transferred by the
appointed haulage company nominated by the ground works contractor.

There will be a safe working area established within the site and the existing security fencing will
be retained to stop any construction vehicle accessing the main runway or turning areas adjacent
to the working location. This fencing will be removed at a later stage when the link road is
constructed by PCA and open to use.

Plymouth City Airport Tower will be contacted by the nominated personal to advise when the
works commence and finish on a daily basis. The contractor will be expected to work with the
machinery applying restrictions to the arm reach stipulated by the PCA.

All operatives will be expected to wear PPE, hard hat, hi visibility jackets and safety footwear in
the operating areas. Due to the noise generated from the airfield every personal will be advised
to wear hearing protection during heavy traffic movement in the airfield.

The spoil movement will be delayed until the onsite roads are completed to base course
completion. The material will be transferred from the site using the construction access turning
left at Plymbridge Road. Lorries will not be allowed to park and wait on Plymbridge Road during
this operation. There will be a banksman employed to help with the traffic movement during the
bulk material disposal.

The ground works contractor will be responsible for maintaining the existing highway free from
any spoil spillage and causing mud on road during the wet period. The contractors will be
instructed to ensure and take all necessary steps to control the dust from all their operations
associated with this project.

The attached site plan show the following as proposed for this development:-
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
• Sales centre location has been identified within plots 60-62. This will be established within
the planning for phase 1. There will be a provision for sales parking of up to 3 cars outside
the sales centre area.
• Plots 18 – 32 will be of timber frame construction

• The site set up has been identified in GREEN on the attached plan and this area will be
used as the site compound for the duration of this phase and the remaining phases. The
re-location of this compound will be subject to the planning of the future phases.

• The area highlighted in PURPLE CROSS HATCHED will be utilised for the site waste
management. All waste will be segregated on site during the project and dispose off to
either a waste transfer station or the recycling centre.

• The area highlighted in YELLOW will be used for the storage of bulk and palletised
materials. This will be a good central service area to maintain the delivery traffic to off
load the material and turn around to exit through Plymbridge Road. Until such time the
link road is built and open to public, all deliveries and the site traffic will be using the
access from Plymbridge Road. The traffic management plan will be reviewed once the link
road is in place. This will allow us to manage the site delivery traffic using a one way traffic
arrangement to enter the site from Plymbridge Road and exit through the Tavistock Road
via the new link road.

• The area highlighted in YELLOW/BLACK HATCHING will be used initially for the sub-
contractors parking. However, during the construction the plans will be reviewed to
accommodate other project requirements. In the case of further development taking
place in the vicinity of this area, the parking provisions will be relocated within the
development.

• The haul road is marked in BLUE and this road will be utilised for the construction of the
initial phase. The construction access route will be reviewed regularly to correspond with
all future site activities. Future estate roads and the new development phases will have an
impact on this haul road. The construction haul road will be diverted at all times to
segregate the pedestrians and the residents from the daily construction activities.

• The initial construction access will be via Plymbridge Road and this access is highlighted
with RED DIRECTION ARROWS.

• Once completed the initial section of new site roads will be screened off by Timber
hoarding to stop any construction vehicles entering the site. This area will be clearly
marked with directional signage for the site visitors and residents who will be taking
occupations of the completed units.

• The sequence of the build will follow as indicated in GREEN arrows starting with plots
18 –> 32 in Timber frame; 17 –> 12; 11 –> 7; 6 –> 1; 33 –> 38.

• The traffic management during construction and occupation will follow the route as
indicated on the attached plan as marked in RED and BLUE. See the Traffic management
Plan for detailed information.
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

• The Site manager will be expected to keep close liaison with PCA regarding operations
involving cranes due to low flying aircraft. The crane operating company must adhere to
all PCA and CAA requirements regarding operations. Notifications to PCA tower and
agree the operating times are paramount during heavy lifting of floor slabs and timber
frame components

Existing mains/services

No evidence of any overhead services through this parcel of land. There are many underground
services some of which will require diversion during the construction works. All diversion works
will be carried out as appropriate in coordination with the project. All off site services will be
brought to the site boundary by others.

Existing BT and Virgin media cables have been identified within the existing footpath at the
entrance to the site. The depth of these cables will have an impact on the road construction
when forming the site entrance. These cables will require lowering during the construction or
placement of concrete slab to protect the services. Lowering of the cables will be carried out by
the service companies prior to commencement of the road works.

All new services will been laid and co-ordinated information will be issued to site as soon as they
are available.

Construction Vehicle Movements:-

During the ground works activity it is anticipated a minimum of 10 vehicles per day will be
visiting site.
This will increase to a maximum of 20 vehicles per day and additional 15 vehicles to
remove the spoil. Movement will be limited to shorter timescale of 1-2 weeks at any on time and
the vehicle movement will be at shorter intervals leaving or entering the site.
All transporters will be loaded within the site boundary and the site personal will be
responsible for managing the traffic flow, to and from the site.
During the superstructure activities the number of construction delivery vehicles
will increase. This is estimated at 15 further vehicles per day. All deliveries will be unloaded
nearer the compound area which is located in the centre of the development..

Construction Operation Hours:-

As stated in the code of Practice the construction operation hours are as


Follows:-
Monday – Friday 08.00 - 18.00
Saturday 08.30 - 13.00
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

Construction Vehicular Routes:-

The attached traffic management statement and the route plan shows how the
traffic will be managed to and from site initially. However, the management of the vehicle will vary
from time to time and this will reflect in the on-site traffic management record. Due to the nature of
the development the traffic management route is likely change when the link road is completed and
open to use.

Construction Delivery Hours:-

Construction deliveries will be managed within the site operating hours and
all suppliers will be notified about the delivery times.

Construction vehicles and Parking;-

It is anticipated at least 20-25 sub-contactors vehicle per day to service this site.
The sub-contractors will be expected to park their vehicles within the site
boundary in the allocated parking area. This will exclude the statutory authorities
who will be carrying out service alterations and other works outside the site
boundary.

Sub-contractors will be encouraged to share the transport to minimise the


parking provisions required on site.

Site Investigation and Reports


The following reports have been produced and available for reference:-
• Energy Statement
• Acoustic Report and Recommendations by RPS acoustics
• Soakaway Test Report by Ruddlesden Geotechnical Ltd
• Ground Condition Report Phase 2 by Peter Brett Associates
• Ecological Assessment by Acorn Ecology Ltd
• Archaeology Report by AC Archaeology
• Risk Assessment by BAE Systems
• Drainage Assessment by Faber Maunsell
• Environmental Statement
• Flood Risk Assessment
• Health Impact Assessment
• Ground Condition Assessment Phase 1
• Transport Assessment
• Sustainability Statement
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

TRAFFIC MANAGEMENT PLAN

1. All site deliveries to use a two way system to unload materials using the existing access road
to the designated areas. Directional signs will be displayed to warn the delivery vehicles from
the construction site entrance. The construction site entrance will be checked for all the
visibility requirements prior to the site set up works. Any long wheel vehicles entering the
site will be managed with a use of a banksman to maintain a safe entrance or exit.

All suppliers and the sub-contractors will be notified at the time of placing the orders
regarding the traffic management systems.

The traffic management will be set out initially in two stage plan. The first plan is to use the
access from Plymbridge Road for access and egress. This access will be used by only the
construction workers and the material delivery vehicles. The second plan is change the traffic
system into a one way system. The vehicles will enter the construction area via Plymbridge
Road and exit through the new Link Road onto Tavistock Road. This can only be achieved on
completion of the Link Road. Therefore, it is necessary to review the plan during the
construction period to suit the available further options. These changes will be in consultation
with the highway authority to take into account the general traffic volumes in this location.

2. Sub-contractor parking has been identified in the construction area. This area will be shared
with the site waste management facility. All adjacent areas to the compound will be utilised
for material storage. The site forklift and the machinery used by the ground works contractor
must comply with the traffic plan. However, any operations affecting the pre-planned traffic
management should be considered by the site team.

3. Sales visitors and other users visiting the site will be directed through the completed estate
road. This access road will be clearly marked for the site visitors and the residents. In
Plymbridge Road clear road signs will be placed to manage the traffic flow.

4. This traffic management plan will be reviewed and amended during the construction
programme by the site team to ensure a safe traffic management system is in place at all
times. It is important to review the stages of purchaser’s occupation in a methodical sequence
to incorporate a suitable and effective system. Regular coordination between sales
department and the site team during construction should take place to provide detail
information to occupiers and the site visitors.

(PLEASE REFER TO ATTACHED TRAFFIC MANAGEMENT PLAN )


CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

APPENDIX 6 CONSTRUCTION PROGRAMME

FC Concrete Foundations

B1 Brickwork/block to DPC

OS Beam and block including drainage

B2 Brickwork/block to joist

B4 Brickwork/block to gables or to wall plate (3-storey)


J1 Joists 1st floor including scaffold adaption’s

CR
B5 Carpentry to roofto( gables
Brickwork/block 3-Storey)
(3-storey)
B3 Brickwork/block to wall plate or 2nd floor joists (3-storey)

B5 Brickwork to gables (3-Storey)


CR Carpentry to roof (2-Storey)

RO Roof onnd
J2 Joists 2 floor including scaffold adaptions

PS Plumbing and screed floors

C1 Stairs and metal stud

P1 Plumbing 1st fix

E1 Electric 1st fix

DL Dry lining

C2 Carpentry 2nd fix

P2 Plumbing 2nd fix including carpentry boxing

K/T Kitchens and wall tiling


CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

E2 Electric 2nd fix

DE Decorations

FF Finals
Externals

SN Snagging including build clean

R
BC Retaining walls and handover inspections
Build completion

DEx
HO External
Handoverdecoration
to Sales

S Plot services

PD Paths and drives including patios

W Install windows

F/T Fencing & Turfing

RW Render walls
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

APPENDIX 7 NOTIFIABLE PARTICULARS

SITE NOTICE BOARD LAYOUT

Emergency Fire Action A1 Site Plan Health & Safety


Action Plan at law Poster
Information

Site Safety Induction


Rules Information

Indemnity HSE Form Hazard Hazard Traffic Management COSHH


Insurance F10 Sheet 1 Sheet plan Poster
3

Emergency Hazard Hazard Site Services Plan


Contact Sheet Sheet
Information 2 4

Construction Phase plan Scaffold Plant Accident Book


Record Record
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
APPENDIX 8 SITE PLAN
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
APPENDIX 9 TRAFFIC ACTION PLAN
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
APPENDIX 10 F10
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE
APPENDIX 11 HAZ I DRAWING
CONSTRUCTION PHASE HEALTH & SAFETY PLAN
CONSTRUCTION PHASE PLAN
SITE NAME – PLYMOUTH AIRPORT (Main Site) 504K PHASE ONE

Potrebbero piacerti anche