Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
4.0 STAKEHOLDERS
10.0 CONCLUSION
11.0 REFERENCES
12.0 APPENDIX
1.0
PROJECT INTRODUCTION
Project Scope
Fig. 5.1.13 : Sijil Carian Rasmi Fig. 5.1.14 : Land title Fig. 5.1.15 : Site boundary
5.1 SCHEMATIC DESIGN PHASE
Conclusion
5.2
PROJECT INFORMATION
Air
Conditioning and Mechanical
Ventilation (ACMV) services.
.
5.2 DESIGN DEVELOPMENT PHASE
5.2.7.1 BORANG A
Analysis statement
Payment
Preparation
Valuation
Certificate
1.
2.
3.
4.
5.4 CONTRACT IMPLEMENTATION PHASE
5.4.2.1.9 Stage Claim
To collect a professional fee , PLUS Berhad has their own invoice
checklist that ensures efficient process of stage claim.
5.4 CONTRACT IMPLEMENTATION PHASE
Fig. 5.5.3.1 : Borang G checklist Fig. 5.5.3.2 : Letter for checks to Fig. 5.5.3.3 : Letter to notify the
authorities submission of Borang G to
consultant
The quantity surveyor prepares the financial statement and ensure the
Fig. 5.5.6.1 : Letter notifying the
accounts are balanced according to the agreed contracts. Once the client of the issue of CMGD and Final
final accounts are completed, the architect issues a letter to notify the Accounts
client to release funds for final payment and complete the contract.
Fig. 5.5.6.2 : Summary of final certificate Fig. 5.5.6.3 : Final payment certificate Fig. 5.5.6.4 : Statement of Final Accounts
5.6 IMPLEMENTATION TOOLS
5.6.4 Lumion
Harris, F., McCaffer, R. and Edum-Fotwe, F. (2013). Modern construction management. Hoboken, N.J.: Wiley-Blackwell,
pp.171-210.
S.Barrie, D. and C. Paulson, B. (1981). Professional construction management. [South Melbourne, Vic.]: Royal Australian
Institute of Architects (Victorian Chapter), pp.332-352.
Cidb.gov.my. (2019). Contractor Registration Requirements and Procedure with CIDB. [online] Available at:
http://www.cidb.gov.my/index.php/en/legislation/guidelines/keperluan-dan-prosedur-pendaftaran-kontraktor-dengan-cidb
[Accessed 1 Oct. 2019].
Copperproject.com. (2019). PM 101 — How to Define Project Success Criteria? - Copper Project Management Software.
[online] Available at: https://www.copperproject.com/2018/03/pm-101-define-project-success-criteria/ [Accessed 1 Oct.
2019].
Linkedin.com. (2019). Final Account Procedures (for construction projects). [online] Available at:
https://www.linkedin.com/pulse/final-account-procedures-construction-projects-mina-anis/. [Accessed 1 Oct. 2019].
Process (2019). Tender Process | A Complete Procurement Guide. [online] Slideshare.net. Available at:
https://www.slideshare.net/TenderProcess/tender-process-27047746 [Accessed 1 Oct. 2019].
Pro), M. (2019). The 3 Procurement Methods: Advantages and Disadvantages. [online] Property Like a Pro. Available at:
https://propertylikeapro.com/procurement-methods/ [Accessed 1 Oct. 2019].
The Constructor. (2019). Risk Management in Construction Projects. [online] Available at:
https://theconstructor.org/construction/risk-management-construction-projects/24873/ [Accessed 1 Oct. 2019].
WhatIs.com. (2019). What is triple constraint? - Definition from WhatIs.com. [online] Available at:
https://whatis.techtarget.com/definition/triple-constraint [Accessed 1 Oct. 2019].
.
12.0
APPENDIX
12.0 APPENDIX
12.0 APPENDIX
Concept proposal.
12.0 APPENDIX
Land title
12.0 APPENDIX
Site boundary
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
12.0 APPENDIX
Letter notifying the client of the issue of CMGD and Final Accounts.
12.0 APPENDIX