name date
Design
Project Check
Bulding Approve
0.850
0.0222
2-2 CHECK ONE WAY SHEAR CAPACITY AT THE FACE OF COLUMN & PILE (ACI 318-08, Chapter 11)
2-2 CHECK COLUMN PUNCHING CAPACITY (ACI 318-08, 11.4.7.4, 11.11.1.2, 11.11.6 & 13.5.3.2)
2-3 CHECK SINGLE PILE PUNCHING CAPACITY (ACI 318-08, 11.4.7.4, 11.11.1.2, 11.11.6 & 13.5.3.2)
0.850
0.0222
2-2 CHECK ONE WAY SHEAR CAPACITY AT THE FACE OF COLUMN & PILE (ACI 318-08, Chapter 11)
2-2 CHECK COLUMN PUNCHING CAPACITY (ACI 318-08, 11.4.7.4, 11.11.1.2, 11.11.6 & 13.5.3.2)
2-3 CHECK SINGLE PILE PUNCHING CAPACITY (ACI 318-08, 11.4.7.4, 11.11.1.2, 11.11.6 & 13.5.3.2)
0.836
0.0262
2-2 CHECK ONE WAY SHEAR CAPACITY AT THE FACE OF COLUMN & PILE (ACI 318-08, Chapter 11)
2-2 CHECK COLUMN PUNCHING CAPACITY (ACI 318-08, 11.4.7.4, 11.11.1.2, 11.11.6 & 13.5.3.2)
2-3 CHECK SINGLE PILE PUNCHING CAPACITY (ACI 318-08, 11.4.7.4, 11.11.1.2, 11.11.6 & 13.5.3.2)