Empresa: CIBA Industrial
PROYECTO : CONSTRUCCION E INSTALACION DE LA CANALES
EN HIERRO Y ACERO
$ -
$ -
$ -
SUBTOTAL
1.2 INSUMOS iva
1.21 Soldadura 6011 de 1/8 Kg 2.2 1
1.22 Soldadura 7018 de 1/8 Kg 0.0 1
1.23 Grata de limpieza Un 0 1
1.24 Cepillo Un 0.50 1
1.25 Disco de Corte 14 Un 1.00 1
1.26 Disco de pulir 7 Un 1.00 1
1.27 EPP Un 1 1
1.28 Lijas Un 2 1
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
1.6 TRANSPORTE
1.61 Transporte de Herramientas Viaje 0.2
1.62 Trasporte de Equipo Viaje 0.2
SUBTOTAL
COSTO DIRECTO
FECHA : MARZ-23-12
METRO LINEAL
VALOR/UN VR/TOTAL
$1,309 $98,161
$0
$0
$98,161
$ 6,000 $ 13,200
$ 6,000 $ -
$14,000 $ -
$8,500 $ 4,250
$7,500 $ 7,500
$7,500 $ 7,500
$1,000 $ 1,000
$700 $ 1,400
$34,850
Iss+Pension
###
$100,000 $0
$90,000 $0
$70,000 $37,800
$40,000 $16,200
$40,000 $16,200
$20,000 $10,800
$81,000
$5,000 $0
$10,000 $5,000
$10,000 $5,000
$5,000 $2,500
$5,000 $0
$12,500
$29,016 $0
$830 $62,250
$62,250
###
$50,000 $10,000
$50,000 $10,000
$20,000
$308,761
A.I.A Arquitectos e Ingenieros
Empresa: CIBA
PROYECTO : CONSTRUCCION E INSTALACION DE CANALES
SUBTOTAL
1.2 INSUMOS iva
1.21 Soldadura 6011 de 1/8 Kg 1.6 1
1.22 Soldadura 7018 de 1/8 Kg 0.0 1
1.23 Grata de limpieza Un 0 1
1.24 Cepillo Un 0.50 1
1.25 Disco de Corte 14 Un 1.00 1
1.26 Disco de pulir 7 Un 1.00 1
1.27 EPP Un 1 1
1.28 Lijas Un 2 1
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
1.6 TRANSPORTE
1.61 Transporte de Herramientas Viaje 0.2
1.62 Trasporte de Equipo Viaje 0.2
SUBTOTAL
COSTO DIRECTO
FECHA : MARZ-23-12
METRO LINEAL
VALOR/UN VR/TOTAL
$1,309 $70,414
$0
$0
$70,414
$ 6,000 $ 9,600
$ 6,000 $ -
$14,000 $ -
$8,500 $ 4,250
$7,500 $ 7,500
$7,500 $ 7,500
$1,000 $ 1,000
$700 $ 1,400
$31,250
Iss+Pension
###
$100,000 $0
$90,000 $0
$70,000 $28,350
$40,000 $10,800
$40,000 $10,800
$20,000 $8,100
$58,050
$5,000 $0
$10,000 $5,000
$10,000 $5,000
$5,000 $2,500
$5,000 $0
$12,500
$29,016 $0
$1,200 $64,560
$64,560
###
$50,000 $10,000
$50,000 $10,000
$20,000
$256,774
A.I.A Arquitectos e Ingenieros
Empresa: CIBA
PROYECTO : CONSTRUCCION E INSTALACION DE CANALES
SUBTOTAL
1.2 INSUMOS iva
1.21 Soldadura 6011 de 1/8 Kg 3.0 1
1.22 Soldadura 7018 de 1/8 Kg 0.0 1
1.23 Grata de limpieza Un 0 1
1.24 Cepillo Un 0.50 1
1.25 Disco de Corte 14 Un 2.00 1
1.26 Disco de pulir 7 Un 2.00 1
1.27 EPP Un 1 1
1.28 Lijas Un 2 1
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
1.6 TRANSPORTE
1.61 Transporte de Herramientas Viaje 0.2
1.62 Trasporte de Equipo Viaje 0.2
SUBTOTAL
COSTO DIRECTO
METRO LINEAL
VALOR/UN VR/TOTAL
Peso (Kg) Kg/m2
84.00 #REF!
$1,600 $134,400
$0
$0
$134,400 1,600
$ 6,000 $ 18,000
$ 6,000 $ -
$14,000 $ -
$8,500 $ 4,250
$7,500 $ 15,000
$7,500 $ 15,000
$1,000 $ 1,000
$700 $ 1,400
$54,650 651
Iss+Pension
$100,000 $0
$90,000 $0
$70,000 $28,350
$45,000 $12,150
$45,000 $12,150
$35,000 $14,175
sin ISS
$66,825 796 530
$5,000 $0
$10,000 $5,000
$10,000 $5,000
$5,000 $2,500
$5,000 $0
$12,500 149
$29,016 $0
$1,200 $100,800
$100,800 1,200
$100,000 $20,000
$100,000 $20,000
$40,000 476
$409,175 4,871
$40,918
$4,092
$32,734
$77,743
M2 $486,918 5,797
A.I.A Arquitectos e Ingenieros
Empresa: CIBA
PROYECTO : CONSTRUCCION E INSTALACION DE CANALES
SUBTOTAL
1.2 INSUMOS iva
1.21 Soldadura 6011 de 1/8 Kg 0.0 1.16
1.22 Soldadura 7018 de 1/8 Kg 0.0 1.16
1.23 Grata de limpieza Un 0 1.16
1.24 Cepillo Un 0.00 1.16
1.25 Disco de Corte 14 Un 0.10 1.16
1.26 Disco de pulir 7 Un 0.40 1.16
1.27 EPP Un 1 1.16
1.28 Lijas Un 2 1.16
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
1.6 TRANSPORTE
1.61 Transporte de Herramientas Viaje 0.1
1.62 Trasporte de Equipo Viaje 0.1
SUBTOTAL
COSTO DIRECTO
FECHA : MARZ-23-12
METRO LINEAL
VALOR/UN VR/TOTAL
$321,667 $321,667
$1,100 $0
$1,000 $0
$321,667
$ 6,000 $ -
$ 6,000 $ -
$14,000 $ -
$8,500 $ -
$7,500 $ 870
$7,500 $ 3,480
$1,000 $ 1,160
$700 $ 1,624
$7,134
Iss+Pension
###
$100,000 $0
$90,000 $0
$70,000 $3,500
$40,000 $3,000
$40,000 $0
$20,000 $1,500
$8,000
$5,000 $500
$10,000 $0
$10,000 $0
$5,000 $167
$5,000 $0
$667
$29,016 $0
$830 $0
$0
###
$30,000 $3,000
$30,000 $3,000
$6,000
$343,468
A.I.A Arquitectos e Ingenieros
Empresa: CIBA
PROYECTO : CONSTRUCCION E INSTALACION DE CANALES
SUBTOTAL
1.2 INSUMOS iva
1.21 Soldadura 6011 de 1/8 Kg 0.0 1.16
1.22 Soldadura 7018 de 1/8 Kg 0.0 1.16
1.23 Grata de limpieza Un 0 1.16
1.24 Cepillo Un 0.00 1.16
1.25 Disco de Corte 14 Un 0.10 1.16
1.26 Disco de pulir 7 Un 0.40 1.16
1.27 EPP Un 1 1.16
1.28 Lijas Un 2 1.16
SUBTOTAL
SUBTOTAL
SUBTOTAL
SUBTOTAL
1.6 TRANSPORTE
1.61 Transporte de Herramientas Viaje 0.1
1.62 Trasporte de Equipo Viaje 0.1
SUBTOTAL
COSTO DIRECTO
FECHA : MARZ-23-12
UNIDAD
VALOR/UN VR/TOTAL
$160,834 $160,834
$1,100 $0
$1,000 $0
$160,834
$ 6,000 $ -
$ 6,000 $ -
$14,000 $ -
$8,500 $ -
$7,500 $ 870
$7,500 $ 3,480
$1,000 $ 1,160
$700 $ 1,624
$7,134
Iss+Pension
$100,000 $5,000
$90,000 $4,500
$70,000 $3,500
$40,000 $3,000
$40,000 $0
$20,000 $1,500
$17,500
$5,000 $500
$10,000 $0
$10,000 $0
$5,000 $167
$5,000 $0
$667
$29,016 $3,029
$830 $0
$3,029
$50,000 $5,000
$50,000 $5,000
$10,000
$199,163
A.I.A Arquitectos e Ingenieros
Empresa: CIBA & POC
PROYECTO : CONSTRUCCION E INSTALACION DE LA ESTRUCTURA
METALICA DE CUBIERTA PARA LOS EDIFICIOS PERIMETRALES
SUBTOTAL
INSUMOS iva
Cepillo Un 10 1.16
Grata de copa 3 in Un 30 1.16
Disco de pulir 7 Un 30 1.16
Lijas Un 20 1.16
SUBTOTAL
SUBTOTAL
SUBTOTAL
SERVICIOS iva
SUBTOTAL
TRANSPORTE
SE Transporte de Herramientas Viaje 2
SE Trasporte de Equipo Viaje 2
SUBTOTAL
COSTO DIRECTO
Metros Cudrado
VALOR/UN VR/TOTAL
$5,125 $4,280,400
$4,591 $3,834,125
$521 $435,000
$8,549,525
$8,500 $ 98,600
$12,500 $ 435,000
$7,500 $ 261,000
$700 $ 16,240
$810,840
Iss+Pension
###
$100,000 $0
$100,000 $0
$80,000 $1,800,000
$40,000 $1,800,000
$20,000 $1,350,000
$4,950,000
$5,000 $300,000
$5,000 $300,000
$1,800 $2,700,000
$1,801 $540,300
$5,000 $300,000
$4,140,300
$0
###
$200,000 $400,000
$150,000 $300,000
$700,000
$19,150,665
$1,915,066
$383,013
$1,532,053
$3,830,133
$22,980,798
$245,129
$14,013
Area(m2)
660.0
12,954
1,229
7,500
6,273
-
1,061
29,016
34,819
$21.23
Vr/Kg*M2