Sei sulla pagina 1di 1

Contractor's Waste Management Tracking Form

Project Name: Declaration:


Project Address: I certify that this project has implemented a waste management plan and diverted the following quantities of
Project Type: Demolition New Construction Renovation construction, renovation and demolition waste to uses other than landfill. All waste generated from the
project (recycled and disposed) are listed below by type of material, receiving facility, amount and diversion
Company Name:
ratio. Hazardous and excavated materials (such as asbestos, lead, earthwork) are be excluded from this
Contractor Name: waste management tracking.

Waste measured in: Metric Tonne Cubic Yards Signature: Submission Date:

Weight
Type of Waste Date of Haul Total Waste Diversion Amount Comments
Recycling Facility Reciept
[select from menu] Day/Month/Year Generated Rate (%) Diverted (i.e. details of specific material such as ashpalt shingles)
Number
EXAMPLE - Siding 28-Feb-18 Recycling Is Us 2 95% 1.9 Vinyl siding 12346
Wood Products 0
Gypsum Wallboard 0
Metals 0
Concrete 0
Masonry units 0
Plastic 0
Roofing (specify) 0
Siding (specify) 0
Flooring (specify) 0
Window Glass 0
Insulation 0
Appliances 0
Misc Furnishings 0
Mixed C&D waste 0
Green waste 0
Cardboard/paper 0
Other (specify) 0
Total Quantity of Waste Generated from the Project 0.0 -
Total Quantity of Waste Diverted from Landfill 0 -
Percentage of Waste Diverted: 0%
NaN %
Note:
1. Recycling facility is the final destination of the material, and is different from hauling company.
2. Material sent to landfill is considered to have a diversion rate of 0% with fully recycled/salvaged waste materials equivalent to 100%.
3. Contact the Recycling Council of BC for information regarding recycling facilities across the province (www.rcbc.bc.ca, 1-800-667-4321, hotline@rcbc.bc.ca)

AST-012 (2016-08-30) Contractor's Waste Management Tracking Form

Potrebbero piacerti anche