EXPENSE FOR Vellore Single Layer

S:NO DESCRIPTION QTY UNIT

1 PRIMER 5 25L BOX

2 BITUMEN 700 KG

ROLLS-3 MM for membrane


5 110 NOS
treatment

8 GAS 8 NOS

9 LABOUR 65 NOS

10 Aluminium Paint 4 20 L

11 Transportation for materials

12 OTHER ACCESSORIES

13 FOOD FOR WORKERS

14 Accomodation for Worker

TOTAL
PER SFT FOR 9684 SFT

Total 900 sqm


Total in Sqf 9684
ellore Single Layer
RATE VALUE Remarks
One time application
2400 12000 during the start of the
process

Considering 2 times
65 45500 application as per specs
given, 300 KG's /
application (9600 SFT)

Considering Three layers


2600 286000 have kept a buffer of 20
rolls for overlapping

1350 10800

600 39000 Considering 20 days of


work with 3 manpower
for 6 days (14 manpower
buffer kept)
4400 17600

30000 30000 Considering Three trips


with expense of travel
30000 30000

22000 22000 Considering 300


Rs/worker for 2.5 weeks

Considering
20000 20000 Rs.1000/worker for 6 days
for 2.5 weeks
512900
53
Specs To Consider

Providing and laying Membrane Waterproofing as mentioned below or as directed by Engineer- in- charge etc complete.

SPECIFICATION : (THREE LAYERS TREATMENT)

1. A coat of Bituminous Primer

2. A layer of hot applied Blown Grade Bitumen

3. A layer of Polymeric Bituminous Membrane 3 mm thick/2.25Kgs Per Sqm.

4. A layer of hot applied Blown Grade Bitumen

5. A layer of Polymeric Bituminous Membrane 3 mm thick/2.25Kgs Per Sqm.

6. A layer of hot applied Blown Grade Bitumen

7. Aluminium Paint Over the Bitumen Layer


EXPENSE FOR Vellore Double Layer
S:NO DESCRIPTION QTY UNIT

1 PRIMER 5 25L BOX

2 BITUMEN 1000 KG

ROLLS-3 MM for membrane


5 220 NOS
treatment

8 GAS 12 NOS

9 LABOUR 115 NOS

10 Aluminium Paint 4 20 L

11 Transportation for materials

12 OTHER ACCESSORIES

13 FOOD FOR WORKERS

14 Accomodation for Worker

TOTAL
PER SFT FOR 9684 SFT

Total 900 sqm


Total in Sqf 9684
ellore Double Layer
RATE VALUE Remarks
One time application
2400 12000 during the start of the
process

Considering 2 times
65 65000 application as per specs
given, 300 KG's /
application (9600 SFT)

Considering Three layers


2600 572000 have kept a buffer of 20
rolls for overlapping

1350 16200

600 69000 Considering 20 days of


work with 5 manpower
for 6 days (14 manpower
buffer kept)
4400 17600

30000 30000 Considering Three trips


with expense of travel
30000 30000

22000 22000 Considering 300


Rs/worker for 2.5 weeks

Considering
20000 20000 Rs.1000/worker for 6 days
for 2.5 weeks
853800
88
Specs To Consider

Providing and laying Membrane Waterproofing as mentioned below or as directed by Engineer- in- charge etc complete.

SPECIFICATION : (THREE LAYERS TREATMENT)

1. A coat of Bituminous Primer

2. A layer of hot applied Blown Grade Bitumen

3. A layer of Polymeric Bituminous Membrane 3 mm thick/2.25Kgs Per Sqm.

4. A layer of hot applied Blown Grade Bitumen

5. A layer of Polymeric Bituminous Membrane 3 mm thick/2.25Kgs Per Sqm.

6. A layer of hot applied Blown Grade Bitumen

7. Aluminium Paint Over the Bitumen Layer