from (months/year) to (months/years) SKD Engineering College 2011 - 2014 B.Tech Govt .Polytechnic College 2007 – 2010 DEEE Anantapur
6. Language skills: (Mark 1 to 5 for competence, where 5 is the highest)
Language Reading Speaking Writing
English 5 4 4 Telugu 5 5 5 Hindi 3 5 2 Tamil 0 4 0
7. Membership of professional bodies: NA
8. Other skills (e.g. computer, literacy, etc.): MS-Office, Auto Cad.
9. Present position: Electrical Engineer
10. Total Years of Experience: 4+ years
11. Key qualifications (relevant to the project):
12. Professional experience record:
Date: Since Nov 2018
Location: Gujarat Company: Tuv india pvt Ltd Position: Electrical Engineer Description: Presently working with ENVISION 197.5MW wind power Project of 2.5MW WTG model as an Electrical installation & Quality Inspection Engineer.
A00F006e Seite 1 von 2 Rev.02/03.11
Date: Jan 2016 to Nov 2018 Location: Andhra Pradesh Company: Suzlon Energy Ltd. Position: Electrical Engineer Description: Projects Handled: 1.50MW Project in Beluguppa site,customer:retailer, 2.100MW Project in Beluguppa site,customer:ORANGE 3.119MW Project in Ellutla site, customer : RENEW POWER, 4. 50MW project in Borampalli site. To complete 33KV HT yard and Line work with in time with quality and safely. Transformer and CSS Erection ,Earthing,control cable termination & Commissioning. In solar project module erection,termination and cabling work. WTG,Transformer,CSS and 33kv line maintenance. Giving weekly&monthly planning to the contractor. Excution of Planning According to the schedule. To inspect the 33kv line& HT and giving pending points and preparing the points list by location wise. WTG cable laying,transformer to ACB to T4 junction box to generator stator and rotor terminal box. Power cable crimping,lugging,provide heat sleeves. Conduct the cable tests,continuotity test,IR tests Carried out cable inspection as per check list before laying. Contorol cables terminations,cable routing. Preparing the PQHC,QCP checklists . 33kv transformer & pole errections. Pre-commissioning Test on Transformer and CSS. Closing of pending points given by Customer
Participating in Safe run & HOTO activites.
Date: AUG 2014 to Dec 2015
Location: Anantapur Company: Sri Sai Electricals Position: Electrical engineer Description: 33KV Line survey, Managment of Material and Man power. Transformer power cables terminations,33KV line planning&execution, involved in transformer erection and vcb testings.
13. others (e.g. Publications): NA
I hereby confirm that the above information is correct.
Gujarat D. Sreenivasa Reddy [PH:7013874590]
_____________________ ____________________________________ Place / Date Applicant